New England 9, April 29, 2020

Page 1

State Supplement sponsored by:

1

11

THE NEW ENGLAND EDITION

A Supplement to:

95

1

201 16 9

26

2

1 3

91

89

2

95 3

2 2 7

1

93

495

16

89 4

89

95

202

7

91

9

95

93

2

95 2

93 90

90

7

95 91

7

SHIP WITHIN 48 HOURS

3

84

495 6

84

6

6

195

395

95 91

April 29 2020

Vol. LI • No. 9

95

SAME DAY PARTS AVAILABILITY

95

®

24 HOUR TECHNICAL SUPPORT BACKED BY A 75 YEAR BUSINESS Thousands in Service!

“The Nation’s Best Read Construction Newspaper… Founded in 1957.”

Your New England States Connection •  Kent Hogeboom 315-866-1423 2208 Plainfield Pike • Johnston, RI 02919 401-943-7100 • Fax: 401-647-5041

www.jrvinagrocorp.com info@jrvinagrocorp.com

Affordable Price. Premium Service.

CALL 800-367-4937 *On approved credit • Financing Available

Despite COVID-19, Construction Continues on Milford Bridge

Specializing in:

Demolition, Portable Crushing, Material Sales, C & D Recycling, Land Clearing, Heavy Hauling & Trucking Call for Pricing

LEED Accredited in Waste Management

2020 EZ-Screen 1200XLS 36 Month lease AS LOW AS

$1,500* / Month Authorized Doosan Dealer

978-454-3320 (Dracut, MA) 603-410-5540 (Bow, NH) Optional 3 Product Conveyor

6’x5’ Double Deck Screenbox Works with 1/2 to 1 3/4 Yd. Loaders, 25 H.P. Kohler Diesel Engine, 24” Conveyor Dumps Screened Product 9’ High, Two (2) Year Warranty! $44,900 plus freight. Other Screeners Available

EZ-SCREEN

www.ez-screen.com

*Limited time offer. Some restrictions apply. See dealer for details.

WE STOCK RUBBER TRACKS for Over 6,000 Models! Some Used Tracks A & GA Available. NJ, TX, WOUSES WAREH • HIGH QUALITY • FAST SHIPPING • GUARANTEED TO FIT • UNDERCARRIAGE PARTS • FLATPROOF SKIDSTEER TIRES • RUBBER PADS FOR STEEL TRACKS

888-888-1248

248-745-5828

The existing bridge was built in 1941 and is being replaced because it is structurally deficient and functionally obsolete, according to Kevin Nursick, a CTDOT spokesperson.

By Ken Liebeskind

CEG CORRESPONDENT Cat IT38G, 3.25cy, 7,800 Hrs, Mich Radials 67%, 3rd Valve, Owned for many years, Runs Excellent, No blow by, No leaks, Very Good ..$49,750 or bo

Phil (413) 427-7171 • Largest hammer repair facility in North America • Demolition tools and parts for ALL makes and models • Hammer-equipped excavator rentals • Backed by a 75 year family owned business CALL YOUR ONE-STOP HAMMER SHOP™ TODAY!!!

www.foleyengines.com

CALL 888-81-GORILLA(46745)

The construction of a replacement bridge that carries Wheelers Farms Road over State Road 796, a short highway that connects the Merritt Parkway and Wilbur Cross Parkway to I-95 and the Boston Post Road in Milford, Conn., resumed in early April with completion projected for the fall of 2021. The job has continued during the COVID-19 pandemic with construction jobs not stopped in Connecticut. Though Gov. Ned Lamont has established business restrictions during the pandemic, he has spared the construction industry,

with limitations only placed on indoor construction jobs. “We’re keeping our big, outdoor, public construction projects going, roads, bridges, schools — where it’s easier to keep social distancing,” Lamont said. The new structure will be a two-span continuous multigirder bridge resting on concrete abutments and a center pier. The profile of Wheeler’s Farm Road will be raised to increase the minimum vertical clearance over SR 796 to the required 15 ft. The new spans will be lengthened to allow a 6.5-ft. inside shoulder, three 12-ft. travel lanes and a 10 ft. outside shoulder in each direction on SR 796. New England Road of Clinton, Conn., is the general see MILFORD page 4


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.