Skip to main content

New England 16, August 3, 2022

Page 1

State Supplement sponsored by:

1

THE NEW ENGLAND EDITION

11

A Supplement to:

95

1

201 16 9

26

2

1 3

91

89

2

95 3

2 2 7

1

93

495

16

89 4

89

95

202

7

91

9

95

93

2

95 2

93 90

90

7

95 91

7

SHIP WITHIN 48 HOURS

3

84

495 6

84

6

6

195

395

95 91

95

95

®

August 3 2022

Thousands in Service!

“The Nation’s Best Read Construction Newspaper… Founded in 1957.” Your New England States Connection • Kent Hogeboom 315-866-1423 2208 Plainfield Pike • Johnston, RI 02919 401-943-7100 • Fax: 401-647-5041

www.jrvinagrocorp.com info@jrvinagrocorp.com

Specializing in:

Demolition, Portable Crushing, Material Sales, C & D Recycling, Land Clearing, Heavy Hauling & Trucking Call for Pricing

LEED Accredited in Waste Management

2022 EZ-Screen 1200XLS

Visit Equipment East for a demo. Authorized Doosan Dealer

O ptional3 Product C onveyor

6’x5’Double Deck Screenbox W orks with 1/2 to 1 3/4 Yd. Loaders,Kohler Diesel, 24” Conveyor Dum ps Screened Product 9’High,Two (2)Year W arranty! $69,900 plus freight.

508-484-5567 (BROCKTON, MA) 978-454-3320 (Dracut, MA) 603-410-5540 (Bow, NH)

Tibbits Equipment Services, Inc.

www.tibbitseq.com

802-479-9696 KWIK KLEET ts Traction Clea ®

O ther Screeners Available

EZ-SCREEN

www.ez-screen.com

248-745-5828

Specialty Construction Equipment SALES • RENTALS • HAMMERS Since 1989

‘05 Caterpillar 928G $36,800

• Largest hammer repair facility in North America • Demolition tools and parts for ALL makes and models

• Exhaust Scrubbers • Perkins Engines • Deutz Engines • Twin Disc/Rockford Clutches

www.foleyengines.com

24 HOUR TECHNICAL SUPPORT BACKED BY A 75 YEAR BUSINESS

Vol. LX • No. 16

Phil (413) 427-7171

SAME DAY PARTS AVAILABILITY

• Hammer-equipped excavator rentals • Backed by a 75 year family owned business CALL YOUR ONE-STOP HAMMER SHOP™ TODAY!!!

CALL 888-81-GORILLA(46745)

Affordable Price. Premium Service.

CALL 800-367-4937 *On approved credit • Financing Available

Irish Immigrant Pursues American Dream With Kilmoyley Construction Kilmoyley Construction is a diverse construction firm experienced in a wide variety of construction applications, including utility work, paving, concrete, site excavation and more. The company’s owner and founder, Padraig Sheehy, immigrated to the United States in 1999 from County Kerry, Ireland, determined to start his own business. Sheehy was raised on a dairy farm in Ireland and also was an athlete who grew up participating in the sport of hurling, a very physically intense field sport of Gaelic Irish origin, which bears a little bit of resemblance to lacrosse. Between hurling and the hard work learned on the dairy farm, Sheehy understands the value of hard work, grit and perseverance, which he see KILMOYLEY page 12

Padraig Sheehy and the crew at Kilmoyley Construction stand use JCB and Avant equipment purchased from Alta Equipment Company.

Walden Hill Buys, Receives First Volvo ECR25 Electric Mini-Excavator in N.A. Since its founding in 2014, Walden Hill has focused on putting nature, animals and people first through sustainable forestry and other environmentally friendly practices on their 400-acre farm in Massachusetts. Now, they have a machine to support their philosophy. Walden Hill, which placed the first North American order for a Volvo ECR25 Electric compact excavator, received the new fully electric, zero-emission machine in mid-July.

Tylan Calcagni and Jennifer Milikowsky own Walden Hill, a New England farm that emphasizes sustainability, making them a perfect fit for the Volvo CE ECR25 Electric compact excavator.

“The delivery of this machine marks an exciting milestone for sustainably powered equipment,” said Stephen Roy, president, Region North America at Volvo CE. “Our compact electric machines stood up to real-world testing in North America and received high marks from the customers who demo’d them. This is the first of many electric machines to be delivered to their owners in 2022.” see ELECTRIC page 14


Page 2 • July 20, 2022 • www.constructionequipmentguide.com • New England States Supplement • Construction Equipment Guide

Call Mark Doty @ 203-823-2316 2010 WIRTGEN 2100

2011 JOHN DEERE 310SJ

2014 JOHN DEERE 245G LC

Cat power, 6'5" 15mm drum, rigid conveyor, 60% bottoms, good belting with grade, stk# 26377 ................................................$145.000

stk# 27589, 2405 hrs, C/air, 4x4, extenda hoe, front and rear couplers and hyds, pattern control switch, ride control and pilots ........$56,500

stk# 27609, 6070 hrs, C/air, aux hyds, JRB coupler ..............................................$135,000

2015 KUBOTA KX080-4

2019 BOBCAT S740

2015 JOHN DEERE 624K

stk# 27162, c/air, 2 speed, aux hyds, angle blade, 80% rubber tracks ....................$54,500

stk# 26515, c/air, 2 speed, 12” rubber, 76” bucket, switchable controls, 1240 hrs..$52,500

stk# 27608, 9702 hrs, C/air, aux hyds, JRB coupler, 3.5 yard bucket one owner machine .. ..........................................................$120,000

2021 DEERE 17G

2019 DEERE 333G

2014 HAMM HD+120IVVH

stk# 27468, hyd thumb, good tracks, ROPS, pilots, low hours, extendable tracks, 80% tracks ..................................................$33,500

stk# 27123, c/air, hi flow hyds, 2 speed, forestry package, new tracks, 84” bucket ........ ............................................................$69,500

stk# 24340, 1493 hours, 78” drums, dealer maintained since new, very good condition ...... ............................................................$84,500

