State Supplement sponsored by:
1
11
THE NEW ENGLAND EDITION
A Supplement to:
95
1
201 16 9
26
2
1 3
91
89
2
95 3
2 2 7
1
93
495
16
89 4
89
95
202
7
91
9
95
93
2
95 2
93 90
90
7
95 91
7
SHIP WITHIN 48 HOURS
3
84
495 6
84
6
6
195
395
95 91
July 24 2019
Vol. L • No. 15
95
SAME DAY PARTS AVAILABILITY
95
®
24 HOUR TECHNICAL SUPPORT BACKED BY A 75 YEAR BUSINESS Thousands in Service!
“The Nation’s Best Read Construction Newspaper… Founded in 1957.”
Your New England States Connection • Kent Hogeboom 315-866-1423 2208 Plainfield Pike • Johnston, RI 02919 401-943-7100 • Fax: 401-647-5041
www.jrvinagrocorp.com info@jrvinagrocorp.com
Affordable Price. Premium Service.
CALL 800-367-4937 *On approved credit • Financing Available
Road Widening, Bridge Construction Under Way in Weymouth, Abington, Mass.
Specializing in:
Demolition, Portable Crushing, Material Sales, C & D Recycling, Land Clearing, Heavy Hauling & Trucking Call for Pricing
LEED Accredited in Waste Management
2019 EZ-Screen 1200XLS
Large Enough to Service You; Small Enough to Know You
61 Silva Lane • Dracut, MA 01826
Optional 3 Product Conveyor
6’x5’ Double Deck Screenbox Works with 1/2 to 1 3/4 Yd. Loaders, 25 H.P. Kohler Diesel Engine, 24” Conveyor Dumps Screened Product 9’ High, Two (2) Year Warranty! $44,900 plus freight. Other Screeners Available
EZ-SCREEN
www.ez-screen.com
Call Today (978) 454-3320
WE STOCK RUBBER TRACKS for Over 6,000 Models! Some Used Tracks A & GA Available. NJ, TX, WOUSES WAREH
Upgrades to the highway will include adding two travel lanes in each direction from Highland Place in Weymouth to Route 139 in Abington.
• HIGH QUALITY • FAST SHIPPING • GUARANTEED TO FIT • UNDERCARRIAGE PARTS • FLATPROOF SKIDSTEER TIRES • RUBBER PADS FOR STEEL TRACKS
CEG CORRESPONDENT
888-888-1248
248-745-5828
Cat IT38G, 3.25cy, 7,800 Hrs, Mich Radials 67%, 3rd Valve, Owned for many years, Runs Excellent, No blow by, No leaks, Very Good.. $49,750 or bo
Phil (413) 427-7171 • Largest hammer repair facility in North America • Demolition tools and parts for ALL makes and models • Hammer-equipped excavator rentals • Backed by a 75 year family owned business CALL YOUR ONE-STOP HAMMER SHOP™ TODAY!!!
www.foleyengines.com
By Ken Liebeskind
CALL 888-81-GORILLA(46745)
MassDOT is overseeing a road widening and bridge reconstruction project in Weymouth and Abington, Mass., that will widen and repave 4 mi. of Route 18 and replace a bridge that runs over commuter rail tracks on the highway that is 15 mi. south of Boston. P. Gioioso & Sons of Hyde Park, Mass., and D&R General Contracting of Melrose, Mass., are the lead contractors on the job, with Gioioso performing the bulk of the work and D&R focusing on the road paving. Joseph Gioioso, a project manager, said the company is using the Komatsu 360LCi-11 excavator and the Komatsu D61PXi-23 bulldozer on the job, intelligent machines with GPS control devices that make the job quicker and easier for operators. Gerry Carney, manager of CN Wood of Woburn, Mass., the equipment dealer that sold Gioioso the units, said, “The
excavator digs down so it doesn’t go through the plane and pulls back the bucket so it cuts down on over digging. It gives the operator more information on where he is on the job, drastically increases efficiency and makes the job quicker.” The control function on the machines allow operators to move material without worrying about digging too deep or damaging the target surface, which improves productivity, precision and safety on the work site. The GPS function of the machine utilizes 3D design data loaded into the machine’s monitor to show machine position relative to target grade. When the bucket reaches the target surface, automation kicks in to limit over excavation. “The 360LCi-11 is flexible and versatile enough to be at home on almost any job site,” said Jason Anetsberger, senior product manager of Komatsu America. Gioioso said the company also is using a Link-Belt RTC8050 crane, a rough terrain crane with four steering modes. see MASSDOT page 14
Page 2 • July 24, 2019 • www.constructionequipmentguide.com • New England States Supplement • Construction Equipment Guide
2016 KOMATSU WA270-7
2015 HYUNDAI HL955
2014 LEEBOY 8510C
Stk# 24861, air, 3rd valve, gp bucket, good rubber ..................................................$88,000
c/air, 3 spool, 3.7 yd bucket, 865 Hours, Stk# 24074 ................................................$136,000
2025 Hours, Stk# 24650, Kubota, 8-15' propane screed, one owner unit ..........$75,000
2016 BOBCAT T590
2011 CEC SC 300
2013 CAT 262D
1613 Hours, cab/air, single speed, 80% tracks, one owner, Stk# 24965 ..........................$45,000
cone crusher, 1795 Hours Stk# 21994 .............. ..........................................................$290,000
c/air, EH controls, GP bucket, good condition, Stk# 24947 ..........................................$33,500
2009 JOHN DEERE 244J
2010 JOHN DEERE 344J
2018 JOHN DEERE 344K
5584 Hrs, c/air, aux hyds and hyd coupler, GP bucket, 70% rubber, fully serviced, Stk# 24822.... ................................................................$36,500
650 hrs, 3rd valve, hyd coupler, 90% rubber, super clean loader, Stk# 24970 ..........$110,000
125 Hours, c/air, Ride control, aux hyds, hyd coupler, 2yd GP bucket, like new condition, Stk# 24724....................................................$135,000
See Our Complete Inventory at www.wiclark.com
Construction Equipment Guide • New England States Supplement • www.constructionequipmentguide.com • July 24, 2019 • Page 3
Contact your local dealer:
251 Shaker Road East Longmeadow, w, MA 01028 800.292.6351 1980 Berlin Turnpik Turnpike Berlin, CT T 06037 0603 800.352.4473
PAAVIN V G TODAY TODAY. BUILDIING TOMORROW. At Volvo, V l we k kn now that th t you need d relia li ble, bl d durable bl and d capable paving g equipment. That’s whyy we work to build sustainable, pro oductive and innovative machines m that help you get more do one faster. The future is w waiting – turn to Volvo for help with w building tomorrow.
