State Supplement sponsored by:
1
11
THE NEW ENGLAND EDITION
A Supplement to:
95
1
201 16 9
26
2
1 3
91
89
2
95 3
2 2 7
1
93
495
16
89 4
89
95
202
7
91
9
95
93
2
95 2
93 90
90
7
95 91
7
SHIP WITHIN 48 HOURS
3
84
495 6
84
6
6
195
395
95 91
September 30 2020 Vol. LI • No. 20
95
SAME DAY PARTS AVAILABILITY
95
®
24 HOUR TECHNICAL SUPPORT BACKED BY A 75 YEAR BUSINESS Thousands in Service!
“The Nation’s Best Read Construction Newspaper… Founded in 1957.”
Your New England States Connection • Kent Hogeboom 315-866-1423 2208 Plainfield Pike • Johnston, RI 02919 401-943-7100 • Fax: 401-647-5041
www.jrvinagrocorp.com info@jrvinagrocorp.com
Affordable Price. Premium Service.
CALL 800-367-4937 *On approved credit • Financing Available
W.I. Clark’s Team Blue Crushes Connecticut With Kleemann Line
Specializing in:
Demolition, Portable Crushing, Material Sales, C & D Recycling, Land Clearing, Heavy Hauling & Trucking Call for Pricing
LEED Accredited in Waste Management
2020 EZ-Screen 1200XLS
*Limited time offer. Some restrictions apply. See dealer for details.
3 Month lease 36 AS LOW AS
$1,500* / Month Authorized Doosan Dealer
Optional 3 Product Conveyor
6’x5’ Double Deck Screenbox Works with 1/2 to 1 3/4 Yd. Loaders, 25 H.P. Kohler Diesel Engine, 24” Conveyor Dumps Screened Product 9’ High, Two (2) Year Warranty! $46,900 plus freight. Other Screeners Available
EZ-SCREEN
508-484-5567 (BROCKTON, MA) 978-454-3320 (Dracut, MA) 603-410-5540 (Bow, NH)
In 2013, W.I. Clark acquired the Kleemann line of aggregate and recycling products when the Wirtgen Group brought the products to the United States. W.I. Clark had already been a Wirtgen Group dealer for milling machines, Vogele pavers and Hamm compactors. The dealer also represents John Deere (of which the Wirtgen Group is a subsidiary) construction and industrial equipment in the state of Connecticut “W.I. Clark had sold aggregate equipment for many years, but having the Kleemann products allowed us to sell to all applications in that business,” said Mark Brester. Brewster had been a main line salesman for W.I. Clark since 2002 and took on responsibility for aggregate and recycling equipment in 2017. “The Kleemann product line is in a league of its own and put us in a position to have the equipment the premier aggregate producers in the state of Connecticut need in their operations as well see KLEEMANN page 10
• Largest hammer repair facility in North America • Demolition tools and parts for ALL makes and models • Hammer-equipped excavator rentals
www.ez-screen.com
• Backed by a 75 year family owned business
248-745-5828
CALL YOUR ONE-STOP HAMMER SHOP™ TODAY!!!
(L-R): Russell Hansen of W.I. Clark; Doug C. Hansen, president of W.I. Clark; and Mark Brester, aggregate and production class equipment specialist of W.I. Clark.
Equipment East to Open Brockton, Mass., Location
CALL 888-81-GORILLA(46745)
Cat IT38G, 3.25cy, 7,800 Hrs, Mich Radials 67%, 3rd Valve, Owned for many years, Runs Excellent, No blow by, No leaks, Very Good ..$49,750 or bo
Phil (413) 427-7171
www.foleyengines.com
Equipment East has a new location, south of Boston, coming soon. The new facility will include sales, rental, service and parts, and will represent Doosan, Wacker Neuson, Yanmar, Multihog, LiuGong, Felling Trailers, Gorman Rupp pumps, Multiquip, Ramfos and EE-branded hydraulic hammers, buckets and other attachments.
Scheduled to open Oct. 5, the store hours will be 7 a.m. to 5 p.m., Monday through Friday, and Saturdays from 7 a.m. to 1 p.m. Equipment East’s new facility is located at 196 Manley St., in Brockton, Mass., at exit 17A off of Route 24. Equipment East also has locations in Dracut, Mass., and Bow, N.H. CEG
Page 2 • September 30, 2020 • www.constructionequipmentguide.com • New England States Supplement • Construction Equipment Guide
2017 JOHN DEERE 650K
2016 BOBCAT T590
2015 GEHL V270
1182 hrs, cab / air, 105" blade, fully serviced and ready for work, stk# 25886 ........$120,000
846 Hrs, c/air, EH controls, electric coupler, GP bucket, 80% tracks, Stk# 25972....$45,500
c/air, pilots, 82” bucket, 650 hrs, Stk# 25361 .. ............................................................$32,500
LeeBoy 8510B
2013 METSO MINERALS LT200HP
2016 LEEBOY 8515C
3600 Hrs, stk # 25926, new eng, 8-15’ electric screed, dual controls and spraydowns $45,000
4300 hrs, stk# 25979 ........................$325,000
2,400 Hrs, Stk# 25464, 8-15’ electric screed, poly pads..............................................$76,000
2008 JOHN DEERE 850JXLT
2012 ROADTEC RX700E-3
2005 VOGELE 1110RTB
REDUCED PRICE
2800 hrs, 158” PAT blade, 30” pads, one owner unit, serviced and ready to go stk#26009
5125 Hrs, Stk# 25590, 7’ drum, Cat engine, full grade controls ..............................$115,000
Cummins, 10-19’ electric screed, 70% tracks, all wear items 70%, ready to work, stk# 25947 ............................................................$35,000
See Our Complete Inventory at www.wiclark.com
Construction Equipment Guide • New England States Supplement • www.constructionequipmentguide.com • September 30, 2020 • Page 3
New 738 M purp p pose-built p h d is tree handler BIG neews for tree care specialists s SENNEBOGEN’ N’s “game-changing” tree care hand dlers have raised the bar even higher! The T new 738 M weighs in at twice the size of 718 M and R-HD models, with more power and more reach h to take k on bigger bi j b ! jobs!
PUR RPOSE-BUIL T
The 738 M, fittted with a power grapple saw, is attached to a 75 ft. telescoping bo oom and stick to quickly fell or prune trees as high as 125 ft. to 150 ft. tall. Th hen it easily cuts, swings and stacks the wood with a single operator to co omplete the whole job.
