State Supplement sponsored by:
1
11
THE NEW ENGLAND EDITION
A Supplement to:
95
1
201 16 9
26
2
1 3
91
89
2
95 3
2 2 7
1
93
495
16
89 4
89
95
202
7
91
9
95
93
2
95 2
THOUSANDS of units in service
93 90
90
7
95 91
7
3
84
495 6
84
6
6
195
395
Shipment in 1-3 days
95 91
September 5 2018 Vol. L • No. 18
95
95
®
SAME DAY shipping on parts & tools FULLY SUPPORTED by a 75 YEAR FAMILY BUSINESS 10% off 10,000 ft. lb. hammers
“The Nation’s Best Read Construction Newspaper… Founded in 1957.”
Your New England States Connection • Kent Hogeboom 1-800-988-1203 2208 Plainfield Pike • Johnston, RI 02919 401-943-7100 • Fax: 401-647-5041
www.jrvinagrocorp.com info@jrvinagrocorp.com
LEED Accredited in Waste Management
Optional 3 Product Conveyor
6’x5’ Double Deck Screenbox Works with 1/2 to 1 3/4 Yd. Loaders, 25 H.P. Kohler Diesel Engine, 24” Conveyor Dumps Screened Product 9’ High, Two (2) Year Warranty! $42,900 plus freight. Other Screeners Available
EZ-SCREEN
VTrans Project Replaces Century-Old Rail Spans With Tunnel in Middlebury CEG CORRESPONDENT
Call for Pricing
GIVE US YOUR HAMMER!
*On approved credit • Financing Available
By Cindy Riley
Specializing in:
Demolition, Portable Crushing, Material Sales, C & D Recycling, Land Clearing, Heavy Hauling & Trucking
2018 EZ-Screen 1200XLS
Why pay more?
CALL 800-367-4937
• Repairs • Rebuilds • Replacement Parts in Stock
30% off same class Ramfos hammer with competitor’s trade in
61 Silva Lane • Dracut, MA 01826
Call Today (978) 454-3320
WE STOCK RUBBER TRACKS for Over 6,000 Models! Some Used Tracks A & GA Available. NJ, TX, WOUSES WAREH • HIGH QUALITY • FAST SHIPPING • GUARANTEED TO FIT • UNDERCARRIAGE PARTS • FLATPROOF SKIDSTEER TIRES • RUBBER PADS FOR STEEL TRACKS
888-888-1248
www.ez-screen.com
248-745-5828
In an effort to permanently replace two aging rail bridges with a tunnel, the Vermont Agency of Transportation (VTrans) is working with the town of Middlebury on a complex project that will take years to complete at an estimated cost of $71 million. The work comes not a moment too soon. “Two 1920s roadway bridges spanning a railroad in downtown Middlebury were in deteriorated condition and needed replacement,” said Timothy Pockette, VTrans resident engineer. “Clearance is insufficient for double-stack rail cars.” The nearly century-old structures were built roughly 300 ft. apart on two roads. Main Street/VTRoute 30 is classified as a minor arterial with an average daily traffic of 12,200, with 11 percent truck traffic. Merchants Row is a two-block local road see TUNNEL page 16
VTrans photo
Main equipment being used on the job includes cranes for drainage improvements and tunnel construction; excavators for drainage improvements, excavation of soils, construction of roadways and railroad improvements; and a variety of trucks.
Malloy Announces Imminent Completion of I-84 Widening Project in Waterbury
Metrotrak Mobile Track Jaw Crusher Low Hours, Side Converter, Magnet, Scale
Phil (413) 427-7171 • Largest hammer repair facility in North America • Demolition tools and parts for ALL makes and models • Hammer-equipped excavator rentals
www.foleyengines.com
• Backed by a 75 year family owned business
I-84 Waterbury photo
CALL YOUR ONE-STOP HAMMER SHOP™ TODAY!!!
Gov. Dannel P. Malloy speaks of progress of transportation infrastructure in Connecticut.
CALL 888-81-GORILLA(46745)
Gov. Dannel P. Malloy announced the imminent completion of the I-84 widening project in Waterbury, with three eastbound lanes opening and the three westbound lanes opening by mid-September — one year early. “The I-84 Waterbury widening project is transforming and revitalizing mobility in Waterbury, and supports our goal to make Connecticut’s transportation infrastructure best-inclass,” Malloy said. “This project is see WATERBURY page 4