tylerequipment.com
Page 4 • July 24, 2019 • www.constructionequipmentguide.com • New England States Supplement • Construction Equipment Guide
OVER 1000 MACHIN NES & ATTACHMENTS IN OUR FLEET!
208 Holland Road Brimfield, MA 01010
Sales Contact: R.J. Poirier rjpoirier@rjpoirier.com 413-245-3882
Shawmut Equipment Expands Operations With New Facility in Halifax, Nova Scotia
Fax: 413-245-3522
www.rjpoirier.com
2016 CAT 988K, 9 Yd, High Lift, New Tires...... CALL (3) 2016 980M, Agg Handler, GP, Low Hrs...... CALL 2014 CAT 988K, 9 Yd, High Lift........................ CALL 2015 CAT 336FL, Coupler, Bucket.................... CALL 2013 CAT D8T, 8U w/ Twin Tilt, S/S..................SOLD 2011 D8T, 8U w/Twin Tilt, S/S, ARO................ CALL
The new Canadian headShawmut Equipment of quarters is located in the East Canada Inc. recently opened Hants Business Park in the doors of its new facility Elmsdale, Nova Scotia. Due located in the Halifax, Nova to the large geographical Scotia, area, where its cusarea that Shawmut tomer base and business volEquipment of Canada covume has been constantly ers, the company will addiexpanding. To meet the tionally continue to serve increased demand for prodcustomers out of its Saint ucts and services, Shawmut John, New Brunswick, locadecided to open an additiontion. al location to better serve its Shawmut Equipment repcustomers. The facility was The new facility provides vast yard space, multiple specifically designed by repair bays equipped with the latest diagnostic equip- resents the Manitowoc Shawmut to transform the ment and two 10-ton overhead cranes, a large parts Crane Group, including Manitowoc crawler cranes, newly constructed building warehouse and expansive office space. Grove mobile hydraulic into an industry leading space where its factory trained techni- office space. The full-service location cranes, GMK all terrain cranes, cians and knowledgeable parts and will act as the new Canadian headquar- National boom trucks, Potain selfservice staff can quickly and efficiently ters, offering crane and utility equip- erecting cranes, as well as a variety of ment sales, rentals, parts and service utility equipment. Shawmut support all customer needs. The new facility provides vast yard support. The central location and prox- Equipment of Canada Inc. is a fullyspace, multiple repair bays equipped imity to the Halifax airport will allow owned subsidiary of Shawmut with the latest diagnostic equipment for quick technician dispatch, as well Equipment Company Inc., which has and two 10-ton overhead cranes, a as expedited shipping times for parts been serving the crane industry since 1957. large parts warehouse and expansive orders.
Construction Equipment Guide • New England States Supplement • www.constructionequipmentguide.com • July 24, 2019 • Page 5
Page 6 • July 24, 2019 • www.constructionequipmentguide.com • New England States Supplement • Construction Equipment Guide
A.F. Mallet Wins Special-Edition Cat CB24B Utility Compactor
(L-R): Jaimee and Andrew Mallet hold the “key” to their new Cat CB24B small tandem vibratory roller with D. Scott Phipps, paving industry sales manager — North America, Cat Paving.
