1
11
THE NEW ENGLAND EDITION
A Supplement to:
95
1
201 16 9
26
2
1 3
91
89
2
95 3
2 2 7
1
93
495
16
89 4
89
95
202
7
91
9
95
93
2
95 2
93 90
90
7
95 91
7
3
84
495 6
84
6
6
195
395
95 91
September 20 2017 Vol. l • No. 19
95
95
® FALL SPECIAL
2% financing* on
Gorilla Hydraulic Breakers “The Nation’s Best Read Construction Newspaper… Founded in 1957.”
Your New England States Connection • Amanda Hogeboom-guilfoyle 1-800-988-1203 Specializing in:
2208 Plainfield Pike • Johnston, RI 02919 401-943-7100 • Fax: 401-647-5041
Call for Pricing
LEED Accredited in Waste Management
2017 EZ-Screen 1200XLS
WE STOCK RUBBER TRACKS for Over 6,000 Models! Some Used Tracks A & GA Available. NJ, TX, WOUSES EH R A W • HIGH QUALITY • FAST SHIPPING • GUARANTEED TO FIT • UNDERCARRIAGE PARTS • FLATPROOF SKIDSTEER TIRES • RUBBER PADS FOR STEEL TRACKS
888-888-1248
New Option Separate 3 Products
6’x5’ Screenbox Works with 1/2 to 1 3/4 Yd. Loaders, 25 H.P. Kohler Diesel Engine, 24” Conveyor Dumps Screened Product 9’ High
$41,900 plus freight. Other Screeners Available
ArguS INduStrIAl CO.
www.ez-screen.com
866-745-5828
GIVE US YOUR HAMMER!
• Repairs • Rebuilds • Replacement Parts in Stock
30% off same class Ramfos hammer with competitor’s trade in
61 Silva Lane • Dracut, MA 01826
Call Today (978) 454-3320
VERY NICE SHAPE • Largest hammer repair facility in North America • Demolition tools and parts for ALL makes and models • Hammer-equipped excavator rentals • Backed by a 75 year family owned business CALL YOUR ONE-STOP HAMMER SHOP™ TODAY!!!
www.foleyengines.com
Start
Crews Build Slurry Wall for Boston High-Rise in Seaport District CALL 888-81-GORILLA(46745) *On approved credit
The Seaport District of tower will contain 733 luxusouth Boston has experiry apartment residences enced explosive growth over along with 125,000 sq. ft. of the past decade, and with the retail and restaurant spaces. announcements of General Residential amenities will Electric moving its headinclude two signature outquarters and Amazon builddoor pool areas, an indoor ing a major facility in South pool, expansive sundecks, Boston, the growth rate has courtyards and oversized achieved even greater levels. private terraces. The current level of conConstruction on this projstruction in Boston is rivaling ect began in January 2017 Big Dig levels. and completion is anticipatAmong the major projects ed in early 2020. currently under way is the Used for pick and carry situations, this Mantis 15010 $900 million mixed residen- 77-ton hydraulic boom crawler crane has been a good Treviicos tial and commercial project fit for Treviicos. Here, the crawler is being used to The slurry wall construcat 145 Seaport Blvd.. This drop a slurry wall cage. tion of this project has been project, owned by awarded to Treviicos, the California’s Cottonwood Management, includes three mixed North American subsidiary of Trevi. Treviicos was set up in use towers containing 1.3 million sq. ft. constructed on a 3- 1997 when Trevi’s underground engineering and tunneling 1/2 acre parcel. Two of the towers will contain more than 400 division purchased ICOS Boston, a company with a 40-year combined luxury condominium residences, and the third see SlurrY page 6
URI Overcomes Unique Challenges to Build New $125M Engineering Complex
By lori tobias
CEG CORRESPONDENT
Cat D7F
Phil (413) 427-7171
Programs available for ALL buyers!*
stuff today!
Demolition, Portable Crushing, Material Sales, C & D Recycling, Land Clearing & 30-115 Yd. Trailers
www.jrvinagrocorp.com
• Priced up to 50% below the competition. • Fully supported by a 75 year family business. • Shipment in 2-3 days for most carriers.
CALL 888-81-GORILLA(46745)
When the University of Rhode Island committed to building a new engineering complex, two decisions were obvious. One, five historical buildings, all built in the late 1950s and early 1960s would have to go; and two, the new building needed to be a cutting-edge structure that spoke clearly of its purpose.
Groundbreaking on the $125 million, 190,000-sq. ft. complex took place in April.
“This was about making a very bold statement that this is an engineering building,” said Dean Raymond Wright. “There are 2,300 tons of structural steel, and 3,700 square feet of glass in the interior alone. There is a lot of glass on the exterior, which is a very unique feature on this campus. One of the features in the cafeteria is a unique composite see urI page 4
Page 2 • September 20, 2017 • www.constructionequipmentguide.com • New England States Supplement • Construction Equipment Guide
THE W.I. CLARK COMPANY Danbury, CT • Wallingford, CT • Plainfield, CT Call Mark Doty @ 203-823-2316 2011 John Deere 50D
2006 Komatsu PC138USLC
2005 Takeuchi TB 175
2675 hrs, c/air, blade hyd thumb, 24” bucket, stk#23535 ............................................$46,500
2765 original hours, rubber pads, aux hyds, 36” bucket, push blade, stk#23933......$78,500
air, steel tracks, aux hyds, Wain Roy coupler and 2 buckets, stk#24010....................$29,500
2012 Hamm HD12VV
2014 Mauldin 1750C
2013 Leeboy 8616B
foldable ROPS, Deutz diesel, 47” drums, excellent condition, stk#23994 ............$31,500
Cat diesel, 8-15’ electric screed, fresh service and new lower augurs, stk#23944 ......$70,500
HD poly pads, slope and power crown, vibratory, all updates are complete. Stk#21988 ..........................................................$125,000
2005 Deere 850JLT
2008 Deere 624J
Deere 323E
c/air, 158” 6 way blade, recent U/C turn and service, stk#22281 ............................$115,000
air, Hi Vis cplr, 3rd valve hyds, 3.5 yd bucket and forks fresh 2K service completed, stk#23992 ..........................................$110,000
Yanmar, c/air, EH Controls, 2 Speed, 18” Tracks, 78” Bucket, stk#23928 ............$39,500
See Our Complete Inventory at www.wiclark.com
Construction Equipment Guide • New England States Supplement • www.constructionequipmentguide.com • September 20, 2017 • Page 3
!
%
!
%
!
!
!
!
!
!
!
% ! ! ! ! ! ! !
!
!
!
! !
!
!
!
!
!
!
!
!
!Q
!
!
!
!
!
!
! 2
! 2
!
!Q !
!
! !
!
Q
! !
! !
%2
!
!
%
%
!
%
Q
! !
!
!
! !
!
!
!
! Q
Some companies have you choose power or fuel efficiency. You chose both. %
%
!
! ! 2
!
! ! !
! %
! !
%
!
!
%
!Q
Q
%
DEALER LOGO %
%
!
2
! ! ! !
2 2
%
!
!
%
% % Turnpike % 1980 Berlin Berlin, CT 06037 800.352.4473 Company y Name N 1234 Any Road 251 Shaker Road City, Longmeadow, ST 12345 East MA 01028 123.456.7890 800.292.6351
!