FROM M THE GROUND O UP
As big A bi and d powerful f l as it is, i the th 738 keeps pacce with the 718 M and 718 R-HD macchines with precise handling and fast cycle times to process up to 150 trees per day. From the road dside, on embankments or in heavy wo oods, the 738 M is the new gamee-changer for all land clearing, right-of-way maintenance and heavy tree care operations. GET THE DETA AILS ON THE T HIGH EFFICIENCY SOLUTION N FOR CUSTOM TREE REMOVAL A
USTOM-ENGINEERED D TREE CARE HANDLERS H deal for all tree serrvice operators sed for woodlot thinning, harvesting wood fuell to clearing storm debris up to 48” and up to 125’ high ll wheel drive or tracked models obsite safety increased with trimming, cutting, loading and stacking operatio ons as all are done rom the confines of o the SENNEBOGEN elevating ng and tilting Maxcab
The New 738 M
ww.senneboggen-na.com | +1-704-347-4910 251 Shakker Road East Longmeadow, MA 01028 (800) 292-6351
1980 Berlin Turnpike Berlin, CT 06037 (800) 352-4473
www.tylerequipment.c t.com
Page 4 • September 30, 2020 • www.constructionequipmentguide.com • New England States Supplement • Construction Equipment Guide
Rhode Island Officials Celebrate Route 146 Project Kickoff Rhode Island’s two United States senators, along with its congressmen, were joined by other state and local leaders Sept. 2 on the side of State Route 146 in Smithfield to announce much-needed improvements to the roadway, made possible by a federal $65 million INFRA grant. On hand to highlight the road upgrades were Sen. Jack Reed, Sen.Sheldon Whitehouse, U.S. Representative Jim Langevin, and his House colleague Congressman David Cicilline. The Infrastructure for Rebuilding America (INFRA) discretionary funds were secured earlier this summer by Rhode Island’s Congressional delegation for the Route 146 project Also present to describe the enterprise was Rhode Island Department of Transportation (RIDOT) Director Peter Alviti Jr. The estimated $150 million build will replace multiple bridges along the Route 146 corridor, repave 8 mi. of roadway and correct numerous safety and congestion problems — including at the Sayles Hill Road interchange where the announcement took place. RIDOT will remove the traffic signal where Route 146 meets Sayles Hill Road and build a bridge so the highway can pass freely over Sayles Hill Road. This intersection averages more than 85 crashes per year and is a source of significant congestion and travel delay. It is the only signalized inter-
section on the entire Route 146 highway corridor in Rhode Island. “Today, we are announcing the start of relief for the 170,000 vehicles that navigate the bumps and ruts of Route 146 every day. Help is on the way. This is a critical transportation route that has gone unimproved for far too long,” Alviti said. “Once again our Congressional delegation has gone to bat for Rhode Island and delivered tens of millions of dollars in grant funding so we can properly address all our concerns with Route 146 in a single project. We owe them a huge debt of gratitude.” In his remarks, Reed, the ranking member of the Appropriations Subcommittee on Transportation, Housing and Urban Development, said, “This federal investment will allow RIDOT to go beyond simply fixing what we have. It will lead to significant safety improvements, including the reconfiguration of the Sayles Hill Road intersection.” Whitehouse authored INFRA in 2015 to help meet Rhode Island’s need for largescale infrastructure investments “I developed the INFRA program to clear our national backlog of major infrastructure projects, including the overhaul of Route 146,” he said. “As anyone who lives in the northern part of the state will tell you, driving on 146 can be a real headache. I’m thrilled that RIDOT won its largest federal grant ever and is ready to get Rhode Islanders to work upgrading Route 146 with
new bridges and a modernized design.” Other highlights of the project include: • Replacing two bridges along the corridor and doing preservation work on four others, • Building frontage roads for easy and safe access to businesses at the Sayles Hill Road interchange, • Repaving Route 146 from the I-295 interchange to the Massachusetts state line, • Adding bus-on-shoulder accommodations along the southern end of Route 146 in North Providence and Providence, • Extending existing fiber optic lines and Intelligent Transportation Systems/traffic monitoring from the I-295 interchange to the Massachusetts state line, • Rebuilding the Route 146/Route 146A interchange, removing dangerous U-turns by building a diverging diamond interchange, • Extending the weave length for the Route 99 ramp and Route 146 south, • Improving the geometry of the I-295 southbound off-ramp to Route 146, • Building new drainage systems, and • Replacing guardrails and making other safety improvements such as wrong way driving detection systems. “I’m thrilled to join my Congressional colleagues and state officials in beginning long-anticipated improvements along Route 146,” said Langevin. “Improving Rhode Island’s roads promotes a robust local economy, enhances quality of life, and creates
good employment opportunities. “Going forward, we must guarantee investments in Rhode Island’s future...even in the face of financial challenges posed by COVID-19,” the congressman continued. “As Rhode Island and states across the nation face budget shortfalls, I will be working with RIDOT Director Alviti and my colleagues to introduce legislation ensuring federal highway funds continue to be available to cash-strapped states and that goodpaying construction jobs remain in the Ocean State.” Cicilline added, “Our Congressional delegation works together very effectively to make sure Rhode Island has the funding it needs for vital projects like this. I look forward for this work getting started and the difference it will make for Rhode Islanders when it’s completed.” More than 171,000 vehicles travel Route 146 between Providence and Worcester, Mass., each day. Design work is well under way on the highway and RIDOT anticipates advertising for construction in late 2021, with construction starting in spring 2022. The entire project is expected to be complete in 2025. The Route 146 Project is made possible by RhodeWorks, the RIDOT’s ongoing commitment to repair structurally deficient bridges and bring Rhode Island’s transportation infrastructure into a state of good repair, promote economic development and create jobs.
In Scenic Town of Adams, It Was the Summer of the Shovel The summer of 2020 proved to be a busy one in the beautiful town of Adams, tucked in the beautiful Berkshire Hills of northwest Massachusetts. Although a tourist town of more than 8,000 residents, a lot of the activity in Adams also is due to the myriad of construction projects that are under way or almost complete in the community. Town Common Renovation This project includes the creation of a new plaza on Center Street that will hold a Susan B. Anthony statue. Other work at the site was designed to create an outdoor public gathering place, with paths, benches, plantings (including a hedge screen at the border with the local McDonald’s), and a new gazebo. William J. Keller & Sons Construction, from Castleton-on-Hudson, N.Y., is the contractor. Crews began the project in early July, with a completion date set for Nov. 30. The cost of the renovation effort is $424,900, of which $297,400 will be covered by a state Parkland Acquisitions and Renovations for Communities Grant.