Caterpillar Inc. recently celebrated 30 years of small vibratory roller manufacturing and surpassed the 30,000th roller production mark. To commemorate the milestone achievement, Caterpillar held a sweepstakes in the United States to give away a special-edition Cat CB24B roller. Thousands of contractors entered the Feelin’ Lucky sweepstakes held from Feb. 4 through April 15, 2019. Produced in Caterpillar’s Minerbio, Italy, factory, the commemorative CB24B tandem vibratory roller features an exclusive charcoal gray paint scheme with the 30th Anniversary sticker and a chrome Cat badge on the hood. The 3.0-ton (2.7-t) Cat CB24B compactor boasts three vibrating frequencies to meet the job at hand. With its 47-in (120-cm) compaction width, this utility roller can be used for small paving jobs, large project finish rolling and landscape applications. Intuitive controls with multifunction control panel and easy viewing LCD display make this roller perfect for the rental market, according to the manufacturer. Athol, Mass.-based excavation and paving contractor A.F. Mallet Excavating won the Feelin’ Lucky special-edition CB24B vibratory roller. Andrew Mallet founded the north central Massachusetts excavation contracting business in 2007 and included asphalt paving services to complete all phases of the project. With the company’s main team members offering more than 75 years of experience, A. F. Mallet completes a range of residential, commercial and municipal projects. “To be honest, I couldn’t really believe it at first. Once I received the verification email, I realized it
“We feel incredibly lucky and grateful that we won this piece of equipment. We look forward to putting it to work.” Andrew Mallet A.F. Mallet Excavating
was legit and was extremely excited. I printed a picture of the roller and hung it on our refrigerator at home,” said Mallet. “We feel incredibly lucky and grateful that we won this piece of equipment. We look forward to putting it to work.” Representatives from A.F. Mallet received the 30th Anniversary roller during a ceremony held on June 26, 2019, at Milton Cat’s Londonderry, N.H., branch. Also on hand for A.F. Mallet’s receipt of the CB24B compactor was D. Scott Phipps, paving industry sales manager — North America, Cat Paving. A short video of the 30th Anniversary roller being built can be seen at: https://youtu.be/QYxFK6LXtBM For more information, visit www.cat.com.
Caterpillar Inc. recently celebrated 30 years of small vibratory roller manufacturing and surpassed the 30,000th roller production mark. To commemorate the milestone achievement, Caterpillar held a sweepstakes in the United States to give away a special-edition Cat CB24B roller.
Construction Equipment Guide • New England States Supplement • www.constructionequipmentguide.com • July 24, 2019 • Page 7
Wilmington n, MA Concord, NH Middleboro o, MA Lewiston, ME Shrewsburry, MA Waallingford, CT
WH HAT DOES S AV A ANT DO DO?
WH HAT DOESN D N T AV N'T AVANT ANT DO? DO
Page 8 • July 24, 2019 • www.constructionequipmentguide.com • New England States Supplement • Construction Equipment Guide
Fed Judge Clears Path for $1B Railroad Bridge Plan
The existing Walk Bridge, or Norwalk River Railroad Bridge, carries four tracks that serve about 200 trains daily, including Amtrak.
NEW HAVEN, Conn. (AP) A federal judge has cleared the way for state and federal transportation officials to move forward with a $1.1 billion project to replace a 122year-old movable railroad bridge in Norwalk. U.S. District Court Judge Stefan Underhill ruled against opponents of the plan, who argued in a lawsuit that there are cheaper alternatives for replacing or fixing the span. The existing Walk Bridge, or Norwalk River Railroad Bridge, carries four tracks that serve about 200 trains daily, including Amtrak. It swings open to allow larger boats coming in from Long Island Sound to pass through to reach a gravel company, a marina and a once-industrial waterfront area that now holds chic condominiums. But a conservation group, Norwalk Harbor Keeper and others say that unlike a century ago, few boats with tall masts currently pass in and out of the Norwalk River. They had suggested replacing the current bridge, which pivots to open and allow tall vessels through, with a fixed span or welding the current bridge shut. They said that would save taxpayers millions of dollars and cause less disruption to the environment. In his ruling, Underhill said the plaintiffs lacked standing to sue. He also found the government made its decision properly after considering other options. He said transportation officials had determined, for example, that the Coast Guard and other agencies would not approve further limiting navigation under the bridge. “Defendants reasonably believed, based on comments made during initial scoping, that the agencies that would need to sign off on the project would not do so unless current
navigability was maintained,” Underhill wrote. Messages seeking comment were left for attorneys in the case. Judd Everhart, a spokesman for the state Department of Transportation, said numerous alternatives for the project were considered and the department believes it has been responsive to the concerns of all of the project’s stakeholders and the community. “We will continue to engage the public on design and construction progress for this critical project that is necessary for the future of Norwalk and the Northeast Rail Corridor,” he said. Handwritten logs from bridge staff show the bridge was opened 78 times in 2016, excluding tests. Of those, more than 30 for were for a single boat. The 564-ft.-long Walk Bridge, a hulking steel structure that rotates on a circular pier, is projected to see its rail ridership double by 2065. It has been prone to getting stuck in the open position, delaying commuters on the Metro-North Railroad, which takes commuters to and from New York. The U.S. Department of Transportation has said the $1.1 billion price tag includes engineering, rights of way and construction costs, including a new four-track interlocking system that will allow trains to switch tracks, improvements to another nearby rail line and rail storage area and other related railroad and bridge projects. Connecticut has received about $161 million in federal funding for the bridge from a program intended to improve the resiliency of infrastructure after Superstorm Sandy. The agency also intends to use other federal funds during construction.
Construction Equipment Guide • New England States Supplement • www.constructionequipmentguide.com • July 24, 2019 • Page 9
®
Page 10 • July 24, 2019 • www.constructionequipmentguide.com • New England States Supplement • Construction Equipment Guide
The Nice Company, Inc
9 Rosenfeld Drive, Hopedale, M A Toll Free# 888-717-8096 • w w w.theniceco.com
We sell NICE machines! Equipment Sales and Rentals Thank you for making us the fastest growing independent heavy equipment rental company in New England!!!
