Skip to main content

New England 10, May 11, 2022

Page 1

State Supplement sponsored by:

1

THE NEW ENGLAND EDITION

11

A Supplement to:

95

1

201 16 9

26

2

1 3

91

89

2

95 3

2 2 7

1

93

495

16

89 4

89

95

202

7

91

9

95

93

2

95 2

93 90

90

7

95 91

7

SHIP WITHIN 48 HOURS

3

84

495 6

84

6

6

195

395

95 91

95

95

®

May 11 2022

SAME DAY PARTS AVAILABILITY 24 HOUR TECHNICAL SUPPORT BACKED BY A 75 YEAR BUSINESS Thousands in Service!

Vol. LX • No. 10

“The Nation’s Best Read Construction Newspaper… Founded in 1957.”

Affordable Price. Premium Service.

CALL 800-367-4937

Your New England States Connection • Kent Hogeboom 315-866-1423 2208 Plainfield Pike • Johnston, RI 02919 401-943-7100 • Fax: 401-647-5041

www.jrvinagrocorp.com info@jrvinagrocorp.com

Specializing in:

Demolition, Portable Crushing, Material Sales, C & D Recycling, Land Clearing, Heavy Hauling & Trucking Call for Pricing

LEED Accredited in Waste Management

*On approved credit • Financing Available

ESI … Responding to All Types of Emergency Environmental Issues A John Deere 270D with 60-ft/-long reach working at a demolition site

2022 EZ-Screen 1200XLS

Visit Equipment East for a demo. Authorized Doosan Dealer

Optional 3 Product Conveyor

6’x5’ Double Deck Screenbox Works with 1/2 to 1 3/4 Yd. Loaders, Kohler Diesel, 24” Conveyor Dumps Screened Product 9’ High, Two (2) Year Warranty! $59,900 plus freight.

508-484-5567 (BROCKTON, MA) 978-454-3320 (Dracut, MA) 603-410-5540 (Bow, NH)

Tibbits Equipment Services, Inc.

www.tibbitseq.com

802-479-9696 ®

KWIK KLEET ts Traction Clea

Other Screeners Available

EZ-SCREEN www.ez-screen.com

248-745-5828

Specialty Construction Equipment SALES • RENTALS • HAMMERS Since 1989

‘05 Caterpillar 928G $36,800

Phil (413) 427-7171

• Largest hammer repair facility in North America • Demolition tools and parts for ALL makes and models

• Exhaust Scrubbers • Perkins Engines • Deutz Engines • Twin Disc/Rockford Clutches

www.foleyengines.com

• Hammer-equipped excavator rentals • Backed by a 75 year family owned business CALL YOUR ONE-STOP HAMMER SHOP™ TODAY!!!

CALL 888-81-GORILLA(46745)

Environmental Services Inc. (ESI) is a full-service environmental contractor providing planned and emergency services to private customers and governmental agencies throughout southern New England. Founded in 1991, it is the largest privately held environmental services company in the area, with a staff of more than 70 employees, including project managers, supervisors,

compliance and regulatory personnel, equipment operators, craftsmen, field technicians with decades of experience in emergency response and remediation, hazardous waste management and backgrounds in the petroleum and construction industries. Billy Mitchell, one of the founding principals of see ESI page 4

Massport’s $1.3B Capital Plan Features Funding for Logan Airport Upgrades The Massachusetts Port Authority (Massport) board of directors unanimously approved a three-year, $1.3 billion spending plan that invests approximately $300 million into new projects including roadway optimizations, runway rehabilitation and net-zero carbon emission initiatives. According to a report from the State House News Service (SHNS) in Boston, while a majority of the capital investment plan focuses on ongoing or completed projects, the new

spending that Massport intends to carry out comes as passenger volumes for Boston’s Logan International Airport and cargo passthrough at the Conley Container Terminal are trending upward compared to last year but remain below pre-pandemic levels. Three-quarters of new spending over the next three years see AIRPORTS page 16


Page 2 • May 11, 2022 • www.constructionequipmentguide.com • New England States Supplement • Construction Equipment Guide

Call Mark Doty @ 203-823-2316 2010 WIRTGEN 2100

JRB 1.25YDSD BUCKET

2005 WIRTGEN W2000

Cat power, 6'5" 15mm drum, rigid conveyor, 60% bottoms, good belting with grade, stk# 26377 ................................................$145.000

Fits JRB backhoe hooks, comes with jumper hoses, stk# 27297..................................$3,000

stk# 26376, 7759 hours, Cat, 6’7” drum, good bottoms, grade controls, serviced & ready for work ..................................................$115,000

2015 KUBOTA KX080-4

2019 BOBCAT S740

2018 DEERE 550KXLT

stk# 27162, c/air, 2 speed, aux hyds, angle blade, 80% rubber tracks ....................$54,500

stk# 26515, c/air, 2 speed, 12” rubber, 76” bucket, switchable controls, 1240 hrs..$52,500

stk# 26504, 240 hours, ROPS, 18” pads, 105” 6 way blade, like new condition ........$119,500

2020 CASE TV450

2019 DEERE 333G

2014 HAMM HD+120IVVH

stk# 26945, c/air, pilots, 2 speed, RC, Hi Flow, hyd coupler, 84” bucket 80% tracks ..$68,500

stk# 27123, c/air, hi flow hyds, 2 speed, forestry package, new tracks, 84” bucket ........ ............................................................$69,500

stk# 24340, 1493 hours, 78” drums, dealer maintained since new, very good condition ...... ............................................................$84,500

See Our Complete Inventory at www.wiclark.com


Construction Equipment Guide • New England States Supplement • www.constructionequipmentguide.com • May 11, 2022 • Page 3

New 738 8M purpose p p e-built t h tree han ndler is BIG new ws for tree care speecialists SENNEBOGEN’s “game-changing” tree care handlerrs have raised the bar even higher! Thee new 738 M weighs in at twice the size of 718 M and R-HD models with mo models, ore power and more reach to take on bigger jobs! d with a power grapple The 738 M, fitted saw, is attached to a 75 ft. telescoping boom and stick to t quickly fell or prune trees as high as 1125 ft. to 150 ft. tall. Then it easily cutts, swings and stacks the wood with a single operator to hole job. complete the wh

CUSTOM MENGINE EERED TREE CARE HANDLLERS

PU URPOSE-BUILT

FR ROM THE GR ROUND UP

• Ideal for all tree seervice operators • Used for woodlot thinning, harvesting wood fuel f to clearing storm debris up to o 48" and up to 125' high • All wheel drive or tracked models • Jobsite safety incrreased with trimming, cuttingg, loading and stacking operation ns as all are done from the con nfines of the SENNEBOGEN eleevating and tilting Maxcab

As big and poweerful as it is, the 738 keeps pace with w the 718 M and 718 R-HD machines with precise handling and fasst cycle times to process up to 150 trees per day. From the roadsid de, on embankments or in heavy wood ds, the 738 M is the new game-changger for all land clearing, right-of-way right of way maintenance and heavy tree care operations.

