Skip to main content

New England

Page 1

State Supplement sponsored by:

1

11

THE NEW ENGLAND EDITION

A Supplement to:

95

1

201 16 9

26

2

1 3

91

89

2

95 3

2 2 7

1

93

495

16

89 4

89

95

202

7

91

9

95

93

2

95 2

THOUSANDS of units in service

93 90

90

7

95 91

7

3

84

495 6

6

6

195

395

84

95 91

August 8 2018

Vol. L • No. 16

95

Shipment in 1-3 days

95

®

SAME DAY shipping on parts & tools FULLY SUPPORTED by a 75 YEAR FAMILY BUSINESS 10% off 10,000 ft. lb. hammers

“The Nation’s Best Read Construction Newspaper… Founded in 1957.”

Your New England States Connection •  Amanda Hogeboom-Guilfoyle 1-800-988-1203 2208 Plainfield Pike • Johnston, RI 02919 401-943-7100 • Fax: 401-647-5041

www.jrvinagrocorp.com info@jrvinagrocorp.com

Specializing in:

Demolition, Portable Crushing, Material Sales, C & D Recycling, Land Clearing, Heavy Hauling & Trucking Call for Pricing

LEED Accredited in Waste Management

2018 EZ-Screen 1200XLS

Optional 3 Product Conveyor

6’x5’ Double Deck Screenbox Works with 1/2 to 1 3/4 Yd. Loaders, 25 H.P. Kohler Diesel Engine, 24” Conveyor Dumps Screened Product 9’ High, Two (2) Year Warranty! $42,900 plus freight. Other Screeners Available

EZ-SCREEN

GIVE US YOUR HAMMER!

• Repairs • Rebuilds • Replacement Parts in Stock

30% off same class Ramfos hammer with competitor’s trade in

61 Silva Lane • Dracut, MA 01826

Call Today (978) 454-3320

WE STOCK RUBBER TRACKS for Over 6,000 Models! Some Used Tracks A & GA Available. NJ, TX, WOUSES WAREH • HIGH QUALITY • FAST SHIPPING • GUARANTEED TO FIT • UNDERCARRIAGE PARTS • FLATPROOF SKIDSTEER TIRES • RUBBER PADS FOR STEEL TRACKS

888-888-1248

www.ez-screen.com

Why pay more?

CALL 800-367-4937 *On approved credit • Financing Available

Sargent Rebuilds Section of Route 12 in New Hampshire

By Lori Tobias

CEG CORRESPONDENT

For more than a decade, stakeholders in New Hampshire’s western towns of Walpole and Charleston have been trying to come up with a fix for an old rural stretch of highway plagued by numerous problems. This spring, crews at long last began the work. The $14.8 million project was awarded to Sargent Corporation of Stillwater, Maine, with a completion date set for August 2020. Route 12 runs 3 mi. between Walpole and Charleston with roughly 7,000 vehicles traveling the road daily. It is bordered by the Connecticut River on one side and railroad tracks on the other, making widening a difficult and potentially pricey project. “There are no shoulders,” said Ron Guyette, contract administrator of the New Hampshire Department of Transportation. “If someone breaks down, there is no place see SARGENT page 16

The $14.8 million Route 12 widening project was awarded to Sargent Corporation of Stillwater, Maine, with a completion date set for August 2020.

Contractor Goes to War Against Emerald Ash Borer, Snowstorms, Hurricanes, More

248-745-5828

Metrotrak Mobile Track Jaw Crusher Low Hours, Side Converter, Magnet, Scale

Phil (413) 427-7171 • Largest hammer repair facility in North America • Demolition tools and parts for ALL makes and models • Hammer-equipped excavator rentals • Backed by a 75 year family owned business CALL YOUR ONE-STOP HAMMER SHOP™ TODAY!!!

www.foleyengines.com

CALL 888-81-GORILLA(46745)

Hurricanes, nor-easters, snow storms and infestations of Emerald Ash Borer have been taking a toll on trees in Massachusetts for several years. For arborists like Jason Yerke, of Distinctive Tree Care, it’s been a challenge to keep up with demand for clearing roads and power lines. But with the arrival of his new Sennebogen 718 M “E” tree care handler, Yerke feels he

With the cab raised and tilted, the operator has a clear view of the work being done.

now has the right tool for the job. “It’s like, year after year, you go off to war with a musket…and then one day you show up with a machine gun,” Yerke said. Adapted from Sennebogen’s extensive line of log-handling equipment, the 718 is a 21 ton rubbertired machine equipped with a telescoping stick and a see ARBORIST page 14


Page 2 • August 8, 2018 • www.constructionequipmentguide.com • New England States Supplement • Construction Equipment Guide

2014 LEEBOY 8515C

2013 LEEBOY 8616K

2017 LEEBOY 8816B

2406 Hrs, stk#24565, c/air, hyd thumb, 80% tracks ..................................................$85,000

1215 Hrs, stk#21988, Kubota, HD poly pads, slope, power crown, 8-15’ electric screed ........ ............................................................$95,000

195 Hours, stk#24427, Kubota, 8-16’ electric screed, heated end gates, 20’ extension pave kit included and remaining factory warranty .... ..........................................................$225,000

2015 HYUNDAI HL955

2011 CEC SC300 CONE CRUSHER

1990 DEERE 644E

c/air, 3 spool, 3.7 yd bucket, 450 Hrs, stk#24074 ..........................................$149,000

300HP Cat, new liner and V belts, dealer maintained unit ..........................................$400,000

c/heat, JRB hydraulic coupler, 4.5 yd bucket, 80% rubber, one owner unit. Stk#24648 $35,000

2012 CAT 305E

2007 JOHN DEERE 50D

2014 EAGER BEAVER 20XPT

c/air, rubber tracks, blade, hyd thumb and 3 buckets, great condition, stk#24089 ....$44,500

3804 Hrs, stk#24097, c/air, hyd thumb, many 50D’s to choose from............................$37,500

21’ deck, roto rings, 6’ ramps, nice trailer, stk#24178 ............................................$18,500

See Our Complete Inventory at www.wiclark.com


Construction Equipment Guide • New England States Supplement • www.constructionequipmentguide.com • August 8, 2018 • Page 3

!