2016 CAT 330FL, 4300 hours, AC, 32" pads, Back up Camera.................. $149,000
2018 Doosan EX300LC-5, unused, aux. hydraulics, 24" pads........................$189,000
2016 Volvo EC350EL, 4500 hours, Aux. Plumbing, 12' stick, 65" bucket.... $149,000
2014 CAT 312E, 2200 hours, hyd. QC bucket, 11' stick, aux. hyd., AC...... $94,500
2014 Komatsu WA470, 7350 hrs, Ride Control, 26.5R25 Tires..................$129,000
2014 Komatsu WA380, 5300 hrs, Nice unit!!............................................ $109,000
2016 Komatsu WA380-8, 3600 hours, AC, New front rubber, GP bucket........ $139,000
2015 CAT 930K, 2700 hours, QC, AC/Heat, GP bucket......................................$129,000
Baker-Polito Celebrate South Coast Rail Groundbreaking Gov. Charlie Baker, Lt. Gov. Karyn Polito, MassDOT Secretary and CEO Stephanie Pollack and MBTA General Manager Steve Poftak joined municipal leaders, elected officials and local stakeholder groups to celebrate the beginning of Phase 1 South Coast Rail work and tour action taking place along the New Bedford Main Line in East Freetown, an area in which culvert work is taking place. “South Coast Rail Phase 1 will connect Taunton, Fall River, New Bedford and the surrounding areas to Boston, giving people more options to get to and from southeastern Massachusetts,” said Baker. “We are proud to advance South Coast Rail further than it’s ever been as part of our administration’s $8 billion MBTA infrastructure investment plan over the next five years.” “Having Phase 1 of South Coast Rail fully funded in the FY20-24 Capital Investment Plan is a significant milestone,” said Polito. “Thank you to everyone who played a role in keeping this project going forward and we look forward to Phase 1’s start of service in 2023.” “After years of advocacy, the day when this expansion project will provide service to Southeastern Massachusetts communities is finally in sight,” said Pollack. “This is a proud moment for MassDOT and the MBTA, and a proud moment for the Commonwealth. I look forward to watching the infrastructure in this corridor take shape and am eager for the day in
2023 when the very first train operates on this route carrying passengers.” “Like the Green Line Extension, South Coast Rail is a priority that would not be possible without the strong support of the BakerPolito Administration and the MassDOT and MBTA Boards,” said Poftak. “The MBTA is excited to build on the foundation that MassDOT built, and to begin passenger rail service to the South Coast in 2023.” “Since the first SouthCoast Rail groundbreaking ceremony I attended twenty-one years ago, the necessity of this project has only become more clear,” said Sen. Michael J. Rodrigues. “The communities of the SouthCoast deserve to be economically competitive with the rest of the region, and SouthCoast Rail is a large piece of that. I applaud the Baker-Polito Administration for finally making this long-promised project a reality.” South Coast Rail early action projects currently under way have included infrastructure work on track, culverts, and bridges as well as the acquisition of land for stations: • Special track work: awarded to Progress Rail in December 2018 with shop drawings submitted for approval; • Early action culverts: awarded to JF White in March 2019 with right of way clearing having begun and the first culvert installed in late April 2019; and • Early action for four bridges: contract
awarded by MassDOT Board in April 2019. Other South Coast Rail activities have included: • Developing Phase 1 operations and maintenance cost; • Advancing a portion of the Northern Corridor’s 30-percent design; • Development of MBTA commuter rail station design standards; • Ongoing community meetings; • Developing scopes for Force Account Agreements with utility companies, Mass Coastal Railroad, Keolis Commuter Services, and Amtrak; and • Property acquisition for station sites. In April 2019, MassDOT and the MBTA announced that the South Coast Rail Program recently reached two critical Phase 1 milestones. First, a finance plan was completed and fully funded in the Commonwealth’s Capital Investment Plan. Second, the U.S. Army Corps of Engineers (USACE) approved the final federal permit required for the program to advance. With a recently agreed upon total program cost of $1.047 billion, Phase 1 of the South Coast Rail Program will be funded 100 percent by the Commonwealth through a combination of general obligation bonds and special obligation bonds to be issued under existing authorization for the Rail Enhancement Program. The MBTA is not required to issue any revenue bonds that might otherwise impact the
MBTA’s future operating budgets. All bond cap provided to the South Coast Rail Program will be in addition to the bond cap that MassDOT currently receives to fund its capital plan. There will be no reduction in bond cap allocated to MassDOT as part of the South Coast Rail Finance Plan. Other permitting milestones that have been achieved this year include the final USACE approval and the issuance of the Chapter 91 License, MassDEP 401 Permit, and the Mass Coastal Zone Management Consistency Review. South Coast Rail Phase 1 program management and oversight also is currently transitioning from MassDOT to the MBTA with the MassDOT Highway Division and Rail Group continuing to manage early action projects. Additional elements of South Coast Rail Program Phase 1 work include: • Extending the existing Middleborough Line service using diesel-powered trains to New Bedford and Fall River; • Reconstructing 17.3 mi. of the New Bedford Main Line and 11.7 mi. of the Fall River Secondary; • Upgrading the existing Middleborough secondary track from Pilgrim Junction to Cotley Junction (a distance of 7.1 mi.); • Constructing two new layover facilities; and • Constructing six new stations. For more information, visit mass.gov/ south-coast-rail.
