Skip to main content

New England 7 April 5, 2017

Page 1

1

11

THE NEW ENGLAND EDITION

A Supplement to:

95

1

201 16 9

26

2

1 3

91

89

2

95 3

2 2 7

1

93

495

16

89 4

89

April 5 2017

91

9

95

93

2

95 2

93 90

90

7

95 91

7

495 6 195

395

95 91

3

84 6

84

Vol. l • No. 7

95

E

q

6

u

I

P

m

E

N

t

g

u

I

d

E

95

“The Nation’s Best Read Construction Newspaper… Founded in 1957.”

Your New England States Connection •  Amanda Hogeboom-guilfoyle 1-800-988-1203 Specializing in:

2208 Plainfield Pike • Johnston, RI 02919 401-943-7100 • Fax: 401-647-5041

FORMERLY

95

202

7

®

Demolition, Portable Crushing, Material Sales, C & D Recycling, Land Clearing & 30-115 Yd. Trailers

www.jrvinagrocorp.com

Call for Pricing

Malfunctioning Swing Span Spurs New Beverly Drawbridge Project By Brenda ruggiero CEG CORRESPONDENT

LEED Accredited in Waste Management

2017 EZ-Screen 1200XLS

Come Join Us!

Bring your business card for chance to win Choose up to 3,000 lb. Hammer

Open House

New Option Separate 3 Products

6’x5’ Screenbox Works with 1/2 to 1 3/4 Yd. Loaders, 25 H.P. Kohler Diesel Engine, 24” Conveyor Dumps Screened Product 9’ High

$41,900 plus freight. Other Screeners Available

ArguS INduStrIAl CO.

www.ez-screen.com

Saturday, May 6 8am-4pm

61 Silva Lane • Dracut, MA 01826

Call Today (978) 454-3320

WE STOCK RUBBER TRACKS for Over 6,000 Models! Some Used Tracks A & GA Available. NJ, TX, WOUSES WAREH • HIGH QUALITY • FAST SHIPPING • GUARANTEED TO FIT • UNDERCARRIAGE PARTS • FLATPROOF SKIDSTEER TIRES • RUBBER PADS FOR STEEL TRACKS

888-888-1248

The Massachusetts Bay Transportation Authority (MBTA) is heading a project that includes replacing a drawbridge swing span superstructure. The Beverly Drawbridge carries the Rockport and Newburyport Commuter Rail Line over the Danvers River in Beverly, Mass., which is located in Essex County. In the past four years, there have reportedly been numerous service delays caused by malfunctions of the swing span, which was built in 1885 and is now more The Massachusetts Bay Transportation Authority (MBTA) is heading a project that includes replacing a drawbridge swing span superstructure. than 130 years old. The swing span project began on March 15, 2016, and is scheduled for completion by Dec. 23, ical and electrical system. According to Lisa Battiston of MDTA communications, 2017. The full dollar amount is $16.1 million. The contract calls for the replacement of Beverly the main challenges with the project involve the 28-day Drawbridge swing span superstructure with a new mechansee BrIdgE page 16

East Windsor Economic Development Commission Announces New Casino

866-745-5828

WANTED: Cat 330 Excavator

Send info to philg123@comcast.net

YOUR ONE-STOP HYDRAULIC HAMMER SHOP™ New Hydraulic Hammers. Remanufactured Hammers. Hammer repairs/rebuilding with free area pickup. Hammer toolbits delivered to your site!

www.foleyengines.com

CALL 888-81-GORILLA(46745) *Some restrictions apply

During the regular meeting of the East Windsor Economic Development Commission held recently, the Commission announced that the MMCT chose East Windsor for the new Connecticut Casino. The EDC is looking forward to working with the new Casino Group to make this opportunity a success and to help other businesses in town benefit from the growth. “The announcement of East Windsor, Conn., as a location for a third casino, illustrates we are open for business” stated Eric Moffett, EDC chair. “MMCT chose East Windsor for all the right Reasons”.