Get th he details on the high effficiency solutio l ion for custom tree rem movall

The New 738 M

www.seennebogen-na.com | +1-7040 347-4910

251 Shakker Road East Longmeadow, MA 01028 (800) 292-63 6351

1980 Berlin Turnpike Berlin, CT 06037 (800) 352-4473

www.tylerequipmentt.com


Page 4 • May 11, 2022 • www.constructionequipmentguide.com • New England States Supplement • Construction Equipment Guide

Earthmoving Iron Plays Key Role for Conn.-Based ESI

On a tank removal and soil remediation project, a John Deere 130G excavator is used in tandem with a John Deere 317G tracked loader.

A John Deere 270D with a 60-ft.-long reach is used to clean up after a motor vehicle accident involving a chemical spill. Environmental Services’ vac-truck is cleaning up following a tanker spill.

This trailer is used to detonate unstable materials on the cleanup site. The material or chemical is placed inside the trailer and then detonated.

ESI from page 1

ESI, is still involved with the day-to-day operations as general manager. He is highly respected in the industry. ESI’s staff of professionals provides continuity throughout every stage of environmental challenges, large or small. According to Mitchell, “When the company got its start in 1991, the company was primarily focused on tank removals, contaminated soil cleanup and chemical spills. Over the last several decades, the company has experienced tremendous growth and has diversified into a wide variety of environmental related service areas.” Today, the company responds to all types

of emergency environmental issues, including but not limited to over-the-road truck spills, train derailments, PFAS release due to fires and drug labs that involve hazardous materials. ESI even has a marine division to take care of contaminated water issues. The company’s demolition team is fully equipped to take down buildings and facilities of any size and deal with contamination issues such as asbestos in the process. ESI also offers site services that include contaminated soil transportation and disposal, portable toilets, frac tanks, as well as rolloff services. ESI has a 24,000 sq. ft. office, warehouse and maintenance facility in South Windsor,

Conn., and the company is permitted in Connecticut, Massachusetts, New Hampshire, New York, Pennsylvania, Rhode Island and Vermont for hazardous waste transportation and spill response. For several of its key divisions, earth moving construction equipment is a significant tool. Contaminated soil cleanup and tank removal, as well as demolition work, incorporate the use of heavy iron. In addition, ESI is an approved contractor for multiple states and relies on its heavy equipment to respond to highway incidents. Oftentimes, vehicles have left the highway completely and tumbled over embankments and emptied their load. In such a case, ESI not only has to have the means to pull these vehicles back up to the highway to be transported away from the scene, but it also must be equipped to excavate and remove the impacted materials from the site. Once the scene has been cleaned up, ESI

has to haul in fill or whatever other organic materials are needed to restore the site to its original condition. Sometimes environmental cleanup projects come in some pretty unexpected places, including cleaning up after an airplane crash at a local airport. ESI’s growth over the past 30 years has been phenomenal and with ever-changing environmental regulations, ESI has adapted and diversified its operations to be able to respond and complete projects in a timely and effective manner. Anyone who has spent any time with Billy Mitchell or has seen any of ESI’s cleanup projects is acutely aware that their construction equipment brand of choice is John Deere, which they obtain from The W.I. Clark Company. The list of John Deere equipment in ESI’s fleet includes JD 310 and JD 410 tractor see ESI page 16


Construction Equipment Guide • New England States Supplement • www.constructionequipmentguide.com • May 11, 2022 • Page 5


Page 6 • May 11, 2022 • www.constructionequipmentguide.com • New England States Supplement • Construction Equipment Guide

The Nice Company, Inc

9 Rosenfeld Drive, Hopedale, M A Toll Free# 508-381-3939 • w w w.theniceco.com

Equipment Sales and Rentals

We sell NICE machines!

2017 Doosan DX235LCR-5, 2500 hrs., reduced tail swing, 36” bucket, hyd. thumb, aux. hydraulics, heat/AC, good condition, work ready. $139,000

2018 CAT 320FL, 3800 hrs, 50" Strickland Bucket, QC, Aux. Hydraulics, Clean Cab, Front/Side Cameras, Work Ready $169,000

Spring Specials 2018 CAT 336+FL, 2500 hrs, Single Grouser Pads, 54" Bucket, QC, AC/Heat/Radio, Rear Camera, Long Undercarriage $289,000

2014 CAT D6K2 XL, 960 hours, Heat/AC/radio, Very Clean, 1 Owner Machine $179,000

Burlington Finally OKs Contract to Build Champlain Pkwy. At its meeting April 25, the Burlington City Council unanimously approved a $45 million contract to build the first phase of the Champlain Parkway, a landmark moment in the decades-long effort to get the Vermont roadway built. The announcement was made in a news statement from the office of Burlington Mayor Miro Weinberger. The project was stuck in limbo for 35 years after construction had begun before its entire funding could be secured for completion. When the two-lane project is finished, set for 2027, the effort will improve traffic circulation, alleviate overburdened roadways, protect Lake Champlain through enhanced stormwater management, and improve vehicular, bike and pedestrian safety in the southwest section of the city, according to Weinberger’s news release. The sole bidder for the $45 million project, which includes $4 million in contingency costs, was Williston, Vt.-based S.D. Ireland Brothers and Kubricky Construction, from Wilton, N.Y. Their joint bid came in nearly $14.5 million higher than initial estimates, likely due to inflation and the war in Ukraine, which has driven up energy costs, according to Seven Days, an

online Vermont news source. The 2.8-mi.-long, 25-mph Champlain Parkway will begin at the Interstate 189 interchange on Shelburne Road, run north from Home to Lakeside avenues, then east onto Pine Street, where it would extend up to Main. Initial work this summer will focus on project segments off Pine Street to coordinate construction with the Shelburne Street Roundabout project, as Pine Street is a key detour for the roundabout. Scheduled to end in October 2024, this part of the project will not make a new connection to the interstate highway system and, therefore, is not projected to increase overall traffic in the area, the release said. By phasing construction of the Champlain Parkway, the Weinberger administration and city council said it can work with the public in the future to decide when the community is ready for the second phase of the project that will make the interstate connection. The second and final phase is planned for 2025 through 2027 and will be coordinated with other Burlington South End projects through the South End Construction Coordination Plan, minimizing impacts on residents and businesses.