Construction Equipment Guide • New England States Supplement • www.constructionequipmentguide.com • July 24, 2019 • Page 11
Streng e tth and maneuver e ability ge et dif d ficult work done. With remarkable over-the-side lifting performance, the DX63-3 Doosan® excavator takes on many jobs on challenging worksites. Excellent slew performance makes it ideal for working on slopes. The offset boom swing allows you to dig in line with the tracks, ideal for confined areas. Plus its smooth, refined hydraulic system gives you ultimate control to deliver the performance you demand forr difficult work. Stop in and demo a Doosan exca avvator to oday y..
Doosan® and the Doosan logo are reg istered t r ademar k s of Doosan Cor p. in the United S t a t e s a n d v a r i o u s o t h e r c o u n t r i e s a r o u n d t h e w o r l d . 1 8 - D 0 0 3. 4
Authorized Doosan Dealer
Equipment East 61 Silva Lane • Dracut, MA 01826 978-454-3320 1474 Route 3A • Bow, NH 03304 603-410-5540 www.equipmenteast.com
Page 12 • July 24, 2019 • www.constructionequipmentguide.com • New England States Supplement • Construction Equipment Guide
MassDOT, MBTA OK $18.3B Capital Investment Plan The Massachusetts Department of Transportation Board of Directors and MBTA Fiscal Management and Control Board today voted to approve the five-year $18.3 billion MassDOT and MBTA Capital Investment Plan (CIP) for Fiscal Years 2020-2024, an increase of approximately $1 billion over the last five-year CIP. The CIP includes all MassDOT road and bridge projects, public use airports, rail and transit, including the MBTA and Regional Transit Authorities as well as the Registry of Motor Vehicles. The CIP includes investments that vary significantly in scale and in purpose — from small-scale maintenance projects to large-scale multimodal modernization projects. The CIP identifies and includes long-term investments and funding obligations to maintain, modernize, and expand the Commonwealth’s transportation system. The CIP is a rolling five-year plan that is updated annually. “We are continuing to invest historic levels of funding into the MBTA and strengthen our roadway and bridge networks in order to provide a more reliable transportation system across Massachusetts,” said Gov. Charlie Baker. “This latest update to the MassDOT and MBTA Capital The South Coast Rail project will provide rail service to accommodate the existing and future demand for public transportation Investment Plan includes projects that between Fall River/New Bedford and Boston, enhance regional mobility and support smart growth planning and development will serve residents throughout the strategies in southeastern Massachusetts. Commonwealth including delivering • $118 million in new funding for the South Coast Rail and supporting the ongoing roads, bridges, railways, airports, and multi- upgrading the facilities and infrastructure transformation of the Red and Orange modal pathways, and providing improved needed to support the new vehicles. When Mattapan High Speed Line Transformation, services for our customers,” said fully implemented, these investments are for initial investments for bridges, stations, Lines.” “Over the next five years, our Transportation Secretary and CEO expected to allow three-minute headways on track, and other infrastructure to modernize Administration will continue carrying out Stephanie Pollack. “We have appreciated the the Red Line and four and a half minute the Mattapan Line; and • $640.6 million for other improvements capital projects that improve transportation input of members of the public and stake- headways on the Orange Line. The total cost infrastructure throughout local communi- holders throughout the CIP process and we of these improvements is $2.8 billion. to the Red Line, including bridges, track, signals, stations, accessibility improvements, ties,” said Lt. Gov. Karyn Polito. “The thank the MassDOT and MBTA staff mem- Investments in this CIP include: • $753.7 million for 252 new Red and 152 and wayfinding. Capital Investment Plan is a thoughtful bers who have worked for months to create new Orange Line vehicles, a complete $1.36 billion for the Green Line roadmap that reflects our focus on invest- this comprehensive planning document.” The Baker-Polito Administration has replacement of both fleets; Extension Project. This project consists of ments that increase safety and resiliency in • $591.5 million for maintenance facilities constructing a 4.7-mi. light rail line, which the Commonwealth’s statewide, multimodal increased the total level of investment in the transportation system in recent years from and infrastructure to accommodate the new will extend the current Green Line service transportation system.” from a relocated Lechmere Station in East Approximately 45 percent of the $18.3 $15.1 billion in the FY2017-2021 trans- vehicles; and • $253 million to upgrade all signals to a Cambridge, Mass., to a terminus at College billion in total investments (both MassDOT portation plan to $17.3 billion in the and MBTA) identified for the next five years FY2019-2023 plan and now $18.3 billion in modern