Skip to main content

New England 7 April 3, 2019

Page 1

State Supplement sponsored by:

1

11

THE NEW ENGLAND EDITION

A Supplement to:

95

1

201 16 9

26

2

1 3

91

89

2

95 3

2 2 7

1

93

495

16

89 4

89

95

202

7

91

9

95

93

2

95 2

93 90

90

7

95 91

7

SHIP WITHIN 48 HOURS

3

84

495 6

84

6

6

195

395

95 91

April 3 2019

Vol. L • No. 7

95

SAME DAY PARTS AVAILABILITY

95

®

24 HOUR TECHNICAL SUPPORT BACKED BY A 75 YEAR BUSINESS Thousands in Service!

“The Nation’s Best Read Construction Newspaper… Founded in 1957.”

Your New England States Connection •  Kent Hogeboom 1-800-988-1203 2208 Plainfield Pike • Johnston, RI 02919 401-943-7100 • Fax: 401-647-5041

www.jrvinagrocorp.com info@jrvinagrocorp.com

LEED Accredited in Waste Management

Large Enough to Service You; Small Enough to Know You

61 Silva Lane • Dracut, MA 01826

6’x5’ Double Deck Screenbox Works with 1/2 to 1 3/4 Yd. Loaders, 25 H.P. Kohler Diesel Engine, 24” Conveyor Dumps Screened Product 9’ High, Two (2) Year Warranty! $42,900 plus freight. Other Screeners Available

EZ-SCREEN

*On approved credit • Financing Available

Rhode Island’s Victory Highway Bridge in Second Phase of Reconstruction

CEG CORRESPONDENT

Call for Pricing

Optional 3 Product Conveyor

CALL 800-367-4937

By Ken Liebeskind

Specializing in:

Demolition, Portable Crushing, Material Sales, C & D Recycling, Land Clearing, Heavy Hauling & Trucking

2019 EZ-Screen 1200XLS

Affordable Price. Premium Service.

Call Today (978) 454-3320

WE STOCK RUBBER TRACKS for Over 6,000 Models! Some Used Tracks A & GA Available. NJ, TX, W USES

WAREHO

• HIGH QUALITY • FAST SHIPPING • GUARANTEED TO FIT • UNDERCARRIAGE PARTS • FLATPROOF SKIDSTEER TIRES • RUBBER PADS FOR STEEL TRACKS

888-888-1248

Reconstruction of the Victory Highway Bridge, which carries Victory Highway, Route 102, over Route 95 in West Greenwich, R.I., started in Nov. 2017 and is in its second phase, with half the bridge having been demolished and rebuilt and the second half under way. The bridge, which was built in 1969 and has been classified as “structurally deficient” since 1995, is one of 250 the state is scheduled to be replaced in Rhodeworks, its 10-year transportation program, according to Esam Eid, the Rhode Island Department of Transportation project manager. The budget for this job is $19 million, with 80 percent to be paid by the federal government. Eid said the north side of the bridge has been completed and the entire job should be done by the fall of 2020. see VICTORY page 16

Crews will resurface Route 102 ramps, replace signing, striping and guardrails and complete minor landscaping and draining work to complete the project.

Hitachi Announces Bobcat of Connecticut as New Compact Wheel Loader Dealer

www.ez-screen.com

248-745-5828

Cat IT38G, 3.25cy, 7,800 Hrs, Mich Radials 67%, 3rd Valve, Owned for many years, Runs Excellent, No blow by, No leaks, Very Good.. $49,750 or bo

Phil (413) 427-7171 • Largest hammer repair facility in North America • Demolition tools and parts for ALL makes and models • Hammer-equipped excavator rentals • Backed by a 75 year family owned business CALL YOUR ONE-STOP HAMMER SHOP™ TODAY!!!

www.foleyengines.com

CALL 888-81-GORILLA(46745)

Hitachi Construction Machinery Loaders America Inc. (HCMA) has announced Bobcat of Connecticut Inc. as a new compact wheel loader dealer. Based in Hartford, Conn., Bobcat of Connecticut will be serving the Connecticut, Rhode Island and Massachusetts region with the full lineup of Hitachi compact wheel loaders in addition to offering parts and full maintenance packages. Bobcat of Connecticut Inc. has five full service branches: East Hartford, Conn.; Stratford Conn.; west Springfield, Mass.; Warwick, R.I.; and Auburn, Mass. Bobcat of Connecticut opened its doors with five employees in Hartford, Conn., in 1990 and expanded rapidly through the region. Customers in these areas will now be able to rent and see BOBCAT page 16

Stu Graham, president of Bobcat of Connecticut (L) and Gary Bell, HCMA compact business manager.


Page 2 • April 3, 2019 • www.constructionequipmentguide.com • New England States Supplement • Construction Equipment Guide

2014 CATERPILLAR CB34B

2010 JOHN DEERE 344J

2015 HYUNDAI HL955

345 hrs, Stk# 24907, PSI water system, Double Drum ......................................................$42,500

650 hrs, 3rd valve, hyd coupler, 90% rubber, super clean loader, Stk# 24970 ..........$110,000

c/air, 3 spool, 3.7 yd bucket, 676 Hrs, Stk# 24074 ................................................$136,000

2018 JOHN DEERE 344K

2016 KOMATSU WA270-7

2009 JOHN DEERE 244J

125 Hrs, c/air, Ride control, aux hyds, hyd coupler, 2Yd GP bucket, like new condition, Stk# 24724....................................................$135,000

Stk# 24861, air, 3rd valve, gp bucket, good rubber ..................................................$88,000

5584 Hrs, c/air, aux hyds and hyd coupler, GP bucket, 70% rubber, fully serviced, Stk# 24822.... ................................................................$36,500

2013 CAT 262D

2014 LEEBOY 8510C

2005 BOBCAT 430AG

c/air, EH controls, GP bucket, good condition, Stk# 24947 ..........................................$30,000

2025 Hours, Stk# 24650, Kubota, 8-15' propane screed, one owner unit ..........$75,000

ROPS, rubber tracks, push blade, fully serviced, Stk# 24788 ..................................$24,500

See Our Complete Inventory at www.wiclark.com


Construction Equipment Guide • New England States Supplement • www.constructionequipmentguide.com • April 3, 2019 • Page 3

Telem e matics done right. Done for you.