See Our Complete Inventory at www.wiclark.com


Construction Equipment Guide • New England States Supplement • www.constructionequipmentguide.com • August 3, 2022 • Page 3

PR ROVEN UPTIME WITH UPTIIME KITS SENNEBOGEN, in keeeping with their philosophy to maxim mize uptime, has created UPTIME Kits. Whether you are a service technician in-house or on the road, these kits have everything you need for every servicee, maintenance and PM task in one place. p They were created to save you time and money. Managing hundreds of o related service d nuts to O-Rings parts, from belts and and special tools becomes easy with a single part number to o order and stock. stock

E H T D N O Y BE

E N I H C A M I virtually lose NO downtime

They are: s ock • Easy to order and eaasy to st components l t and d too t ols • Ideal for stocking seervice sshops and trucks owing kits: Choose from the follo • Central lubrication system kits • Preventive maintenance service kits • O-Ring kits • Electrical service kits • Hydraulic service kits k And the best thing iss that these kits, in stock and ready to go, are custommodel built to match your machine m and series. Count on SENNEBOGEN in-house. For more in nformation on he QR code. UPTIME Kits, scan th

over month to go ing rough once a br th st e ju om y] c n he ia [t echnic situation, Theyy have a t ck. Iff I have a downtime… Since they ba o t t on r f , ually lose no every machine ne and I virtu ck quickly. achi g t the unit ba in another m air parts in sttock. I ge ld Hills, MI have the rep t r, Bloomfie ontracto Demolition C rsale afte hee Machine” eyond th out how our “B e for SENNEBOGEN ab e or m ad e R mizes uptim to-ship maxim ories of readycommitment mplete invent om c ith w . s er se custom warehou rth American parts in our No

ns icciiaan t ained tecchn -ttr y r o to t ct ac f N E G SENNEBO

support througho out the life of its equipment. We’re thinking “beyond the machine” to deliver dependable uptime aand lower Total Cost of Ownership (TCO) for every customer.

Parts • Service • Train ning • Application Speciallists • Flexible Financing • Attachments 251 Shaker Roaad East Longmead dow, MA 01028 (800) 292-6351

1980 0 Berlin Turnpike Berliin, CT 06037 (800 0) 352-4473

www.tyleerequipment.com m Learn more about a our commitment to our customers

sennebogeen-na.com/beyond-the-machine -


Page 4 • August 3, 2022 • www.constructionequipmentguide.com • New England States Supplement • Construction Equipment Guide

R.I. Airport Connector Resurfacing Project Breaks Ground Gov. Dan McKee, United States Senators Jack Reed and Sheldon Whitehouse, Congressman Jim Langevin, Rhode Island Federal Highway Administrator Carlos C. Machado and Rhode Island Department of Transportation (RIDOT) Director Peter Alviti Jr. broke ground July 18 for the Airport Connector project in Warwick, one of the major paving projects scheduled for this year. This project combines the best of both worlds, improved paving and safety with a massive landscaping project that will provide more than 400 plants and trees in both the median and the shoulder. The landscaping is designed to blend seamlessly with similar plantings around Rhode Island T.F. Green International Airport to create a visually appealing gateway. “For thousands of visitors to Rhode Island, the Airport Connector is Rhode Island’s welcome mat,” McKee said. “These improvements will make vital safety improvements while providing a great first impression of our great state.” The $12.9 million Airport Connector and Post Road resurfacing project is one of the first major resurfacing projects as part of RIDOT’s commitment to paving statewide. This year, RIDOT will spend $92 million on

paving projects and $492 million over the next five years. This project will replace paving on four miles of road and put in new guide signs along the Airport Connector and I-95. “Visitors and residents alike rely on RIDOT to help get them where they need to go, and I’m pleased to direct federal funding to the state to accelerate and advance key infrastructure upgrades like this. The Airport Connector is a critical access point and these improvements will ensure a safer, smoother ride for everyone getting to and from the airport,” said Reed. “Combined with other federally funded projects at T.F. Green, the modernized Airport Connector will improve the overall experience of flying out of PVD for locals and tourists alike,” said Whitehouse, a senior member of the Senate Environment and Public Works Committee. “Many more job-creating upgrades to Rhode Island’s roads, bridges and airports are on the way thanks to the bipartisan infrastructure bill we passed in Washington.” “This crucial project will improve safety for drivers while also supporting landscaping to create a beautiful gateway for the thousands of Rhode Islanders and visitors who travel along the Airport Connector

“The Airport Connector is a critical access point and these improvements will ensure a safer, smoother ride …” Jack Reed U.S Senator

every day,” said Langevin. “The Bipartisan Infrastructure Investment and Jobs Act continues to deliver for Rhode Island, providing millions of dollars in federal funds to repair our roadways and improve the driving experience for all Rhode Islanders.” “Rhode Islanders have seen the transformation in our roads and bridges, and thanks to the new federal Infrastructure and Investment Jobs Act, we will be kicking our paving program into high gear and providing

the type of safe, smooth roadways Rhode Islanders and all visitors to Rhode Island expect and deserve,” Alviti said. The new road surface will give travelers a safer riding surface on the 1-mi. Airport Connector and 3 mi. of Route 1 and Route 1A (Post Road), from Coronado Road to Warwick Avenue. In addition to new pavement, the project design eliminates hazardous drop-offs and includes new high visibility pavement markers. It also improves pedestrian access conditions along Post Road with new sidewalks and pedestrian ramps. On the I-95 southbound ramp, the project will replace the median guardrail and install a grass swale. The plantings will be placed in the median and along the grass shoulder. The Airport Connector carries 20,000 vehicles daily. The project is scheduled for completion in June 2023. All construction projects are subject to changes in schedule and scope depending on needs, circumstances, findings and weather. The Airport Connector Project is made possible by RhodeWorks, RIDOT’s commitment to bring Rhode Island’s infrastructure into a state of good repair while respecting the environment and striving to improve it. 