%%! !
!
Q !
!
!
the industry’s first fuel efficiency guarantee g so you never have ave % Volvo %developed 2 % 2 pe to compromise on erformance or productivity. An nd with CareTr eTrack machine monitoring, you can focus f your attention on more im mportant things — like growing your businesss. Get the details at volvoce.com/sm /smartfuel. 2
Page 4 • September 20, 2017 • www.constructionequipmentguide.com • New England States Supplement • Construction Equipment Guide
Formwork, Concrete Pours Under Way for URI Building Project Fun Facts, Courtesy of Dimeo
Crews have since finished excavating for the foundation, installed the steel piles that support the foundations and have begun formwork and pouring concrete. URI from page 1
material.” Groundbreaking on the $125 million, 190,000-sq. ft. complex took place in April. Crews have since finished excavating for the foundation, installed the steel piles that support the foundations and have begun formwork and pouring concrete, said Doug Peckham, vice-president of Dimeo Construction Company, headquartered in Providence, R.I. “There are several challenges that the project will face
NEW ENGLAND EDITION
Founder, Publisher & CEO Northeast Publisher Editor In Chief Associate Editor Editorial Consultant Production Mgr. Controller Circulation Mgr. Director of Web Services
Edwin M. McKeon Sr. Edwin M. McKeon Jr. Craig Mongeau Christine Allen Pete Sigmund John Pinkerton Judith Nixon Cathy Printz Teddy McKeon
Main office 470 Maryland Drive
Fort Washington, PA 19034
215/885-2900 Toll Free 800/523-2200 Fax 215/885-2910
Web site www.constructionequipmentguide.com
Editorial e-mail editorial@cegltd.com
Advertising e-mail production@cegltd.com
• Package labels used during move-out from existing buildings — 32,000 • Crane picks for structural steel — 3,000 • Structural steel — 2,300 tons • Concrete — foundations: 9,700 cu. yds. • Concrete — slabs: 2,300 cu. yds. • Concrete — site: 1,450 cu. yds. • Bricks — 14,000 sq. ft. • Excavated soil — 14,000 cu. yds. • Backfilled soil — 10,000 cu. yds. • Underground electric cable — 1 mi. • Underground drainage, sewer, water and steam piping — 2 mi. • Debris from demolition — 10,000 tons • Interior glass wall systems — 3,700 sq. ft. • Exterior glass wall systems — 77,000 sq. ft. • Fire protection, plumbing and mechanical piping — 17 mi. • Electrical wire (interior) — 24 mi.
during the construction of the building and site,” Peckham said. “The footprint of the new building overlays onto the sequenced demolition of the existing five buildings and there was a series of underground utilities that connected to those buildings, but also continued on to other buildings within the campus infrastructure. We had to pre-plan sequencing installation of new and demolition of existing utilities parallel to the old buildings being demolished while
For advertising rates: Contact Edwin M. McKeon Jr.
215/885-2900
Toll Free 800/523-2200 Fax 215/885-2910
e-mail tmckeon@cegltd.com
Contact Amanda Hogeboom-Guilfoyle
• New England 518/396-7659 Toll Free 800/988-1203 Fax 315/866-1379 e-mail ahogeboom-guilfoyle@cegltd.com Contact Kent Hogeboom
• New York • New England 315/866-1379 Toll Free 800/988-1203 Fax 315/823-4136 e-mail khogeboom@cegltd.com
Construction Equipment Guide Northeast Edition (ISSN 1081-7034) is published bi-weekly by Construction Equipment Guide Ltd. Advertising and Editorial Offices are located at 470 Maryland Dr., Ft. Washington, PA 19034. Toll Free 800/523-2200 or Fax 215/885-2910. Annual Subscription Rate $65.00. Call for Canadian and foreign rates. Periodicals postage paid at Ft. Washington, PA and at additional mailing offices. POSTMASTER: Send address changes to Construction Equipment Guide Northeast Edition, 470 Maryland Dr, Ft. Washington, PA 19034. Contents Copyrighted ©2017, by Construction Equipment Guide, which is a Registered Trademark, registered in the U.S. Patent Office. Registration number 0957323. All rights reserved, nothing may be reprinted or reproduced(including framing) in whole or part without written permission from the publisher. All editorial material, photographs, drawings, letters, and other material will be treated as unconditionally assigned for publication and copyright purposes and are subject to Construction Equipment Guide's unrestricted right to edit and comment editorially. Contributor articles do not necessarily reflect the policy or opinions of this publication. Call or write for advertising rates, publication schedule and media kit. The Construction Equipment Guide is not responsible for clerical or printer's errors, every care is taken to avoid mistakes. Photographs of equipment used in advertisements are not necessarily actual photographs of the specific machine. Similar photographs are used occasionally and every effort is taken to depict the actual equipment advertised. The right is reserved to reject any advertising.
keeping all utilities functional to surrounding buildings as we were getting the new building pad ready. We had to clear all the area and reroute utilities around the new building in order to install the new building footprint.” The exterior of the building, designed by Ballinger architects, utilizes an aluminum unitized curtain wall and features fin projections along with a combination of etched glass wall systems including a large skylight at the roof. “The building is very transparent as you are looking in from the exterior which reveals the exposed structural steel skeleton,” Peckham said. “The unitized curtain wall system is a type of system in which it is mostly erected from the interior of the building and reduces the labor intensity of field erection. The system is prefabricated in large sections and segmented together in the field, in lieu of a conventional curtain wall system which is ‘stick-built’ in the field. You can still get the same look with other systems, but the designer’s approach has made the exterior a very transparent view from exterior into interior. In total, there is [more than] 77,000 square feet of glass wall systems on the exterior envelope. see URI page 8
A large drill rig for drilling the hydraulic elevator piston casing will mobilize to the site parallel to concrete installations.
Construction Equipment Guide • New England States Supplement • www.constructionequipmentguide.com • September 20, 2017 • Page 5
160 Elm Street Walpole, MA 02081 (508) 660-7600
Page 6 • September 20, 2017 • www.constructionequipmentguide.com • New England States Supplement • Construction Equipment Guide
A slurry wall is a system that can provide lateral retention, load-bearing capacity and waterproofing to a foundation while becoming part of the permanent structure. It can be built with zero clearance to exist-
What Is a Slurry Wall? ing structures, act as under-pinning of superficial foundations and in conjunction with pre-founded columns, constitute the perimeter wall in top-down construction projects.
Slurry walls are very versatile — they can assume any shape, with thicknesses varying from 2 to 5 ft. and depths of up to 400 ft., and can be constructed in any imaginable soil condition.