Yo ou wantt to spend your time keeping your business running smoo othly — not deciding which o of the th thousand d off machine ds hi alerts l t you receive i are important. i t t That’s Th t’ why h ActiveCare A ti C Direct does the work w k for f you. The experts e at the Volvo Uptime Center filter out the noise, and you receive only the information that’s imp portant to you — actionable insights to keep your machines up and running. Contact your y local dealer, or visit volvoce.com//Activ ActiveCareDirect for complete details. *ActiveCare e Direct is free for a year on applicable new machine purchases. 251 Shaker Road East Longmeadow, MA 01028 800.292.6351 1980 Berlin Turnpike Berlin, CT 06037 800.352.4473


Page 4 • April 3, 2019 • www.constructionequipmentguide.com • New England States Supplement • Construction Equipment Guide

Maine Releases Logger, Log Trucker Industry, Wage Report Maine is facing a shortage of loggers and log In addition to Maine expansions already truckers that will grow and could hinder the announced by mill owners including Verso, growth of the $8.5 billion forest products Sappi, Nine Dragons and Pleasant River industry in the state if wage growth does not Lumber, the FOR/Maine (Forest Opportunity occur, an occupational analysis released March Roadmap), a broad coalition working to diver14 concludes. sify the state’s wood products businesses, The employment availability and wage attract capital investments and develop greater analysis prepared by the Maine Center for economic prosperity for communities impactBusiness and Economic Research at the ed by recent mill closures has announced an University of Southern Maine found wages for action plan to grow Maine’s forest economy logging equipment operators and log truckers from the current $8.5 billion (annual) to $12 in Maine are lower than those for comparable billion by 2025. This growth would position jobs in competing industries in the state, and the state to compete in and take advantage of PCL of Maine photo substantial global market opportunities with this combined with a tight labor market and looming retirement for large numbers of log- With low unemployment and strong competition for skilled operators of heavy much of the projected 40 percent growth comgers is concerning for Maine’s forest economy. machinery and trucks, logging contractors are struggling simply to keep the ing from new markets for the state. Such “This analysis simply confirms and rein- workers they have, let alone attract new ones. growth also would require a significant expanforces what many in the industry have known sion of the logging and log trucking workforce for a long time,” Dana Doran, executive director of the operators of heavy machinery and trucks, logging contrac- in Maine, Doran noted. Professional Logging Contractors of Maine (PLC), which tors are struggling simply to keep the workers they have, let Key findings of the employment availability and wage commissioned and partnered with the Center on the study, alone attract new ones, Doran said. study include: “We know from surveying our own membership, which said. “The root of Maine’s vital forest products economy — • Although capital expenses in the logging industry have the logging industry — must be able to offer higher wages to cuts approximately 75 percent of all wood harvested in risen across the board, rates for wood harvesting and truckcompete for existing workers and attract new ones at a time Maine, that the industry is already unable to fill an estimated ing have not. when they are desperately needed to support a resurgent for- 750 to 1,000 jobs today,” Doran said. “Add to that the pro• Recently announced expansions increasing demand for jected loss of upwards of 200 workers per year over the next wood will require an additional 100 jobs in the logging est products industry.” The heart of the problem is profit margins for logging con- 10 years due to retirements, coupled with the need for more industry in the immediate future. In addition, occupation protractors have dwindled as costs of doing business have risen, loggers and truckers to meet rising demand for wood from jections suggest upwards of 200 workers per year will need limiting the ability of contractors to raise pay for workers. expansions that have been announced by mills in the state to be replaced over the next 8 to 10 years due to an aging logWith low unemployment and strong competition for skilled recently and you begin to see the extent of this problem.” ger workforce. • Business critical occupations in the logging industry, including equipment operators and truck drivers which comConstruction Equipment Guide Northeast NEW ENGLAND EDITION prise 2 out of every 3 jobs, currently earn relative wages well Edition (ISSN 1081-7034) is published bi-weekly by Construction Equipment Guide below comparable occupations in other industries, making it Ltd. Advertising and Editorial Offices are Founder, Publisher & CEO Edwin M. McKeon Sr. Main office 470 Maryland Drive difficult to recruit and attract workers. Logging equipment located at 470 Maryland Dr., Northeast Publisher Edwin M. McKeon Jr. operators ranked lowest for wages out of 19 comparable Ft. Washington, PA 19034. Toll Free Fort Washington, PA 19034 800/523-2200 or Fax 215/885-2910. Executive Publisher Teddy McKeon skilled occupations surveyed, while logging truck drivers Annual Subscription Rate $65.00. Call for Editor In Chief Craig Mongeau 215/885-2900 ranked second to last for wages out of 14 heavy truck driving Canadian and foreign rates. Associate Editor Joe Barron sectors. Toll Free 800/523-2200 Periodicals postage paid at Ft. Washington, Editorial Assistant Katherine Devlin • The average earnings for all employment in Maine’s logPA and at additional mailing offices. Fax 215/885-2910 Editorial Consultant Pete Sigmund POSTMASTER: Send address changes to ging industry have increased by five percent since 2010, an Construction Equipment Guide Northeast Production Mgr. John Pinkerton average increase of just over $2,100 per worker compared to Web site www.constructionequipmentguide.com Edition, 470 Maryland Dr, Ft. Washington, Controller Judith Nixon an average increase of $5,500 in comparative industries, PA 19034. Editorial e-mail editorial@cegltd.com Circulation Mgr. Cathy Printz such as construction, wood manufacturing and pulp and Contents Copyrighted ©2019, by Advertising e-mail production@cegltd.com Web Editor Emily Buenzle paper manufacturing. Construction Equipment Guide, which is a Registered Trademark, registered in the U.S. • More than 400 workers in the industry are at retirement Patent Office. Registration number age (65+), while an additional 850 workers will be reaching 0957323. All rights reserved, nothing may retirement age within the next 10 years. Attracting younger be reprinted or reproduced(including framing) in whole or part without written generations of workers will be critical in replacing the retirFor advertising rates: permission from the publisher. All editorial ing workforce. material, photographs, drawings, letters, • Based on 2018 data, an estimated 4,927 jobs were directand other material will be treated as Contact Edwin M. McKeon Jr. Contact Kent Hogeboom unconditionally assigned for publication ly supported by traditional (paid employee), self-employed, and copyright purposes and are subject to • New York • New England 215/885-2900 and proprietor income employment in logging. This supportConstruction Equipment Guide's unrestricted Toll Free 800/523-2200 ed another 3,266 jobs from indirect and induced spending 315/866-1379 right to edit and comment editorially. Contributor articles do not necessarily reflect impacts. In addition, a total of $320.8 million in earnings Fax 215/885-2910 Toll Free 800/988-1203 the policy or opinions of this publication. (compensation) were supported by direct, indirect, and Fax 315/823-4136 e-mail tmckeon@cegltd.com Call or write for advertising rates, publicainduced employment from the logging industry. tion schedule and media kit. The e-mail khogeboom@cegltd.com The Executive Summary of the study is available at: mainelConstruction Equipment Guide is not responoggers.com/new/wp-content/uploads/2019/03/Professionalsible for clerical or printer's errors, every care is taken to avoid mistakes. Logging-Contractors-of-Maine-Occupational-WagePhotographs of equipment used in adverAnalysis_final-1.pdf. tisements are not necessarily actual photoFor the full report, visit: maineloggers.com/new/wp-congraphs of the specific machine. Similar photographs are used occasionally and every tent/uploads/2019/03/Professional-Logging-Contractors-ofeffort is taken to depict the actual equipMaine-Occupational-Wage-Analysis-Data-Appendixment advertised. The right is reserved to FINAL.pdf.  reject any advertising.