Proposal for $381M School in Conn. Takes Step Forward It would cost taxpayers in Norwich, Conn. more to have maintenance and repairs done to the city’s seven existing, but aged, elementary schools than to build four new schools, architects told a small gathering at a public presentation on the $381 million proposal, according to the Day, a daily news source in nearby New London. After an estimated 67 percent state reimbursement, Norwich city taxpayers’ share of the multi-million project would be $149 million. But if the city chose a “do nothing” option, representatives from Drummey Rosane Anderson Inc. (DRA) in Waltham, Mass., said necessary repairs alone to the seven old elementary schools and one older middle school would cost an estimated $165 million over the next 20 years, with “precious little” state reimbursement. The architects also estimated that even if the city chose to renovate the existing buildings, the cost would be comparable to building new schools, and in the end, only three of the seven primary schools would be large enough to meet current education needs. Following the presentation, the Norwich

School Building Committee on June 28 unanimously endorsed a preliminary master plan that calls for new elementary schools to house about 525 students in preschool through fifth grade and to extensively renovate the Teachers’ Memorial Global Studies Middle School. In addition, the Day reported that new schools would be built on the grounds of the Moriarty Environmental Sciences Magnet School, the John B. Stanton School, the Uncas Elementary School and property where the Greeneville School once stood. The proposal also calls for the Norwich school district’s central offices to move, along with its Regional Adult Education classes, into the Samuel Huntington School, while the Wequonnoc Elementary School in Taftville would become a virtual learning center. Along with those actions, Norwich’s Thomas Mahan and Veterans’ Memorial elementary schools, the Bishop Early Learning Center (Pre-K), and the school district’s central offices in the former John Mason School all would be discontinued, the Day noted.

School Proposal Headed for November Referendum Following the endorsement, the committee, along with Norwich Mayor Peter Nystrom and three council members, set a schedule for more public presentations and potential City Council endorsement. Another public information meeting was set for July 11 with a detailed presentation by the architects followed by questions and comments from the audience. After that, the council hoped to introduce the formal ordinance to bond for the project at its July 18 meeting and hold a public hearing Aug. 1. The current schedule calls for putting the project before voters in a referendum on the Nov. 8 election ballot, according to the New London newspaper. School Building Committee Chairman Mark Bettencourt said he was disappointed with the low turnout at the important presentation in late June on the future of the school system. Those who were in attendance heard Gregory Smolley, the senior project manager of DRA, stress the costs of doing nothing

about the old schools, compared to the proposed four new buildings and renovated middle school. For his part, Bettencourt added that the Norwich School Building Committee needs to stress to the public the higher costs of trying to keep the existing, but inadequate, buildings going, with longer bus rides, cramped classrooms and inequitable education depending on a family’s neighborhood. School board member Mark Kulos said one problem that will be difficult to sell to voters is the entire $381 million cost must be placed on the referendum question, the Day reported. If the project is approved by the state, Norwich would be reimbursed at regular intervals as construction moves forward, added Smolley. “What it comes down to is, it’s $165 million over 20 years to repair schools that don’t meet our needs,” noted Stacy Gould, a Norwich alderwoman, and School Building Committee member, “or we spend $149 million to build schools that will meet our needs for the next 20 to 30 years. That’s the applesto-apples.” 

w w w. C o n s t r u c t i o n E q u i p m e n t G u i d e . c o m


Construction Equipment Guide • New England States Supplement • www.constructionequipmentguide.com • August 3, 2022 • Page 5

AVAILABL VA LE TO RENTT TODAY! AY JCB 35Z Zero Tailswing Excavators

JCB 85Z Zero Tailswing Excavators

JCB 131X Excavators

JCB 150X Excavators

JCB 220X Excaavators

JCB 245XR Reduced Tailswings

JCB Hydradig 110W Wheel Excaavators

JCB 512-83R Rotoating Telehandlers

JCB 509-42 Lift & Placce Telehandlers

JCB 510-56 Lift & Place Te Telehandlers

JCB Compact Wheel Loaders

JCB Wheel Loaders

Bergmann C815s Wh heel Dumpers

Bergmann C912s Tr Track Dumpers

Vibroscreen Box Screenerss

Vibroscreen Tr Trommels

888 8-RNT T--ALTA TA A | AltaRentsNE.co om


Page 6 • August 3, 2022 • www.constructionequipmentguide.com • New England States Supplement • Construction Equipment Guide

The Nice Company, Inc

9 Rosenfeld Drive, Hopedale, MA Toll Free# 508-381-3939 • www.theniceco.com

Equipment Sales and Rentals

We sell NICE machines!

RENTALS AVAILABLE! CAT D3 - D8 Dozers CAT 906 - 966 Wheel Loaders 3K - 12K Lbs. Hammers 30 Ton Articulating Trucks CAT 303 - 345 Excavators

2018 CAT 320FL, 6000 hrs, 50" Strickland Bucket, QC, Aux. Hydraulics, Clean Cab, Front/Side Cameras, Work Ready $149,000

Summer Deals 2018 CAT 336+FL, 2500 hrs, Single Grouser Pads, 54" Bucket, QC, AC/Heat/Radio, Rear Camera, Long Undercarriage $279,000

2014 CAT D6K2 XL, 960 hours, Heat/AC/radio, Very Clean, 1 Owner Machine $169,000


Construction Equipment Guide • New England States Supplement • www.constructionequipmentguide.com • August 3, 2022 • Page 7


Page 8 • August 3, 2022 • www.constructionequipmentguide.com • New England States Supplement • Construction Equipment Guide