“It has been 35 years since this project stopped mid-construction…” Miro Weinberger Burlington Mayor

City Fought Hard to Get Parkway Project Moving Again Funding for the Champlain Parkway project comes primarily from the federal government, which is contributing 95 percent of the cost. The State of Vermont will pay 3 percent, with Burlington responsible for the remaining 2 percent. Weinberger’s office explained that the city will also handle certain related costs outside of the federal project scope such as development soils, landscaping and decora-

tive lighting. “It has been 35 years since this project stopped mid-construction, and it has been a major, unresolved issue in this community ever since,” he said in the statement. “Since taking office, I have been committed to securing an effective resolution to this multidecade challenge. To achieve that resolution, for a decade we have worked to dramatically improve the design and functionality of the new roadway, add critical bike and pedestrian safety improvements, secure state and federal support for a second major project — the Railyard Enterprise Project — and more. I am grateful to our city team, and our committed state and federal partners who got us to tonight, and to the City Council for [its] careful engagement and unanimous support.” Burlington’s Department of Public Works Director Chapin Spencer added, “Through the successful efforts of multiple administrations and multiple councils, the project has evolved from a four-lane, high-speed highway into a new two-lane city street with extensive bike, pedestrian and stormwater improvements. Thank you to Vermont Agency of Transportation [VTrans] and the Federal Highway Administration for supporting this work.” 


Construction Equipment Guide • New England States Supplement • www.constructionequipmentguide.com • May 11, 2022 • Page 7

THE JCB 512-83R roto telehand dler introduces a whole e new realm of opportunities by combining three mach machines m hines into one with the maneuverability ccess capacity of a telehandlerr, reach and lifting capability of a crane, and ac of a MEWP P..

HIGHLIGHT TS ht of 83' 3" • Maximum capacity c of 12,000 lb and a maximum lift heigh • Powered by y a 145 hp JCB EcoMac engine - no DPF etract and level • 4 scissor tyype outriggers with AUTO functions: deploy, re joysticks in large, ergonomic operatorr station • Dual seat mounted m s and limits; agement System (LMS) that displays capacities • Load Mana can be set for specific applicaiton situations hments recognition corresponding with in-cab LMS system • RFID attach • LiveLink tellematics for real-time machine data

800-Go-2-ALT TA A • AltaEquipNE.com


Page 8 • May 11, 2022 • www.constructionequipmentguide.com • New England States Supplement • Construction Equipment Guide

R.I. Officials Unveil Plans to Renovate Work On Bridge Over Providence’s Iconic ‘Superman’ Building Connecticut River Enters Second Year A complex financing plan was unveiled by Rhode Island Gov. Dan McKee and other state leaders on April 12 to redevelop the long-vacant “Superman” building in downtown Providence, arguing that a mix of public and private funding can revive the iconic skyscraper to its former glory. The proposal for transforming the 26-story Art Deco office tower into a mixed-use building with 285 apartments as well as office, retail and event space, is intended to revive the skyscraper for a second century atop the city skyline. Locally, the 95-year-old Art Deco structure is commonly referred to as the “Superman Building” because of its visual similarity to the headquarters of the Daily Planet newspaper in the superhero’s comic books and shown on “The Adventures of Superman” TV series from the 1950s.

Renovation Comes With Supersized Cost WPRI 12 News in Providence reported that the total cost of the renovation project is estimated at more than $220 million. At a State House news conference, Rhode Island Commerce Secretary Stefan Pryor said $26.2 million of the project’s budget will come from the state; $15 million from the city of Providence; up to $24.1 million will come from federal tax credits; and the rest will be financed by building owner High Rock Development, a Newton, Mass., LLC, through a mix of cash, debt and equity. Due to the timing of when High Rock will receive its Rebuild Rhode Island tax credits from the state, the Rhode Island Foundation has agreed to extend a loan to the developer to lower the financing costs for the project, backed by the tax credits. “As Rhode Island continues to lead the region in our economic recovery, this project will help to maintain that momentum by reinvigorating downtown Providence, creating good-paying construction jobs, increasing our state’s market-rate and affordable housing supply, and generating further opportunities for the residents and businesses of our capital city,” McKee said in a statement. Located at 111 Westminster St., Rhode Island’s tallest building began its life as the Industrial Trust building, named for the bank that built it in the 1920s. In 1982, the bank changed its name to Fleet, before it was later acquired by Bank of America. High Rock bought the building in 2008 for $33.2 million, but just five years later it was left empty and decaying when Bank of America moved out. Multiple proposals to redevelop it have foundered since then, according to WPRI 12 News. At the same time, the building’s assessed value dropped from $31.3 million in 2009 to just $14.2 million as of last year, according to Providence city records. With a substantial plan and a new influx of cash, though, Pryor argued the building’s makeover could be transformative for Providence. “Most of the images of our capital city’s skyline involve this building,” he told 12 News. “It’s a gorgeous, although dormant, feature of the skyline. This set of investments will breathe new life into this iconic tower. It will also bring hundreds of new residents to our capital city’s downtown.” He added, “[The renovation] will produce hundreds of construction jobs, and it will send a signal that our capital city and ... our state are on the upswing.”

Locally, the 95-year-old Art Deco structure is commonly referred to as the “Superman Building” because of its visual similarity to the headquarters of the Daily Planet newspaper in the superhero’s comic books and shown on “The Adventures of Superman” TV series from the 1950s.