Construction Equipment Guide • New England States Supplement • www.constructionequipmentguide.com • April 3, 2019 • Page 5


Page 6 • April 3, 2019 • www.constructionequipmentguide.com • New England States Supplement • Construction Equipment Guide

The Nice Company, Inc

9 Rosenfeld Drive, Hopedale, M A Toll Free# 888-717-8096 • w w w.theniceco.com

We sell NICE machines! Equipment Sales and Rentals Thank you for making us the fastest growing independent heavy equipment rental company in New England!!!

2016 CAT 330FL, 4300 hours, AC, 32" pads, Back up Camera ..................$149,000

2018 Doosan EX300LC-5, unused, aux. hydraulics, 24" pads........................$189,000

2016 Volvo EC350EL, 4000 hours, Aux. Plumbing, 12' stick, 65" bucket ....$149,000

2014 CAT 312E, 2000 hours, hyd. QC bucket, 11' stick, aux. hyd., AC ......$94,500

2014 Komatsu WA470, 7000 hrs, Ride Control, 26.5R25 Tires..................$149,000

2014 Komatsu WA380, 5300 hrs, Nice unit!! ............................................$119,000

2016 Komatsu WA380-8, 3600 hours, AC, New front rubber, GP bucket ........$139,000

2016 Case TR270 Tracked Skid Steer, 450, Aux. Hydraulics, EH Controls, Rubber Tracks, GP Bucket ..........................$34,500

PORTABLE ROCK CRUSHING

C

Onsite or Quarry • Making aggregates since 1983

Call us today ROCK CRUSHING•(8 ) 4 - GOSHEN, CT

www.FAYWRIGHTINC.com

USACE Begins Maintenance Project on Bourne Bridge Over Cape Cod Canal Maintenance work on the Bourne Bridge spanning the Cape Cod Canal in Bourne, Mass., began on March 25, 2019 and will continue through late May 2019, according to U.S. Army Corps of Engineers (USACE), New England District officials. During the work, travel over the Bourne Bridge will be reduced from two lanes in each direction to one wider 12-ft. lane in each direction. State and local police will be on duty at all Pablo Valerio photo via Wikimedia Commons times work is being performed U.S. Army Corps of Engineers (USACE), New England District officials began to assist the motoring public. The lane restrictions will maintenance work on the Bourne Bridge spanning the Cape Cod Canal in Bourne, remain in place 24 hours per Mass. day. Motorists planning to use the bridges, which are a vital component to pavement surfaces; and replacement of Bourne Bridge should be aware that the transportation system of Cape Cod, waterproof membranes. Work crews travel delays are likely to occur during the Islands and southeastern also will perform maintenance work the morning and afternoon peak travel Massachusetts. Work will include the on the bridge lighting and drainage replacement of bridge joints on the systems during this timeframe. periods each day. For more information, visit This bridge work is critical to main- roadway; repair of deteriorated steel taining the structural integrity of the and concrete; patching of damaged nae.usace.army.mil. 