Crews Build Slurry Wall Foundation Before Excavation SLURRY from page 1
history in the United States. The two company names were combined to form Treviicos. ICOS Boston had specialized in the slurry wall foundation construction process. This process made possible the construction of hundreds of infrastructure projects and many noted buildings, including the original World Trade Center, according to the company. In 1997, the newly formed Treviicos was awarded the contract for the construction of the complex foundation system of Boston’s new Southeast Expressway, better known as the Big Dig. With the completion of the Big Dig, Treviicos was able to capitalize on the flourishing Boston economy and was intricately involved in the construction of many new hotels, condominiums and office buildings, as well as medical and educational facilities. While Treviicos is widely diversified, the core of its reputation in New England was built around slurry wall construction. On the Seaport Boulevard project, Boston’s Silver Line subway tunnel dissects the job site at depths ranging between 18 and 40 ft. below the surface. This had to be taken into consideration in the engineering and design of the slurry wall when the tunnel area comes into play. As a result of this, a slurry wall runs parallel to the tunnel area on each side of the tunnel. Slurry Wall Construction Begins When construction of the slurry wall begins, one of the most obvious differences from conventional construction methods is that the site has not yet been excavated. Traditionally, one might think in terms of a hole being dug and then a foundation wall being constructed. On this project, the slurry wall will be completed, the excavation will begin and the slurry wall will be braced where bracing is necessary.
A crane-operated clamshell bucket is used to excavate material within the boundaries of the guide wall. At times, rock is encountered during the excavating process that cannot be removed using the clamshell bucket. In this scenario, crane-operated grinders, which are capable of breaking up even the hardest New England granite, are dropped into the hole.
This photo shows a section of the concrete guide wall, which lays out for the equipment operators exactly where the slurry wall will be constructed. When dictated by rocky conditions, grinders such as this are lowered into the hole to remove the obstacle.
Upon completion of the guide wall, excavation for the slurry wall begins. Massive clamshell buckets, which are controlled by very specialized cranes, start excavating the dirt and stone between the areas outlined by the guide wall. The excavation at times will reach depths up to 90 ft.
Once the foundation has been excavated, slurry composed primarily of water and Bentonite is pumped into the hole. This mixture helps maintain the integrity of the walls of the hole until concrete is poured. With the slurry in place, 22-ft. wide steel panels manufactured from reinforced steel, which resemble a rebar cage in design, are lowered into the foundation and are sealed together. Each panel weighs between 30,000 and 75,000 lbs..
Steel workers custom fabricating one of the 22-ft.-long steel panels, which will be dropped into the excavated hole prior to concrete pumping.
Once the panel walls are in place and have been sealed together, cranes are used to place concrete funnels that are as long as the depth of the dig into the hole so that concrete can be poured.
Construction of the slurry wall has already started, but the excavation of the site has not yet begun.
Before construction of the actual slurry wall begins a concrete guide wall is laid out and built.
A crane-operated clamshell bucket is used to excavate material within the boundaries of the guide wall.
see SLURRY page 10
Construction Equipment Guide • New England States Supplement • www.constructionequipmentguide.com • September 20, 2017 • Page 7
CONSTRUCTIION EQUIPM CO MENT EXPO
Oct tober 5th 1 Patriot Place, Foxborough, MA 9:30am - 2:30pm 2
Nort Northla rthla andJCB.co an andJCB.com com
(888)) 485-0383 (888) 485-0383
Consttr C Constructio truc ru ucctttion on Equipment Equi uipmeentt Gu Gui uide idee readers reeaad ders gain g in eexc ga xxclusive xc lus usivve VIP V P acce VI acce ac ccceess ess by registering reggi re g stteri r ng online... onlinee... F FREE! REE! tiny tinyurl.com yurl y yur ur url.c l.co co c om/northlandjcb m//no m/ northlan no rt thlan andj and djc jcb
6 Jonspin Rd. R Wilmington, MA A 01887
230 Cherry Stt. Shrewsburyy,, MA 01545 0
3 Chalet Rd. (R Route outee 44) Middleboro, MA 02346 2346
114 Hall St. Concord, NH 03301
23 Foss Rd. Lewiston, ME 04240
150 N. Plains Industrial Rd. Wallingford, W allingford, CT 06492
Page 8 • September 20, 2017 • www.constructionequipmentguide.com • New England States Supplement • Construction Equipment Guide
PORTABLE ROCK CRUSHING C
Onsite or Quarry • Making aggregates since 1983
Crushed 1.2 Million Tons in 2016! Call us today ROCK CRUSHING•(8 ) 4 - GOSHEN, CT
www.FAYWRIGHTINC.com
Equipment For Sale! Located in Milford, CT 1972 MACK DM 600 complete rebuilt cab. Remanufactured engine. Remanufactured Transmission. Has not been operated in 15 years, but still runs great. asking ................ $10,000 obo
1990 Komatsu WA 500 12,638 hours- A/C cab, extra counter weights, Full Service oil check via certified Komatsu dealer, Completely rebuilt bucket with line board and new pins. Sandblasted and painted. Stored in heated garage for 15 years. Runs great! asking: .... $48,000
P&H 50 Ton w/ lattice boom 3,300 original hours, Upper & lower running in good condition asking: ............ $14,500
Nicholas Equipment, Inc. Call Larry: (203) 500-3179
Officials Open New $5.3M I-95 Interchange in Maine Due to Innovative Partnership Due to an innovative busimunicipal/business entity ness partnership program, requests such as responding the Maine Department of to changing local transportaTransportation was able to tion needs on state and stateopen a new Interstate 95 aid highways, developing interchange in Waterville, economic opportunities and north of Augusta. relieving safety concerns on The agency said the interor adjacent to these highchange for Exit 124 at ways.” Trafton Road allows direct The program is designed access to I-95 and will help to promote public/private to foster business growth partnerships between the Maine DOT photo opportunities within the “This is an exciting opportunity for businesses in the department and municipaliarea. area to utilize this new interchange,” said David ties, public utilities, private “This is an exciting Bernhardt, state DOT commissioner. businesses and other entities opportunity for businesses in by leveraging additional the area to utilize this new resources on a voluntary interchange,” said David Bernhardt, Department of Commerce’s Economic basis to match limited state resources. state DOT commissioner. “The city of Development Administration, the city “It will make improvements to state Waterville and surrounding communi- of Waterville and Trafton Properties — and state-aid highways often utilizing ties now have a new point of access which utilized the Maine DOT’s more flexible project delivery methods that allows an easy connection to the Business Partnership Initiative. when the nature of the highway and The state DOT described that project allow” the department said. interstate, saving time and direct fuel costs which will positively affect their Business Partnership Initiative as “a (This story also can be found on one-third state, two-third Construction Equipment Guide’s bottom line.” The $5.3 million project was funded business/municipal demand response website at www.constructionequipby the Maine DOT along with the U.S. program, designed to respond to mentguide.com.)