Moffett added that direct highway access, local work force, and development policies all make East Windsor a great place for development. Following a smart development strategy set forth by the town, the EDC continues to see success. In recent years, a new 200,000 sq. ft. (18,580 sq m) retail store opened; the industrial park has seen new tenants come to town; and many local businesses have expanded. With new commuter rail services being developed between New Haven and Springfield, Mass., East Windsor is situated less see CASINO page 16


Page 2 • April 5, 2017 • www.constructionequipmentguide.com • New England States Supplement • Construction Equipment Guide

THE W.I. CLARK COMPANY Danbury, CT • Wallingford, CT • Plainfield, CT Call Mark Doty @ 203-823-2316 2008 Deere 35D

2011 John Deere 50D

2005 John Deere 672D

C/air, blade, hyd thumb, 24” bucket, 80% tracks, stk#23631................................ $24,500

2675 hrs, c/air, blade hyd thumb, 24” bucket, stk#23535............................................ $52,500

c/air, low profile cab, 12’ blade, radials, front scarifier, well maintained unit, stk#22195........ .......................................................... $159,500

1998 Deere 744H

2013 Leeboy 8616B

2008 IR 1600WCU

TIER 3 repower, 5.5 yard bucket, c/air, ride control, stk#23768................................$49,000

Kubota Diesel, HD Poly Pads, Slope, Power Crown, stk#21988.............................. $135,000

3000 hrs, Cummins power, well maintained by WIC from new, exc. cond, stk#22097.. $90,000

2005 Deere 850JLT

Ingersoll Rand DD-90HF

1999 Case 590SL

Cummins power, dual vibratory, water system, good condition, stk#23760.................. $22,500

C/Heat, front and rear couplers, and hyds, 4-1 front bucket, 30” rear, ext hoe, loaded up machine, stk#23688............................ $33,500

c/air, 158” 6 way blade, recent U/C turn and service, stk#22281............................ $115,000

See Our Complete Inventory at www.wiclark.com


Construction Equipment Guide • New England States Supplement • www.constructionequipmentguide.com • April 5, 2017 • Page 3

!"#+%&'()'%345//!"#$%!&'(()R+,-.! "/01!)R**R.!),,+!456.!S*4K.!+3<-T! J?;;L5.!)+T!G:UUL5!V5H@$6.!^H?D!G8=! A8:;BL5.!3*T!7:@$L#.!F/AQQ<.9!1"""%2

!"#6%&'()'%74 7 8#!$4!"#$%!&'(()2,2*.! "/01!33(RS-+.!2*)!456.!VL?5!*.!K?B8#!A#5B! W"X!-!IH=!I/!F:Y!4=>.!+3T!7:@$L#.! 7889!":6;<""=6.!QQQQQQQQ.091"""%2

!"#$%&'()'%*+",-!"#$%!&'(()*+,-.!"/ 01!233(2),.!2((!456.!7889!": :6;<!4=><! ':?@$!A;B5!25>!C:D@E8D.!F/A.!GH>?8!I/! AJ!KBH=L5.!"?DMBL!NLOL5!A#5B6!!I/! /!25>! C:D@E8D<.!4?PCB8I!4=>!!Q<<QQQ< Q<./01"""2

!""/%&'()'%::##/F5!"#$%!&'(()33*,.! "/01!),+R(3.!3R*-!456.!A:99? 9 D6!&DM?DL.! -+T!J5:96.!"#58UL.!4WJ!0?M_#!N?M_EDMZ 53:G43:%>5H4HI,JJJKKKKKKKKKKKKKKKKKK.+/1"""%2

!"#$%!&'(()R)3+.!Z !"#0%:'';<<=%>!$" % 3S(AC[!H#!)((K"W\!HD>!)+SAC[!H#! )S(K"W\.!V?L5!*C!JL:#]!&DM?DL.!Z !!!!!!!??>(@<;@%4<((%A'B%>BCDC=E??2

!"#0%5<\;'=%#$+0%"#$%!&'(()R*)-.! "/01!3)3)R.!3(!456.!2a!Y!Ra!"?DMBL! JL@$!"@5LLD.!N8I!-a)(T!N8H>?DM!)<S! @:<!=><!_8;;L5!_______KK. KK.6!1"""Z

!""$%&'()'%345$/!"#$%!&'(()R-SS.! "/01!)(2S+<!**-3!456.!3*T!7:@$L#.!"-! A8:;BL5.!)RT!G:UUL5!V5H@$6.!R)T!"#><! J?;;L5!F59.!7BH>LQQQQQQ.!/1"""2