Construction Equipment Guide • New England States Supplement • www.constructionequipmentguide.com • April 3, 2019 • Page 7

Wilmington n, MA Concord, NH Middleboro o, MA Lewiston, ME Shrewsburry, MA Waallingford, CT

PAYMEN Y NTS A AS LOW OW AS $$99

*

*Y You ou cou could uld lease any of these six ccompact excavators unde under er the SPRING LEASE SPECIAL using the flat rate. For example, the 19C-1 would be 60-months at just $549.23 per month OR O you could make six monthly onthly payments per year at just $99 a month and the rremaining six monthly payyments per year would be $999. Lease for less than renting and keep the equuipment year round. *All applications aree subject to credit review and approval. Security deposit may be required based on applicant’s credit. Spring Lease e Special assumes 5-year/500 hours per year lease with stated purchase option. Six (6) “ON-SEASON” higher gher payments and six (6) “OFF-SEASON” reduced payments of just $99. First payment due in advance, and must be b an “ON” payment. Minimum “OFF” payment is $99 9 + applicable taxes. Offer valid only on specific models els listed. Offer may change without prior notice, and additional terms and conditions may apply.


Page 8 • April 3, 2019 • www.constructionequipmentguide.com • New England States Supplement • Construction Equipment Guide

Border Wall Could Grab $200M From Portsmouth Shipyard KITTERY, MAINE (AP) the Mexican boundary last The Defense Department’s list month after Congress limited of projects that could be cut to him to just under $1.4 billion to fund President Donald Trump’s build border barriers. wall at the southern border That could allow him to includes more than $200 milsiphon $3.6 billion from mililion of projects that are aimed at tary construction projects to fulmaking Portsmouth Naval fill his 2016 campaign promise Shipyard more efficient in refufor a border wall. The 21-page eling and overhauling nuclearDefense Department list powered submarines. released March 18 targets projProjects that could be slashed ects around the world. include $110 million for dry The congressional delegadock improvements; $62 miltions in Maine and New lion for a paint, blast and rubber Hampshire are opposed to any facility; and $40 million for an cuts at the oldest continually extended crane rail. operated public shipyard in the Richard Smith, president of country. The shipyard, which the Metal Trades Council, the opened in 1800, is located on largest union at the shipyard, Seavey Island in the Piscataqua said it’s “disturbing” that the River, which separates Maine funding cuts could cause delays and New Hampshire. to projects that have been in the Projects that could be slashed at the Portsmouth Naval Shipyard include $110 million for dry dock “The Portsmouth Naval pipeline for years, putting more improvements; $62 million for a paint, blast and rubber facility; and $40 million for an extended crane rail. Shipyard is vital to our national pressure on an already strained security interests, and ripping The paint, blast and rubber facility would The improvement at Dry Dock 1 would funding away from these important confleet. “There’s a way to do everything that we consolidate scattered operations across the allow Los Angeles-class attack submarines struction projects would jeopardize the need to do in this country. We need to find a shipyard under one roof with modernized to enter without the need to provide extra Shipyard’s ability to keep our attack submaway to get it done. Why can’t we do it equipment to speed up work and save buoyancy as currently required. rine fleet ready for action,” said U.S. Sen. money. Trump declared a national emergency at Maggie Hassan, D-N.H.  together?” he said.

Tobin Bridge, Route 1 Chelsea Lane Closures Start in April The Massachusetts Department of Transportation (MassDOT) announced the Department will be rehabilitating the surface of the Tobin Bridge and complete required maintenance to improve the structure which will require lane closures and result in significant traffic impacts on the Tobin Bridge and Chelsea Curves section of Route 1 beginning April 1. These impacts will lead to increased travel times on sections of Route 1 northbound and southbound for drivers and MBTA bus customers. The Department also released details about transit options available to travelers such as free fares in the inbound direction on the SL3 bus line offered at the Chelsea, Bellingham Square, Box District, and Eastern Avenue stops for the duration of construction. The MBTA also announced that they will be running additional MBTA Blue Line trains to additional capacity, and these measures will be funded by MassDOT Highway Division project funds. Beginning April 1, lane closures on the Tobin Bridge northbound will be put in place, although two of three travel lanes will be open during daytime hours. One of the three travel lanes on the Tobin Bridge northbound will be open during overnight hours. Beginning by early May, Route 1 travel

“MassDOT is carrying out simultaneous work on this infrastructure which was constructed in the middle of the 20th century...” Jonathan Gulliver MassDOT

lanes in the Chelsea Curves area will be reduced so that two of three north and southbound travel lanes will be open in the daytime. One of three north and southbound travel lanes will be open during overnight hours. “MassDOT is carrying out simultaneous work on this infrastructure which was constructed in the middle of the 20th century and hasn’t been rehabilitated since the 1970s in order to ensure its continued use and reliability and minimize the overall impact on commuters and the local community,” Jonathan Gulliver, highway administrator said. “We thank travelers for their patience as MassDOT begins this necessary project,

and we encourage everyone traveling throughout the Route 1 area to make smart commuting decisions such as considering public transit, using the appropriate technology apps to find the best route and time to travel, and building extra time into their commutes to account for potential roadway congestion.” “During construction, free fares are being offered for Silver Line 3 [SL3] inbound customers at certain station stops and additional Blue Line train capacity is being added. In addition, public transit customers will be able to use a CharlieCard to travel between North Station and Chelsea on the Commuter Rail,” said Steve Poftak, MBTA general manager. “Some MBTA customers on certain bus routes will experience delays, so we urge riders to consider taking advantage of these additional travel options being offered during construction.” MassDOT is advising the public also to consider using the Haverhill or Newburyport/Rockport Commuter Rail lines and note that the Haverhill Line historically has parking capacity at Haverhill and Bradford stations. The Newburyport/Rockport Line historically has parking capacity at Newburyport, Salem and Lynn stations.