!

! !

! !

!

! !

!

!

%

! !

%

!

!

!

!

!

!

!

!

!

% ! ! ! ! ! ! !

!

!

!

!

!

!

!

! ! !

2

! !

!

! !

!

!

!Q

! !

!

! !

!

Q

%

! !

! !

%2

!

!

!

!

!

!

!

%

!

!

! !

! ! 2

!

!

% %

% %

%

! !

! ! !

! %

%

!

%

! !

!

!

! !

%

!

!

!

!Q

%

%

! ! !

!

!

! Q !

2

2

%

2

%

2 %

%

Corporation % Tyler Equipment % % % 1980 Berlin Turnpike Berlin, CT 06037 860.356.0840

251 Shaker Road East Longmeadow, MA 01028 413.525.6351

www.tylerequipment.com

2


Page 4 • August 8, 2018 • www.constructionequipmentguide.com • New England States Supplement • Construction Equipment Guide

Feds to Aid Transportation Infrastructure Durability Center The University of Vermont in collaboration with the VTRANS photo University of Maine and others will create a highlycompetitive University Transportation Center (UTC) called the Transportation Infrastructure Durability Center (TIDC). TIDC aims to help save taxpayer dollars by extending the life of our transportation assets, including bridges, roads and rail. The U.S. Department of Transportation will provide as much as $14.2 million over five years for this University of Maine-led coalition, which includes the University of Vermont, University of Rhode Island, University of Connecticut, University of Massachusetts Lowell and Western New England University. Mandar Dewoolkar, chair and professor of the Department of Civil and Environmental Engineering at UVM, will be receiving $1.25 million over five years to assist in the development of this regional initiative. UVM professors Ehsan Ghazanfari, Dryver Huston and Ting Tan collaborated on the proposal. Additional partners include representatives from the Vermont Agency of Transportation, Maine Department of Transportation, Massachusetts Department of Transportation, Connecticut Department of Transportation, Rhode Island The Richmond “Checkered House” Route 2 bridge over the Winooski River was repaired and widened in 2011. Department of Transportation and the American New England’s transportation infrastructure faces unique Society of Civil Engineers Transportation and Development portation infrastructure,” said Dewoolkar. “I look forward to this partnership with the University of Maine and others challenges due to harsh winter weather and short construcInstitute. “This is an exciting opportunity for UVM students, across all New England states, which will strengthen our col- tion seasons. According to American Society of Civil research staff and faculty to perform innovative research for laboration in transportation research, education and technol- Engineers, nearly 30 percent of New England roads are rated improving the durability and extending the life of our trans- ogy transfer.” in poor condition which, on average, costs each motorist $584 annually in extra vehicle repairs and operating costs. Nationally, driving on roads in need of repair costs United Construction Equipment Guide Northeast For advertising rates: Contact Edwin M. McKeon Jr. NEW ENGLAND EDITION Edition (ISSN 1081-7034) is published States motorists $120.5 billion. bi-weekly by Construction Equipment Guide Working with state departments of transportation, the new 215/885-2900 Ltd. Advertising and Editorial Offices are Founder, Publisher & CEO Edwin M. McKeon Sr. TIDC seeks to identify new materials and technologies that located at 470 Maryland Dr., Toll Free 800/523-2200 Northeast Publisher Edwin M. McKeon Jr. Ft. Washington, PA 19034. Toll Free maximize the impact of transportation infrastructure investFax 215/885-2910 800/523-2200 or Fax 215/885-2910. Executive Publisher Teddy McKeon ments. Annual Subscription Rate $65.00. Call for e-mail tmckeon@cegltd.com Editor In Chief Craig Mongeau The center will work along four pathways: Canadian and foreign rates. Associate Editor Liz Kemmerer • Develop improved road and bridge monitoring and Periodicals postage paid at Ft. Washington, Editorial Consultant Pete Sigmund PA and at additional mailing offices. assessment tools; Contact Amanda Hogeboom-Guilfoyle Production Mgr. John Pinkerton POSTMASTER: Send address changes to • develop better ways to strengthen existing bridges to Construction Equipment Guide Northeast Controller Judith Nixon • New England extend their life; Edition, 470 Maryland Dr, Ft. Washington, Circulation Mgr. Cathy Printz PA 19034. • use new materials and systems to build longer-lasting 518/396-7659 Web Editor Emily Buenzle Contents Copyrighted ©2018, by new bridges and accelerate construction; and Toll Free 800/988-1203 Construction Equipment Guide, which is a • use new connectivity tools to enhance asset and performFax 315/866-1379 Registered Trademark, registered in the U.S. ance management while promoting workforce development. Patent Office. Registration number Main office 470 Maryland Drive e-mail ahogeboom-guilfoyle@cegltd.com 0957323. All rights reserved, nothing may TIDC will harness the experience of 28 faculty Fort Washington, PA 19034 be reprinted or reproduced(including researchers and train 280 student researchers from all New framing) in whole or part without written England states. It will focus on real infrastructure needs idenpermission from the publisher. All editorial 215/885-2900 material, photographs, drawings, letters, tified by the department of transportation partners and will Contact Kent Hogeboom Toll Free 800/523-2200 and other material will be treated as prioritize extending the life of existing transportation assets unconditionally assigned for publication • New York • New England Fax 215/885-2910 and copyright purposes and are subject to to ensure cost-effectiveness. Construction Equipment Guide's unrestricted 315/866-1379 Since 1987, the University Transportation Center program Web site www.constructionequipmentguide.com right to edit and comment editorially. Toll Free 800/988-1203 has advanced transportation research and technology at colContributor articles do not necessarily reflect Editorial e-mail editorial@cegltd.com the policy or opinions of this publication. Fax 315/823-4136 leges and universities across the country. Every five years, Advertising e-mail production@cegltd.com Call or write for advertising rates, publicaacademic institutions nationwide compete to form their e-mail khogeboom@cegltd.com tion schedule and media kit. The region’s UTC. Construction Equipment Guide is not responThe University of Vermont and other member universities sible for clerical or printer's errors, every care is taken to avoid mistakes. of the new TIDC have an extensive record of accomplishPhotographs of equipment used in adverments in transportation infrastructure research, education tisements are not necessarily actual photoand technology transfer. graphs of the specific machine. Similar photographs are used occasionally and every (This story also can be found on Construction effort is taken to depict the actual equipEquipment Guide’s website at www.constructionequipment advertised. The right is reserved to mentguide.com.) reject any advertising.


