State Supplement sponsored by:
1
11
THE NEW ENGLAND EDITION
A Supplement to:
95
1
201 16 9
26
2
1 3
91
89
2
95 3
2 2 7
1
93
495
16
89 4
89
95
202
7
91
9
95
93
2
95 2
93 90
90
7
95 91
7
SHIP WITHIN 48 HOURS
3
84
495 6
84
6
6
195
395
95 91
October 16 2019 Vol. L • No. 21
SAME DAY PARTS AVAILABILITY
®
24 HOUR TECHNICAL SUPPORT BACKED BY A 75 YEAR BUSINESS Thousands in Service!
“The Nation’s Best Read Construction Newspaper… Founded in 1957.”
Your New England States Connection • Kent Hogeboom 315-866-1423 2208 Plainfield Pike • Johnston, RI 02919 401-943-7100 • Fax: 401-647-5041
www.jrvinagrocorp.com info@jrvinagrocorp.com
LEED Accredited in Waste Management
Large Enough to Service You; Small Enough to Know You
61 Silva Lane • Dracut, MA 01826
Optional 3 Product Conveyor
6’x5’ Double Deck Screenbox Works with 1/2 to 1 3/4 Yd. Loaders, 25 H.P. Kohler Diesel Engine, 24” Conveyor Dumps Screened Product 9’ High, Two (2) Year Warranty! $44,900 plus freight. Other Screeners Available
EZ-SCREEN
CALL 800-367-4937 *On approved credit • Financing Available
Working Together: DOTs Collaborate on Piscataqua River Bridge Project CEG CORRESPONDENT
Call for Pricing
2019 EZ-Screen 1200XLS
Affordable Price. Premium Service.
By Lori Tobias
Specializing in:
Demolition, Portable Crushing, Material Sales, C & D Recycling, Land Clearing, Heavy Hauling & Trucking
Call Today (978) 454-3320
WE STOCK RUBBER TRACKS for Over 6,000 Models! Some Used Tracks A & GA Available. NJ, TX, WOUSES WAREH • HIGH QUALITY • FAST SHIPPING • GUARANTEED TO FIT • UNDERCARRIAGE PARTS • FLATPROOF SKIDSTEER TIRES • RUBBER PADS FOR STEEL TRACKS
888-888-1248
www.ez-screen.com
248-745-5828
24x36 CRUSHER On Tracks, Magnet, Scale, Side Conveyor, 2600 Hrs........................ $112,000
Phil (413) 427-7171 • Largest hammer repair facility in North America • Demolition tools and parts for ALL makes and models • Hammer-equipped excavator rentals
www.foleyengines.com
95
95
Crews working on a $53 million bridge repair over a New England river are getting a big assist from a piece of equipment never before used in Maine. Working in collaboration with the New Hampshire Department of Transportation (NHDOT), the Maine DOT (MDOT) is repairing the I-95 bridge over the Piscataqua River. The 4,500-ft. long bridge sits 130 ft. above the water and features three lanes in each direction, plus a shoulder. It’s the major route into Maine. The height and the limited working space pose very specific Crews working on a $53 million bridge repair over a New England river are challenges. But a construction getting a big assist from a piece of equipment never before used in Maine. method used worldwide is making life a bit easier. Developed by Lindsay Transportation open lane, they can bring in more equipment and work safely Solutions, the system is made up of the Reactive Tension behind the barrier, then in the morning, close the lane back Barrier and the Road Zipper Machine. Combined they’re up for the day.” The machine being used on the New England project is known as the The Road Zipper System. “At night, the machine picks up the barrier and moves it about 30 ft. long with two seats that the drivers use to guide through the machine and places it 11 feet — one lane — it from each side. One driver steers the front wheels and the over,” said MDOT project engineer Craigh Hurd. “With an see BRIDGE page 8
Gov. Baker Touts Act in Testimony Before Joint Committee on Transportation “The $18 billion … will continue the evolution our transportation system …”
• Backed by a 75 year family owned business
Charlie Baker
CALL YOUR ONE-STOP HAMMER SHOP™ TODAY!!!
Massachusetts Governor
CALL 888-81-GORILLA(46745)
Mass. Gov. Charlie Baker joined Secretary of Transportation Stephanie Pollack and MBTA General Manager Steve Poftak Oct. 8 to testify before the Massachusetts Joint Committee on Transportation in support of An Act Authorizing and Accelerating Transportation Investment. The administration’s proposed legislation seeks $18 billion in additional capital authorization to invest in building see TESTIMONY page 16