New URI Engineering Building Will Feature 2,300 Tons of Structural Steel URI from page 4
“The structural steel is another signature feature of the building, which again leads into the glass which will allow the public to view this very unique steel shape that supports the building. The main component of the steel is the bridge, which is composed of three long span parallel trusses that traverse in the east-west direction or long-axis of the building and are a series of vertical, horizontal and skewed angular steel shapes connected together. The bridge starts at the main floor level and continues vertically to the roof allowing for a exterior of the building, designed by Ballinger architects, utilizes an long clear span on the lower level The aluminum unitized curtain wall. with no visible support.” “The complexity of the steel fabrication due to the geometry of the structure, the steel erection porary heating, so we can pour concrete on each level tolerances, as well as the significant amount of welding through the winter. That’s the immediate challenge in front required on the bridge trusses will be challenging for the of us.” Equipment on site includes backhoes, front-end loaders, project schedule. In addition, the majority of the steel installation will be occurring during the cold months this winter. bulldozers, large dump trucks, large excavators, various size The challenge will be to complete the installation of the steel see URI page 14 and efficiently put in weather protection measures and tem-
Construction Equipment Guide • New England States Supplement • www.constructionequipmentguide.com • September 20, 2017 • Page 9
The e best in heavy v eq quipm ment. Doosan wheel loaders are packed with comfor t features you can see, hear and fee e l. A wide-open view of the work area. Low noise levels. Air suspension seat and ergonomic controls in line with your natural movements. Still, performance and productivity are key, and your Doosan loader delivers power and torque to penetrate hard materials. Superior lift height and lift capacity increase efficiency. Operators can see and n fe eel the difference. Get a closer loo ok. Stop by and visit us today y..
D o o s a n a n d t h e D o o s a n l o g o a r e r e g i s t e r e d t r a d e m a r k s o f D o o s a n C o r p. i n t h e U n i t e d S t a t e s a n d var ious other coun tr ies around the wor ld. 16 -D012
Au thor ized Doos an De aler
Equipment East 61 Silva Lane • Dracut, MA 01826 978-454-3320 • w w w.equipmenteast.com
Page 10 • September 20, 2017 • www.constructionequipmentguide.com • New England States Supplement • Construction Equipment Guide
Slurry Wall Construction Requires Cranes for Heavy Lifting SLURRY from page 6
A view of one of the completed 22-ft. rebar panels.
A concrete funnel being lowered into place.
The concrete is being added to the hole through the funnel in the forefront of this photo. The back of the photo shows the slurry mix being pumped out of the excavated area to the screening and separating station.
Heavy Lifting The construction of a slurry wall is crane intensive work. According to Jeffrey Taylor, senior project manager of Treviicos, “The cranes on our projects are our life blood. Cranes are involved in nearly everything that we do. No single crane manufacturer builds the full variety of cranes that are needed on one of our projects.” The cranes that Treviicos uses for the lifting of the clamshell buckets and diggers are duty cycle cranes manufactured by Liebherr that the company has modified for its specific application. For the hoisting of the rebar cages into the excavated holes and doing general pick and carries around the site such as unloading rebar, Treviicos selected a Mantis 15010 77-ton hydraulic boom crawler crane from Empire Crane headquartered in Syracuse, N.Y. “[The Mantis 15010] perfectly fits the specs we are looking for in this application. It offers tremendous stability and the best maneuverability possible in this application. It has 111 feet of boom, which is all hydraulic. We had previous experience with the use of this crane on a major casino project that we were involved in that contained very tight quarters. With no outriggers, the machine reaches its full capacity in a very small footprint,” Taylor said. “We have worked with Empire Crane for several years and one of the things that we look for in any vendor is service and support. We are doing severe duty work in all types of weather conditions and Empire Crane as well as their sales representative Justin Melvin has come through for us under many difficult circumstances. Their mechanics are top notch and they respond to our needs immediately.” For more information about Treviicos, visit www.treviicos.com. For more information about Empire Crane, visit www.empirecrane.com. (This story also can be found on Construction Equipment Guide’s website at www.constructionequipmentguide.com.)
Using advanced technology, aggregate materials and Bentonite are separated from the slurry water.
Once the concrete is poured into place at the bottom of the hole the lighter slurry mixture of water and Bentonite displaces to the top of the hole and the slurry is pumped to a screening and separation area.
The aggregate separated from the slurry is then stockpiled and dried.
Jeffrey Taylor (L), senior project manager of Treviicos and Justin Melvin, New England sales representative of Empire Crane.
Construction Equipment Guide • New England States Supplement • www.constructionequipmentguide.com • September 20, 2017 • Page 11
RO ONG Run stron ng through your toughest jobs. s Doosan® equip pment stands up to punishing work and com mes back fo or more everry day. Our lineup of he eavy equipment delivers the solid durability, easy maintenance and hardw d orking perrform o ance you demand d. Trust its fast cycle time es and multiple workin ng modes to efficiently y tackle mountains of harsh material. Calll or visit i you o r loc l al authoriz h i ed dd de ealler tod day and d see the he Doosan diff differ e enc e e. Authorized Doosan n Dealers
Equipment East, LLC 61 Silva Lane e • Dracut, MA 01826 • 978-454-3 9 320 • www.equipmenteast.com
Barry Equipment q Co., In nc. 30 Birch Island a Road • Webster, MA 01570 • 508-949-0005 • www.barryequipment.com o
F&W Equipment 164 Boston Post Road • Orange, CT 06477 0 • 203-795-0591 • www w .fwequip.com
Central Equipment Company 45 Dempseyy-Greaves Lane • Stillwater e , ME 04489 • 207-827-6 6193 • www.centralequip pmentco.com
Doosan® and the Doosan logo are registered trademarks of Doosan Corp. in the United States and various other countries arou und the world. 17-D011
Page 12 • September 20, 2017 • www.constructionequipmentguide.com • New England States Supplement • Construction Equipment Guide
DISPLAY ADS/ CLASSIFIEDS Hydraulic Cranes 8 to 600 Ton Daily & Hourly Services www.astrocrane.com
Fully Insured 200 Codman Hill Rd., Boxborough, MA 01719 978-429-8666
Place Your Business Card for... 3 months 6 months 12 months
$300* $585* $1040*
only $50 an issue only $45 an issue only $40 an issue
Call now to reserve your space! 800-225-8448 * pre-payment required
Classified Rates: 30 Words or Less for $40.00. Each Additional Word is $1.16. For just an additional $20 your ad can be posted on our online searchable database for 30 days. Ad runs for 2 (two) insertions - no changes in second insertion. PLEASE ENCLOSE PAYMENT WITH ORDER and mail to: 470 Maryland Drive• Fort Washington, PA 19034
215/885-2900 • Fax 215/885-2910 Toll Free 1-800/523-2200 CRANE INSPECTIONS
DEMOLITION
FLAT RATE INSPECTIONS
Sennebogen 818 M-E, S/N 81802048, Used condition, No generator, 670 hrs....$192,900. Gibson Machinery 440-439-4000
All Types, Any Model Cranes OSHA Inspected and Certified Certified OSHA and ANSI Full-Time Inspectors Dielectric Testing Call 800-325-6455 Stephenson Equipment Visit our website: www.stephensonequipment.com
DAILY AND WEEKLY EQUIPMENT RENTALS CLOSE TO YOUR JOB SITE
RENTMACHINES.COM CATERPILLAR® GENIE® CHALLENGER® SCREEN MACHINE®
Construction Equipment Guide • New England States Supplement • www.constructionequipmentguide.com • September 20, 2017 • Page 13
THE STRENGT TH TO DO
MORE R Stop in and learn how to do m more with Doosan n® equipment q p . A u t h o r i z ed D o o s a n D e a l e r
Bar r y Equipment Co. 30 Birch Island Road • Webster, M A 01570 w w w.bar r yequi u pment.com • 508-949- 0005 Doosan® and the Doosan logo are registered tr ademar k s of Doosan Cor p. in the United States and var ious other countr ies around the wor ld. 17- D017
No two days are the sa s me. You need streng th and flexibility, power an nd agility. YOU NEED DOOSAN.