Russell Field Improvements Located off Harmony Street in Adams, near the Ashuwillticook Rail Trail, the sports complex includes a regrading of the softball field, with a new backstop, drainage work to stop water flow off a nearby hill; two new tennis courts (with lines for pickleball play), adult fitness stations, new swing sets fully accessible bleachers, and electrical conduits for later work to upgrade light poles. The fieldhouse is the only component of the park not undergoing an upgrade. The cost of the improvements is $528,153, with a 2019 Community Development Block Grant covering $469,953 of the total. Mountain View Landscapes and Lawncare in Chicopee started the work in July and is set to finish the upgrades by the end of 2020. Adams Memorial Middle School Renovation and Reuse Located at 30 Columbia St., the former 69,786-sq. ft. school educated students for 60 years until it was consolidated with the town’s high school in 2012.
Since February, crews from Kurtz in Chicopee have continued work to prepare the old school building for possible use as housing and for community activities. A new mechanical system, upgrades to the electrical and plumbing systems, improvements to restrooms, the installation of new doors, and upgrades to address building code shortcomings have all been on the docket. The improvements are expected to be completed soon. The contract for this project in Adams is $639,683, with all but $55,000 (the town’s share) paid by a 2018 Community Development Block Grant. Crotteau Street Improvements This residential street project is designed to install a full reconstruction of 1,300 ft. of the roadway, as well as put in new sidewalks from Murray to Sparrow streets, new granite curbing, new wheelchair ramps and several drainage improvements. The road is just east of the Hoosic River and downtown Adams. Greenfield’s Clayton D. Davenport Trucking is the contractor for the work,
which started June 9 and is expected to be wrapped up by Nov. 30. The cost of the enterprise is $445,063, paid for through a Massachusetts Department of Transportation (MassDOT)Complete Streets Funding Program grant of $290,281, and a $154,782 share of the town’s Chapter 90 state aid. Street Drainage Improvements The upgrades include work along four streets in Adams: Grant, Valley, Lincoln and Cross. Commenced on Aug. 1, with a planned completion by June 30, 2021, crews will install 2,000 ft. of concrete drainpipes to replace failing systems, with new catch basins and manholes. The project was spurred, in part, by heavy local flooding seen during a September 2018 microburst. This project has a contract value of $1,306,600, paid for with borrowing by the town and a $572,100 grant. The civil and environmental construction firm of J.H. Maxymillian Inc., in Pittsfield, Mass., is performing the work.
Construction Equipment Guide • New England States Supplement • www.constructionequipmentguide.com • September 30, 2020 • Page 5
Commanding power.. Pro oven ve reli e ability. Boost your performance and save time digging, loading trucks and more thanks to the best-in-class hydraulics of Doosan® excavators. You can rely on consistent power deliver y to the arm and bucket to confidently take on tough digging conditions that slow other machines down. And increased swing torque helps you easily swing uphill and backfill fasterr,, with better results. Experience Doosan Strong today y.. Stop in ffo or a demo.
Doosan® and the Doosan logo are reg istered t r ademar k s of Doosan Cor p. in the United S t a t e s a n d v a r i o u s o t h e r c o u n t r i e s a r o u n d t h e w o r l d . 1 8 - D 0 0 3. 7
Au thor ized Doos an De aler
Equipment East
196 Manley St. • Brockton, MA 02301 • 508-484-5567 61 Silva Lane • Dracut, MA 01826 • 978-454-3320 61 Silva Lane • Dracut, MA 01826 1474 Rte 3A • Bow, NH • 603-410-5540 978-454-3320 • w w w.equipmenteast.com www.equipmenteast.com
Page 6 • September 30, 2020 • www.constructionequipmentguide.com • New England States Supplement • Construction Equipment Guide
Construction Equipment Guide • New England States Supplement • www.constructionequipmentguide.com • September 30, 2020 • Page 7
Tier 4 Final RTC-8050 Series II RTC-8065 Series II
75 RT
RTC-8090 Series II
100 RT
120 RT RTC-80130 Series II
RTC-80160 Seriess II
YOUR O #1 SOURCE FOR ROU UGH TERRAIN RENTALS A Ver e mont 802-658-1700 Masssachusetts 508-499-1950 Pennnsylvania 717-795-0700 N Yoork 315-676-2008 New
w .woodscrw.com www
BUY
•
LEASE
Lexington, Kentucky | www.linkbelt.com .