Still, Pryor acknowledged it had taken six months to produce the new plan, and that the framework needs several approvals before it can move forward. He also suggested the state had driven a hard bargain with High Rock, reducing its original state subsidy request of $48.3 million by nearly half, and doubling the number of affordable apartment units. “Until it’s voted upon, it’s not enacted,” he cautioned. “Having said that, the key executives from each of these boards, commissions and councils have been involved with this process, so we believe that these commitments will be fulfilled.” Tower to Provide Living Space for Lower Income Folks WPRI 12 News reported the $220 million project cost will be used to turn the Superman building into a mainly residential structure, with 285 apartments taking up most of its 350,000 sq. ft. The tower’s elegant 26,000-sq.-ft. banking hall is to become a space for retailers, events, and community use. Another 8,000 sq. ft. would be set up for commercial office space. Under the terms of the deal, 20 percent of the apartments are for lower- and moderate-income residents. Of that, 10 percent will be for people who make up to 120 percent of the area median income (AMI), or $72,650 a year for an individual; five percent for individuals making up to 100 percent of AMI, or $60,550; and five percent for individuals who make up to 80 percent of AMI, or $48,450. The rest would be market-rate units. According to Pryor, other pledges made by High Rock include using a project labor agreement to ensure union workers work on the restoration, which he said would create more than 1,500 construction jobs, and making “a best-effort commitment” to give 20 percent of subcontracts to womenand minority-owned businesses. High Rock will also seek LEED certification for environmental friendliness. 

With spring weather close by in the Northeast, the New Hampshire Department of Transportation (NHDOT) has restarted construction of an eight-span steel girder bridge to replace two existing spans carrying NH Route 119 in Hinsdale, N.H., over the Connecticut River into Brattleboro, Vt. Reed & Reed Inc., of Woolwich, Maine, is the general contractor for the $61.2 million project that has an expected completion date of Oct. 25, 2024. The bridge replacement effort began at the end of June 2021 and is being carried out by a Project Lead Team consisting of NHDOT and the Vermont Agency of Transportation (VTrans), along with New Hampshire’s Southwest Regional Planning Commission, and the Windham Regional Commission in Vermont. NHDOT serves as the project’s lead implementer. The new Hinsdale-to-Brattleboro bridge will replace the Charles Dana and Anna Hunt Marsh truss bridges, both of which were opened in 1920, as a carrier of cars and trucks. The 122-year-old structures will not be demolished; instead, they will be rehabilitated for pedestrian access only, the Brattleboro Reformer reported. Busy Workload Ahead On Both Sides of River As work progresses this year on both NH 119 in Hinsdale and Vermont Route 142 in Brattleboro, Mark Moran, communications coordinator for the NHDOT’s construction bureau, noted that motorists can expect times where alternating one-way traffic patterns, with periods of short delays and lane shifts, will be needed. “Work has commenced on both sides of the river with temporary trestle construction, bridge abutment and pier work occurring in New Hampshire,” Moran wrote in an email to the Brattleboro Reformer. “As the construction season gets under way, Reed & Reed will continue to make [its] way into the river from New Hampshire via NH 119 with continued trestle construction to gain access to six of the seven proposed pier locations.” He added that during the bridge replacement project, crews will realign this section of NH 119 to completely bypass the two older structures. The reconstruction will begin approximately 600 ft. south of Georges Field Road and extend north and west along the new alignment for six-tenths of a mile before connecting to VT 142 in Brattleboro. At that point, a new intersection is to be installed 900 ft. south of the existing intersection of VT 119 and VT 142. Approximately 1,700 ft. of VT 142 also will be rebuilt as part of the project, in addition to the construction of a new boat ramp on the New Hampshire side of the river. Recently, the Raymond Metals building on Vernon Street (VT 142) in Brattleboro was razed to make way for the bridge landing at that location. “The initial stages of underground utility and drainage improvements have begun along VT 142 between Royal Road and Bridge Street,” Moran explained in his email to the Brattleboro newspaper. “Work to replace and relocate underground infrastructure will continue throughout the spring and summer months, with Vermont’s bridge abutment work anticipated to begin late summer or early fall of 2022.” 


Construction Equipment Guide • New England States Supplement • www.constructionequipmentguide.com • May 11, 2022 • Page 9

2021 MCCLOSKEY SDX130: Serial Number: 90666, New Telescoping Stacker 36"x130' Electric Hydraulic Power WEG 20HP. Standard Hopper, Pivot Point, Hydraulic Landing Gear, Hydraulic Wheel Drive, Remote Greaselines, Walking Beam w/Lift Axle >>>Call

2022 MCCLOSKEY ST100T: Hours: 53, Serial Number: 92129, Stacker with Impact Idlers Under Hopper, Upgraded Belt Cleaner/Scraper, Telematics, Upgraded Hydraulics, CAT C2.8 Tier 4F/ Stage V 74HP Engine>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>Call

2005 EXTEC C12: Hours: 8,310, Serial Number: 9658, Deutz Engine, Rebuilt recently and runs great. New jaw bearings and shaft. New main jaw drive motor. Jaw dies replaced recently. Discharge belt replaced recently>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>$169,500

2020 MCCLOSKEY C3: Hours: 1556, Horsepower: 510 hp, Serial Number: 91189, METSO designed cone, 300 HP Class. Volvo D13 Medium Cone Liner currently installed.>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>Call

2018 MCCLOSKEY R155: Hours: 3,565, Serial Number: 89762>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>$255,000

2020 MCCLOSKEY S190 3D: Hours: 536, Horsepower: 130 hp, Serial Number: 91405, Tracked Triple Deck Heavy Duty Screener. CAT Tier 4F Engine. 15ft Feeding Hopper. Chevron Belt on Main Conveyor. Remote Machine Shut Off >>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>Call

2021 MCCLOSKEY RF80: Serial Number: 77883, Hopper Wear Plates, Extended Hopper Wing Plates, Upgraded Belt/Cleaner Scraper, Variable Speed and Start Stop Feeder Kit, CAT C3.6 Tier 4/Stage V 134HP Engine >>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>Call