Construction Equipment Guide • New England States Supplement • www.constructionequipmentguide.com • August 8, 2018 • Page 5

GEAR UP FOR SPRING WITH 160 Elm Street • Walpole, MA 02081

508-660-7600


Page 6 • August 8, 2018 • www.constructionequipmentguide.com • New England States Supplement • Construction Equipment Guide

140 Nutmeg Road South South Windsor, CT 06074

51 Veterans Drive Loudon, NH 03307

1-800-53-CRUSH or 860-627-6596 www.powerscreen-ne.com

MOVING RIGHT ALONG No interruptions, no hiccups – it’s business as usual for you, with compressor rentals from Milton CAT. • Contractor, high-pressure and instrument-quality models. • Range from 2 hp to 500 hp. • Portable models from 185 cfm to 1,600 cfm; up to 500 psi. • Diesel and electric models. • Meeting all emission requirements. • After-cooler, sound-attenuated enclosures available. • Prices to fit all budgets. • Expert service and support. Generators, Compressors, Chillers, Light Towers

Call for In Stock Parts

1-800-53-CRUSH

800-821-6412 Serving MA, RI, NH, ME, VT and Upstate NY.

www.miltoncat.com


Construction Equipment Guide • New England States Supplement • www.constructionequipmentguide.com • August 8, 2018 • Page 7

A Tip of the Hat to Monroe Tractor

We’re proud to have Monroe Tractor as part of the Okada America, Inc. Distributor network providing our valued customers in the greater Connecticut, Massachusetts and Rhode Island areas with the: • Full-line of TOP Series and ORV Series hydraulic breakers, OAC vibratory compactor/drivers, OSC Series Secondary Crushers and Magnet Pulverizers, ORC Series Rotating Pulverizers, TSRC Series Multi-Crushers, TS Series Primary Crushers, TMB Series Trommel Screening Buckets (Padding Buckets) and Pedestal Rock Breaker Boom Systems. • Factory authorized parts and service to keep those Okada products productive and on the job.

6 Sandra Drive South Windsor, CT 06074 T: 860-920-0075 F: 860-906-9024

www.monroetractor.com

47 Southwest Cutoff Worcester, MA 01604 T: 508-845-4343 F: 508-845-6418 192 New Boston Street Woburn, MA 01801 T: 781-933-4217 F: 781-935-0854

904 Medina Road Medina, Ohio 44256 T: 330-239-2666 F: 330-239-3670 www.okadaamerica.com


Page 8 • August 8, 2018 • www.constructionequipmentguide.com • New England States Supplement • Construction Equipment Guide

MassDOT Provides I-90 Allston Intermodal Project Update On June 27, at a meeting of the Allston I90 Intermodal Project Task Force, the Massachusetts Department of Transportation (MassDOT) announced that it is reviewing two key aspects of the project: the design of the “throat” section of the highway along the Charles River and when to construct a new regional transit hub at West Station. Transportation Secretary and CEO Stephanie Pollack committed to deferring a decision on a preferred alternative design of the throat section until after completion of the 90-day review by an independent consultant team. “We will take a hard look at the benefits and challenges of building the highway on the ground or on an elevated viaduct,” Pollack said. The review team is fully independent of the project team, and consists of engineers, designers and permitting experts that will analyze improved versions of viaduct and at-grade options for the throat. Members include individuals who helped to successfully redesign the MBTA Green Line Extension Project. At the same time, MassDOT is undertaking two collaborative studies of transit and mobility needs now and in the future

throughout the Allston/Beacon Park Yards area: a study of long-term potential land use and public transit outcomes to be developed by the Metropolitan Area Planning Council, and a sixth-month study of immediate transit needs in the Allston area. The additional transit analysis will help inform a decision on when to build West Station and make future transit investments. “The proposed West Station is the staging area for reconstructing the Massachusetts Turnpike, meaning that the station cannot physically be built prior to 2025 when construction activities are expected to be completed,” Pollack said. “MassDOT will re-phase this project to start construction of West Station as soon as it is both possible and sensible.” As the independent review is carried out, MassDOT project team members will continue to advance other aspects of the project including environmental review work and technical tasks such as field surveying and geotechnical investigations. The Final Environmental Impact Report for the Allston I-90 Intermodal Project is currently expected to be filed in spring 2019.