MassDOT, Contractor to Speed Repairs On Historic Bridge The Massachusetts Department of Transportation (MassDOT) and its contractor are devising ways to speed up repairs to the Rocks Village Bridge over the Merrimack River, according to a July 18 report in the Daily News of Newburyport. The historic bridge that connects West Newbury to Haverhill in northeastern Massachusetts was significantly damaged March 17 when a large truck tried to cross the bridge. The impact occurred midway across the bridge within a section that swings open for marine traffic. Its closure for repairs caused major headaches and frustration for commuters, area homeowners, businesses, and the Pentucket and Whittier Vocational schools, the Daily News reported. The report by Dan Fielding of MassDOT confirms that the first phase of the bridge fix, which involved adding structural elements to replace damaged parts, was substantially completed with the swing span safely swung open May 27. He added that the contractor used timber blocking and jacks to temporarily support the swing span’s bridge fender system. The

river channel is now available for use by marine traffic that normally requires the bridge to be opened, but the span itself remains closed to pedestrians, bicyclists and vehicles until the permanent repairs are completed and the bridge is returned to service. Use of an approved jacking procedure is planned to remove the loading from the damaged components, according to the state agency. Approval also was received for shop drawings for the new structural steel elements, allowing for creation of the components. Manufacturing of the longer lead items begins later in July, Fielding said. The contractor is estimating that the fabrication of the new steel components and their delivery to the site will take another four weeks. Looking for Solutions Hoping to move along the repairs, MassDOT brainstormed with the contractor to modify the work plan and avoid the need for environmental permits that could have delayed the start of the permanent repairs.

The transportation department also is looking into the feasibility of removing some of the damaged components ahead of time to compress the schedule further. In addition, MassDOT is weighing the benefits of extending work shifts during the installation of the new steel components to advance the final work phase as quickly as possible so the bridge can be safely restored to normal operations, Fielding noted. Currently, construction hours at the site are Monday to Friday, 7 a.m. to 3:30 p.m. Span Was First Built in 1883 The Rock Village Bridge is a two-lane, steel hybrid truss bridge originally constructed in 1883 and known as the Merrimack Bridge. But, it was added onto again in 1895 and 1914 — each time with other types of truss styles — five in total — giving it a unique appearance. It also has a historic hand-operated swing span built in 1883 by Boston Bridge Works. The structure stretches 812-ft. over the Merrimack, with a main span 192 ft. in length, and a 24-ft.-wide roadway, the Daily News noted.

In 2013, a multiyear, $14.1 million restoration project funded through Massachusetts’s accelerated bridge program closed the structurally deficient bridge. The posted height restriction for the structure is 12-ft.-6-in., but despite the installation of signs alerting drivers to its limits, accidents like the recent one where a truck struck the bridge still occurs from time to time: • In 2018, a box truck lost its roof when it scraped the steel top of the bridge. • In July 2019, the top cargo part of a Mack truck transporting an empty dumpster for a local disposal company struck a bridge bracing, causing it to fall from the back of the truck, damaging the bridge, a guardrail and the road. • Yet another bridge strike, causing slight damage, happened in January 2020. Members of the Town of Haverhill Select Board recently discussed the possibility of petitioning MassDOT to permanently close the Rocks Village Bridge to trucks, but the group agreed to seek legal counsel before making the request, the Newburyport newspaper reported. 

Aging Span Will Not Be Replaced for at Least Two More Years Officials with the Maine Department of Transportation (MaineDOT) said recently that plans to build a new bridge to serve as a major traffic artery in Old Town, north of Bangor, will not begin for at least two more years even as the current 70-year-old span continues to crumble. The transportation agency was supposed to replace the Llewellyn Estes Memorial Bridge, which carries Stillwater Avenue over the Stillwater River on the town’s west side, as part of a multi-year, $20 million project. But MaineDOT rejected all bids for the work in April after they came in at around double the budgeted amount, the Bangor Daily News reported July 19. Nearly three months later, MaineDOT told the newspaper that it will take an “innovative” approach to get the work done while keeping costs down. Initially, the effort to replace the bridge — which includes two spans — was to be bundled with work that would have made improvements to the accident-prone Bennoch Road and College Avenue intersections with Stillwater Avenue. Together, the two projects were estimated to cost $20 mil-

lion, but the lowest bid that came in was nearly double that at $39.2 million. The higher bids came amid a time of inflated costs for construction materials and labor that have added to the costs of several other Maine projects, the Daily News noted. To save money, MaineDOT now plans to separate the bridge project from the intersection work and will issue a new request for bids on the latter. “During the planning phase of this project, we could not have predicted many of the current cost drivers, such as the high cost of steel components as well as material and labor availability risks over a more thanfour-year-long construction period,” Maine Transportation Commissioner Bruce Van Note said in a statement. “As such, we decided to reject all bids on the project. We don’t like to do this but proceeding with the original plan no longer represented the best value for the people of Maine.” Less Costly Composite Bridge Envisioned While the department aims to stick to the

original designs for the work on the Bennoch Road and College Avenue intersections, along with work on I-95, the Estes Memorial Bridge work will see an innovative approach to its construction, MaineDOT spokesperson Paul Merrill told the Daily News. “Although the cost of bridges presents a formidable challenge, it also presents an opportunity to showcase the innovation and advances being made in composite bridge construction, especially those being led by the University of Maine [UM],” he said. As an example of a similar bridge build envisioned in Old Town, Merrill cited a span that carries U.S. Highway 1A over Souadabscook Stream in Hampden that opened in late 2020. That structure was the first of its kind to make use of a composite girder system developed by researchers at UM in partnership with Brewer, Maine’s AIT Bridges, a division of Advanced Infrastructure Technologies in California. MaineDOT currently expects the construction phase for the Old Town span, using the new composite materials process, to begin in 2024.