2021 MCCLOSKEY R155: Hours: 269, Serial Number: 91850, Remote Variable Speed Feeder, Safety Beacon Lights, Telematics, CAT Tier 4F 130HP Engine >>>>>>Call

2003 TEREX PEGSON 2644 PREMIERTRAK: Hours: 11,448, Engine: Cat C9, 1 Owner Machine, New Jaw Dies, New Cheek Plates, Jaw Box has been recently rebuilt, New Bearings in Pittman, New Toggle >>>>>>>>>>>>>$225,000

2021 MCCLOSKEY R105: Hours: 578, Serial Number: 77461, Screener with Remote Variable Speed Feeder, Remote Machine Shut off, Safety Beacon Lights, Telematics. CAT Tier 4F 130HP >>>>>>>>>>>>>>>>>>>>>>>Call

2021 MCCLOSKEY ST80: Hours: 6, Serial Number: NEW MWS CSP200 COMPACT SAND PLANT, Serial 92183, CAT 2.2 Tier 4F 49 HP, Hydraulic Axle Jacks, Number: 20349, cost and energy efficient, exceptional Hydraulic Axle Extensions, Hydraulic Landing Gear, performance, 14 x 6 dewatering screen, can produce Hopper Wear Plates, Impact Idlers under Hopper Call 1 grade of sand, self regulating sump tank >>>>>>>Call

2021 MWS S190: Hours: NEW, Serial Number: 91989, Screening Plant with Fitted Rinser Kit with Spray Bars on Screenbox, Aux Drive Circuit, Plain Belt on Main Conveyor >>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>Call

2021 MCCLOSKEY C2: Hours: 17, Serial Number: 92089, Metal Detector on Feeder, Discharge Chute on Main Conveyor, Upgraded Belt Cleaner/Scraper on Main, Telematics, CAT C9.3B Stage V/Tier 4F 375 HP Engine >>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>Call

2021 MCCLOSKEY J40: Hours: 214, Serial Number: 90232, Belt Protection Deflector Plate, Overband Magnet on Main, Working lights, Safety Beacon Lights, Telematics, Volvo D8 T4F 252HP Engine>>>>Call

2006 EXTEC ROBOTRAC: Hours: 5,008, Serial Number: 9872, Well maintained. Deutz Engine. 10’x8’10” screen deck with side discharge conveyor>>>>>>>>>>>>$59,500

NEW ENGLAND’S EXCLUSIVE MCCLOSKY DEALER!!!


Page 10 • May 11, 2022 • www.constructionequipmentguide.com • New England States Supplement • Construction Equipment Guide

YOU O R REPUTA TATION IS ON THE LINE EVERY RY DA AY. Jobs keep getting tougher. Timelines keep getting shor ter. Yo Y ou need to get it done faster and more ef ficiently. We get it. That’s why we’ve been making the big moves that keep yo y u moving for ward. Rolling out new machines engineered with a “get it done” mentality. Providing Af After Sales Solutions that keep you up and running. Because yo y u’ve earned it. And your customers deser ve it.

hitachi h cm.us Hitachi Construction Machiner y A mericas Inc.

Milford, NH 603.673.2640

Brentwood, NH 603.642.5666

chappelltractor.com

Concord, NH 603.225.3361

Now Your Hitachi Dealer for Vermont, New Hampshire and Massachusetts


Construction Equipment Guide • New England States Supplement • www.constructionequipmentguide.com • May 11, 2022 • Page 11

AUTHORIZED DOOSAN DEALER

DRACUT

BROCKTON

BOW

978-454-3320 61 Silva Lane Dracut, MA 01826

508-484-5567 196 Manley St. Brockton, MA 02301

603-410-5540 1474 Rte 3A Bow, NH 03304

www.equipmenteast.com

DESIGNED TO DOMINATE. POWERED BY INNOVATION. Punishing jobsites require rugged machines. New -7 Series wheel loaders are redesigned to help you load more material, carry with confidence and get more done. Visit Equipment East for a demo. ©2021 Hyundai Doosan Infracore. All rights reserved. Hyundai Doosan Infracore is an affiliate of Hyundai Heavy Industries Group. , is used under license from Doosan Corporation. The Doosan trademark,


Page 12 • May 11, 2022 • www.constructionequipmentguide.com • New England States Supplement • Construction Equipment Guide

Norwalk Officials Vote to Build New HS On Football Field The board of education (BOE) in December 2023. The athletic faciliNorwalk, Conn., on March 15 voted ties would be completed in the two in favor of building a new Norwalk years after the school is built. High School on the existing football Option A would have built the field. new high school in five phases over The school board voted 7-2 to 55 months on the footprint of the adopt Option B, the construction existing structure at an estimated plan recommended by the city’s cost of $225 million. building management department. In 2020, the Connecticut Board member Erica DePalma Legislature approved the project for told the New Haven Register that $189 million with an 80 percent the BOE was not deciding whether reimbursement rate in its school construction of the building moves construction bill. State lawmakers forward, but only giving its preferalso approved a 50 percent reimence for how the project is designed bursement rate for the installation of if Norwalk decides to move forward the indoor pool, which will cost $8 on the new school. million, the Register reported. The BOE facilities committee The Norwalk Common Council met in February to discuss two approved a little over $50 million options on the table and chose to for the project in 2020 to cover costs defer a final decision to the full not reimbursed. board. Norwalk BOE Chair Colin Alan Lo, the city’s building and Hosten said during March 15’s The school board voted 7-2 to adopt Option B, the construction plan recommended by the city’s facilities manager, told the BOE that meeting that members of the com- building management department. Norwalk needs to go back to the mittee wanted the extra two weeks state to bring the total package up to to clarify questions raised through public include the costs of rebuilding athletic would produce a 330,000-sq.-ft. building $225 million, which was the original facilities displaced during the construction to be completed in two phases, spanning request in 2020, because construction feedback. A presentation of the new school project of the new high school, and the cost of about 50 months. The actual school build- costs continue to rise. He said the usual ing would be finished in three years, with increase per year for building projects is 3 clarified that the total cost for either option building an indoor pool. The Register reported that Option B construction projected to start in percent; however, it is now at 5 percent.  would be $225 million. This would