Page 14 • September 20, 2017 • www.constructionequipmentguide.com • New England States Supplement • Construction Equipment Guide
RIDOT Completes Drone Assists Contractor by Contour South Kingston Mapping Topography of URI Job Site Road Repairs Early URI from page 8
The Rhode Island Department of Transportation (RIDOT) joined with state and local officials to celebrate the early completion of the High Street and Kingstown Road Improvements project in South Kingstown. The much-needed repair for 1.3 mi. of roadway in the villages of Wakefield and Peace Dale finished in August, approximately two months ahead of schedule and about $300,000 under budget. “I’d like to congratulate our project management team for their diligent work that allowed us to finish this work early while staying on budget,” said Peter Alviti Jr., RIDOT director. “And thanks to the funding provided by the RhodeWorks program, we can check two more roads off the list of bad roads in Rhode Island.” These two roads had historic street flooding problems, which contributed to deteriorated pavement conditions. The driving surface had gotten so poor that following the severe winter of 2015, RIDOT had to invest $81,500 to patch large sections of pothole-ridden roadway to keep it passable until this project could begin. “The town of South Kingstown is truly appreciative of the state’s efforts in bringing the High Street and Kingstown Road Improvements project to fruition,” said Stephen A. Alfred, South Kingstown town manager. “These critical arterial/collector roads have suffered poor pavement and drainage conditions for many years. We applaud RIDOT’s entire project team that, under the leadership of Director Alviti, worked tirelessly in seeing that these much-needed improvements were completed, all for the betterment of the entire community — residents, businesses and visitors alike.” In addition to drainage improvements, the $6.5 million project focused on pavement replacement; Americans with Disabilities Act (ADA)-compliant sidewalk installation; and the addition of new signing and striping. Work also included the installation of school zone flashing signs to call more attention to the school zone for passing motorists during normal school hours at the Wakefield Elementary School. The project area encompasses 1 mi. on High Street, from Main Street to Route 108 (Kingstown Road), and 0.3 mi. on Route 108 (Kingstown Road) from High Street to North Road. This fall, RIDOT expects to wrap up work on an additional project design to minimize the impact of stormwater runoff from these roads into the nearby Saugatucket River. This $715,000 project involves the installation of three stormwater treatment areas in the Saugatucket River watershed, and is on budget and on schedule, set to finish in November. These improvements will result in a net improvement in water quality around the river, which flows through the heart of South Kingstown and into Point Judith Pond. (This story also can be found on Construction Equipment Guide’s website at www.constructionequipmentguide.com.)
cranes and pile driving/drilling equipment. During the concrete foundations installation, most of the concrete pours utilized a concrete pump truck to convey concrete from mixing truck to within the formwork. A large drill rig for drilling the hydraulic elevator piston casing will mobilize to the site parallel to concrete installations. In addition, pumps and dewatering frac tanks have been employed to control the height of the existing water table during concrete foundation installations. Once the foundations are complete, two cranes will mobilize the site in mid-October to support the structural steel erection sequence which will be sized at 300 tons [crawler] and 170 tons [hydraulic] each. Another unique tool being utilized on the project is a drone. “We’ve used a drone to fly over the site at certain intervals to do some contour mapping of the topography of the existing site. This will enable us to see what the grades were at a certain date when they were handed off to another contractor.” Peckham said. “In addition, we can utilize the footage from the drone to identify existing features and conditions that existed on a certain date, and compare the footage several months or years later, if there’s been damage, we have a good benchmark for all existing conditions. To that point, we’ve also utilized vibration monitoring for preparation of pile driving to monitor any movement or cracking within the
existing buildings that are in immediate proximity to the pile driving or heavy equipment operation within the site.” They’ve also utilized building information modeling, or BIM, for mechanical, electrical, plumbing and fire protection systems design analysis. They’ll continue utilizing the modeling throughout the project for the coordination of all of the piping, duct work and electrical systems conduit/lighting through the buildings, as well as to develop certain exterior building facade mock-up documents, Peckham said. “It’s definitely going to be a signature building that consolidates most of the engineering programs into one building. The campus over the last 15 years plus has transformed quite a bit, especially on that side with the recent buildings they have been constructed which are a little more cutting edge versus the original older style buildings. It’s definitely a different look.” The consolidation allows students and faculty who were once grouped by program to now be grouped by interest, making problem solving that much easier, Wright said. The steel work is scheduled to begin in October, with exterior glass on the building envelope set to begin in March 2018. The building is projected for a completion in the summer of 2019. (This story also can be found on Construction Equipment Guide’s website at www.constructionequipmentguide.com.) CEG
Vermont-Based BlackRock Construction Ranks No. 42 on Exclusive 2017 Inc. 5000 Inc. magazine ranked Vermontbased construction and development company, BlackRock Construction, at number 42 out of 5,000 companies with 6,611.25 percent growth on its 36th annual Inc. 5000 list, an exclusive ranking of the nation’s fastestgrowing private companies. The list represents a comprehensive look at the most important segment of the economy — America’s independent entrepreneurs. “We couldn’t be more excited to have our rapid growth at BlackRock Construction recognized through the Inc. 5000,” said Tom Hergenrother, co-owner of BlackRock Construction. “It’s a big day for our company. We are so proud to have landed in the top 50 of America’s fastest-growing companies, alongside other remarkable organizations. We continue to look
forward to transforming more lives in Vermont and beyond and are grateful for how far we’ve come so quickly.” The 2017 Inc. 5000, unveiled online at Inc.com and with the top 500 companies featured in the September issue of Inc., is the most competitive crop in the list’s history. The average company on the list achieved a mindboggling three-year average growth of 481 percent. The Inc. 5000’s aggregate revenue is $206 billion, and the companies on the list collectively generated 619,500 jobs over the past three years. Complete results of the Inc. 5000, including company profiles and an interactive database that can be sorted by industry, region, and other criteria, can be found at inc.com/inc5000. “The Inc. 5000 is the most persuasive evidence I know that the
American Dream is still alive,” said Eric Schurenberg, Inc. president and editor-in-chief. “The founders and CEOs of the Inc. 5000 tell us they think determination, risk taking, and vision were the keys to their success, and I believe them.” The list represents a unique look at the most successful companies within the American economy’s most dynamic segment — its independent, small, and midsized businesses. Companies such as Microsoft, Dell, Domino’s Pizza, Pandora, Timberland, LinkedIn, Yelp, Zillow and many other well-known names gained their first national exposure as honorees of the Inc. 5000. (This story also can be found on Construction Equipment Guide’s website at www.constructionequipmentguide.com.)
Visit CEG’s Web Site at www.ConstructionEquipmentGuide.com
Mustang Compact Skidd Steers and Track Loaders come me standard with the right power needed to tackle the t biggest tasks. Purchase a new Mustang Skid Steer or Track Loader and receive a 2 year / 2,000 hour XPRT total (full machine) extended coverage plan at no additional dditional cost. cost Offer subject to change, change inquire for details.