The current viaduct structure carries 150,000 vehicles each day into and out of downtown Boston. The viaduct is the primary route of vehicular travel from Western Massachusetts and Central Massachusetts into the city. The viaduct is outmoded and structurally deficient, and MassDOT annually spends approximately $800,000 to maintain the viaduct in usable condition. The viaduct currently is safe Stephanie Pollack for travel. MassDOT For several years, MassDOT has hosted regular meetings of a public Task Force in order to vet all aspects MassDOT would then carry out the process of the project elements with neighborhood to procure a design-build construction con- residents, representatives of local organizatractor in 2020. tions and regional transportation stakeholdThe independent review, which was ers. Since the inception of the project, launched on June 27, is expected to be com- MassDOT has held more than 30 Task pleted in 90 days and will analyze areas of Force and public meetings. each potential throat section design such as For more information,visit constructability, environmental impacts, massdot.state.ma.us/highway/HighlightedP resiliency, geometry, risk, and cost. The rojects/AllstonI90InterchangeImprovement independent team will receive feedback Project.aspx. from key stakeholders and members of the (This story also can be found on project Task Force in order to best under- Construction Equipment Guide’s webstand the benefits and challenges of the dif- site at www.constructionequipmentferent design concepts. guide.com.)

“We will take a hard look at the benefits and challenges of building the highway on the ground or on an elevated viaduct.”

Local Business Owner Turns Developers Announce $20M Quarry Into Event Space Downtown Rutland Hotel Project Emily Buenzle CEG WEB EDITOR

An old Vermont quarry will soon be repurposed into a space for local music. The five-acre quarry, located in Proctor, Vt., was bought by Frank and Karen Beyette in 2015, whose restaurant sits across the street from the site, the Rutland Herald reported. According to Frank, the scenic water and rock in the quarry, plus the Red Rocks Amphitheater in Colorado inspired him to create a live music venue. “It’s a good sister project for the restaurant, and we can cater right from here,” he told the Rutland Herald. “There aren’t many reasons to come to Proctor. We want to put Proctor back on the map.” Not to mention the site’s natural beauty. “It’s picturesque as heck,” said Beyette. “I just wanted it for the backdrop.”

A Work in Progress Beyette has been working on the site with his own crew and equipment to clear surrounding trees and create a space where audiences can sit and enjoy music while taking in the beauty of the marble rock face, which will serve as a natural backdrop and centerpiece of the amphitheater. When complete, “The Quarry” will have removable walls, a 30-by-40-ft. pavilion, bathrooms, a sewer system, a cooking space, a fence along the edge of the old quarry and enough room to seat 775 people, Beyette said. Construction is expected to be complete by summer 2019, but for now, Beyette is focused on getting his Act 250 permit approved by the fall, the Rutland Herald reported. “If the snow’s gone by April, I’ll start digging,” he said. (This story also can be found on Construction Equipment Guide’s website at www.constructionequipmentguide.com.)

RUTLAND, Vt. (AP) Developers are planning a $20 million hotel project at the site of the former Rutland Herald building. The Rutland Herald reports the Willistonbased firm DEW Construction confirmed it had signed a $620,000 purchase agreement for the Rutland property. Pete Kelley, DEW vice president said there aren’t any design plans for the project yet. Alderwoman Melinda Humphrey, who serves as chairwoman of the Community and Economic Development Committee, said she’s excited about the project. Humphrey

said the hotel could appeal to tourists and skiers. Downtown Rutland Partnership executive director Steve Peters said the hotel would increase business in the area. According to Kelley, the old Herald building would be demolished. The proposal still needs to pass the Act 250 process. For more information, visit rutlandherald.com. (This story also can be found on Construction Equipment Guide’s website at www.constructionequipmentguide.com.)

Keep Up With All the Industry News Subscribe to

Construction Equipment Guide Today! Toll Free 800/523-2200


Construction Equipment Guide • New England States Supplement • www.constructionequipmentguide.com • August 8, 2018 • Page 9


Page 10 • August 8, 2018 • www.constructionequipmentguide.com • New England States Supplement • Construction Equipment Guide

The Nice Company, Inc

9 Rosenfeld Drive, Hopedale, M A Toll Free# 888-717-8096 • w w w.theniceco.com

We sell NICE machines! Equipment Sales and Rentals Thank you for making us the fastest growing independent heavy equipment rental company in New England!!!

2017 Doosan DX225LC, Plumbed for QC, rearview camera, plumbed w 3rd valve, 42" Doosan bkt w teeth - UNUSED!....$139,000

2013 Volvo 380DL, Plumbed, 3300 hours, GP bucket......................................$159,000

2017 Doosan DX85R-3, NEW, AC, 7’5� stick, QC, digging bucket ................$79,000

2014 CAT 312EL, 1000 hours, Med. stick, plumbed, North American machine..$109,000

2015 Cat D5K2 LGP, 2800 Hrs, Pre-Wired for Grade Control, System 1 Undercarriage, Sweeps, Draw-Bar ........................$109,000

2011 John Deere 750J LGP, 4300 hours, 6 way Dozer, AC cab, Plumbed for ripper/winch ....................................$69,000

1998 Fontaine 50T Trailer, 80%+ Tires and Breaks, Wet Line Operated, Recently Rebuilt Rear Boxes, Outriggers, Work Ready!$39,000