MassDOT’s traffic modeling suggests that on Route 1 northbound, afternoon peak travel times could increase in duration and have significant delays. Vehicle backups are expected to extend onto the I-93 ramps, along the Leverett Connector, and towards Rutherford Avenue. On Route 1 southbound, morning peak travel times could similarly increase in duration with significant delays expected. Vehicle backups are expected to extend to the Route 60 Rotary in Salem and may intermittently extend beyond Salem Street. MassDOT is carrying out work on the Tobin Bridge and Chelsea Curves section of Route 1 at the same time so that these projects will be completed in 2021. If the projects were done at separate times, drivers would be inconvenienced for additional years. This work will eliminate the need for weight restrictions and postings, and MassDOT will use accelerated construction techniques to shorten the overall construction time. MassDOT encourages the public to be mindful of these impacts and seek alternate routes. Those traveling through the area should reduce speed and use caution. These operations are weather dependent and subject to change without notice. 


Construction Equipment Guide • New England States Supplement • www.constructionequipmentguide.com • April 3, 2019 • Page 9

Op pen Hou use April 25, 2019 783 Bloo omingbur g g Rd Bloomingburg, NY 3:30 p pm – 7:00 p pm

Get in th he seat and seee for yoursellf what H O Pen H.O. nn and SITEC CH have to offferr.. • Demo a vaariety of Caterpillar Eqquipment • Talk Talk with our ouur experts about how w SITECH technology technologgy and &DW 0DFKLQQHU\ U\ FDQ EHQH¿W \R \RXU EXVLQHVV • Learn abouut our Product Suppoort offferings ferings 6WR WRS E\ RXUU IR IRRG WH WHQW DQG KDYH YH GLQQHU RQ XV

CAT A SP PORTS CAR Ch heck out the Acura #57 Cat racing machine and meet driver Jackie Heinricher.

OPERATOR O C CHALLENGE

Registeer now at hopenn.com/open-hou use or caall Alex Van Van Peltt at 845-437-41066

Test e yyour skill on our Cat equipment. Co ompete against otther t operattors for th for $5 500 and a chance to o represent H..O. Penn at the regional finals.


Page 10 • April 3, 2019 • www.constructionequipmentguide.com • New England States Supplement • Construction Equipment Guide

208 Holland Road • Brimfield, MA 01010

Sales Contact: R.J. Poirier rjpoirier@rjpoirier.com 413-245-3882 Fax: 413-245-3522

2016 CAT 988K, 9 Yd, High Lift, New Tires ......CALL (2) 2016 980M, Agg Handler, GP, Low Hrs ......CALL 2015 CAT 336EL, Thumb, Tool ar ....................SOLD 2015 CAT 336FL, Coupler, Bucket ....................CALL 2015 CAT D6N XL, Low Hour, ARO..................SOLD 2008 CAT 980H, 7.5 Yd GP ..............................CALL 2012 CAT 966K, GP, Auto Lube, New Tires ......CALL 2011 D8T, 8U w/Twin Tilt, S/S, ARO ................CALL 2002 CEDARAPIDS COBRA IMPACTOR ............CALL

www.rjpoirier.com

BOBCAT OF CONNECTICUT 54 Alna Lane

East Hartford, CT 06108 Dealer Imprint Area (860) 282-2648 Fax: (860) 282-6164

BOBCAT OF WORCESTER

BOBCAT OF STRATFORD

6 Westec Drive Auburn, MA 01501 (508) 752-8844 Fax: (508) 752-2595

821 Woodend Road Stratford, CT 06615 (203) 380-2300 Fax: (203) 380-9791

BOBCAT OF SPRINGFIELD

BOBCAT OF RHODE ISLAND

181 Wayside Avenue West Springfield, MA 01089 (413) 746-4647 Fax: (413) 746-4648

421 Lincoln Avenue Warwick, RI 02888 (401) 921-4300 Fax: (401) 921-4306

www.bobcatct.com


Construction Equipment Guide • New England States Supplement • www.constructionequipmentguide.com • April 3, 2019 • Page 11

Cut your big g jobs down to size. Go beyond scooping, carr ying and loading. The impressive digging and high tractive power of Doo D san® wheel loaders help you take on the most challenging material-handling tasks. Powered by a Tier 4 diesel engine, you’ll penetrate tough materials, tilt and lift with ease, and carr y more in ever y cycle. It’s your ticket to making harder work easier, longer days more enjoyable and ever y minute more productive and profitable. Stop in fo for details on Doosan wheel loaders s to oday y..