•
RENT
Page 8 • September 30, 2020 • www.constructionequipmentguide.com • New England States Supplement • Construction Equipment Guide
ǡ Ƭ ǤǤǤ
ϴϬϬͲϱϮϵͲϮϱϭϱ ƵƚŚŽƌŝnjĞĚ ŝƐƚƌŝďƵƚŽƌƐ &Žƌ
Z KůƐŽŶ DĨŐ͕ ͞ Ƶŝůƚ ŝŶ ƚŚĞ h^ ͕͟ ďĞůŝĞǀĞƐ ŝŶ ďƵŝůĚŝŶŐ ƚŚĞ ƐƚƌŽŶŐĞƐƚ͕ ŽǀĞƌ ĞŶŐŝŶĞĞƌĞĚ͕ ďĞƐƚ ƌŽĐŬ ĐƌƵƐŚŝŶŐ͕ ƐĐƌĞĞŶŝŶŐ͕ ƌĞĐLJĐůŝŶŐ͕ ĐŽŶǀĞLJŝŶŐ ƉŝĞĐĞ ŽĨ ĞƋƵŝƉŵĞŶƚ ŵŽŶĞLJ ĐĂŶ ďƵLJ͘
ZŽĐŬƐƚĞƌ EŽƌƚŚ ŵĞƌŝĐĂ͛Ɛ ƉƌŽĚƵĐƚ ůŝŶĞ ŝŶĐůƵĚĞƐ ƚƌĂĐŬ ŵŽƵŶƚĞĚ ŝŵƉĂĐƚ ĂŶĚ ũĂǁ ĐƌƵƐŚĞƌƐ ĂƐ ǁĞůů ĂƐ ƚƌĂĐŬĞĚ ƐƚĂĐŬĞƌƐ ĂŶĚ ƐĐƌĞĞŶŝŶŐ ĞƋƵŝƉŵĞŶƚ
^ > ^ d D ƐŬ ĂďŽƵƚ ŽƵƌ ŽŵƉĞƟƟǀĞ ZĞŶƚĂů ZĂƚĞƐ ĂŶ dƌŽŝĂŶŽ Ͳ ϮϬϯͲϱϬϲͲϯϴϲϬ ; d͕ D ͕ Z/Ϳ :ŽĞ ŽůůĂnjŽ Ͳ ϮϬϯͲϴϴϲͲϱϱϱϴ ;Ez͕ E,͕ D ͕ sdͿ
^ĞĞ ŽƵƌ ĐŽŵƉůĞƚĞ ŝŶǀĞŶƚŽƌLJ Ăƚ
ǁǁǁ͘ Yh/WͲ^ > ^͘ĐŽŵ
Work Starts on Trail Bridge Over Vt.’s Winooski River Work got under way Sept. 18 on the construction of a trail bridge over the Winooski River between East Montpelier and Berlin, Vt., as part of the Cross Vermont Trail. Local leaders and trail enthusiasts were on hand for a celebration of the official start of site work. The 200-ft.-long bridge is a central piece of a larger project to build miles of new trail connecting the Montpelier bike path, according to the Cross Vermont Trail Association (CVTA). The group said it was awarded a large federal highway grant that will cover 80 percent of the $1.2 million cost of the bridge but needed to raise the remaining 20 percent. “It’s been a big lift, but over the last five years hundreds of local individuals, businesses and municipalities have all pitched in and we are at long last ready to go,” the CVTA said on its website. CCS Constructors LLC, from Morrisville, Vt., is contracted to build the Winooski River trail bridge. The structure may be installed over the river as early as November, with any remaining work around the site being completed spring 2021. The goal of the span is getting the Cross Vermont Trail off the shoulder of U.S. Highway 2 (known locally as Route 2) and onto a path in the woods. The problem for hikers and bikers using the trail is that Route 2 in East Montpelier is a high speed (depending on traffic), busy road and truck route. The shoulders are wide but are often used by cars and trucks as turning or passing lanes. The statewide Cross Vermont Trail often utilizes scenic roads to connect existing sections of trail. But, according to the CVTA’s website, the road segment near where the bridge is to be built has long been identified as the worst on scenic trail. The CVTA, a grassroots group of Vermont citizens, has worked hard to make this major infrastructure improvement and create a safer trail system.
“This is made possible by [the Vermont Agency of Transportation] and the Federal Highway Administration [FHA] believing in us and supporting the project development over many years,” read a project page on the CVTA website. “They provided several large federal grants that are paying for 80 percent of the cost of the bridge and some related expensive structures.” The CVTA’s portion of the remaining percentage of the project money came from local donors and went to pay for engineering, permitting and landowner permissions. The trail association said, though, the Winooski River trail bridge is just the keystone piece of a larger vision, one that connects the regional trail network (the Montpelier Bike Path, the Central Vermont Regional Path through Berlin, Barre and Barre Town, and the East Montpelier Trail) up to the U-32 Middle and High School and on across East Montpelier to where the Montpelier and Wells River Rail Trail begins at Vermont Rt. 14. From there, the Cross Vermont Trail continues east in various forms on toward the New Hampshire border. The bridge project will provide immediate access to the Winooski River for fishing, paddling and walking through conserved land along the banks, as well as to new trailheads, parking and other amenities, such as single-track mountain bike loop trails. The CVTA has long desired building a new, accessible trail, on conserved land in the woods and along the river, away from the road as far as possible. But they recognized that it’s a big job, especially since it includes heavily engineered structures, like the Winooski River bridge. In addition, the trail design also involves the input of numerous landowners, as well as being created in an environmentally sensitive and sustainable fashion. The association hopes the result will be a permanent, conserved greenway corridor that families can enjoy for generations to come.
Keep Up With All the Industry News Subscribe to
Construction Equipment Guide Today! Toll Free 800/523-2200
Construction Equipment Guide • New England States Supplement • www.constructionequipmentguide.com • September 30, 2020 • Page 9
Page 10 • September 30, 2020 • www.constructionequipmentguide.com • New England States Supplement • Construction Equipment Guide
Aggregate Firms Praise W.I. Clark’s ‘Team Blue’ Expertise KLEEMANN from page 1
as the Connecticut’s recyclers.” As W.I. Clark has always known those customers have a different set of demands and needs that need to be addressed. Aggregate producers and recyclers not only have their own language, but they also had a very unique set of circumstances unlike a contractor with a fleet of equipment. A contractor who owns a fleet of 25 machines can certainly be hurt by one machine going down, but it is unlikely that it would stop the entire operation. However, an aggregate producer/recycler can have its entire business come to a screeching halt when its machine is not running. According to Brester, “That puts the demands on the dealership to a whole new level. Our technicians need to be trained well. Our parts department has in stock the right parts and to source immediately those parts they need not in stock. When we sell a piece of equipment, it has to be the right piece of equipment for the application at hand. “We needed everyone involved in the Kleemann product to be a product specialist, so we came up with the concept internally of ‘Team Blue,” consisting of individuals within W.I. Clark who would receive specialized training and would be ready to react when the Kleemann customer needs us.”
(L-R): Mike Greenwood, service field technician; Geoff Bleiler, rental manager; Rich Prunier, parts manager; Russell Hansen, scheduler; Chuck Bakutis, Kleemann parts representative; Jeremy Castilli, service field technician; Mike Greenwood Sr., assistant service manager/Kleemann tech advisor; Mark Brester, aggregate and production class equipment specialist; Mike Lallier, service shop technician/screeners; and Kyle Levesque, service shop technician.
Team Blue at W.I. Clark: • Jeremy Kastelli, field service technician • Mark Brester, aggregate/production class equipment specialist • Kyle Levesque, shop service technician • Mike Greenwood Sr., assistant service manager/Kleemann • Mike Lallier, shop service technician/screeners tech advisor • Chuck Bakutis, Kleemann parts inventory management • Geoff Bleiler, rental manager Here are three different examples of how W.I. Clark’s Blue • Russell Hansen, service administration Team has come through for aggregate customers. One recycling, • Mike Greenwood Jr, field service technician one screening and one rock crushing.