2012 Komatsu PC360LC-10, 5500 hours, QC, Aux. Hydraulics ....$129,000 $114,000

6HOI (UHFWLQJ 2SWL :LGWK 7HFKQRORJ\ 2SHUDWHV DW ƒ2XW RI /HYHO )RXQGDWLRQ &RQWUDFWRU¡V 7HOHFUDZOHU RI &KRLFH 1996 HYUNDAI 290 EXCAVATOR with CBI Shear in Good Condition. Clean Engine & Hydraulics. Rebuilt Hydraulic Cylinders. New Joy Stick. Excellent Yard Machine $42,500 Used FLEXXAIRE FAN for 3412 CAT Engine with NEW Linear Actuator $2,500

ZZZ (PSLUH&UDQH FRP Used FLEXXAIRE FAN for 3412 CAT Engine $2,000

1HZ (QJODQG 6DOHV -XVWLQ 0HOYLQ

6$/(6 3$576 6(59,&( 5(17$/6


Construction Equipment Guide • New England States Supplement • www.constructionequipmentguide.com • August 8, 2018 • Page 11

The streng e th t to take on heav y-duty loads. Experience the highest horsepower, tipping capacity and breakout force available in the Doosan® wheel loader lineup. The heavy-duty DL550-5 is designed d to take on your largest material-handling jobs, yet is agile and smooth despite its size. Multiple cab improvements make your work easier and more comfor table, while reduced cycle times and increased uptime help improve your bottom line. Stop in and demo a Doosan wheel loader to oday y..

Doosan® and the Doosan logo are reg istered t r ademar k s of Doosan Cor p. in the United S t a t e s a n d v a r i o u s o t h e r c o u n t r i e s a r o u n d t h e w o r l d . 1 8 - D 0 0 3. 3

Au thor ized Doos an De aler

Equipment East 61 Silva Lane • Dracut, MA 01826 978-454-3320 • w w w.equipmenteast.com


Page 12 • August 8, 2018 • www.constructionequipmentguide.com • New England States Supplement • Construction Equipment Guide

DISPLAY ADS/ CLASSIFIEDS Hydraulic Cranes 8 to 600 Ton Daily & Hourly Services www.astrocrane.com

Fully Insured 200 Codman Hill Rd., Boxborough, MA 01719 978-429-8666

Place Your Business Card for... 3 months 6 months 12 months

$300* $585* $1040*

only $50 an issue only $45 an issue only $40 an issue

Call now to reserve your space! 800-225-8448 * pre-payment required

Classified Rates: 30 Words or Less for $40.00. Each Additional Word is $1.20. For just an additional $25 your ad can be posted on our online searchable database for 30 days. Ad runs for 2 (two) insertions - no changes in second insertion. PLEASE ENCLOSE PAYMENT WITH ORDER and mail to: 470 Maryland Drive• Fort Washington, PA 19034

215/885-2900 • Fax 215/885-2910 Toll Free 1-800/523-2200 LOADERS

ROAD MAINTENANCE

2000 CASE 621, Multi purpose bucket, Used condition, 9,700 hours ..........................$29,500.

Sweepers

Gibson Machinery, LLC 440-439-4000

DAILY AND WEEKLY EQUIPMENT RENTALS

2002 Schwarze A7000, Great shape! Front Spray Bar, Beacon Light, Mounted on Sterling SC8000, 2,050 hours .............. ..................................$37,000. Stephenson Equipment, Inc. 717-564-3434

CLOSE TO YOUR JOB SITE

Concrete Road Barriers

RENTMACHINES.COM

Concrete Roadway Barriers For Sale

CATERPILLAR® GENIE® CHALLENGER® SCREEN MACHINE®

180 Pieces 12’0” Long – 52” High $325.00 each + Tax – Includes Loading F.O.B. Philadelphia, PA Contact: email@dbicontractors.com


Construction Equipment Guide • New England States Supplement • www.constructionequipmentguide.com • August 8, 2018 • Page 13

2015 Merlo Roto 45.21 10,000 lb. lift capacity, 68'2" maximum lift height, Iveco NEF T4 Int 176HP engine, 4WD, 3 steering modes, heat and AC, front/rear stabilizers,continuous rotation, coldstart kit, hydraulic winch, and 48" forks, stk8469

$199,000 *For an additional $19,500, include these attachments: 1.75 yd3 bucket, aerial work platform, reduced height boom crane and 6'6" jib.

2013 Link-Belt RTC8065II, 115’ Boom, 35’-58’ Fly, 40-ton block, 8.5-ton ball, auxiliary lifting sheave, stk7694.......... ................................................................................$POR

2012 National 14127A, 33 Ton, 127’ Boom, SFO, Ball, Full LMI, AC in Operator Cab, Peterbilt 365, Paccar 380HP, Eaton Fuller 8LL Trans, stk9557 ............$249,500

2016 Volvo EC160EL, S6 Quick Coupler, 24" Track Pads, 17'11" Boom, 9'10" Arm, X3 Auxiliary Hydraulics, stk10040 ..................................................................$POR

2017 National 1300A, 110’+44’, 18’ Wood Deck, SFO, Peterbilt 348, stk9094 ..............................................$POR

2003 Grove TMS900E, 90 ton, 142’+56’, two winches, 35-ton block, ball, hyd luffing jib, hyd tilting cab, Cummins ISM 450HP, stk8397 ..........................$269,500

1997 Link-Belt HTC8670, 115’+61’ Two Winches, Block, Ball, Aux Sheave, Greer RCL & A2B, Detroit Series 60 365HP, Jake Brake, stk4175 ..............................$189,500

2015 Volvo ECR145EL, Dozer Blade, Engine Block Heater, AC, Extra Work Lights, Rearview Camera, Pilot Control Pattern Changer, stk8604 ......................$137,900