CALL YO OUR AR REA MUSTA ANG DE EALER TODAY! Y
ABLE TOOL & EQUIPMENT 149 Rocus Street 410 Burnham Street Springfield, MA 01104 South Windsor, CT 06074 413-363-0780 860-289-2020 www.abletool.net
ww w w. musta n gmf g .c om o
The Nice Company, Inc 9 Rosenfeld Drive, Hopedale, M A Toll Free# 888-717-8096 • w w w.theniceco.com
Volvo Palooza! We sell NICE machines!
The Nice Company is the largest independent used Volvo equipment dealer in New England!
Please let us earn your business!!
In Stock EXCAVATORS: 2013 EC380DLC, 3300 hours, 65" bucket, 10'7" stick, hyd plumbing, pattern changer ......$159K 2013 EC340DL, 2800 hours, 54" bucket, med stick, plumbed..........................................$139K 2014 EC250D, 1600 hours, GENERATOR, hyd thumb ....................................................$124K 2013 EC220DL, SINGLE GROUSER PADS, 3600 hours, coupler, plumbed ............................$89K 2013 EC140DL, ONLY 700 hours, coupler, hyd thumb ........................................................$93K 2013 Volvo ECR88, 2200 hours, coupler, plumbed ....................................................$59K
In Stock LOADERS: 2014 L90G, 2200 hours, third valve, coupler .... ................................................................$119K 2014 Volvo L70G, 2400 hours, third valve, coupler ....................................................$114K
WE RENT • WE RENT • WE RENT • WE RENT • WE RENT • WE RENT • WE RENT • WE RENT • WE RENT • WE RENT • WE RENT • WE RENT • WE RENT • WE RENT • WE RENT • WE RENT • WE RENT • WE RENT • WE RENT
ADDED PROTECTIO ON FOR THE MUST TANGS ANGS S IN YOUR ST TABLE ABLE
WE RENT • WE RENT • WE RENT • WE RENT • WE RENT • WE RENT • WE RENT • WE RENT • WE RENT • WE RENT • WE RENT • WE RENT • WE RENT • WE RENT • WE RENT • WE RENT • WE RENT • WE RENT • WE RENT
Construction Equipment Guide • New England States Supplement • www.constructionequipmentguide.com • September 20, 2017 • Page 15
Page 16 • September 20, 2017 • www.constructionequipmentguide.com • New England States Supplement • Construction Equipment Guide
Maine Deactivates 1035th Survey, Design Detachment By Sgt. Sarah Myrick 121ST PUBLIC AFFAIRS DETACHMENT
Sgt. Sarah Myrick photo
Lt. Col. Joshua E. Doscinski, the 133rd Engineer Battalion Commander and Chief Warrant Officer 3 Daniel S. Dubay Jr. participate in the 1035th Engineer Company’s deactivation and flag folding ceremony at the Brunswick Armed Forces Reserve Center Sept. 10, 2017. The company’s lineage is the second oldest in the state. It was founded in 1810 in Norway as an infantry company, said 1st Lt. Jonathan D. Bratten, the Maine Army National Guard Command Historian. The Lineage will be preserved by Maine’s 251st Engineer Company to ensure that the heritage of the unit never disappears.
The Maine Army National Guard’s 133rd Engineer Company held a Deactivation and Flag Folding Ceremony for the 1035th Engineer Survey and Design Detachment at the Brunswick Armed Forces Reserve Center Sept. 10, 2017. The 1035th Engineer Detachment helped support other engineer companies statewide by providing surveys of job sites, land analysis, detailed drawings, maps and plans for vertical construction, horizontal construction and geospatial engineer missions. “They possess a specialty skill that assists and supports all engineer units with projects,” said Chief Warrant Officer 3 Daniel S. Dubay Jr., the commander of the 1035th Engineer Detachment. “They are the only quality control and quality assurance pertaining to ground projects. If the 1035th assets weren’t available, engineer projects would suffer to an extreme degree.” The 1035th Engineer Company lineage is the second oldest in the state. It was founded in 1810 in Norway as an infantry company, said 1st Lt. Jonathan D. Bratten, the Maine Army National Guard command historian. The lineage will be preserved by Maine’s 251st Engineer Company to ensure that the heritage of the unit continues. The knowledge of the existing survey and design team
members will be utilized by integrating soldiers directly into engineer units. “Some soldiers of the 1035th will stay at the headquarters and headquarter’s company 133rd and others will be pushed out to the subordinate units, all continuing to train and execute survey and design practices,” said Dubay. “Consolidated training a few times a year will be required in order to properly train new soldiers.”
The detachment holds battle honors from the War of 1812, Civil War, WWI, WWII, Iraq and most recently Afghanistan in 2013. “We are not going away,” said Dubay. “A man is only as strong as the company he keeps.” (This story also can be found on Construction Equipment Guide’s website at www.constructionequipmentguide.com.)
UConn Students Return to Find Major Construction on Campus STORRS, CONN. (AP) Thousands of University of Connecticut students returned to campus to find some major road construction and traffic problems. About 19,300 undergraduate and graduate students started classes on Aug. 28 in Storrs and 12,400 moved into the dormitories. The school was unable to complete scheduled road construction this summer, leaving one entrance to campus closed and several roads with altered or one-way traffic patterns. The school said the construction is part of
a multi-year project necessary to replace aging pipes and other underground infrastructure. Students were emailed directions on how to get where they are going, and the school is asking them not to rely on GPS devices, which don’t show the construction. Other motorists are being asked to avoid the area. (This story also can be found on Construction Equipment Guide’s website at www.constructionequipmentguide.com.)
Keep Up With All the Industry News Subscribe to
Construction Equipment Guide Today! Toll Free 800/523-2200
Construction Equipment Guide • New England States Supplement • www.constructionequipmentguide.com • September 20, 2017 • Page 17
CONSTRUCTION AUCTION DAVIS AUCTIONS, INC. SATURDAY, SEPTEMBER 30, 2017 • 9:00 A.M. LOCATION: 210 CHESHIRE ROAD, RT. 68, PROSPECT, CT
THINK SUNSHINE!!!
Davis Auctions, Inc. will be conducting our next auction of utility and construction equipment and related supplies on September 30, 2017. This auction will consist of excess equipment from the power companies, municipalities and others to be sold in absolute.