JRD Properties JRD Properties is recycling 50,000 yds. of material just off I-84 in downtown Waterbury, Conn. This giant pile consists of a mixture of rock, dirt, asphalt and concrete and other debris that is being recycled into a 1-1/2-in. minus product and then sold locally. The area is extremely tight on space and a traditional recycling spread made up of a jaw, cone and screener just would not fit. To make it work, Mark Brester of W.I. Clark, and the rest of Team Blue at W.I. Clark installed a Kleemann MR110 track-mounted impact crusher. This single machine takes up far less real estate, yet does the job that required three machines in the past. The Kleemann MR110 Impactor features include: • an independent pre-screen that effectively removes
fines to by-pass the rotor. This frees up the rotor to crush what’s only needed. The pre-screened fines and crushed material can blend back together underneath the crusher box. This improves machine throughput, wear life and fuel efficiency. • The diesel/electric power (versus diesel/hydraulic) operates at a consistent rpm and constantly adjusts the amount of material being fed to the impactor box to optimize productivity and keep operating costs as low as possible. • The classifier sizes everything discharged from the Kleemann (here 1-1/2-in. minus) and recycles anything larger back to the impactor. • The Kleemann impactors use a material flow design
concept where each component gets wider as it moves through the machine. This reduces potential blockages and maximizes material flow for optimum performance in these types of applications. • As much as all users are careful, every crushing operation will have uncrushables fed to the system. When the MR110 rotor is immediately stopped from spinning at 1,700 rpms, the energy is relieved by a “blowout” plate. This is easily and quickly replaced and the customer is back to work minimizing very costly repairs. A Kleemann stacker was added to the spread to lower significantly the customer’s overall operating costs see KLEEMANN page 14
The Kleemann model MR110 ZI EVO2 does the work of a jaw, cone and screen all in one machine.
(L-R): Seamus Loftus, technical sales manager of Wirtgen America; Mark Brester, aggregate and production class equipment specialist of W. I. Clark; Bill Kirhoffer of S & S Asphalt Paving; and George Lescadre of JRD Properties.
Construction Equipment Guide • New England States Supplement • www.constructionequipmentguide.com • September 30, 2020 • Page 11
R O C K S O L I D S E RV I C E · W E C R U S H Y O U R R O C K S 140 Nutmeg Road South South Windsor, CT 06074 51 Veterans Drive Loudon, NH 03307
LARGEST DEALER IN NEW ENGLAND Selling the most advanced Portable Crushing & Screening Plants All of our plants are designed for high productivity and easy movability Save labor, power, maintenance, plant relocation costs, time Gain productivity and profitability Ideal for applications involving hard, abrasive materials Call today for more information
1-800-53-CRUSH Over 100 Machines in Stock
W W W. P O W E R S C R E E N - N E . C O M Family Owned and Operated for over 20 years
Call for Parts Today
R O C K S O L I D S E RV I C E · W E C R U S H Y O U R R O C K S
Page 12 • September 30, 2020 • www.constructionequipmentguide.com • New England States Supplement • Construction Equipment Guide
Transportation Collective to Advance Transit, Reduce Costs A new collective purchasing agreement for bus and bike lane road markings to help accelerate multimodal infrastructure was announced Sept. 2 by the Massachusetts Bay Transportation Authority (MBTA). The agency’s partners are the Metropolitan Area Planning Council (MAPC), the Massachusetts Department of Transportation (MassDOT) and Massachusetts Port Authority (Massport), along with the city of Boston and 12 other municipalities in the metropolitan area. The other cities and towns participating in the agreement include Cambridge, Somerville, Brookline, Everett, Watertown, Quincy, Chelsea, Revere, Medford, Malden, Arlington and Lynn. This collective procurement effort will allow public transportation agencies to cooperate and achieve a greater economy of scale in building projects, ultimately bringing costs down. “This is another example of the region working together to move everyone forward. Increasingly, we all need to collaborate in new ways to better serve our riders and constituents,” explained MBTA General Manager Steve Poftak. “This agreement will ensure that public agencies like the MBTA
will be using their funds as cost effectively as possible, especially throughout the current public health and economic crisis.” MAPC Transportation Director Eric Bourassa said, “Establishing more bus and bike lanes is critical for the region as we continue to re-open the economy during this pandemic. By reducing costs for the MBTA, as well as cities and towns, we can stretch our public dollars further to make public transit and cycling better and safer.” MBTA said the winning bid from K5 Construction — $4.70 per square foot for red bus lane material — is competitive and will aid an unprecedented expansion in multimodal projects at a critical time. Previous costs ranged from $7 to $12 per square foot, depending on the municipality. Combined, the participating municipalities represent more than one-fifth of the Commonwealth’s total population and account for most major regional transit corridors in the metropolitan region. Based on past construction costs across the region and projected project budgets, the MBTA said it estimates that this joint procurement effort could save taxpayers more than $2 million next year, or about 10 percent of what the MBTA plans to spend on the
Rapid Response Bus Lanes Program. Additional savings are expected if the procurement is renewed for future years and potentially expanded to more municipalities. As Massachusetts municipalities have implemented more quick-build design solutions like bus and bike lanes through road markings, flex posts, and signage in recent years, costs have remained a barrier for some localities, according to MBTA. The agency is partnering with some of the same cities and towns over the next year to advance projects that make regional road-
ways more reliable for tens of thousands of daily bus riders. The MBTA and the cities of Boston, Somerville, Everett and Chelsea previously announced several projects to be implemented by spring 2021, adding up to 14 new miles of bus-only infrastructure for routes with some of the highest ridership since the pandemic began. For many projects that include transit priority measures, the MBTA provides funding for design costs and for bus lanes’ red paint while the municipality pays for other multimodal corridor improvements.