Doosan® and the Doosan logo are reg istered t r ademar k s of Doosan Cor p. in the United S t a t e s a n d v a r i o u s o t h e r c o u n t r i e s a r o u n d t h e w o r l d . 1 8 - D 0 0 3. 2

Au thor ized Doos an De aler

Equipment East 6 1 SSilva ilva LaLane ne • D•raDracut, cut, MAMA 0182 6 61 01826 • 978-454-3320 9 78-454 320••Bow, w w w.NH equ•ip603-410-5540 menteast.com 1474 Rte-33A www.equipmenteast.com


Page 12 • April 3, 2019 • www.constructionequipmentguide.com • New England States Supplement • Construction Equipment Guide

M N OFFICE:: (603) 623-36 MAI 669

603 Mammoth Road a Londonderry, y NH www.TQ QUIP.com equipmentsales a @tquip.com Mon nday-Frid i ay 8am-5pm | Saturday 8am-1pm 5% OFF ALL RENTALS

(EXCLUDES HAMMER & D8T RENTTA ALS S))

WHEN YOU MENTION THIS CODE: CEGSP19

PUSH IT. I MOVE E IT. ROLLL IT. DUMP MP IT. HAUL UL IT.

DISPLAY ADS/ CLASSIFIEDS Hydraulic Cranes 8 to 600 Ton Daily & Hourly Services www.astrocrane.com

Fully Insured 200 Codman Hill Rd., Boxborough, MA 01719 978-429-8666

Place Your Business Card for... 3 months 6 months 12 months

$300* $585* $1040*

only $50 an issue only $45 an issue only $40 an issue

Call now to reserve your space! 800-225-8448 * pre-payment required

Classified Rates: 30 Words or Less for $40.00. Each Additional Word is $1.20. For just an additional $25 your ad can be posted on our online searchable database for 30 days. Ad runs for 2 (two) insertions - no changes in second insertion. PLEASE ENCLOSE PAYMENT WITH ORDER and mail to: 470 Maryland Drive• Fort Washington, PA 19034

215/885-2900 • Fax 215/885-2910 Toll Free 1-800/523-2200 BUSINESS OPPORTUNITIES

LOADERS

Industrial Building for Lease 4000-5000 sq. ft, modern offices, shop, outside storage yard. Ideal contractor’s yard! Located in Chalfont/Doylestown, PA.

2015 Gehl R190, Cab w/ Heat , 2- Speed, 74’’ Bucket, Excellent condition, 425 hours ..$37,500.

For More Information Call 267-446-1325

EQUIPMENT RENTALS

EXCAVATORS

RENTMACHINES.COM

2016 Doosan DX140LCR US20, S/N 1148, Good condition, 519 hours ........$123,800.

CATERPILLAR® GENIE® CHALLENGER® SCREEN MACHINE®

Stephenson Equipment, Inc. 717-564-3434

DAILY AND WEEKLY

Gibson Machinery LLC 440-439-4000

CLOSE TO YOUR JOB SITE


Construction Equipment Guide • New England States Supplement • www.constructionequipmentguide.com • April 3, 2019 • Page 13

Proven worldd-class Tele-craw e wlers LER TELE CRAW TH ORT N NO

1LIINNE UP

#

CA!! R CA MEER AAM

223 ft | 68m main boom 348 ft | 105m max tip height full attachment with Superior capacities winch design Ultra-wide Vision package - 4 cameras!

Ver e mont 802-658-1700 02-658-1700 Massachusetts etts 508-499-1950 Pennsylvaniia 717-795-0700 New Yoork 315-676-2008 www.woodsscrw.com

250 t | 230 mt TELESCOPIC CRAWLER

Lexington, Kentucky, USA | www.linkbelt.com

HIGHEST CAPACITY A AVAIL A ABLE IN THE MARKET!

B U Y

•

L E A S E

•

R E N T


Page 14 • April 3, 2019 • www.constructionequipmentguide.com • New England States Supplement • Construction Equipment Guide

ALL NEW

C RTT PILOT CONTROLS

TRACK LOADER

TM

lbs.

www.mustang gmfg g.com TRACK LOADERS

•

SKID LOADERS

•

ARTICUL LA T ED L OADER S

ABLE TOOL & EQUIPMENT 149 Rocus Street 410 Burnham Street Springfield, MA 01104 South Windsor, CT 06074 413-363-0780 860-289-2020 www.abletool.net


Construction Equipment Guide • New England States Supplement • www.constructionequipmentguide.com • April 3, 2019 • Page 15

TH HE STRENGTH H TO

DO M D MO ORE E

No two days are the same. You need streng th and flexibility, powe w r and agility.

YOU NEED DOOSAN. Stop in and d learn how to do more with Doosan® crawler excavators. e A u t h o r i ze d D o o s a n D e a l e r

Barry Eq quipment Co. 30 Birch Island Road Webster,, M MA 01570 57 www.barrye equipment.com 508-949-00 005 Doosan® and the Doosan logo are registered trademarks of Doosan Corp. in n the United States and various other countries arou und the world. 17-D013


Page 16 • April 3, 2019 • www.constructionequipmentguide.com • New England States Supplement • Construction Equipment Guide