2011 Link-Belt RTC8065II, One Winch, Auxiliary Lifting Sheave, 8.5-ton Swivel Ball, 40-ton Block, 35’ to 58’ Offset Fly, stk6199 ............................................$289,500


Firm Sees Big Productivity MVY Lands $11M Gains Using Sennebogen Runway Grant ARBORIST from page 1

grapple saw attachment. The machine has a maximum reach of up to 43 ft. (13 m), with powerful hydraulics tuned for delicate tree surgery. With a lifting capacity of up to 3,700 lbs. (1,700 kg) and a hydraulic tree saw, Yerke’s machine easily grasps, cuts, moves and Its long reach and capability to lift and place logs stacks tree limbs at an aston- make it easy for the operator to stay in one place while working an area. ishing rate. The operator works from Sennebogen’s enclosed Maxcab, which can morning rounds, Yerke found that the 718 be hydraulically elevated to an eye-level of had already dismantled seven trees in the 18 ft. (5.5 m). The cab also comes with a tilt- first hour of the day: “cut, stacked and ready ing mechanism to improve the operator’s to chip.” visibility while operating the machine. A Big Step Forward for Safety Troy agrees that the 718 is a big step for“No Joke” — 10 Times Faster Yerke said that the 718 is simply doing ward. “The visibility is great — with the camtraditional tree-trimming and removal, but eras I can see forward to the stick, to the side doing it better. “It’s not ‘what’ we can do with it,” he said or behind, or all three views at once. I’m “… it’s how fast we can do it now, with one really comfortable in it. The cutting feels a person instead of three. Until now, we’d lot safer. I can sit 40 feet away from the cut have one guy up in a bucket, and one with a point; the chances of anyone getting hurt are rope, and another one handling the limb slim to none.” Yerke also is impressed with the safety either by hand or with a mini-excavator. Now a single operator in the 718 can handle, aspect of 718. “Nobody is in harm’s way here. It really or dismantle, trees safely, under control, in a climate-controlled cab. And he’s increasing eliminates the hands-on cutting and handson handling of the branches. It’s so methodproduction by — no joke — ten times.” After another season of heavy storms, on ical; it’s like a robot with the right operator. the heels of Hurricane Sandy and Storm It’s such a great way to ‘dismantle’ a tree.” Alfred a few years ago, Yerke was on the “You Can’t Touch It” hunt for a new solution last year. He considThe Distinctive crew is quickly getting a ered equipping an excavator for the job, but had doubts that he could achieve the capabil- sense of how to make best use of the unique ity he wanted. This past October, however, capabilities of the 718. “It’s not perfect for every job,” Yerke said. he attended the TCIA show in Columbus and “But, when you do the right stuff with it, you discovered the 718. can’t touch it. It’s ideal for the urban environment. You just set up at the edge of the paveDoing More With Less A fellow arborist, Dan Mayer of Mayer ment or on a nice piece of flat ground. You Tree Service, was at the show as a get the rubber tires, outriggers and crazy Sennebogen spokesperson. Mayer pur- reach. You’re not going to put metal tracks in chased the first 718 in North America, and a shopping mall, or on a curb, or next to a guard rail. has become a vocal fan of the machine. “Once you see it, it all makes sense. With “Dan was there kind of explaining the benefits of the 718. We hit it off, and I hired its strength, you can move and stack larger him to work at a site in Connecticut. I’ve pieces, too — there’s also less handling to been doing this for 25 years and I know, that do, and clean-up is easier. Then when you’re job would have been 20 days with our usual done, often, you can simply drive it right to bucket truck and crews. He completed it in 3 the next job.” For more information, visit days,” Yerke said. “Once, I saw it I thought ‘sold.’ It just www.sennebogen-na.com. (This story also can be found on arrived here two weeks ago — today, we’ll Construction Equipment Guide’s website at have it working at 3 or 4 locations.” Speaking to his operator, Troy, on his www.constructionequipmentguide.com.)

The U.S. Department of Transportation has announced a grant of more than $11 million for the Martha’s Vineyard Airport. The grant is to reconstruct the main runway at the airport. The total project cost is $11.4 million. The project will begin at the end of the summer travel season this fall and is scheduled to be completed prior to the 2019 summer season. Bob Rosenbaum, chair of the Martha’s Vineyard Airport Commission, credits the airport’s partnership with the Federal Aviation Administration. “The Airport Commission has worked hard to foster a relationship with the FAA that allows us to work together to improve the Martha’s Vineyard Airport,” Rosenbaum said. The rehabilitation of Runway 6-24 will be constructed by Lawrence-Lynch Corporation of Falmouth, Mass. The design and construction management was done by McFarland Johnson Inc. of Concord, N.H. The reconstruction was necessary because the runway, the only runway on the island of Martha’s Vineyard able to accommodate commercial airline traffic, has exceeded its 20-year design life. The project also will include the installation of no-taxi islands and electrical improvements to improve the safety of the facility. “Martha’s Vineyard is a world-class destination and it deserves an airport of world-class distinction,” said Sen. Edward J. Markey, a member of the Senate Commerce, Science and Transportation Committee. “With this federal funding, Martha’s Vineyard Airport can restore its runway, ensuring it is as welcoming as the neighboring beaches. I am proud of this strong federal investment in Martha’s Vineyard’s economy, and I look forward to continuing the strong local-federal partnership with the region to address critical infrastructure needs.” Martha’s Vineyard Airport is managed by the Martha’s Vineyard Airport Commission. It offers seasonal airline service by American Airlines, Delta Air Lines and JetBlue and year-round service by Cape Air in addition to robust general aviation facilities. (This story also can be found on Construction Equipment Guide’s website at www.constructionequipmentguide.com.)