digital system, which will allow for Avenue in Medford, Mass., and a spur to will be focused on the reliability and resilien- this FY2020-2024 plan. The priorities for the increased reliability and more frequent serv- Union Square in Somerville, Mass. The total cost of this project is $2.3 billion and is fundcy of the core transportation system. Another plan are to continue improving the condition ice. $875 million for additional capital ed with federal and state support of $1.99 28 percent is devoted to modernizing the of roads and bridges, building capacity to system in order to better accommodate cur- support projects across the MassDOT and investments in the Red Line. This includes billion along with pledged contributions for the project totaling approximately $296 milrent or anticipated growth and respond to MBTA systems, and helping address the funding for the following major projects: • $114.9 million for rehabilitating lion from the cities of Cambridge and new needs, such as increased accessibility needs of municipally owned transportation Longfellow Approach, including $109.5 Somerville ($75 million), the Boston MPO and safety requirements that may not have assets. Highlights of the Capital Investment Plan million of new funding in this year’s CIP. ($157 million) and MassDOT ($64.3 million existed when these assets were initially This project will rehabilitate the viaduct car- through Special Obligation Bonds). planned and constructed. 16 percent of include: $1.58 billion for Red Line/Orange Line rying the Red Line from the Beacon Hill Investments in this CIP include: investments will help expand diverse trans• $1.1 billion for tracks, railroad bridges, portation options for communities through- improvements. This program includes all portal to Charles/MGH station, the platforms investments related to replacing and expand- at Charles/MGH station, and the first span of out the Commonwealth. see CAPITAL page 16 “We are proud to continue investing in our ing the Red Line and Orange Line fleets and the Longfellow Bridge;
Construction Equipment Guide • New England States Supplement • www.constructionequipmentguide.com • July 24, 2019 • Page 13
VISIT H.O. PENN TO LE AR N M O R E
RIGHT NOW, NOW W, WE WE’RE REE OFFER RING 0% FOR 60 MONTH HS ON NEW CAT AT COMPA PACT EQUIPMENT WITH A 2-Y 2-YEAR STA TANDARD D WA WARRANTY. Y.* ®
WWW.HOPENN.COM
844-CAT AT-1923 )LQDQFLQJ RႇHUV YDOLG IURP -XQH WR 6HSWHPEHU IRU PRQWKV ¿QDQFH UDWH DYDLODEOH RQO\ RQ WKH IROORZLQJ QHZ PDFKLQHV PDQXIDFWXUHG E\ &DWHUSLOODU ,QF &DW 0LQL ([FDYDWRUV &RPSDFW 7UDFN /RDGHUV 0XOWL 7H 7HUUDLQ /RDGHUV 6NLG 6WHHU /RDGHUV DQG &RPSDFW :KHHO /RDGHUV PRGHOV RQO\ 7R 7R EH HOLJLEOH IRU DQ (TXLSPHQW 3URWHFWLRQ 3ODQ RႇHU ZKHUH DSSOLFDEOH WKH PDFKLQH PXVW EH ¿QDQFHG ZLWK &DW )LQDQFLDO )LQDQFLQJ DQG SXEOLVKH HG UDWH WHUPV DUH VXEMHFW WR FUHGLW DSSURYDO WKURXJK &DW )LQDQFLDO IRU FXVWRPHUV ZKR TXDOLI\ %X\HUV DUH QRW JXDUDQWHHG WR TXDOLI\ +LJKHUU UDWHV PD\ DSSO\ IRU EX\HUV ZLWK ORZHU FUHGLW UD DWLQJ RU TXDOL¿FDWLRQV )OH[LEOH SD\PHQW WHUPV DYDLODEOH D WR WKRVH ZKR TXDOLI\ 7KLV RႇHU FDQQR RW EH FRPELQHG ZLWK DQ\ RWKHU RႇHUV 2ႇHU VXEMHFW WR PDFKLQH DYDLODELOLW\ 2ႇHU PD\ FKDQJH ZLWKRXW SULRU QRWLFH DQG DGGLWLRQDO WHUPV DQG D FRQGLWLRQV PD\ DSSO\ 7KH WZR \HDU VWDQGDUG ZDUUDQW\ KRXUV RU PRQWKV ZKLFKHYHU RFFXUV ¿UVW DSSOLHV RQO\ WR QHZ &DW 0LQL ([FDYDWRUV &RPSDFW 7UDFN /RDGHUV 0XOWL 7H 7HUUDLQ /RDGHUV DQG 6NLG 6WHHU /RDGHUV
Page 14 • July 24, 2019 • www.constructionequipmentguide.com • New England States Supplement • Construction Equipment Guide
MassDOT Oversees Widening, Paving Project Over Railway
Joseph Gioioso, a project manager, said the company is using the Komatsu 360LCi-11 excavator and the Komatsu D61PXi-23 bulldozer on the job, intelligent machines with GPS control devices that make the job quicker and easier for operators. MASSDOT from page 1
Tom Akins, a MassDOT area manager said the bridge that will be reconstructed goes over the commuter rail tracks in Weymouth. “It’s an old-style bridge and the reconstruction accommodates the widening of the road,” he said. Gioioso said, “The bridge will be installed with an accelerated bridge construction technique. We’ll offset the bridge from its final location on a designated weekend before moving it to its final location.” He said the company will utilize slide-in construction that utilizes temporary supports parallel to the existing bridge
while the new bridge is built and slid into place. The new bridge foundations will be 360 ft. long and 80 ft. wide. The road widening will transform the section from two lanes to four. “It’s now a single lane in each direction,” Gioioso said. Upgrades to the highway will include adding two travel lanes in each direction from Highland Place in Weymouth to Route 139 in Abington. Gioiso and Akins acknowledged that the road widening is being done to accommodate the development at the site of the old Weymouth Naval Air Station at Union Point. “Housing units are being built so the road is being
Joseph Gioioso, a project manager, said the company also is using a Link-Belt RTC8050 crane, a rough terrain crane with four steering modes.