RIDOT Reconstructs Structurally Deficient Victory Bridge VICTORY from page 1

Beta Engineering, Lincoln, R.I., is the design firm on the job and the John Rocchio Corp., Smithfield, R.I., is the contractor. Paul Cappelletti, JRC’s project manager, said, “We demolished the first half of the old bridge and rebuilt that side with abutments and piers to carry steel beams and the concrete deck. Phase one was completed up to paving at the The budget for this job is $19 million, with 80 percent end of January.” to be paid by the federal government. The equipment used on the job included a large excavator with a hydraulic hammer to peel back the deck. A subcontractor used a skid steer to push the broken concrete deck back and peel it to the end of the bridge and a hydraulic hammer to break it up further and a large excavator to break the deck into smaller pieces, Cappelletti said. He said cast-in-place concrete was used on steel beams for the bridge deck. A crane sitting below Route 95 was used to erect steel Cast-in-place concrete was used on steel beams for beams on top of bridge abut- the bridge deck. ments and piers. Traffic has been maintained during con- vibratory hammer into the soil,” Cappelletti said. “It was a different process struction. “There is a median barrier in the middle on one side of the bridge because of the with all traffic on one side with a work zone ledge height.” But he said the job has gone relatively on the other side,” Eid said. There will be median work to do after the smooth and will be completed according to second half of the bridge is rebuilt and schedule. He also said when the job is complete lanes in both directions will be a little paving, Cappelletti said. JRC experienced difficulty early in the job wider than they are now. “We started the second half of the job in with earth support. “The ledge was higher than we antici- February. The tasks for both phases are pated so we had to augur rock sockets in almost identical,” Cappelletti said. “We’ll the ledge with steel piles and we drove demolish the old bridge and dig down to put steel plates in between the piles with a in new abutments and piers.”

The bridge, which was built in 1969 and has been classified as “structurally deficient” since 1995, is one of 250 the state is scheduled to be replaced in Rhodeworks.

Reconstruction of the Victory Highway Bridge started in Nov. 2017 and is in its second phase, with half the bridge having been demolished and rebuilt and the second half under way.

Crews will resurface Route 102 ramps, replace signing, striping and guardrails and complete minor landscaping and draining work to complete the project.

Less than 9,000 vehicles a day cross the Victory Highway Bridge. “It’s not a high-volume roadway in the rural part of the state,” Eid noted.  CEG

Bobcat of Connecticut Now Hitachi Compact Wheel Loader Dealer BOBCAT from page 1

purchase Hitachi compact wheel loaders ranging from .65 cu. yds. to 2.0 cu. yds. Bobcat of Connecticut also represents Bobcat skid steers, track loaders, excavators, utility vehicles, tractors and versahandlers, Protech snow pushers and Towmaster trailers, to name of few of the many lines of equipment and attachments. “The Bobcat of Connecticut enterprise,

making up five locations over three states, is the leader in compact equipment within its markets,” said Stu Graham, president Bobcat of Connecticut. “We understand that providing quality customer service allows us to grow with our customers. Hitachi compact loaders gives us the ability to offer our customer base yet another quality equipment solution. Hitachi is a world leader in the equipment industry, we couldn’t be more excited to represent the Hitachi brand and

contribute to establishing Hitachi compact equipment throughout the market place.” “We are pleased and excited to have Bobcat of Connecticut representing the Hitachi compact loader line,” said Gary Bell, compact business manager, HCMA. “This dealer has great credibility in this compact market. They know these customers and the customers know them.” The commitment of Hitachi Construction Machinery Loaders America Inc. to the

North American market is significant. Parts availability, a factory component exchange program, customer and dealer training programs, and a wide range of services and programs, provide outstanding support for the Hitachi line of wheel loaders, according to the manufacturer. The HCMA team is focused on wheel loaders, and only wheel loaders. For additional information, visit news.hitachiwheelloaders.us. 


Construction Equipment Guide • New England States Supplement • www.constructionequipmentguide.com • April 3, 2019 • Page 17

RO ONG Run stron ng through your toughest jobs. s Doosan® equip pment stands up to punishing work and com mes back fo or more everry day. Our lineup of he eavy equipment delivers the solid durability, easy maintenance and hardw d orking perrform o ance you demand d. Trust its fast cycle time es and multiple workin ng modes to efficiently y tackle mountains of harsh material. Calll or visit i you o r loc l al authoriz h i ed dd de ealler tod day and d see the he Doosan diff differ e enc e e. Authorized Doosan n Dealers

Equipment East, LLC 61 Silva Lane e • Dracut, MA 01826 • 978-454-3 9 320 • www.equipmenteast.com

Barry Equipment q Co., In nc. 30 Birch Island a Road • Webster, MA 01570 • 508-949-0005 • www.barryequipment.com o

F&W Equipment 164 Boston Post Road • Orange, CT 06477 0 • 203-795-0591 • www w .fwequip.com

Central Equipment Company 45 Dempseyy-Greaves Lane • Stillwater e , ME 04489 • 207-827-6 6193 • www.centralequip pmentco.com

Doosan® and the Doosan logo are registered trademarks of Doosan Corp. in the United States and various other countries arou und the world. 17-D011


Page 18 • April 3, 2019 • www.constructionequipmentguide.com • New England States Supplement • Construction Equipment Guide

NEW ENGLAND SUPPLEMENT ADVERTISER INDEX ARGUS INDUSTRIAL COMPANY ....................................1 ASTRO CRANE ..............................................................12 BARRY EQUIPMENT CO ..............................................15 BOBCAT OF CONNECTICUT ........................................10 BULLETIN BOARD..........................................................12 CHADWICK-BAROSS INC..............................................20 CLASSIFIEDS ................................................................12 DOOSAN NORTHERN NEW ENGLAND ......................17 EQUIPMENT EAST ......................................................1,11 FAY & WRIGHT EXCAVATING INC ..................................6 FOLEY INC - WORCESTER ............................................1 GORILLA HAMMERS........................................................1 H O PENN MACHINERY CO INC ....................................9 J R VINAGRO CORPORATION........................................1 LORUSSO HEAVY EQUIPMENT LLC..............................5 M G EQUIPMENT ............................................................1 MILTON CAT....................................................................12 MUSTANG MFG ..............................................................14 NORTHLAND JCB ............................................................7 R J POIRIER HEAVY EQUIPMENT REP ......................10 RELIABLE EQUIPMENT LLC ........................................14 ROGERS BROTHERS CORPORATION ........................19 SUMMIT SUPPLY LLC ......................................................1 T-QUIP SALES & RENTAL INC ......................................12 THE N.I.C.E. COMPANY ..................................................6 THE W. I. CLARK COMPANY ..........................................2 TYLER EQUIPMENT CORPORATION ............................3 WOODS CRW CORP......................................................13 The Advertisers Index is printed as a free editorial service to our advertisers and readership. Construction Equipment Guide is not responsible for errors or omissions.