Early Consignments:
EQUIPMENT Excavators: CAT 301.4C Hyd. w/EROPS, Heat /AC, rubber tracks, aux. hyd., blade; CAT 301.4C Hyd., w/ROPS, rubber tracks, aux. hyd., blade; Wheel Loader Backhoe: JOHN DEERE 710B Turbo, 4x4; CAT 426, EROPS, 4x4; 2001 JOHN DEERE 310SG Turbo, diesel, 4x4; Loader: 2000 HYUNDAI HL720-3 Front End, EROPS; Crawler Dozer: NEW HOLLAND C70 LGP, w/Allied Tenton winch, EROPS, Heat/AC; Lifts: JLG 460SJ 40’ Boom, 4x4; Roller: 2001 LEE BOY 400 Super Vibratory; STONE 1 Ton; Sweeper: ELGIN Pelican Series SE; Chipper: WOODSMAN 2018 18”, w/John Deere dsl; Sawmill: 1996 WOOD-MIZER LT40 HD Hyd. Portable, w/ automatic log turner; Misc.: 3 PtH Equipment- Mowers, Spreaders, & York Rake; Misc. Buckets; (4) 86” Hyd. Skid Steer Dozer Blade; 3 PTO HD Backhoe Attachment; 3 PTO 80” HD Rotary Tiller; (2) 3 PTO HD Wood Chipper, fits 40-70 hp; Hay Mulcher; CAT Power Unit, 3208, w/clutch; VEHICLES Bucket Trucks: 2012 INT’L Durastar, w/Terex Telelect Hi-Ranger TPL-40 40’ Bucket, Dakota ut. body, Maxxforce dsl, Allison auto; (2) 2006-2005 INT’L 4400, w/Lift-All LOM-50-1S 50’ Material Handler, Dakota ut. body, DT530, auto, (4) outriggers; 2005 INT’L 4400, w/Terex Telelect Hi-Ranger HR50M 50’ Material Handler, Dakota ut. body, DT530, auto, (4) outriggers; (3) 2005 INT’L 4400, w/50’ Material Handler; 2004 GMC C7500, w/Terex Telelect Hi-Ranger 55-OM 55’ Bucket, Knapheide ut. body, auto, (4) outriggers; 2004 GMC C7500, w/Terex Telelect Hi Ranger 50-M 50’ Bucket, Knapheide ut. body, auto, (4) outriggers; Dump Truck: 2000 INT’L 2574 S/A Dump, w/Pioneer cover & plow mount, Eaton Fuller trans., 10.8L L6 dsl; 1997 FREIGHTLINER FL80 S/A Dump, w/sander & plow mount, 6 spd; 2011 FORD F350 Dump, w/v-plow, dsl, 4x4; 2006 CHEV. 3500HD 1 ton Dump; Crane Truck: 2011 CHEV. 3500HD, w/FASSI Micro15 Crane w/stabilizer, flatbed/rack body, DRW, Tommy Gate hyd. lift gate; 2002 GMC Sierra 3500, w/ECO-TON 11R Auto Crane, flatbed/rack body, DRW, Waltco Lift Gate, turbo dsl; 2001 FORD F550XL SD, DRW, w/IMT 1015 Truck Crane w/stabilizer, platform body, Powerstroke dsl V8; Utility Trucks: 2005 FORD F550XL SD, w/Knapheide ut. body, Tommy Gate hyd. lift gate, ladder rack, Triton V10, 4x4; (2) 2005 FORD F350 Ext. Cab, w/ut. body, 4x4; 2005 FORD F350XL SD Ext. Cab, w/Reading ut. body & Vanguard truck rack, 4x4; 2005 FORD F350XL SD, w/Reading ut. body, Tommy Gate hyd. lift gate, 4x4; 2004 FORD F350XL SD Ext. Cab, w/Reading ut. body, Vanguard truck rack, & 8’ plow, 4x4;
Pump Truck: 1993 INT’L 4900, DT466, Eaton trans.; Specialty Truck: 1995 INT'L 4700 Lo-Profile, w/Western Mule M-16R 1500# fold away crane, air powered pump, air compressor, cable reel, Onan Cummins Generator, mobile control room; 1989 MACK MS300P Flatbed, w/Wildcat Roadpatcher BP005 Asphalt Patcher, 8.8L, L6 dsl; Stake Body: 2004 FORD F550, w/Knapheide service body, 4x4; Reel Body Truck: (2) 2002-2000 FORD F550XL SD, DRW, w/ut. reel body, winch, Powerstroke dsl V8, 4x4; Pickups: 2008 GMC Canyon SLE, w/Craftsman custom ut. body, BrandFX cap, 4x4; 2007 FORD F250XL SD, w/Reading ut. cap & ladder rack, 4x4; (9) 2007-2006 DODGE Dakota Ext. Cab, w/tool box, 4x4; (3) 2006 DODGE Dakota Ext. Cab, w/Reading walk in ut. cap, 4x4; 2006 CHEV. C1500, w/A.R.E. ut. cap; 2005 DODGE Dakota SLT Crew Cab, w/tonneau cover, Magnum V8, 4x4; (2) 2004 FORD F450SD, w/Reading walk in ut. cap, Triton V10, 4x4; 2004 FORD F150STX Triton Ext. Cab, 4x4; (2) 2003 FORD F250XL SD, 4x4; 2003 FORD F250XL SD; CHEV. 3500, dsl, ex-military; SUVs/Vans: (2) 2010 FORD Escape, AWD; 2010 CHEV. Equinox LS, AWD; 2008 DODGE Nitro SLT, 4x4; 2007 DODGE Sprinter 2500 CRD Cargo; 2007 CHEV. Express 1500 Cargo, w/ladder rack, flex fuel E85 ethanol; (6) 2005-2002 FREIGHTLINER MT-55 Step, diesel, (2) w/generator; 2007 CHEV. Equinox LS, AWD; (3) 2007 DODGE Grand Caravan; (3) 2006 GMC Savana Cargo, w/ladder racks, tool boxes, & shelving, AWD; (3) 2005 GMC Safari Cargo, AWD; 2005 GMC Savana, w/shelving; 2005 FORD Escape; 2004 FORD E350SD Cargo, w/shelving; 2004 SUBARU Forester, 4x4; Cars: 2003 FORD Crown Victoria; 2002 TOYOTA Prius Sedan; Trailers: 2004 EAGER BEAVER 12HA Lowbed; (3) 2017 TOPLINE JTW-12FA 6.4’ x 12’, w/side gate & tail gate; 2017 TOPLINE JT-10FA 5’ x 10’ Trailer, w/tail gate; (3) 2006 KENSINGTON K7RE Galvanized 3 Reel, w/tool boxes & Sauber brakes; 1996 FRUEHAUF 48’ x 102” Van; 1995 DORSEY 48’ x 102” Van; KINGSTON 2 Horse 2 Axle; Misc: KUBOTA RTV900 RTV, w/dump, dsl, 4x4; CLUB CAR Intellitrak RTV, w/dump, 4x4; Buildings/Tents: 40’ x 80’ x 21’ Peak Ceiling Double Door Storage Building, 13’ x 15’ drive through doors at both ends; 30’ x 65’’ x 15’ Peak Ceiling Double Door Storage Building, 12’ x 12’ drive through doors at both ends; (2) 20’ x 30’ x12’ Peak Ceiling Storage Shelter; (2) 20’ x 40’ Full Closed Party Tent, 800 sq. ft., windows & doors; (2) 16’ x 22’ Marquee Event Tent, 320 sq. ft., 1 zipper door, 7 windows; (3) 10’ x 10’ Commercial Pop Up Tent; (2) 10’ x 20’ Commercial Pop Up Tent; (2) 8’ x 10’ Twin Wall Greenhouse; Misc.: 80” HD Multi Drawer Tool Cabinet, 12 drawers, 2 large doors, 2 small doors; (2) 10’ 20 drawer HD Metal Work Bench, w/ 40” high hanging peg board; 8800# HD Two Post Auto Lift; Generators; 20’ HD Bi-Parting Wrought Iron Driveway Gate; 75 Ton Hyd. Shop Press; 50 Ton Hyd. Shop Press; (2) HD Tire Changer; (2) HD Wheel Balancer; (2) HD Plate Compactor; 3 Wheel Scooter; Handicap Lift for Vehicle; Racking System; Pallet- Building Brick, Garden Steepers, Paving Blocks, Decorative Retaining Wall, Concrete Pavers, & Terra Retaining Wall; Crates- Thin Stone; Miter Saw; ECHO Tiller; Table Saw; Ratchet Load Binder; (2) HD 3 Ton Chain Hoist; 48” Farm Jack; (2) 2000# 12V ATV Electric Winch
This is our early tentative list. We accept consignments up thru Saturday, September 23, 2017. We never know what will be consigned at the last minute – so come to our inspection and find out!