Norwalk Gets $6M for Development Near Local Train Station The city of Norwalk, Conn., has received $6 million in state funding to support developments in South Norwalk, or SoNo, as it is known locally, under a plan by Gov. Ned Lamont designed to boost community livability. The governor announced in a recent statement that the plan is part of a distribution of $45 million spread among 12 municipalities that aim to improve “distressed municipalities” and add to downtown areas. Norwalk received its funds to upgrade the property next to the SoNo train station at 30 Monroe St., and 15-17 Chestnut St., according to the statement. The work there will be a collaboration with the city, the Norwalk Redevelopment Agency and Spinnaker Real Estate Partners, according to the Norwalk Hour. The development set for the area will include at least 200 mixed-income residential units, 10,000 sq. ft. of commercial space, a public plaza and 60 off-street public-parking spaces, the governor’s office noted. “By investing in infrastructure and streetscape, such as enhancing traffic safety through new sidewalks, mitigating stormwater runoff to prevent flooding and planting more trees, this critical infrastructure project will increase livability and add to the vibran-

“…this critical infrastructure project will increase livability and add to the vibrancy of our city.” Harry Rilling Norwalk Mayor

cy of our city,” Norwalk Mayor Harry Rilling said to the Norwalk news source. “This initiative also allocates funds towards the preservation of existing affordable housing, supporting our vision of making the city a more accessible and equitable place to work and live." With the grant, the city plans to take

vacant and underutilized plots and transform them into transit-oriented developments to accent the SoNo train station, the Hour reported, while the infrastructure upgrades also will allow the potential development of 500 new residential units in the area. Norwalk applied for the grant funding and chose the area for its proximity to public transit and developmental potential, city spokesperson Michelle Woods Matthews told the Norwalk Hour. She added, though, that construction at the site will likely not start for another 18 to 24 months. Another Set of Grants to Be Released Later in 2022 The $45 million is the first round of funding distributed as part of Lamont’s Connecticut Department of Economic and Community Development (DECD), according to his press release. The second round is expected to be announced in the fall. “The grants are leveraging approximately $74 million in non-state and private dollars and will support projects that improve the livability and vibrancy of communities throughout the state,” the statement read. “Consistent with the goals of the program, more than 50 percent of funding will be

invested in Connecticut’s distressed municipalities.” Norwalk’s $6 million grant is the second largest of the 12 distributed as part of the DECD’s Connecticut Community Challenge Grant Program, after the $6.3 million awarded to Hartford to build a twophased mixed-use development that will generate some 60 new residences. Other cities and towns in the state to receive funds from the first round of the program include East Hartford, Killingly, Mansfield, Middletown, New Haven, New London, Norwich, Stamford, Winchester and Windsor. The Norwalk Hour reported that the grant program was created in 2021 with the goal of revitalizing communities and creating about 3,000 new jobs. Lamont’s office noted that the CECD and grant program are expected to award $100 million in grants over the next few years. “The program is an important component of Gov. Lamont’s Economic Action Plan — a strategic package of initiatives that totals more than $750 million over five years, matched approximately dollar-for-dollar by private and other non-state funding that will result in a projected 80,000 new jobs,” the statement read. 


Construction Equipment Guide • New England States Supplement • www.constructionequipmentguide.com • May 11, 2022 • Page 13


Page 14 • May 11, 2022 • www.constructionequipmentguide.com • New England States Supplement • Construction Equipment Guide

MassDOT Wants New Designs for Replacing Aged Bridge The Massachusetts Department of Transportation (MassDOT) is asking for design plans to replace the 125-year-old New Bedford-Fairhaven Bridge, according to an announcement April 6 from State Rep. Bill Straus. He said MassDOT is beginning the process to design and permit a replacement for the aged swing-truss bridge, which carries U.S. Highway 6 over the Acushnet River along the southeastern coast of the state. Construction of the bridge began in 1897, and it occasionally shows its age when the hydraulic system malfunctions, as happened in March when the bridge became stuck for a time in the open position. MassDOT blamed the problem on a hydraulic jack that malfunctioned, but New Bedford’s WBSM News-Talk Radio reported that the incident prompted New Bedford Mayor Jon Mitchell to state on Twitter, “We don’t need more reminders that the bridge needs to be replaced.” He cited a 2014 MassDOT feasibility study that found the bridge is “functionally obsolete,” but that replacing it would cost around $120 million. WBSM reported that the soon-to-bereleased Scope of Work document for the bridge replacement will likely ask engineer-

MassDOT is beginning the process to design and permit a replacement for the aged swing-truss bridge, which carries U.S. Highway 6 over the Acushnet River along the southeastern coast of the state.

ing services to include project development engineering along with environmental considerations, 25 percent highway design submission, public hearings, geotechnical design, structural project development and sketch plans. Completion of preliminary design work is standard for projects of this scope before they can be included on construction funding lists, Straus noted, adding that the work will be “critical to the project’s future funding success.” He praised Mitchell for being “tireless in his advocacy for this project,” while adding, “I cannot recall a legislative delegation meeting where he has failed to bring this up.”

“I want to thank [MassDOT] Highway Administrator [Jonathan] Gulliver and the Highway District 5 staff for their cooperation with me in getting the start for this engineering work,” continued Straus, who is the House Chair of the Transportation Committee on Beacon Hill. “While this project will ultimately cost more than $100 million to permit and construct, a replacement bridge has significant economic value as it will allow better access through our port by widening of the available channel for vessels and providing for more up to date and efficient operations during bridge openings.” Both Straus and his colleague, Massachusetts State Rep. Antonio Cabral,

have long advocated for a bridge replacement project. In 2015, the pair recommended a tall vertical lift bridge design, according to the news release. Old Swing Bridge Limits Local Fishing Industry Mitchell had asked the state to replace the bridge long before its latest failure in March. “I actually wrote a term paper in college, in an urban economics course, arguing for the replacement of this bridge,” Mitchell told WPRI.com. Thirty years later, he added, little to nothing had been done — until now. Mitchell noted that the bridge routinely causes traffic snarls because when it swings open to allow ships through, it does so slowly. In addition, he said it prevents his city’s expansion of the commercial fishing industry. The New Bedford mayor told WPRI.com that the northern part of the harbor cannot be as developed as other sections because large ships will not fit through the old bridge’s narrow opening. “This is the biggest commercial fishing port in the United States. It is a major source of America’s food supply,” Mitchell said. “Lots of people rely on it and so it has to work, and that requires the state to make an investment.” 