www.ConstructionEquipmentGuide.com

Page 14 • August 8, 2018 • www.constructionequipmentguide.com • New England States Supplement • Construction Equipment Guide


Construction Equipment Guide • New England States Supplement • www.constructionequipmentguide.com • August 8, 2018 • Page 15

CRUSHING EQUIPMENT, PARTS & SERVICE

2017 Irock RDS-15 Closed Circuit Impactor - NEW RDS-15 horizontal impact crushing plant. As the name suggests, the RDS — rapid deployment system provides exceptional portability and rapid setup time. Ideal for processing smaller materials such as reclaimed asphalt pavement (RAP) or Concrete demo. Powered by a Caterpillar 350hp engine, 5x14 double deck screen can process up to 350 tons per hour. The entire plant is self-contained, with on-board power supplying full plant operation. Please call if interested

30x60 Electric Stacking Conveyor - NEW Electric Radial Stacking Truss Conveyor. Super strong and over built. There conveyors are made right here in Ct. by Ace/Milroy Company Using all quality components. Come check them out!

Eagle 15x36 Jaw Plant - Used Eagle 1536 Portable Jaw Crushing Plant Model 33D4155, Vibratory Pan Feeder with Hydraulic Grizzly Dump 3 x 6 Scalping Screen,Cummins Diesel Engine Drives 50Kw Generator and Hydraulic Pump,Dual-axle, 30" Fold-up Discharge Conveyor, Rear Discharge Conveyor for Screen throughs. Low hrs, Very Good Condition! Please call if interested.

2012 Telsmith 44SBS Cone/Screen Plant - Used Low hr unit equipped with the latest Telsmith Trac 10 automation for easy adjustment. Onboard Telsmith 7x20 Tripple Deck Screen. Call today.

Telsmith T300 Cone Crusher - Used low hr Telsmith T300 Cone Crusher. This cone has been designed for maximum uptime and productivity while delivering 300HP performance and a crushing capacity output range from 125 to 400 Mt/hr in tough or abrasive mining applications. Comes with full Trac 10 automation. Call for more info today!

2017 JP550 Grizzly Scalping Stand - Keep the BIG nuggets from tearing your screener apart with our JP550 Scalping Stand. Custom built for your application. Back your machine in and start bailing material without worries. Call today for more information.

2015 Irock TC-20 Tracked Impactor - Used TC-20 track impact crusher combines a large feeder, high-performance four-bar impactor and heavy-duty components for exceptional efficiency, reliability and precision. The TC-20 produces a uniform, cubical product, and hydraulically adjustable aprons provide better control over sizing. The unit has the versatility to process soft to medium rock, recycled concrete and recycled asphalt. The rotor measures 40 inches by 56 inches and can process a variety of materials up to 24 inches in diameter. A 440-horsepower Caterpillar® C-13 ACERT Tier 3 engine powers the impact crusher, which can process up to 500 TPH. 800 hrs on machine, come watch it run today!

2014 Irock TS-512 Tracked Screener - Used less than 1200hrs Heavy-duty design. The unit features high portability, three hydraulic folding side conveyors allow easy transport and quick set-up. 100horsepower CAT® C4.4 to sort up to three different product sizes at rates up to 400 TPH. Three hydraulic, folding side conveyors allow easy transport and set-up times of 10 minutes or less. 14foot hydraulic tipping grid enables simplified discarding of larger material.The heavy-duty, high-energy, two-bearing, 12-foot by 5-foot screen box offers 112 square feet of screening area.

Ace Equipment Sales, Inc. and Milroy and Company LLC 171 Tolland Turnpike (Route 74) • PO Box 535 • Willington, CT 06279

Call CJ (413) 896-0793 • (860) 429-2793 Go to www.acecrushers.com for a complete listing and description of our new and used equipment.


Page 16 • August 8, 2018 • www.constructionequipmentguide.com • New England States Supplement • Construction Equipment Guide

NHDOT Rebuilds Section of Route 12 in Walpole, Charleston

Once the steep slope is armored, crews will be able to widen the road to 11 ft. lanes with 4- to 5-ft. shoulders. SARGENT from page 1

NHDOT has an extensive plan in place to protect the river.

for them to get off the road. The road is pretty rough and some of it is old concrete. And there is no place for the water to go now, so it sits on the roadbed.” In the past, engineers discussed moving the roadway to the other side of the railroad tracks or moving the railroad tracks, both pricey propositions. Guyette wasn’t on staff at the time, but said, “I just know at one point I heard $40 million just to go three miles.” The option of widening the road toward the Connecticut River was discouraged for fear of damaging the river. In the end, however, that’s the option NHDOT chose, putting in a place an extensive plan to protect the river. That’s the work crews are busy with now.

“We have to keep the river clean,” said Tim LePlage, Sargent site superintendent. “We are armoring 6,000 feet of the slope and putting in 80,000 cubic yards of riprap. We’re filling in the river. The toe is out in some places 25 feet from shore. We’re changing the shoreline there. “We have a turbidity curtain anchored in the river. It keeps the silt from traveling down river. We’re containing it on site. There are floats on top of it. There is some curtain that has a tail up to 25 feet deep in the river. You have to put blocks and weights to hold it down so the current doesn’t move it.” Once the steep slope is armored, crews will be able to widen the road to 11 ft. lanes with 4- to 5-ft. shoulders. “The challenge is they’ve got to build this access down to the river,” said Guyette. “They have to take all the trees see SARGENT page 18

Route 12 is bordered by the Connecticut River on one side and railroad tracks on the other, making widening a difficult and potentially pricey project.