!"#!%&'()'% '%*!$",%%"#$%!&'(()*S*3.! "/01!2(*).!)*(T!,!A`!U:@$L#.!3,<SG3S! N*!V?5L6.!ALD#5HB!N:ULZ 7LMN5%>5HH43:3%:G48HNIJ.!!$1"""2

!""6%3<E@B%O@<)@B%!"3P>%"#$ # %! &'(()-32-.!),a!b!+aRT.!Ra!7LHOL5#H?B.! Ra!GH9;6.!^88>!JL@$.!VHD>L9! FYBLQQQQQQQQQQQQQQQ<./1$""2

#Q/"%O@B(C=%8RB=SCT@2 O@B(C=1%48%"0"+92 U/""V+$!W669+2

!$#%-X<T@B%5'<Y2 3<;Z%*'=E[@<Y'\1%7L%"#"!/2 U/""V!Q!W0+$#2

-@@%NRB%G;@Y%H=)@=Z'B]%<Z%\\\K%8](@B@^RCS[ [@=ZKD'[2


Page 4 • April 5, 2017 • www.constructionequipmentguide.com • New England States Supplement • Construction Equipment Guide

RIDOT Not Moving Forward With Hopkinton Travel Plaza The Rhode Island Department of Transportation (RIDOT) asked the Federal Highway Administration (FHWA) to rescind RIDOT’S application for a $9 million Transportation Investment Generating Economic Recovery (TIGER) grant for the Rhode Island Travel Plaza and Transit Center. The decision was made in consideration of concerns expressed by Hopkinton residents and sensitive environmental findings at the location RIDOT had chosen to build the center. The proposed location is along I-95, west of Main Street (Route 3) in Hopkinton. The letter requesting that the application be rescinded was delivered to the FHWA division administrator for the Rhode Island division. Peter Alviti, RIDOT director said, “This was the right decision to make for several reasons. First, we wanted to do

what was best for Hopkinton. We understand that the residents treasure the rural nature of their town and they want to keep it that way. Secondly, in light of the findings that came from the environmental site assessments and archaeological review there were other concerns. Finally, in our meetings with FHWA, it was clear that the environmental and social challenges of this project would make it difficult to go through the environmental assessment process in a timely manner.” During the site analysis wetlands were delineated along several areas within the designated parcel. The property also is within a groundwater reservoir district and the proposed development would have been above an existing aquifer. “All of this gave us pause,” said Alviti, “but most importantly our archaeological surveys showed that there were historical artifacts of great significance to the Narragansett

Indians including three cemeteries.” Because RIDOT had already budgeted $3 million for this project, a portion of those funds will be used to enhance the existing Welcome Center on I-95 which has garnered widespread approval from the motoring public and the truckers who use it since RIDOT reopened it last summer. Part of the funds will be put towards installation of electrical pods that will allow truckers to plug in at night for both warmth and light. This will make the area more environmentally sound and more comfortable for the plaza users. RIDOT also will create additional parking bays for trucks. The balance of the funds will be put toward accelerated bridge reconstruction and repair. (This story also can be found on Construction Equipment Guide’s website at www.constructionequipmentguide.com.)

U.S., Canadian Scientists to Study Cross-Border Flooding By Wilson Ring ASSOCIATED PRESS

MONTPELIER, Vt. (AP) United States and Canadian scientists are planning to spend the next five years studying flooding on Lake Champlain and the Richelieu River, which

NEW ENGLAND EDITION

Founder, Publisher & CEO Northeast Publisher Editor In Chief Associate Editor Editorial Consultant Production Mgr. Controller Circulation Mgr. Director of Web Services

Edwin M. McKeon Sr. Edwin M. McKeon Jr. Craig Mongeau Christine Allen Pete Sigmund John Pinkerton Judith Nixon Cathy Printz Teddy McKeon

Main office 470 Maryland Drive

Fort Washington, PA 19034

215/885-2900 Toll Free 800/523-2200 Fax 215/885-2910

Web site www.constructionequipmentguide.com

Editorial e-mail editorial@cegltd.com

Advertising e-mail production@cegltd.com

drains the lake north into Quebec, and whether methods can be developed to control future flooding. Besides studying the causes of past floods, particularly the historic floods in 2011, the scientists will look for ways to better forecast flooding and measures to reduce the effects of future floods, considered likely with weather extremes in an

For advertising rates: Contact Edwin M. McKeon Jr.