MaineDOT to Keep Watchful Eye On Bridge In the meantime, though, the Estes Memorial Bridge, originally built in 1952, continues to deteriorate, particularly the northern span. A May 17 inspection of the bridge revealed that water was leaking through the span’s deck and that it had lost a large section of concrete, Merrill said. The inspection also discovered that the deck rating of the structure had gone from “poor” to “serious” condition. Its superstructure and substructure also are in poor condition, he explained. MaineDOT engineers will monitor the span as it continues to degrade, Merrill said. Additionally, the agency has lowered the maximum weight of vehicles that can travel over this section of the bridge. Beginning July 25, vehicles that weigh 30 tons or more will no longer be able to cross the bridge’s northern span and must use a detour. The new limit will likely prohibit vehicles such as loaded logging trucks and concrete trucks. Merrill did tell the Bangor news source that the bridge posting will not affect fire engines, school buses, oil delivery trucks and most local delivery vehicles. 

w w w. C o n s t r u c t i o n E q u i p m e n t G u i d e . c o m


Construction Equipment Guide • New England States Supplement • www.constructionequipmentguide.com • August 3, 2022 • Page 9

AUTHORIZED DOOSAN DEALER

DRACUT

BROCKTON

BOW

978-454-3320 61 Silva Lane Dracut, MA 01826

508-484-5567 196 Manley St. Brockton, MA 02301

603-410-5540 1474 Rte 3A Bow, NH 03304

www.equipmenteast.com

CHARGING FORWARD. POWERED BY INNOVATION. The next generation of market-leading wheel loaders, redesigned Doosan® -7 Series models take productivity, durability and comfort to another level. Visit Equipment East for a demo. ©2021 Hyundai Doosan Infracore. All rights reserved. Hyundai Doosan Infracore is an affiliate of Hyundai Heavy Industries Group. , is used under license from Doosan Corporation. The Doosan trademark,


Page 10 • August 3, 2022 • www.constructionequipmentguide.com • New England States Supplement • Construction Equipment Guide

YOU O R REPUTA TATION IS ON THE LINE EVERY RY DA AY. Jobs keep getting tougher. Timelines keep getting shor ter. Yo Y ou need to get it done faster and more ef ficiently. We get it. That’s why we’ve been making the big moves that keep yo y u moving for ward. Rolling out new machines engineered with a “get it done” mentality. Providing Af After Sales Solutions that keep you up and running. Because yo y u’ve earned it. And your customers deser ve it.

hitachi h cm.us Hitachi Construction Machiner y A mericas Inc.

Milford, NH 603.673.2640

Brentwood, NH 603.642.5666

chappelltractor.com

Concord, NH 603.225.3361

Now Your Hitachi Dealer for Vermont, New Hampshire and Massachusetts


Construction Equipment Guide • New England States Supplement • www.constructionequipmentguide.com • August 3, 2022 • Page 11

ROCK SOLID SERVICE WE CRUSH YOUR ROCKS

140 Nutmeg Road South South Windsor, CT 06074 51 Veterans Drive Loudon, NH 03307 LARGEST DEALER IN NEW ENGLAND

THE MOST MATERIAL HANDLING MACHINES IN NEW ENGLAND SCREENING CRUSHING CONES IMPACTORS CONVEYORS TROMMELS WASHING RECYCLING

SCREENING

I M PAC T O R S

TROMMELS

USED AND NEW MACHINERY RENTALS AND FINANCING AVAILABLE

CONVEYORS

CRUSHING

1-800-53 CRUSH

Over 100 Machines in Stock

CALL TODAY! 1-800-53-CRUSH

W W W. P O W E R S C R E E N - N E . C O M Family Owned and

Operated for over 20 years

Call for Parts Today

ROCK SOLID SERVICE WE CRUSH YOUR ROCKS


Page 12 • August 3, 2022 • www.constructionequipmentguide.com • New England States Supplement • Construction Equipment Guide

Kilmoyley Construction Performs Long List of UMass Projects KILMOYLEY from page 1

applied to his dream of owning and operating his own construction company. This dream came to fruition in 2003 with the purchase of a JCB tractor loader backhoe and the official of start of Kilmoyley Construction. Kilmoyley is the name of the town in Ireland that he grew up in. In the early days, Sheehy built the company and his bulk of experience doing utility work and sidewalk construction. He later found an opportunity working projects for the University of Massachusetts in Lowell. At UMass, the diversity of the work expanded, and Sheehy found the need to

expand his equipment inventory to include JCB excavators and wheel loaders. The variety of projects that Kilmoyley Construction addresses at UMass seems never ending. Currently, the company is improving an entertainment area and expanding the facility’s stage, adding lighting effects and putting in new sidewalks to what will be an improved concert venue. When the company is not involved in structural construction at the university, much of the work Kilmoyley does at UMass will include snow removal, aquascape repair, sewer and water maintenance system repair and general landscape and property improvements.

JCB Hydradig equipped with an auger.

This JCB Hydradig wheeled excavator equipped with a bucket and thumb is particularly desirable for projects at UMass because of its ability to travel from one end of the campus to the other at speeds in excess of 25 mph.

UMass is not Kilmoyley’s only customer. It has developed a strong reputation in utility installation and repair, and it has done a significant amount of work for area municipalities. During peak seasons, it runs a crew of 10 to 15 employees. Like most construction firms these days, one of Kilmoyley’s biggest challenges is finding the workers to keep the company fully staffed. Kilmoyley takes great pride in the work that the company does, starting each project in a timely manner and finishing the project on time and on spec. In fact, most projects are completed ahead of time. “There are several reasons we are able to complete our projects ahead of schedule,

including a hard-working, experienced crew and our fleet of JCB construction equipment,” said Sheehy. Kilmoyley Construction’s fleet of equipment includes two JCB 427ZX wheel loaders, one JCB Hydradig 110W wheeled excavator and two Avant 640 compact articulated wheel loaders, all purchased from Alta Equipment Company. The purchase of the JCB Hydradig involved matching the purchase of a piece of equipment to some of the unique circumstances that Kilmoyley faces at UMass, as well as other utility repair projects. “UMass has a massive, sprawling campus, and our projects will jump from one end of the university to another, sometimes in the same day,” Sheehy said. “The JCB Hydradig is a wheeled excavator that travels over the road at about 25 mph. We can drive it straight down the roads of the campus doing no damage whatsoever to the road surface and saving ourselves the time and bother of loading the machine up on a trailer and hauling it from point A to point B. “We have equipped the Hydradig with several attachments that have dramatically improved the flexibility of the machine, including several different buckets for a variety of digging applications, a 12-inch auger and a flail mower for cutting back trees and bushes. “The Hydradig also gives us tremendous maneuverability because of its crab steer and four-way steering. You can position it just about anywhere turning on a dime. The Hydradig is also engineered with a very low center of gravity, which gives it a larger lifting capacity and additional stability. It would be extremely difficult to tip this machine and the visibility is amazing. “The Hydradig is also amazingly easy to maintain. Everything you need to access you see KILMOYLEY page 18

This JCB 427ZX wheel loader is one of two owned by Kilmoyley Construction.