MassDOT is overseeing a road widening and bridge reconstruction project in Weymouth and Abington, Mass., that will widen and repave 4 mi. of Route 18 and replace a bridge that runs over commuter rail tracks on the highway that is 15 mi. south of Boston.
widened for traffic mitigation,” Gioiso said. Akins said, “The road widening also handles commuter traffic from southern towns.” D&R General Contracting hasn’t started the road paving yet. “The majority of the work is at the end of the project after the drainage and underground work is done,” said D&R’s project manager Joe Rotundi. see MASSDOT page 16
D&R’s project manager, Joe Rotundi, said the company will use a Caterpillar AP 1000E to do the road paving.
Construction Equipment Guide • New England States Supplement • www.constructionequipmentguide.com • July 24, 2019 • Page 15
TH HE STRENGTH H TO
DO M D MO ORE E
No two days are the same. You need streng th and flexibility, powe w r and agility.
YOU NEED DOOSAN. Stop in and d learn how to do more with Doosan® crawler excavators. e A u t h o r i ze d D o o s a n D e a l e r
Barry Eq quipment Co. 30 Birch Island Road Webster,, M MA 01570 57 www.barrye equipment.com 508-949-00 005 Doosan® and the Doosan logo are registered trademarks of Doosan Corp. in n the United States and various other countries arou und the world. 17-D013
Page 16 • July 24, 2019 • www.constructionequipmentguide.com • New England States Supplement • Construction Equipment Guide
Plenty of Equipment in Use on MassDOT Bridge Project
“The [Komatsu] 360LCi-11 is flexible and versatile enough to be at home on almost any job site,” said Jason Anetsberger, senior product manager of Komatsu America. MASSDOT from page 14
The company will use a Caterpillar AP 1000E to do the road paving, Rotundi said. Giosiso also will construct sidewalks on both sides of Route 18, bicycle lanes and emergency traffic lights outside the
Abington Fire Station. Akins said the budget for the job is $68.4 million with the federal government paying 80 percent and the state of Massachusetts 20 percent. Subcontractors on the job include Island Pavement Cutting of West
Babylon, N.Y., which will apply membrane waterproofing; EDM Construction of Merrimac, Mass. and H&H Steel of Cottontown, Tenn., that will install structural steel; and Don Martin Corp. of Marshfield, Mass., that will assist in paving operations. CEG
The budget for the job is $68.4 million with the federal government paying 80 percent and the state of Massachusetts 20 percent.
Capital Plan Includes Green Line, South Coast Projects CAPITAL from page 12
signals, stations, and other infrastructure work; • $86.7 million for 24 accessible vehicles to address new demand from the Green Line Extension; and • $29.4 million for mitigation including buses. $1 billion for the South Coast Rail Project. This project will provide rail service to accommodate the existing and future demand for public transportation between Fall River/New Bedford and Boston, enhance regional mobility and support smart growth planning and development strategies in southeastern Massachusetts. The 2020–2024 CIP includes full funding for Phase 1 construction and service via the Middleborough route. The scope of work includes: • 1 mi. of track and Right of Way upgrades; • six new Commuter Rail stations; • two new overnight layover facilities; and • reconstruction of 28 grade crossings, 14 bridges and 63 culverts. $913 million for the Green Line Transformation. This a portfolio of more
than 90 projects aimed at holistically revitalizing the Green Line. It unifies all existing projects and new initiatives to form a cohesive investment strategy and unified Green Line capital program. To meet the needs of today and the future, the MBTA is making significant investments to improve safety and reliability, modernize the system, increase capacity, enhance accessibility, and procure the next generation of Green Line trolleys. Investments in this CIP include: • $296 million in track and signal improvements, including significant efforts on the D branch and within the Central Tunnel that will reduce delays and eliminate speed restrictions; • $214 million to begin procuring the Type 10 Green Line light rail vehicles, which will be fully accessible and larger than the existing fleet to address rider demand. This CIP includes the initial down payment for a complete fleet replacement estimated at more than $1 billion; • $83 million for the Green Line Train Protection System; and • $55 million for rehabilitation of the Lechmere Viaduct in order to accommodate the heavier Type 10 vehicles. $538.6 million for the Commuter Rail Safety and Resiliency Program. This
includes investments to improve the safety and resiliency of the Commuter Rail system, including the implementation of Positive Train Control (PTC) and Automatic Train Control (ATC). The total cost of this program including investments in past years is $930.8 million. The investments in this CIP include: • $171.9 million to complete implementation of Positive Train Control across all Commuter Rail lines; and • $313.8 million to upgrade signal systems to Automatic Train Control on the North Side Commuter Rail Lines. $146.5 million for the HopkintonWestborough I-495/I-90 Interchange Improvement Project. This major project will improve safety and operational efficiency at the system interchange of these two nationally and regionally significant interstate highways. This project will increase safety for all movements within the project area and improve traffic conditions for the movement of people and goods. The total cost for this project including investments in future years is approximately $300 million. This project is currently in the design and environmental review phases More than $2.3 billion in funding for
municipalities. The CIP includes several different programs that provide state and federal funds either through direct grants or reimbursements to cities and towns, and/or by leveraging private investment in support economic development. This includes: • $1 billion for the Chapter 90 Program; • $1.2 billion in federal funds programed for municipal projects through the MPO process; • $56.2 million for the Municipal Small Bridge Program; • $50.2 million for the Mobility Assistance Program; • $40.5 million for the Complete Streets Funding Program; and • $15 million for the Industrial Rail Access Program. Public feedback went into preparation of the final CIP: MassDOT held 13 public meetings in addition to briefings for stakeholders, and received 934 comments providing input on proposed plans. In the coming weeks, the Baker-Polito Administration also plans to file a transportation bond bill, which will include authorization to support several items in the FY2020-2024 CIP, as well as future investments in the Commonwealth’s transportation system.