215/885-2900

Toll Free 800/523-2200 Fax 215/885-2910

e-mail tmckeon@cegltd.com

Contact Amanda Hogeboom-Guilfoyle

• New England 518/396-7659 Toll Free 800/988-1203 Fax 315/866-1379 e-mail ahogeboom-guilfoyle@cegltd.com Contact Kent Hogeboom

• New York • New England 315/866-1379 Toll Free 800/988-1203 Fax 315/823-4136 e-mail khogeboom@cegltd.com

Construction Equipment Guide Northeast Edition (ISSN 1081-7034) is published bi-weekly by Construction Equipment Guide Ltd. Advertising and Editorial Offices are located at 470 Maryland Dr., Ft. Washington, PA 19034. Toll Free 800/523-2200 or Fax 215/885-2910. Annual Subscription Rate $65.00. Call for Canadian and foreign rates. Periodicals postage paid at Ft. Washington, PA and at additional mailing offices. POSTMASTER: Send address changes to Construction Equipment Guide Northeast Edition, 470 Maryland Dr, Ft. Washington, PA 19034. Contents Copyrighted ©2017, by Construction Equipment Guide, which is a Registered Trademark, registered in the U.S. Patent Office. Registration number 0957323. All rights reserved, nothing may be reprinted or reproduced(including framing) in whole or part without written permission from the publisher. All editorial material, photographs, drawings, letters, and other material will be treated as unconditionally assigned for publication and copyright purposes and are subject to Construction Equipment Guide's unrestricted right to edit and comment editorially. Contributor articles do not necessarily reflect the policy or opinions of this publication. Call or write for advertising rates, publication schedule and media kit. The Construction Equipment Guide is not responsible for clerical or printer's errors, every care is taken to avoid mistakes. Photographs of equipment used in advertisements are not necessarily actual photographs of the specific machine. Similar photographs are used occasionally and every effort is taken to depict the actual equipment advertised. The right is reserved to reject any advertising.

era of climate change. The scientists conducting the $11.3 million study will look at issues such as what effect the Chambly Canal, which takes vessels around a series of rapids near the Quebec city of Saint-Jean-sur-Richelieu, could have on flooding, said JeanFrancois Cantin, chief of east hydrological operations for Canada's National Hydrological Service. They also could focus on how V-shaped, man-made stone eel-traps, visible in aerial photos of the river shoals, could affect the flow of the river, said Cantin, who also is the Canadian co-chair of the International Lake Champlain Richelieu Study Board. “The shoals there are really the natural control of the whole system upstream of Saint-Jean-sur-Richelieu, the lake [and] the water levels,” he said. The board is conducting the study for the International Joint Commission, an organization formed in 1909 to manage boundary water issues between Canada and the United States. The study began in 2013 in response to historic spring flooding along Lake Champlain in Vermont and New York in 2011 that kept the lake and areas along the river above flood stage for more than two months. The flooding in SaintJean-sur-Richelieu, population about 93,000, affected about 3,000 homes in low-lying areas and lasted until mid-June. The research marks the third time the International Joint Commission has looked at flooding in Lake Champlain and the Richelieu. In 1937, the commission approved construction of a flood control dam near Saint-Jean-sur-Richelieu that was never finished. In 1981, after a six-year study, the commission concluded that flood forecasting and flood plain regulation were desirable and that a flood control system could be built, but no action was taken. Cantin said the public will be kept aware of developments as the study progresses. (This story also can be found on Construction Equipment Guide’s website at www.constructionequipmentguide.com.)


Construction Equipment Guide • New England States Supplement • www.constructionequipmentguide.com • April 5, 2017 • Page 5

HYUNDAI HX SERIES EXCAVATORS

More Standard Features s s s s s s

Faster cycle times, greater productivity Standard rear camera; All-Around View Monitoring option Spacious, quiet cab with Bluetooth and wireless Standard air-suspension seat 3-year Hi-Mate remote management system 3-year, full-machine warranty, plus 5-year / 10,000-hour structural guarantee

To learn more about the HX series excavators, call your Hyundai dealer today. 160 Elm Street Walpole, MA 02081 (508) 660-7600 ©2016 Hyundai Construction Equipment Americas, Inc. All Rights Reserved.