Construction Equipment Guide • New England States Supplement • www.constructionequipmentguide.com • August 3, 2022 • Page 13

2021 MCCLOSKEY SDX130: Serial Number: 90666, New Telescoping Stacker 36"x130' Electric Hydraulic Power WEG 20HP. Standard Hopper, Pivot Point, Hydraulic Landing Gear, Hydraulic Wheel Drive, Remote Greaselines, Walking Beam w/Lift Axle >>>Call

2022 MCCLOSKEY ST100T: Hours: 53, Serial Number: 92129, Stacker with Impact Idlers Under Hopper, Upgraded Belt Cleaner/Scraper, Telematics, Upgraded Hydraulics, CAT C2.8 Tier 4F/ Stage V 74HP Engine>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>Call

2022 MCCLOSKEY TS4065: Hours: 11, Serial Number: 78684, Standard Hopper, Wear Plate Lining in Hopper, Impact Bed in Hopper, Hydraulic Top Fold, Remote Greaselines, CAT C2.2 Tier 4/Stage V 67HP Engine >>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>Call

2020 MCCLOSKEY C3: Hours: 1614, Horsepower: 510 hp, Serial Number: 91189, METSO designed cone, 300 HP Class. Volvo D13 Medium Cone Liner currently installed.>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>Call

2021 MCCLOSKEY J40: Hours: 389, Serial Number: 90232, Belt Protection Deflector Plate, Overband Magnet on Main, Working lights, Safety Beacon Lights, Telematics, Volvo D8 T4F 252HP Engine>>>>Call

2022 MCCLOSKEY ST80TLA: Hours: 10, Serial Number: 92289, Lift Axle, Hopper Wear Plates, Impact Idlers, Belt Cleaner/Scraper, CAT 2.2 Tier 4F 49HP Engine >> >>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>Call

2020 MCCLOSKEY S190 3D: Hours: 543, Horsepower: 130 hp, Serial Number: 91405, Tracked Triple Deck Heavy Duty Screener. CAT Tier 4F Engine. 15ft Feeding Hopper. Chevron Belt on Main Conveyor. Remote Machine Shut Off >>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>Call

2021 MCCLOSKEY RF80: Hours: 124, Serial Number: 77883, Hopper Wear Plates, Extended Hopper Wing Plates, Upgraded Belt/Cleaner Scraper, Variable Speed and Start Stop Feeder Kit, CAT C3.6 Tier 4/Stage V 134HP Engine >>>>>>>>>>>>>>>>>>>>>>>>>>>>>Call

2006 EXTEC ROBOTRAC: Hours: 5,008, Serial Number: 9872, Well maintained. Deutz Engine. 10’x8’10” screen deck with side discharge conveyor>>>>>>>>>>>>$59,500

2022 MCCLOSKEY 516R-T: Hours: 68, Serial Number: 92344, Hydraulic Tipping Grid over Hopper, Remote Start/Stop Feeder, Fitted Safety Beacons, Telematics, CAT C3.4 Tier 4F 74HP Engine >>>>>>>>>>>>>>>>>>>>>>>Call

2003 TEREX PEGSON 2644 PREMIERTRAK: Hours: 11,448, Engine: Cat C9, 1 Owner Machine, New Jaw Dies, New Cheek Plates, Jaw Box has been recently rebuilt, New Bearings in Pittman, New Toggle >>>>>>>>>>>>>$225,000

2021 MCCLOSKEY R105: Hours: 809, Serial Number: 77461, Screener with Remote Variable Speed Feeder, Remote Machine Shut off, Safety Beacon Lights, Telematics. CAT Tier 4F 130HP >>>>>>>>>>>>>>>>>>>>>>>Call

2021 MCCLOSKEY ST80: Hours: 6, Serial Number: NEW MWS CSP200 COMPACT SAND PLANT, Serial 92183, CAT 2.2 Tier 4F 49 HP, Hydraulic Axle Jacks, Number: 20349, cost and energy efficient, exceptional Hydraulic Axle Extensions, Hydraulic Landing Gear, performance, 14 x 6 dewatering screen, can produce Hopper Wear Plates, Impact Idlers under Hopper Call 1 grade of sand, self regulating sump tank >>>>>>>Call

2021 MWS S190: Hours: 165, Serial Number: 91989, Screening Plant with Fitted Rinser Kit with Spray Bars on Screenbox, Aux Drive Circuit, Plain Belt on Main Conveyor >>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>Call

2021 MCCLOSKEY C2: Hours: 324, Serial Number: 92089, Metal Detector on Feeder, Discharge Chute on Main Conveyor, Upgraded Belt Cleaner/Scraper on Main, Telematics, CAT C9.3B Stage V/Tier 4F 375 HP Engine >>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>Call

NEW ENGLAND’S EXCLUSIVE MCCLOSKY DEALER!!!


Page 14 • August 3, 2022 • www.constructionequipmentguide.com • New England States Supplement • Construction Equipment Guide

Volvo CE Delivers Its First E-Machine in North America

Tylan and Jennifer (and their dogs, Ralph and Daisy) with their new ECR25 Electric compact excavator. ELECTRIC from page 1

Jennifer Milikowsky and her husband, Tylan Calcagni, produce maple syrup and harvest acorns used to feed pigs at nearby farms. The couple also handles the marketing, sales and distribution of the pork from those partner farms. Their love and respect for nature led them on a sustainability mission, so the opportunity to purchase a machine that could get the job done while running on renewable energy was important to them. “Minimizing our carbon footprint is critical, so we try to do that with every decision we make,” said Milikowsky. “The thought of buying a diesel machine in 2022 that we would use for a decade or more was hard to accept. “We did a deep energy retrofit on our 1820 farmhouse, we are exploring a solar installation on the farm, and now we get to take a big step forward in trying to convert our fleet of vehicles and machines to electric.” Volvo CE began accepting reservations for the ECR25 Electric compact excavator and the L25 Electric compact wheel loader in North America in August 2021. The first deliveries of those two models are happening now, and additional models have since become available for reservation as well.