Construction Equipment Guide • New England States Supplement • www.constructionequipmentguide.com • May 11, 2022 • Page 15

ROCK SOLID SERVICE WE CRUSH YOUR ROCKS

140 Nutmeg Road South South Windsor, CT 06074 51 Veterans Drive Loudon, NH 03307 LARGEST DEALER IN NEW ENGLAND

THE MOST MATERIAL HANDLING MACHINES IN NEW ENGLAND SCREENING CRUSHING CONES IMPACTORS CONVEYORS TROMMELS WASHING RECYCLING

SCREENING

I M PAC T O R S

TROMMELS

USED AND NEW MACHINERY RENTALS AND FINANCING AVAILABLE

CONVEYORS

CRUSHING

1-800-53 CRUSH

Over 100 Machines in Stock

CALL TODAY! 1-800-53-CRUSH

W W W. P O W E R S C R E E N - N E . C O M Family Owned and

Operated for over 20 years

Call for Parts Today

ROCK SOLID SERVICE WE CRUSH YOUR ROCKS


Page 16 • May 11, 2022 • www.constructionequipmentguide.com • New England States Supplement • Construction Equipment Guide

Capital Plan Also to Provide Funding for Two Other Airports AIRPORTS from page 1

will head to aviation and repair projects, the SHNS noted, with $51 million slated for structural improvements to the upper roadway at Logan’s Terminal B. At the Conley Container Terminal, the quasi-public agency plans to spend $5 million and use another $20 million in federal grants to create added container storage capacity. Luciana Burdi, director of Massport’s capital programs and environmental affairs, explained that Logan takes up a predominant portion of the capital investment plan with about $1 billion heading toward the bustling Boston airport. Oftentimes, she told SHNS, capital investment plans distribute more money to the first year rather than the later ones. But this plan evenly distributes funding across all three years “which highlights the health of our financial organization.” Three Airports to Receive Project Funding The three airports Massport oversees — Logan Airport, Worcester Regional Airport

and Hanscom Field in Bedford — are all in line for runway maintenance and improvements. At Worcester Regional, a project to rehabilitate Runway 29 will cost $18 million while another $7 million will be used over the next three fiscal years to rehab Runway 5-23 at Hanscom. Safety improvements and maintenance for Logan Airport’s 15R-33L runway are slated to cost $40 million. “We have an extensive airfield program coming in these next three years,” Burdi told the news service. “All these three projects are really happening in the spring and summer of 2023.” In addition, the investment plan calls for $16 million to buy eight enhanced electric buses for use on the MBTA’s Silver Line. Burdi said the buses will produce zero emissions while running on the Logan Airport campus. “We’re working with the MBTA to make sure that those buses meet the technical requirements in terms of racks for luggage and facilitate the experience that we’re looking for our passengers,” Burdi said. 

W.I. Clark Helps Match Right Equipment for Many Needs ESI from page 4

loader backhoes; JD 544J and JD 644J loaders; JD 270D excavator with a long front and 60-in. ditching bucket; JD 317G tracked loader; several JD 50G mini excavators; JD 650H dozer; and a JD 130G excavator. Greg Hulbert, of The W.I. Clark Company, is Mitchell’s sales rep and has been since the start of the company’s relationship with John Deere. The service that ESI has received from Hulbert and the service department at The W.I. Clark Company, and the overall reliability of the John Deere product, is what has kept ESI loyal to The W.I. Clark Company. According to Mitchell, “W.I. Clark knows how customers should be treated and the word ‘no’ is not in their vocabulary. In our business we are on all 24 hours a day 7 days a week and we have to work with suppliers that keep the same hours. Not long ago we called W.I. Clark at 4:30 in the afternoon on A John Deere 650H is used to clean up after an accident off the Massachusetts Turnpike. a Friday. We needed a part that was somewhat obscure and due to supply chain issues was not avail- inventory. Through the entire pandemic it was the only time have brought is going to be reliable and up to the task at able. W.I. Clark took the part from one of the machines in they didn’t have a part that we needed. But that situation hand. “Over the years we have worked with Greg Hulbert and their own fleet and got it to me within hours. That type of demonstrated their ‘go to’ attitude. Reliability from the service reinforces to me how much they understand how equipment is critical. In emergency situations we can be dis- the people at W.I. Clark to consistently match up the right patched hundreds of miles in the middle of the night. We equipment to meet our varied needs and it is a relationship critical their equipment is to our business. “That was an unusual scenario, not having the part in have to know when we get there that the equipment that we that we can count on going into the future.” 


Construction Equipment Guide • New England States Supplement • www.constructionequipmentguide.com • May 11, 2022 • Page 17

Discover the NEW A-Series Hyundai Construction Equipment is excited to announce the launching of our new A-series machines. Along with a new look, these machines are packed full of standard new features and benefits to get the job done efficiently. • Cummins Performance Series Engines Stage V emissions compliant engines • EPFC (Electric Positive Flow Control) Reduces daily fuel consumption by 8-11% • EPIC (Electric Pump Independent Control) Improved controllability with reduced RPM drop • Serviceability/Safety Enhanced cab visibility Easy access engine panels

More standard features. More value.

www.hceamericas.com To learn more about the what the new Hyundai A-Series machines can offer your business, contact your Hyundai dealer today.

Chappell Tractor 251 NH-125 Brentwood, NH 03833 603/642-5666

454 RTE 13 Milford, NH 03055 603/673-2640

Kahn Tractor & Equipment, Inc.

Whited Equipment Co. 2160 Hotel Road Auburn, ME 04210 207/346-0279

17 Houlton Road Presque Isle, ME 04769 207/346-0279

520 Pond Road North Franklin, CT 06254 860/642-7596 www.kahntractor.com

391 Loudon Rd. Concord, NH 03301 603/225-3361 www.chappelltractor.com

837 Portland Road Saco, ME 04072 844/430-6810 www.whitedhyundai.com

Lorusso Heavy Equipment, LLC

Quality Fleet Service, Inc.