Construction Abounds On, Along Mass. Route 18 in Weymouth The Massachusetts Department of Transportation (MassDOT) is almost halfway done with its nearly six-year project to improve Route 18 from Weymouth to Abington. The construction will widen the road to two lanes and add a shoulder in each direction throughout the project corridor, a 4-mi. stretch of Route 18 from Middle and West streets in Weymouth to Route 139 in Abington. Part of the project involves replacing the Route 18 bridge over the Massachusetts Bay Transportation Authority’s (MBTA) commuter rail line. MassDOT’s contractor for the Route 18 project, P. Gioioso & Sons in Boston, implemented a new traffic pattern to perform work at the bridge over the commuter rail tracks. Lane widths were narrowed with no shoulder through the work zone. Underground utility work needed for road widening and new traffic signals is ongoing in several locations between the bridge and the Abington town line. Relocation of utility poles and overhead wires also is happening in several locations and may result in short-term service outages,
as scheduled by utility companies. This work will continue throughout 2020. Roadway widening in Weymouth and Abington will begin after utility pole relocation is complete in each section of the project corridor. The project also includes the installation of new bike lanes and sidewalks near the South Weymouth MBTA train station. According to MassDOT, the $58 million project is on schedule to be completed in the spring of 2022. As part of another Weymouth building project along Route 18, construction is under way to finish mixed-use and residential buildings at 39 Trotter Road, a project owned by John M. Corcoran & Co. LLC in Braintree. It will consist of one multi-family structure and two buildings with a mix of apartments and retail shops. Each building has five stories. The first of the three buildings are slated to open for occupancy in mid-October, a project director for the company told the Quincy Patriot Ledger, while the other two buildings will be finished in mid-January and the end of April 2021, respectively.
6$9( $ /,)( '21·7 '5,9( +20( %8==(' %8==(' '5,9,1* ,6 '581. '5,9,1*
Construction Equipment Guide • New England States Supplement • www.constructionequipmentguide.com • September 30, 2020 • Page 13
The Nice Company, Inc
9 Rosenfeld Drive, Hopedale, M A Toll Free# 508-381-3939 • w w w.theniceco.com
Equipment Sales and Rentals
We sell NICE machines!
RENT! RENT! RENT! RENT!
2015 Hyundai Robex 260 LC-9A, 3500 hours, plumbed, Excellent shape! ......$79,000
2018 LINK-BELT 210 X4, 1650 hours, Graptor Bucket and Thumb, Very Nice Machine 39,000
2012 CAT 316EL, 3500 hours, 24" bucket, 10'2" stick, AC........................................$89,000
2016 CAT 962M, 5500 hours, third valve, good rubber ..................................................$139,000
2012 CAT 324EL, 5500 hours, QC, thumb, aux. hydraulics ......................................$99,000
2015 CAT D6N LGP, 4900 hours, 6-way blade, very nice! ............................................$129,000
2015 CAT 305.5E2 CR, 1400 hours, Hyd. thumb, QC, Swing boom ......................$57,500
2017 CAT 323FL, 2400 hours, Manual thumb, QC, AC, Rear view camera ................$139,000
Page 14 • September 30, 2020 • www.constructionequipmentguide.com • New England States Supplement • Construction Equipment Guide
Kleemann Products Help Aggregate Firms Thrive in Conn. KLEEMANN from page 10
1-1/2-in. minus material transfers to the Kleemann stacker for efficient material transfer.
JRD Properties partnered with S & S Asphalt Paving in certain aspects of this project. Bill Kirhoffer was the key person who fed the impactor daily. “The operator in this type of setup is a huge part of the operation,” Brester said. “Bill has proven to be very skillful at mixing from the pile the right combination of materials; dirt versus asphalt versus concrete, which makes all the difference in the quality of the end product.” “What’s great about this setup is that we are using one machine to make one product,” added Kirhoffer. “In the past we would have needed a jaw, an impactor and a screener. This has everything we need in one com-
pact unit. I really appreciate the diesel electric power system; if something gets stuck in a belt, it just trips off a breaker where normally the belt would be ripped to shreds.” “We really appreciate working with W.I. Clark. They are truly professionals. They have been great at selecting the right machine for this job and training us on its proper operation. S & S Asphalt has been doing business with W.I. Clark for more than 30 years, however, this was our first experience using them for aggregate equipment. Mark Brester with W.I. Clark checks in with us on a very regular basis to see what our needs are. He knows the machine inside and out and has been a tremendous help to us.”
Rebar and other unwanted metals are effectively removed from the process via the Kleemann’s magnets.
O&G Industries, Southbury Plant The O&G Quarry Southbury, Conn., plant recently purchased a Kleemann Mobiscreen MS 953I EVO. According to Tom Alexon, quarry superintendent, “The plant was purchased primarily for the production of a 3/8-inch minus product for the use in NovaChip paving, which is in high demand. In addition, we have also used the Kleemann for some asphalt plant cleanup rescreening and classifying, but it is primarily being used for the 3/8-inch minus product production. Material that is processed through this plant has ¼-inch stone removed and the 3/8(L-R): Tom Alexon, quarry superintendent of O&G inch minus product separated.” “The NovaChip paving process is where you Industries; Mark Brester, aggregate and production class specialist of W.I. Clark; and Seamus Loftus, The Kleemann plant was purchased primarily for the pave over an existing surface using Vogele 1800 equipment production of 3/8-in. minus for NovaChip paving. technical sales manager of Wirtgen America. spray jet pavers and eliminate milling, but the spec for the aggregate is very tight,” Alexon Kleemann’s Mobiscreen MS 953I EVO screenadded. “With the increased popularity of this paving ing plant at O&G Industries’ Southbury, process, the demand for this stone has increased dramatiConn., plant. cally, which is what drove O&G to be looking for the new screening plant.” “One of the things that attracted us to this particular screening plant is that it is a dry screening process — thus, there are no environmental issues with water contamination.” With O&G’s setup, because they are screening a 3/8-in. minus, the top decks are removed so that the screens are not worn out. Thus, material is dropped directly to the middle deck; 1/2-in. and larger materials are separated as one product; 5/16-in. material also is separated out, as well as a true 3/8-in. material. “All of the products that are being produced, we current- O&G’s previous screening plant is fuel consumption, how it is used. ly have a market for,” Alexon said. “Thus far, the screening Alexon said. “The Kleemann is easily consuming half the “The screener, with its mobility, can be used all over the plant has met all of our expectations and it has been making fuel versus its predecessor. The difference being the O&G plant. Wherever screening or recycling needs to take spec with a single pass through the screening plant, which Kleemann operates at a much lower rpm. The screening place and with its mobility, it is much more efficient to haul is where O&G has really seen the benefits of this purchase. plant itself is significantly larger and operates at a lower the Kleemann around the O&G plant than it is to haul In the past, it had taken two trips through the screening rpm — the combined effect is larger production numbers material by the bucket load to the screening plant.” plants to make spec.” with lower fuel consumption.” see KLEEMANN page 16 Another significant benefit with the Kleemann versus The plant’s mobility also gives O&G some flexibility in
Construction Equipment Guide • New England States Supplement • www.constructionequipmentguide.com • September 30, 2020 • Page 15
CONSTRUCTION AUCTION DAVIS AUCTIONS, INC. SATURDAY, OCTOBER 17, 2020 • 9:00 A.M. LOCATION: 210 CHESHIRE ROAD, RT. 68, PROSPECT, CT
THINK SUNSHINE!!!