Logical Fit Walden Hill purchased the electric excavator from its local dealer, Tyler Equipment, and financed it through Volvo Financial Services (VFS). “Environmental solutions are great, but if they’re not economically viable, then adoption will be slow,” said Brian Layman, vice president, CE Financial Services, VFS. “It’s exciting to help Walden Hill finance one of the first pieces of electric heavy construction equipment in North America.” Tyler Equipment sales rep Peter Gaj said he thought of Walden Hill right away when the Volvo electric machines were announced. “It wasn’t really a matter of them needing to think about it — it was such a clear fit for their plan,” he said. “They can use it to clear pastures, remove stumps, maintain roads and ditches … all kinds of things.” And they agree. “Anyone who owns or works on a small family farm knows that the daily list of jobs is as diverse as it is long,” Calcagni said. “This excavator might help us put in a culvert under a forest trail one day and help us do site prep for a new sugar house the next. We’re so excited to have this versatile machine at our disposal.” Right Tool for Job The farmers installed a 220-volt outlet in their barn to charge the ECR25 Electric compact excavator but also can charge it with a regular household outlet if needed. Both drive hybrid cars and they already had a 220-volt outlet in their garage. The ECR25 Electric offers more than 5,000 foot-pounds of breakout force and can work four to six hours on a full charge in most applications. “Previously, we would rent an excavator or Tylan would try to figure out how to use our tractor to get a task done,” said Milikowsky. “We realized it’s just so much better if you have the machine for the job. He was spending five hours doing a job that could take him an hour if he had an excavator.” Other perks of the ECR25 Electric compared to a diesel machine include simpler maintenance, much quieter operation and zero emissions — especially important when working near so many plants and animals. “For technology to become mainstream, you need early adopters who demonstrate interest and provide feedback on it,” said Milikowsky. “We’re thrilled to be those early adopters for the electric excavator, and we hope it’s just the beginning of a bigger transformation in the industry.” For more information, visit www.volvoce.com. 


Construction Equipment Guide • New England States Supplement • www.constructionequipmentguide.com • August 3, 2022 • Page 15

Discover the NEW A-Series Hyundai Construction Equipment is excited to announce the launching of our new A-series machines. Along with a new look, these machines are packed full of standard new features and benefits to get the job done efficiently. • Cummins Performance Series Engines Stage V emissions compliant engines • EPFC (Electric Positive Flow Control) Reduces daily fuel consumption by 8-11% • EPIC (Electric Pump Independent Control) Improved controllability with reduced RPM drop • Serviceability/Safety Enhanced cab visibility Easy access engine panels

More standard features. More value.

www.hceamericas.com To learn more about the what the new Hyundai A-Series machines can offer your business, contact your Hyundai dealer today.

Chappell Tractor 251 NH-125 Brentwood, NH 03833 603/642-5666

454 RTE 13 Milford, NH 03055 603/673-2640

Kahn Tractor & Equipment, Inc.

Whited Equipment Co. 2160 Hotel Road Auburn, ME 04210 207/346-0279

17 Houlton Road Presque Isle, ME 04769 207/346-0279

520 Pond Road North Franklin, CT 06254 860/642-7596 www.kahntractor.com

391 Loudon Rd. Concord, NH 03301 603/225-3361 www.chappelltractor.com

837 Portland Road Saco, ME 04072 844/430-6810 www.whitedhyundai.com

Lorusso Heavy Equipment, LLC

Quality Fleet Service, Inc.

Butler Equipment

160 Elm Street Walpole, MA 02801 508/660-7600 www.lhequip.com

548 New Ludlow Road South Hadley, MA 01075 413/213-0632 www.qualityfleetservice.com

631 New Park Ave West Hartford, CT 06110 860-233-5439 www.butlerequip.com ©2022 Hyundai Construction Equipment Americas. All Rights Reserved.


Page 16 • August 3, 2022 • www.constructionequipmentguide.com • New England States Supplement • Construction Equipment Guide

Toys For Boys (and also men) Realistic Scale Models of Construction Equipment, ideal gifts for the Holidays, Birthdays, Graduation, etc.

Manitowic 18000 Crane, 5 Ft. High, 1:50 scale $1,500 Bucyrus Erie 22-B Dragline, 1:50 scale - $290

Bucyrus Erie 22-B Cable Shovel, 1:50 scale - $225

Bucyrus Erie 22-B Cable Backhoe, 1:50 scale - $225

Caterpillar D4, 2T Crawler w/Letourneau Push Blade & Hyster Winch, 1:16 scale - $225

Link Belt 490x4 Excavator, 1:50 scale - $225

Grove GMK3050 All Terrain Crane, 1:50 scale - $175

Roadtec RX-700 Cold Planner, 1:50 scale - $175

International TD-24 Crawler w/Cable Blade, 1:25 scale - $175

Bantam Lattice Crane 0n White WC22 Carrier, 1:50 scale - $160

Allis Chalmers TS300 Cable Operated Motor Scraper, 1:50 scale - $110

Allis Chalmers Forty-Five Motor Grader, 1:50 scale - $110

Kobelco SK140Rlc-7 Compact Excavator, 1:50 scale - $160

Roadtec RP190 Paver, 1:50 scale - $100

Link Belt 210X4 Excavtor, 1:50 scale - $150

Terex 2366 Articulated Dump Truck, 1:50 scale - $140

Shipping and Handling Included

Bmckeon Collectibles 470 Maryland Drive Fort Washington, PA 19034

WE PURCHASE COLLECTIONS!!!

Contact – Barry McKeon

610-506-5961 Email – bmckeon9@gmail.com

Visit our Ebay Store – bmckeon collectibles – for a complete list with pictures.