Butler Equipment

160 Elm Street Walpole, MA 02801 508/660-7600 www.lhequip.com

548 New Ludlow Road South Hadley, MA 01075 413/213-0632 www.qualityfleetservice.com

631 New Park Ave West Hartford, CT 06110 860-233-5439 www.butlerequip.com ©2022 Hyundai Construction Equipment Americas. All Rights Reserved.


Page 18 • May 11, 2022 • www.constructionequipmentguide.com • New England States Supplement • Construction Equipment Guide

NEW ENGLAND SUPPLEMENT ADVERTISER INDEX ALTA EQUIPMENT COMPANY/NITCO LLC ....................7 ARGUS INDUSTRIAL COMPANY ....................................1 BARRY EQUIPMENT CO. INC. ......................................20 BOSTON FREIGHTLINER/NEW ENGLAND....................5 CHADWICK-BAROSS INC..............................................13 CHAPPELL TRACTOR....................................................10 EQUIPMENT EAST ......................................................1,11 FOLEY INC - WORCESTER ............................................1 GORILLA HAMMERS........................................................1 HYUNDAI CONSTRUCTION EQUIPMENT....................17 J R VINAGRO CORPORATION........................................1 M G EQUIPMENT ............................................................1 POWERSCREEN NEW ENGLAND................................15 ROCK & RECYCLING EQUIPMENT LLC ........................9 ROGERS BROTHERS CORPORATION ........................19 SHAWMUT EQUIPMENT CO INC ..................................16 T-QUIP SALES & RENTAL INC ......................................14 THE N.I.C.E. COMPANY ..................................................6 THE W. I. CLARK COMPANY ..........................................2 TIBBITS EQUIPMENT SERVICES INC ............................1 TYLER EQUIPMENT CORPORATION ............................3 The Advertisers Index is printed as a free editorial service to our advertisers and readership. Construction Equipment Guide is not responsible for errors or omissions.

RIDOT Set to Begin Aquidneck Avenue Resurfacing Project Congressman David Cicilline and Rhode Island Department of Transportation (RIDOT) Director Peter Alviti Jr. joined state and local leaders to break ground on a project to resurface approximately 1 mi. of Aquidneck Avenue in Middletown, from East Main Road to Green End Avenue. The $9 million project will rebuild the badly deteriorated road base and make numerous other safety improvements for pedestrians and bicyclists in this busy commercial corridor. Construction will start in early spring and the project will be done in fall 2023. The project includes reconstruction of the road base using a process called pavement reclamation in which the base of the roadway is rebuilt to provide a long-lasting repair of the driving surface. RIDOT also coordinated with the Newport Water Department to install a water main on a portion of the roadway — with Newport and Middletown each contributing up to $267,000 for it — as part of the project. This minimizes the overall disruption to motorists with only one construction project instead of two. “Too many of Rhode Island’s roads have fallen into disrepair, and I’m excited that projects like the Aquidneck Avenue resurfacing are advancing throughout the state,” Cicilline said. “This project, made possible through federal highway funding and state and local support, will bring much-needed improvements to this vital corridor for Middletown’s small businesses, residents, and visitors. The end product will underscore the importance of sound federal, state, and local investments in our roads and bridges. And, thanks to the historic federal funding provided through the Bipartisan Infrastructure Bill, we will be seeing more and more successful projects breaking ground throughout Rhode Island.” “Like many of our roads, Aquidneck Avenue was not properly maintained over decades, leading to the poor conditions we see today,” Alviti said. “We are working hard to bring all of our transportation infrastruc-

Work on Aquidneck Avenue is part of an aggressive effort to resurface many deteriorated roads. ture into a state of good repair, and Rhode Islanders can look forward to many more projects like this to address poor quality roads.” Work on Aquidneck Avenue is part of an aggressive effort to resurface many deteriorated roads, leveraging new funding from the Infrastructure Investment and Jobs Act with existing dollars for these important investments in Rhode Island’s transportation system. These include sections of 17 corridors throughout the state with poor quality pavement that contributed to a marked increase in potholes this season. The Aquidneck Avenue project also will improve pedestrian safety with new sidewalks along the western side of the road and pedestrian crossing features at the entrance to J.H. Gaudet Middle School. RIDOT also will install bike lanes along the corridor, supporting alternative forms of transportation that result in improved air quality through reduced automobile emissions. Approximately 16,100 vehicles per day use this section of Aquidneck Avenue. All construction projects are subject to changes in schedule and scope depending on needs, circumstances, findings and weather. The reconstruction of Aquidneck Avenue is made possible by RhodeWorks, RIDOT’s ongoing commitment to repair structurally deficient bridges and bring Rhode Island’s transportation infrastructure into a state of good repair, promote economic development, and create jobs. For more information, visit www.ridot.net/RhodeWorks. 

“Like many of our roads, Aquidneck Avenue was not properly maintained over decades, leading to the poor conditions …”

Peter Alviti Jr.

Rhode Island Department of Transportation


Construction Equipment Guide • New England States Supplement • www.constructionequipmentguide.com • May 11, 2022 • Page 19

TRAILERS TO MEET EVERY HAULING CHALLENGE! Committed to building superior quality, reliability and durability into every trailer.

ROGERS BROTHERS CORPORATION ALBION, PA

The Ultimate in Trailers®

Tyler Equipment 251 Shaker Road East Longmeadow, MA 01028 (413) 525-6351 • (800) 292-6351 Parts: (877) 255-6351

1980 Berlin Turnpike Berlin, CT 06037 (860) 356-0840 • (800) 352-4473 Parts: (860) 356-0848

C.N. Wood Co., Inc. 200 Merrimac St. Woburn, MA 01801 (781) 935-1919

140 Wales Ave. Avon, MA 02322 (508) 584-8484

3 Rocky Hill Road Smithfield, RI 02917 (401) 942-9191

www.cn-wood.com

www.tylerequipment.com

Over a CENTURY of building the very best heavy-duty trailers for your hauling needs! Contact your local dealer for a quote today.


Page 20 • May 11, 2022 • www.constructionequipmentguide.com • New England States Supplement • Construction Equipment Guide


Turn static files into dynamic content formats.

Create a flipbook
New England 10, May 11, 2022 by Construction Equipment Guide - Issuu