Davis Auctions, Inc. will be conducting our next auction of utility and construction equipment and related supplies on October 17, 2020. This auction will consist of excess equipment from the power companies, municipalities and others to be sold in absolute.
Early Consignments: Excavators; Skid Steer Loaders; Graders; Feller Bunchers; Chippers; Wheel Loader Backhoe; Skid Steer Attachments: Trenchers, Augers, Buckets, Grapple Buckets, Rotary Cultivator, Vib. Roller, Brush Cutters, Snowplows, & Extension Forks; Ditch Witch; Dump Trucks; Coach Bus; Pickups; Cars, Trailers; Boat, w/Boat Trailer; Snowmobile; Easy to Build Mobile House w/shower & toilet; 40’ Shipping Containers; 9’ Storage Container; Dome Shelters, misc. sizes; Port. Toilet w/shower; Plows; Welders; Work Benches/Toolboxes, misc. sizes; Bi-Parting Gates; Wrought Iron Fencing w/entry gate; Container Ramp; Pallets of Bluestone, misc. sizes & types; Pallets of Misc. Tile & Flooring; Light Poles/Flag Poles; Anvils; LED Lights; Saws; Power Tools; Hang Tools and much more. We accept consignments up thru Saturday, October 10, 2020. Please call before bringing items to consign. A early catalog will be available at www.davisauctionsinc.com by October 7. Please be aware this will be a live in-person event. Masks are required by all attendees. Temperatures will be taken at the gate to be allowed to enter and bid. We will be following all CDC guidelines for social distancing and hand sanitizing. Online bidding will also be available. Please register for online bidding a minimum of 24 hours before the sale to receive an online number. Thank you.
THIS IS WHY You call Milton CAT when you need to rent a generator: • Availability. Even when everyone else needs a generator, you’ll get yours. • Product quality. All EPA-certified, clean, well-serviced gensets. • Complete range. From 20 to 2,000 kW; Diesel and gas; portable and Tier IV models. • All the ancillaries. • Expert support; 7/24 service. • Priced to fit your budget.
Generators, Compressors, Chillers
For Online Bidding, Visit Realtimebid.com
800-821-6412 Serving MA, RI, NH, ME, VT and Upstate NY.
Visit www.davisauctionsinc.com for updates. Call for more information: DAVIS AUCTIONS, INC. (203) 758-4087 or 1-800-201-4368 www.davisauctionsinc.com
AUCTIONEER: REGINALD LUSSIER LYNDONVILLE, VT 05851 NH LICENSE #2413
www.miltoncat.com
Page 16 • September 30, 2020 • www.constructionequipmentguide.com • New England States Supplement • Construction Equipment Guide
Continuous Feeding System Impresses Conn. Quarry Rockhead Quarry KLEEMANN from page 14
Rockhead Quarry is producing four products: 1-1/4-in. stone, 3/4-in. clean stone, 3/8-in. clean stone and stone dust. To produce these products, its crushing spread consists of a • Kleemann MC110ZI EVO with a 44 by 28-in. jaw • Kleemann MCO9SI cone with classifier • Kleemann MS703I. screen Nick Ferraina, plant manager, commented on several features of the Kleemann plant and the services provided by W.I. Clark. “I have really been impressed with the continuous feeding system featured in the Kleemann crushing spreads,” he said. “The crusher maintains a continuous, consistent flow of material through the jaw that gives you rock on rock crushing in the cone, providing improved fragmentation. The end result is a better product.” “The new configuration that W.I. Clark and Kleemann gave us eliminated a massive spread that ate up a lot of real estate, took up twice the manpower, consumed twice the fuel and had twice the wear parts. The noise level while crushing is excellent and really helps keeping neighbor complaints to a minimum. “This new spread is compact and portable. We could easily move the entire setup in half a day. When we made this purchase, we shopped the Kleemann and W.I. Clark and compared feature-to-feature and the economics of operation, it just made sense to go with Kleemann and the W.I. Clark Blue Team. “W.I. Clark has given us tremendous support. They have a regular Rockhead LLC quarry’s Kleemann MC 110 ZI EVO
The screening process is completed with a Kleemann MS703I.
(L-R): Doug C. Hansen, president of W.I. Clark; Mark Brester, aggregate and production class equipment specialist of W.I. Clark; Nick Ferraina of Rockhead LLC; and Seamus Loftus, technical sales manager of Wirtgen America.
schedule of visits to check on our operations and how we are getting along with our new setup. Their training is excellent and ongoing. It certainly helps that the Kleemann equipment is interface user-friendly and has good accessibility to the areas that need maintenance. As an example, we are able to change the screen mesh in less than a half hour.” CEG
Kleemann MCO 9SI cone crusher at Rockhead LLC quarry in Monroe, Conn.
Construction Equipment Guide • New England States Supplement • www.constructionequipmentguide.com • September 30, 2020 • Page 17
Chappell Tractor 251 NH-125 454 RTE 13 391 Loudon Rd. Brentwood, NH 03833 Milford, NH 03055 Concord, NH 03301 603/642-5666 603/673-2640 603/225-3361 www.chappelltractor.com
Kahn Tractor & Equipment, Inc.
Lorusso Heavy Equipment, LLC
Quality Fleet Service, Inc.