Page 6 • April 5, 2017 • www.constructionequipmentguide.com • New England States Supplement • Construction Equipment Guide

Terramac Appoints C.N. Wood as New Authorized Dealer Terramac, a manufacturer of representatives will deliver rubber track crawler carriers, timely service and their parts expands its representation in and service technicians are the North American market to equipped with modern techinclude C.N. Wood as part of nology to ensure machines are its dealer network. C.N. Wood maintained at the highest stanwill represent the Terramac dard, according to the compaproduct line in Massachusetts ny. and Rhode Island. “We choose to align our“C.N. Wood is a long standselves with top line manufacing dealership with an experiturers that offer value in their enced team, who’s dedicated products and help our custo providing their customers tomers solve problems in spewith the best possible equipcific applications,” said Jim ment, service and support,” Maxwell, general manager of said Matt Slater, director of C.N. Wood. “Terramac does sales of Terramac. “C.N. just that. We look forward to Wood is a welcomed and making our customers more valuable addition to our dealer competitive in their business network.” with Terramac’s versatile C.N. Wood will offer C.N. Wood will offer Terramac’s RT9, RT14 and RT14R crawler carriers to serve a wide range of industries crawler carriers.” Terramac’s RT9, RT14 and including general construction, environmental and agriculture. In addition to Terramac’s three standard For more information on RT14R crawler carriers to options — convertible dump-to-flat beds (RT9), rock dump beds (RT9, RT14 and RT14R) and flatbeds (RT9 C.N. Wood, visit www.CNserve a wide range of indus- and RT14) — C.N. Wood will offer Terramac units customized with support attachments such as cranes, Wood.com. tries including general con- personnel carriers, water tanks and hydroseeders. For more information struction, environmental and on Terramac, call The team at C.N. Wood will provide 630/365-4800 or visit www.terramac.com. agriculture. In addition to Terramac’s three — C.N. Wood will offer Terramac units cusstandard options — convertible dump-to-flat tomized with support attachments such as professional sales, rental and aftermarket (This story also can be found on beds (RT9), rock dump beds (RT9, RT14 cranes, personnel carriers, water tanks and support on the Terramac product line Construction Equipment Guide’s website at across four branch locations. C.N. Wood’s www.constructionequipmentguide.com.) and RT14R) and flatbeds (RT9 and RT14) hydroseeders.


Construction Equipment Guide • New England States Supplement • www.constructionequipmentguide.com • April 5, 2017 • Page 7

Spring Sale 2016 YANMAR VIO25-6, BLADE, HYD THUMB, HYD COUPLER, RUBBER TRACKS, Hours: 37, Serial Number: 60862, Stock Number: YM2772...... $34,600

0 for 60 Finance Program

2016 YANMAR VIO25-6, BRAND NEW, HYDRAULIC COUPLER, HYDRAULIC THUMB, ZERO FOR 60 FINANCE PROGRAM, Hours: 4, Serial Number: 60859, Stock Number: YM2880........................................ Call

2016 YANMAR VIO35-6A, ANGLE BLADE, HYDRAULIC THUMB, HYDRAULIC COUPLER, LOW RENTAL HOURS, ZERO FOR 60 FINANCE PROGRAM, Hours: 68, Serial Number: 62633, Stock Number: YM2771.... ........................................................................ $42,900

2016 YANMAR VIO35-6A, ENCLOSED CAB, AC, HEAT, RADIO, ANGLE BLADE, HYDRAULIC THUMB, HYDRAULIC COUPLER, 24" BUCKET. ZERO FOR 60 FINANCE PROGRAM, Hours: 62, Serial Number: 62246, Stock Number: YM2882........................................ Call

2015 YANMAR VIO35-6, ENCLOSED CAB, AC, HEAT, RADIO, HYDRAULIC THUMB, HYDRAULIC COUPLER, ANGEL BLADE, 18" BUCKET. ZERO FOR 60 FINANCE PROGRAMS, Hours: 45, Serial Number: 62051, Stock Number: YM2335.................................................. Call