For more than a decade, stakeholders in Walpole and Charleston have been trying to come up with a fix for an old rural stretch of highway plagued by numerous problems.


Construction Equipment Guide • New England States Supplement • www.constructionequipmentguide.com • August 8, 2018 • Page 17

251 NH-125 Brentwood, NH 03833 603/642-5666

Chappell Tractor 454 Rte 13 Milford, NH 03055 603/673-2640 www.chappelltractor.com

391 Loudon Rd. Concord, NH 03301 603/225-3361

Kahn Tractor & Equipment, Inc. 520 Pond Road North Franklin, CT 06254 860/642-7596 www.kahntractor.com

Lorusso Heavy Equipment, LLC 160 Elm Street Walpole, MA 02801 508/660-7600 www.lhequip.com


Page 18 • August 8, 2018 • www.constructionequipmentguide.com • New England States Supplement • Construction Equipment Guide

NEW ENGLAND SUPPLEMENT ADVERTISER INDEX

Crews Put Down Infiltration Stone BMP for Road Bed

ACE EQUIPMENT SALES INC ......................................15 ARGUS INDUSTRIAL COMPANY ....................................1 ASTRO CRANE ..............................................................12 BULLETIN BOARD..........................................................12 CHADWICK-BAROSS INC..............................................20 CLASSIFIEDS ................................................................12 EMPIRE CRANE LLC......................................................10 EQUIPMENT EAST ......................................................1,11 FOLEY MARINE & INDUSTRIAL ENGINE ......................1 GORILLA HAMMERS........................................................1 HYUNDAI CONSTRUCTION EQUIPMENT....................17 J R VINAGRO CORPORATION........................................1 LORUSSO HEAVY EQUIPMENT LLC..............................5 M G EQUIPMENT ............................................................1 M-R WOOD RECYCLING ..............................................10 MILTON CAT ................................................................6,12 MONROE TRACTOR & EQUIPMENT ..............................7 NORTHLAND JCB ............................................................9 POWERSCREEN NEW ENGLAND ..................................6 ROGERS BROTHERS CORPORATION ........................19

The option of widening the road toward the Connecticut River was discouraged for fear of damaging the river. SARGENT from page 16

down on the existing slope. Then they have to have the means to get them out of there. That’s why they’re building stone, so they can get trees out. Then, they’ll continue putting down stone.” The DOT is trying something new on this project, which makes for an additional challenge for Sargent, Guyette said. “We’re putting down infiltration stone BMP for two-thirds of this road bed,” Guyette said. “The first layer is going to be clean, 18-inch infiltration stone. What it is going to do is treat the water before it goes into the rest of the world. This water is going to come off surface of the road, have a place to settle and then will continue down the slope. It’s new to us. “This is one lane alternating traffic and you have to put fabric down and keep the stone clean, then cover it and go forward. He’s got to build one side of the road for a ways and then the other side. Everything has

to be paved in a timely manner. So again, that’s a challenge. We’re doing this to maintain water quality. There is no room here, either with the railroad on one side and the Connecticut River on the other. There is no room for even building temporary roads. We’re pretty much constrained. That’s one of the hardest parts, to keep traffic flowing. We have no room for temporary traffic.” LePlage expects the river work will continue through the summer. “Hopefully, we can start doing pipe shortly. In 2019, we’ll be doing box cutting, graveling and paving in sections. We’re going to have to shut down by winter. Due to the nature of the work, you can’t do the gravel in the winter with snow. And we’ll try to be out of river by winter. That’s why that’s pretty much all we’re doing now.” (This story also can be found on Construction Equipment Guide’s website at www.constructionequipmentguide.com.) CEG

SUMMIT SUPPLY LLC ......................................................1 T-QUIP SALES & RENTAL INC ......................................12 THE N.I.C.E. COMPANY ................................................10 THE W. I. CLARK COMPANY ..........................................2 TYLER EQUIPMENT CORPORATION ............................3 WOODS CRW CORP......................................................13 The Advertisers Index is printed as a free editorial service to our advertisers and readership. Construction Equipment Guide is not responsible for errors or omissions.

This spring, crews at long last began the work along Route 12.


Construction Equipment Guide • New England States Supplement • www.constructionequipmentguide.com • August 8, 2018 • Page 19

TRAILERS TO MEET EVERY HAULING CHALLENGE! Committed to building superior quality, reliability and durability into every trailer.

ROGERS BROTHERS CORPORATION ALBION, PA

The Ultimate in Trailers®

Tyler Equipment 251 Shaker Road East Longmeadow, MA 01028 (413) 525-6351 • (800) 292-6351 Parts: (877) 255-6351

1980 Berlin Turnpike Berlin, CT 06037 (860) 356-0840 • (800) 352-4473 Parts: (860) 356-0848

C.N. Wood Co., Inc. 200 Merrimac St. Woburn, MA 01801 (781) 935-1919

140 Wales Ave. Avon, MA 02322 (508) 584-8484

60 Shun Pike Johnston, RI 02919 (401) 942-9191

www.cn-wood.com

www.tylerequipment.com

For more than 110 years, ROGERS® trailers have stood above the rest in rugged durability, unsurpassed quality and superior design. Contact your local dealer for a quote today.


Page 20 • August 8, 2018 • www.constructionequipmentguide.com • New England States Supplement • Construction Equipment Guide

CHADWICK-BAROSS, INC. 15 Katrina Road Chelmsford, MA 01824 978-256-9571

33 Plan Way, Building 8 Warwick, RI 02886 401-640-9303


Turn static files into dynamic content formats.

Create a flipbook