520 Pond Road North Franklin, CT 06254 860/642-7596 www.kahntractor.com
160 Elm Street Walpole, MA 02801 508/660-7600 www.lhequip.com
548 New Ludlow Road South Hadley, MA 01075 413/213-0632 www.qualityfleetservice.com
Page 18 • September 30, 2020 • www.constructionequipmentguide.com • New England States Supplement • Construction Equipment Guide
NEW ENGLAND SUPPLEMENT ADVERTISER INDEX ARGUS INDUSTRIAL COMPANY ....................................1 DAVIS AUCTIONS INC PROSPECT CT 10/17..................................................15 EQUIP-SALE AND LEASING CORP ................................8 EQUIPMENT EAST ........................................................1,5 FOLEY INC - WORCESTER ............................................1 GORILLA HAMMERS........................................................1 HYUNDAI CONSTRUCTION EQUIPMENT....................17 J R VINAGRO CORPORATION........................................1 M G EQUIPMENT ............................................................1 MILTON CAT....................................................................15 NEW ENGLAND MOBILE CRUSHING ..........................20 NORTHLAND JCB/ALTA EQUIPMENT ............................9 POWERSCREEN NEW ENGLAND ................................11 ROGERS BROTHERS CORPORATION ........................19 SHAWMUT EQUIPMENT CO INC ..................................12 T-QUIP SALES & RENTAL INC ......................................13 THE N.I.C.E. COMPANY ................................................13 THE W. I. CLARK COMPANY ..........................................2 TYLER EQUIPMENT CORPORATION ............................3 WOODS CRW CORP........................................................7 The Advertisers Index is printed as a free editorial service to our advertisers and readership. Construction Equipment Guide is not responsible for errors or omissions.
Vt. Town Builds Lakeside Route Touted as Economic Driver Construction in Newport, Vt., is set to start this fall on a year’s long, $1.3 million project to connect a historic lakeside farm, the city’s beach and several miles of bike paths. The effort — which will link Bluffside Farm, Prouty Beach, the Newport Recreation Path and the Beebe Spur rail trail — is a key piece of the city’s plan to center its economy on outdoor recreation in the Orleans County community. “This is uncharted territory for the city of Newport,” explained Laura Dolgin, city manager. In 2015, the Vermont Land Trust bought Bluffside Farm from the Scott family, which had owned it for five generations, and opened it to the public. The 129-acre property on the shores of Lake Memphremagog is the largest remaining agricultural site in the city. A few months after the purchase, residents proposed rebuilding a bridge that had once connected the property with Prouty Beach, the municipal park, said Tracy Zschau, the land trust’s vice president of conservation. That idea spawned another: Using the bridge to connect the city’s existing downtown bike trail, the Newport Recreation Path, with the one that stretches from the north side of Newport toward the border with Canada — the Beebe Spur rail trail. The result would be a 7-mi. path that cyclists could take from downtown Newport along Lake Memphremagog and then on to Canada. “The idea of this recreation link and what it could mean for Newport” drove the land trust and other partners forward, Zschau said. In recent years the city has pivoted to its greatest natural asset — Lake Memphremagog — and sought to establish itself as a destination for outdoor recreation. Supporters of the Newport City Council’s decision in January to open some municipal roads to all-terrain vehicles cited the same strategy. The 31-mi.-long Lake Memphremagog stretches north to Magog in Quebec. More than 70 percent of the lake and 15 of its 21 islands are in Canada. Five islands are in Vermont, and one staddles the international border. Both the land trust and the city have received numerous grants for the recreationtrail project, which was initially estimated to cost $1.2 million, Zschau said. Those included nearly half a million dollars from the federal Northern Border Regional Commission in 2017, and $35,000 in 2019 as one of the
“This is uncharted territory for the city of Newport.” Laura Dolgin Newport City Manager
“We’re still chasing a few grants that will just seal the budget.” Tracy Zschau Vermont Land Trust
two inaugural community awards from the Vermont Outdoor Recreation Economic Collaborative, an initiative launched by Gov. Phil Scott. The latter grant went to Newport to redevelop Prouty Beach, including constructing the path toward the bridge that needs rebuilding. The path swirls down toward the waterfront and is partly done, said Dolgin. She envisions a future bike ride along the trail: “You’re on the shore of the lake, and each view is more stupendous than the one before.” Zschau said more money needs to be raised for the project. The initial cost went up to $1.3 million because of features not included in the original feasibility study, such as a small parking lot and a wetland restoration project. “We’re still chasing a few grants that will just seal the budget,” she said. “We’re within $30,000 to $40,000 of what we need.” Zschau said construction will likely be split between the fall and next spring, with work beginning on a trail that would lead to Scott’s Cove on Lake Memphremagog — where the rebuilt bridge will eventually sit. Both she and Dolgin are excited that the project could attract more tourists — and residents — to the city. “There’s real momentum right now to look to the lake and really embrace it,” Zschau said, “both for the health and wellbeing of locals as well as something to market for new business and visitation.”
Construction Equipment Guide • New England States Supplement • www.constructionequipmentguide.com • September 30, 2020 • Page 19
TRAILERS TO MEET EVERY HAULING CHALLENGE! Committed to building superior quality, reliability and durability into every trailer.
ROGERS BROTHERS CORPORATION ALBION, PA
The Ultimate in Trailers®
Tyler Equipment 251 Shaker Road East Longmeadow, MA 01028 (413) 525-6351 • (800) 292-6351 Parts: (877) 255-6351
1980 Berlin Turnpike Berlin, CT 06037 (860) 356-0840 • (800) 352-4473 Parts: (860) 356-0848
C.N. Wood Co., Inc. 200 Merrimac St. Woburn, MA 01801 (781) 935-1919
140 Wales Ave. Avon, MA 02322 (508) 584-8484
60 Shun Pike Johnston, RI 02919 (401) 942-9191
www.cn-wood.com
www.tylerequipment.com
For more than 110 years, ROGERS® trailers have stood above the rest in rugged durability, unsurpassed quality and superior design. Contact your local dealer for a quote today.
New England Mobile Crushing Services
Page 20 • September 30, 2020 • www.constructionequipmentguide.com • New England States Supplement • Construction Equipment Guide
CUSTOM HAMMERING
One of the largest hammer excavator combinations available in New England. 25,000 lb hammer paired with a 175,000 lb John Deere excavator.
SAVE TIME & MONEY VS BLASTING • Don’t pay for an oversized cut. • Eliminate lengthy and painful permitting processes • Do away with enviromental and traffic impact studys • No costly traffic management payments • Throw away those blasting mats • Material ready for crushing without further reduction follow us on Facebook
Many other hammer/excavator size combination available to meet your needs. 200 Suncook Valley Rd • Chichester, NH 03258 P: 603-961-0183 • F: 603-961-0135 www.newenglandmobilecrushing.com