RIDOT Making Steel Repairs to Diamond Hill Road Bridge The Rhode Island Department of Transportation (RIDOT) announced it will be performing steel repairs this summer to the Diamond Hill Road Bridge, which carries Diamond Hill Road over I-295 in Cumberland. This will strengthen the bridge’s superstructure, avoiding any traffic or weight restrictions that might be needed if RIDOT did not perform this work. The repairs, estimated to cost $230,000, were prompted by the results of a routine safety inspection completed in late February. The repair work will last until the bridge’s rehabilitation, part of a $24.5 million, threebridge project set to begin construction in summer 2022. This summer’s repair work will be performed from underneath the bridge, and shoulder closures on I-295 are possible. RIDOT will specify in its contract that no lane closures will be permitted on Diamond Hill Road itself, which is part of a $11.3 million safety improvement project designed to alleviate congestion and reduce a high incidence of crashes. “[Due] to the Governor’s RhodeWorks program, we have the funds to complete the long-awaited safety improvements for Diamond Hill Road as well as address the Diamond Hill Road Bridge itself,” Peter Alviti Jr., RIDOT director, said. “We expect a year and a half to two years gap between the projects, and we’ll be working hard through the design process to minimize traffic disruption when the bridge project begins. Unfortunately, we have to apply a $230,000 band-aid to this bridge now to keep it operational. It is another consequence of a legacy of poorly maintained bridges.” In addition to the Diamond Hill Road Bridge, two bridges that carry Douglas Pike over I-295 in Smithfield will be rehabilitated in 2022. All three bridges are structurally deficient and nearing the end of their service lives (Diamond Hill Road Bridge was built in 1963; Douglas Pike Bridges were built in 1971). They were identified as part of RIDOT’s asset management approach for all roads and bridges and are being rehabilitated as part of the Department’s mission to reduce the high number of structurally deficient bridges in Rhode Island and meet the federal standard of 90 percent bridge sufficiency by 2025. The ongoing Diamond Hill Road safety project is on schedule for completion in fall 2020. It includes the installation of two roundabouts near both ends of the Diamond

“[Due] to the Governor’s RhodeWorks program, we have the funds to complete the long-awaited safety improvements for Diamond Hill Road as well as address the Diamond Hill Road Bridge itself.” Peter Alviti Jr. Rhode Island Department of Transportation

Hill Road Bridge, where it meets highway on and off ramps that are frequently congested, sometimes with traffic backing onto I295. Also, under this project, RIDOT is making improvements at two nearby intersections — Chapel Four Corners and Industrial Drive. Combined, all the intersections under this project had more than 170 crashes in a five-year period from 2009-2013.

“...Unfortunately, we have to apply a $230,000 band-aid to this bridge now to keep it operational. It is another consequence of a legacy of poorly maintained bridges.” Peter Alviti Jr.

Rhode Island Department of Transportation

Repairs to the Diamond Hill Road Bridge, the Diamond Hill Road safety project, and the forthcoming rehabilitation of the Diamond Hill Road Bridge and the Douglas Pike Bridges were made possible by RhodeWorks, RIDOT’s ongoing commitment to repair structurally deficient bridges and bring Rhode Island’s transportation infrastructure into a state of good repair, promote economic development, and create jobs. For more information, visit ridot.net/RhodeWorks. 


Construction Equipment Guide • New England States Supplement • www.constructionequipmentguide.com • April 3, 2019 • Page 19

TRAILERS TO MEET EVERY HAULING CHALLENGE! Committed to building superior quality, reliability and durability into every trailer.

ROGERS BROTHERS CORPORATION ALBION, PA

The Ultimate in Trailers®

Tyler Equipment 251 Shaker Road East Longmeadow, MA 01028 (413) 525-6351 • (800) 292-6351 Parts: (877) 255-6351

1980 Berlin Turnpike Berlin, CT 06037 (860) 356-0840 • (800) 352-4473 Parts: (860) 356-0848

C.N. Wood Co., Inc. 200 Merrimac St. Woburn, MA 01801 (781) 935-1919

140 Wales Ave. Avon, MA 02322 (508) 584-8484

60 Shun Pike Johnston, RI 02919 (401) 942-9191

www.cn-wood.com

www.tylerequipment.com

For more than 110 years, ROGERS® trailers have stood above the rest in rugged durability, unsurpassed quality and superior design. Contact your local dealer for a quote today.


Page 20 • April 3, 2019 • www.constructionequipmentguide.com • New England States Supplement • Construction Equipment Guide

5 YEAR / 5,000 HOUR EXCAVATOR WARRANTY EXCAVATOR CAPACITY FROM

1–50 TONS

CHADWICK-BAROSS We are the duly appointed Sany dealer for Massachusetts, Connecticut, and Rhode Island. A V A I L A B L E

SALES

|

SERVICE

|

PA RT S

|

R E N TA L S

A T :

15 KATRINA ROAD, CHELMSFORD, MA 978-256-9571 3 90<4B ? <DA?7H 8=3 7FH, F4BC WARWICK, RI 844-238-7673 | chadwick-baross.com


Turn static files into dynamic content formats.

Create a flipbook