INSPECTION: FRIDAY, SEPTEMBER 29, 2017
This is when/where you find out what is really here!!!
9:00 A.M. – 5:00 P.M.
For Online Bidding, Visit Realtimebid.com
Call for more information: DAVIS AUCTIONS, INC. (203) 758-4087 or 1-800-201-4368 www.davisauctionsinc.com
Auctioneer: Reginald Lussier Lyndonville, VT 05851 NH License# 2413 TERMS: CASH OR GOOD CHECKS WITH IDENTIFICATION.
ABSENTEE BIDS ACCEPTED.
Website list frequently updated. If you don't see what you want here, visit www.davisauctionsinc.com for updates.
Page 18 • September 20, 2017 • www.constructionequipmentguide.com • New England States Supplement • Construction Equipment Guide
NEW ENGLAND SUPPLEMENT ADVERTISER INDEX
Cianbro Opens New Workforce Development Facility in Maine
ARGUS INDUSTRIAL COMPANY.................................... 1 ASTRO CRANE.............................................................. 12 BARRY EQUIPMENT CO.............................................. 13 BULLETIN BOARD..........................................................12 C N WOOD CO INC........................................................ 20 CLASSIFIEDS................................................................ 12 DAVIS AUCTIONS INC.................................................. 17 DOOSAN NORTHERN NEW ENGLAND........................11 EQUIPMENT 4 RENT.................................................... 16 EQUIPMENT EAST........................................................ 1,9 FAY & WRIGHT EXCAVATING INC.................................. 8 FOLEY MARINE & INDUSTRIAL ENGINE...................... 1 GORILLA HAMMERS........................................................1 J R VINAGRO CORPORATION........................................1 LORUSSO HEAVY EQUIPMENT LLC..............................5 M G EQUIPMENT............................................................ 1 MILTON CAT....................................................................12 MUSTANG CO-OP.......................................................... 15 NICHOLAS EQUIPMENT INC.......................................... 8 NORTHLAND JCB............................................................ 7 ROGERS BROTHERS CORPORATION........................ 19 SUMMIT SUPPLY LLC...................................................... 1 T-QUIP SALES & RENTAL INC...................................... 12 THE N.I.C.E. COMPANY................................................ 15 THE W. I. CLARK COMPANY.......................................... 2 TYLER EQUIPMENT CORPORATION............................ 3 The Advertisers Index is printed as a free editorial service to our advertisers and readership. Construction Equipment Guide is not responsible for errors or omissions.
Cinabro photo
Cianbro has outgrown its educational facilities and is now set to unveil its new workforce development center based within the remodeled spaces of the former UTC Tech Center building in Pittsfield, Maine.
In an era of chronic shortages of skilled craftsmen and women in the construction industry, Cianbro has used in-house educational efforts over the years to develop thousands of highly qualified construction professionals. Because of the company’s growth and the intense demand for training, Cianbro has outgrown its educational facilities and is now set to unveil its new workforce development center based within the remodeled spaces of the former UTC Tech Center building in Pittsfield, Maine. The addition of the new facility will allow the company’s workforce development department — The Cianbro Institute — to base future educational initiatives from within the facility’s new fully-equipped classrooms, office spaces for instructors, and spacious areas for larger educational gatherings. Cianbro plans to continue efforts to ease the region’s worker-shortage through the use of the new facility. Gov. Paul LePage and other distinguished guests joined Cianbro leaders Pete and Andi Vigue for a ceremony and tours to commemorate the new facility. The event began with remarks at the podium. “We believe that the challenges that we face with the workforce in our country and state are disguised opportunities,” said Cianbro Chairman and CEO Pete Vigue. “And we believe that it is our responsibility within this organization and within our industry to invest in the development of our future workforce while providing them an opportunity for personal growth. What we've learned when we support and believe in people is that the opportunities are endless, not only for individuals but also for our company.” Until now, the Cianbro Institute has utilized space within the company’s Operational Services Building in Pittsfield,
in combination with classrooms located at North Lancey Street. At these locations, the Institute has conducted sessions ranging from new hire orientation and craft education to leadership development. Once the team is moved into the new facility, the core of Cianbro’s workforce development programs will exist under one roof where instructors and the support team will work together in close proximity. In addition, the new location provides some simple efficiencies such as eliminating travel and setup time between facilities, better management of classrooms, better communication among the team, and a loading dock to offer the ability to move necessary equipment in and out for classroom use. As Cianbro continues to extend its reach as a company (currently working in more than 40 states), it will be critical for instructors to have the ability to deliver certain developmental opportunities remotely or via broadcast. By having multiple rooms equipped with cameras, this option will become a reality, giving Cianbro the opportunity to reduce travel costs, reach more team members at one time, and cut down on time away from a project. Additionally, the facility will have a skilled-trades multi-functional room to conduct a variety of hands-on educational sessions. For example, rigging is an important skill to develop across many of the trades. The multi-functional room will offer the ability to set up 16-ft. gantries for indoor demonstrations and activities. The possibilities for this room are plentiful, as are all of the many potential uses that the new Cianbro Institute facility brings to the company. (This story also can be found on Construction Equipment Guide’s website at www.constructionequipmentguide.com.)
Construction Equipment Guide • New England States Supplement • www.constructionequipmentguide.com • September 20, 2017 • Page 19
TRAILERS TO MEET EVERY HAULING CHALLENGE! Committed to building superior quality, reliability and durability into every trailer.
ROGERS BROTHERS CORPORATION ALBION, PA
The Ultimate in Trailers®
Tyler Equipment 251 Shaker Road East Longmeadow, MA 01028 (413) 525-6351 • (800) 292-6351 Parts: (877) 255-6351
1980 Berlin Turnpike Berlin, CT 06037 (860) 356-0840 • (800) 352-4473 Parts: (860) 356-0848
C.N. Wood Co., Inc. 200 Merrimac St. Woburn, MA 01801 (781) 935-1919
Avon, MA (508) 584-8484
Johnston, RI (401) 942-9191
www.cn-wood.com
www.tylerequipment.com
For more than 110 years, ROGERS® trailers have stood above the rest in rugged durability, unsurpassed quality and superior design. Contact your local dealer for a quote today.
Page 20 • September 20, 2017 • www.constructionequipmentguide.com • New England States Supplement • Construction Equipment Guide
200 Merrimac Street Woburn, MA 781-935-1919
60 Shun Pike Johnston, RI 401-942-9191
102 State Road Whately, MA 413-665-7009
140 Wales Avenue Avon, MA 508-584-8484