Construction Equipment Guide • New England States Supplement • www.constructionequipmentguide.com • August 3, 2022 • Page 17

Unreserved public equipment auction Equipment From Simscroft-Echo Farms

1 of 2 – Caterpillar 938G Series II

2014 Volvo VHD

2019 Caterpillar AP255E

Caterpillar 325D L

Caterpillar 330C L

Caterpillar 930G

Caterpillar D350E Series II

Caterpillar D6H LGP Series II

Caterpillar D8L

North Franklin, CT

August 16 (Tue) 8 am

Timed Auction Lot Only Event Online bidding information

Financing & leasing available

Location

▸ No minimum bids or reserve prices ▸ It's always free to register and bid online in any of our auctions, create your account now!

Up to 100% financing, with no money down.

275 Route 32, North Franklin, CT 06254

On-site inspection hours

More items added daily Call about selling: 1.860.642.4200

Mon–Fri, 8 am–5 pm

See full auction & equipment listings at rbauction.com/North-Franklin


Page 18 • August 3, 2022 • www.constructionequipmentguide.com • New England States Supplement • Construction Equipment Guide

NEW ENGLAND SUPPLEMENT ADVERTISER INDEX

Contractor Heavily Relies On Alta for Equipment Needs

ALTA EQUIPMENT COMPANY/NITCO LLC....................5 ARGUS INDUSTRIAL COMPANY ....................................1 BARRY EQUIPMENT CO. INC.......................................20 BOSTON FREIGHTLINER/NEW ENGLAND....................7 CHAPPELL TRACTOR ..................................................10

Kilmoyley Construction’s crew works at improving an entertainment area and installing new sidewalks at UMass.

EQUIPMENT EAST........................................................1,9 FOLEY INC - WORCESTER ............................................1 GORILLA HAMMERS........................................................1 HYUNDAI CONSTRUCTION EQUIPMENT....................15 J R VINAGRO CORPORATION........................................1 M G EQUIPMENT ............................................................1 POWERSCREEN NEW ENGLAND................................11

Kilmoyley Construction’s Avant loader is equipped with everything from forks and salt spreaders to buckets, plows and mowers. KILMOYLEY from page 12

RITCHIE BROS. AUCTIONEERS ..................................17 ROCK & RECYCLING EQUIPMENT LLC ......................13 ROGERS BROTHERS CORPORATION........................19 SHAWMUT EQUIPMENT CO INC..................................14 T-QUIP SALES & RENTAL INC........................................6 THE N.I.C.E. COMPANY ..................................................6 THE W. I. CLARK COMPANY ..........................................2 TIBBITS EQUIPMENT SERVICES INC............................1 TYLER EQUIPMENT CORPORATION ............................3 The Advertisers Index is printed as a free editorial service to our advertisers and readership. Construction Equipment Guide is not responsible for errors or omissions.

can do from the ground, including changing all of the filters.” Sheehy is equally impressed with his JCB 427ZX wheel loaders. “Initially, the 427s were purchased for work at UMass. We needed wheel loaders that would offer maneuverability, speed and visibility. Maneuverability is important because of vehicles and obstacles you deal with when doing snow removal, particularly with a 14-foot snow pusher attached; visibility is very important when you factor in thousands of students to the formula. No matter how heavy a snowfall we receive, pushing snow in some massive parking lots, the JCB 427ZX machines are hands down the best machines we have had. “These machines are so comfortable my employees will scrap over who gets to operate them. The loader is easy to get into, the seat is extremely comfortable and the cab stays toasty warm even during the coldest winter days.” For smaller demands, Kilmoyley Construction owns two Avant 640 compact articulated wheel loaders, along with a large variety of attachments, including salt spreaders, forks, mowers and a large variety of

buckets. “These are very diverse machines. The wheels are designed in a way that we can run across the grass or even mow with them. They do a great job of salting or even snow removal on sidewalks. “The visibility is great; they are quite fast and very maneuverable. The Avant is also a very stable machine. We can deal with some very steep terrains without concerns of tipping over. It is a very safe and very comfortable machine to operate.” Alta Equipment Company is Kilmoyley Construction’s primary equipment supplier and it’s not just the quality of the equipment, it’s the support that comes along with doing business with Alta Equipment Company. “Kevin Swartz, our rep with Alta Equipment Company, has been amazing to work with. He goes above and beyond on anything we have asked of him. He answers the phone right away and comes out to our jobs when we need him, even on weekends. When needed, he will run to Alta Equipment, pick up a part and deliver it to us personally. We would recommend Alta Equipment Company, JCB and Avant to anyone who would ask.”  CEG (All photos courtesy of Alta Equipment)


Construction Equipment Guide • New England States Supplement • www.constructionequipmentguide.com • August 3, 2022 • Page 19

TRAILERS TO MEET EVERY HAULING CHALLENGE! Committed to building superior quality, reliability and durability into every trailer.

The Ultimate in Trailers®

Tyler Equipment 251 Shaker Road East Longmeadow, MA 01028 (413) 525-6351 • (800) 292-6351 Parts: (877) 255-6351

1980 Berlin Turnpike Berlin, CT 06037 (860) 356-0840 • (800) 352-4473 Parts: (860) 356-0848

ROGERS BROTHERS CORPORATION ALBION, PA

C.N. Wood Co., Inc. 200 Merrimac St. Woburn, MA 01801 (781) 935-1919

140 Wales Ave. Avon, MA 02322 (508) 584-8484

3 Rocky Hill Road Smithfield, RI 02917 (401) 942-9191

www.cn-wood.com

www.tylerequipment.com

Over a CENTURY of building the very best heavy-duty trailers for your hauling needs! Contact your local dealer for a quote today.


Page 20 • August 3, 2022 • www.constructionequipmentguide.com • New England States Supplement • Construction Equipment Guide


Turn static files into dynamic content formats.

Create a flipbook
New England 16, August 3, 2022 by Construction Equipment Guide - Issuu