Construction Equipment Guide • New England States Supplement • www.constructionequipmentguide.com • July 24, 2019 • Page 17
PORTABLE ROCK CRUSHING
C
Hydraulic Cranes 8 to 600 Ton
Onsite or Quarry • Making aggregates since 1983
Daily & Hourly Services www.astrocrane.com
Fully Insured 200 Codman Hill Rd., Boxborough, MA 01719 978-429-8666
Call us today ROCK CRUSHING•(8 ) 4 - GOSHEN, CT
www.FAYWRIGHTINC.com
Place Your Business Card for... 3 months 6 months 12 months
$300* $585* $1040*
only $50 an issue only $45 an issue only $40 an issue
Call now to reserve your space! 800-225-8448
6$9( $ /,)( '21·7 '5,9( +20( %8==(' %8==(' '5,9,1* ,6 '581. '5,9,1*
* pre-payment required
Page 18 • July 24, 2019 • www.constructionequipmentguide.com • New England States Supplement • Construction Equipment Guide
NOW OFFE ERING YOUR O STABLE A WORKH HORSE
ALL NEW Pilot Control Track Loader oader Series from Mustang by Manitou. Once you experience the Pilot Control you you’llll never look at another track loader the same again. These machines feature a large cab design with seat eat mounted joystick controls, outstanding operator visibility, optional ptional IdealAccess™ fold up door system, industry exclusive IdealTrax™ track tensioning system and class leading fuel capacity. It’s easy to see why operators are preferring Mustanng by Manitou track loaders over the competition. To learn more ore about our full track loader product line-up, visit mustang-by-manitou.com by-manitou.com or your local Mustang by Manitou dealer. Offer expires 9.30.2019
Contact your loc o al Dealer
ALL NEW
PILOT SERIEES TRACK LOADERS
ABLE TOOL & EQUIPMENT 410 Burnham Street South Windsor, CT 06074 860-289-2020
149 Rocus Street Springfield, MA 01104 413-363-0780
www.abletool.net
NEW ENGLAND SUPPLEMENT ADVERTISER INDEX ARGUS INDUSTRIAL COMPANY ....................................1
M G EQUIPMENT ............................................................1
ASTRO CRANE ..............................................................17
MILTON CAT......................................................................8
BARRY EQUIPMENT CO................................................15
MUSTANG MFG ..............................................................18
CHADWICK-BAROSS INC..............................................20
NORTHLAND JCB ............................................................7
DOOSAN NORTHERN NEW ENGLAND ........................9 EQUIPMENT EAST ......................................................1,11 FAY & WRIGHT EXCAVATING INC ................................17 FOLEY INC - WORCESTER ............................................1
R J POIRIER HEAVY EQUIPMENT REP ........................4 ROGERS BROTHERS CORPORATION ........................19 SUMMIT SUPPLY LLC ......................................................1
GORILLA HAMMERS........................................................1
T-QUIP SALES & RENTAL INC ........................................4
H O PENN MACHINERY CO INC ..................................13
THE N.I.C.E. COMPANY ................................................10
J R VINAGRO CORPORATION........................................1
THE W. I. CLARK COMPANY ..........................................2
LORUSSO HEAVY EQUIPMENT LLC..............................5
TYLER EQUIPMENT CORPORATION ............................3
The Advertisers Index is printed as a free editorial service to our advertisers and readership. Construction Equipment Guide is not responsible for errors or omissions.
Construction Equipment Guide • New England States Supplement • www.constructionequipmentguide.com • July 24, 2019 • Page 19
TRAILERS TO MEET EVERY HAULING CHALLENGE! Committed to building superior quality, reliability and durability into every trailer.
ROGERS BROTHERS CORPORATION ALBION, PA
The Ultimate in Trailers®
Tyler Equipment 251 Shaker Road East Longmeadow, MA 01028 (413) 525-6351 • (800) 292-6351 Parts: (877) 255-6351
1980 Berlin Turnpike Berlin, CT 06037 (860) 356-0840 • (800) 352-4473 Parts: (860) 356-0848
C.N. Wood Co., Inc. 200 Merrimac St. Woburn, MA 01801 (781) 935-1919
140 Wales Ave. Avon, MA 02322 (508) 584-8484
60 Shun Pike Johnston, RI 02919 (401) 942-9191
www.cn-wood.com
www.tylerequipment.com
For more than 110 years, ROGERS® trailers have stood above the rest in rugged durability, unsurpassed quality and superior design. Contact your local dealer for a quote today.
Page 20 • July 24, 2019 • www.constructionequipmentguide.com • New England States Supplement • Construction Equipment Guide
318 COOPER CIRCLE, PEACHTREE CITY TY, GA 30269
sanyam merica.com
More T M Than M Machin nes IT’S HOW WORK GETS DONE
Chadwick-BaRoss, Inc.
Thompson
15 Katrina Road • Chelmsford, MA 01824 (978) 256-9571 31 James P. Murphy Industrial Highway • West Warwick, RI 02893 (844) 238-7673
51 N. Lisbon Road • Lewiston, ME 04240 (207) 784-6273