2016 YANMAR VIO45-6A, ENCLOSED CAB, AC, HEAT, RADIO, HYDRAULIC COUPLER, HYDRAULIC THUMB, ANGLE BLADE, 24" BUCKET. ZERO FOR 60 FINANCE PROGRAMS, Hours: 23, Serial Number: 60796, Stock Number: YM2615.................................................. Call

2016 YANMAR VIO35-6A, BRAND NEW! ENCLOSED CAB, AC, HEAT, RADIO, ANGLE BLADE, HYDRAULIC THUMB, HYDRAULIC COUPLER, 24" BUCKET. ZERO FOR 60 FINANCE PLANS, Hours: 62, Serial Number: 62202, Stock Number: YM2881............................ Call

Call us.

391 Loudon Road • Concord, NH 03301

(800) 358-6007 (603) 225-3361 • Fax: (603) 225-4918 www.ewsleeper.com Serving Construction Contractors & Municipalities Since 1964


Page 8 • April 5, 2017 • www.constructionequipmentguide.com • New England States Supplement • Construction Equipment Guide

DOT: Weekly Commute Savings From Toll Booth Removal Drivers into Boston from its western suburbs are now saving 12 minutes of commute time each way, or two hours a week, after the Massachusetts Department of Transportation removed all middle-lane toll booths last fall to let traffic flow without stopping, said state Transportation Secretary Stephanie Pollack. She told AASHTO’s Transportation TV that the changes resulted from a simultaneous set of 23 work-zone projects in the month before Thanksgiving along the Massachusetts Turnpike on Interstate 90. Contractors’ crews first routed all traffic in those zones through outer toll booth lanes while workers removed the center lanes’ toll booth infrastructure and repaired the road bed. Then they opened all the middle lanes to two-way, free-flowing traffic where the booths had been. That was in conjunction with a Mass Pike change to all electronic tolling, through overhead sensors that read in-car transponders or snap pictures to send bills to drivers who do not have the transponders. Once crews, through round-the-clock initial efforts, established the unbroken traffic flow within a short time, they could work more gradually to remove remaining toll

Drivers into Boston from its western suburbs are now saving 12 minutes of commute time each way, or two hours a week, after the Massachusetts Department of Transportation removed all middle-lane toll booths.

booths and related buildings by the end of this year. In designing the nearly $133 million set of projects, Pollack said MassDOT looked at three benefits to come from removing the stop-start pattern for toll collections at booths — improved travel time, safety and

environmental effects. “If you look at the data there are more accidents that occur immediately before and after toll booths,” she said. “There’s a huge safety benefit in eliminating the booths,” she added. And, Pollack said, “if you create these

multi-mile backups at your toll booths, those cars are burning too much gas and emitting too much air pollution.” (This story also can be found on Construction Equipment Guide’s website at www.constructionequipmentguide.com.)

PC Construction Receives One of AGC’s Highest Honors PC Construction has received after tropical storm Irene, the damone of the Associated General age at the Waterbury State Office Contractors of America’s highest Complex was massive and the honors — an Alliant Build redevelopment was a complex, America Award in the construcmulti-step process that required tion management renovation catededication, ingenuity and collabogory — for its work to rebuild the ration across government and in Waterbury State Office Complex. conjunction with Vermont busiPC Construction leaders and nesses, like PC Construction,” members of the project’s consaid Vermont Gov. Phil Scott. struction team accepted the award “Congratulations PC at AGC’s 98th Annual Construction; this award is wellConvention in Las Vegas. This is deserved. We are forever grateful the third Alliant Build America to you and so many others who Award PC Construction has stepped up and answered the call received. to serve our state in the wake of “It is an incredible honor to devastation across our region.” accept this national award on PC Construction’s work at the behalf of the 1,200 hard-working Waterbury State Office Complex employee-owners at PC PC Construction has received one of the Associated General Contractors of America’s highest honors was recognized in 2016 by Construction and so many others — an Alliant Build America Award in the construction management renovation category — for its work Engineering News-Record (ENR) who partnered with us to rebuild to rebuild the Waterbury State Office Complex. with a Merit Award in the New the Waterbury State Office England region and by Associated Complex following Tropical General Contractors of Vermont state roads were damaged or washed away. with a Best Builders Award. Storm Irene,” said Kevin McCarthy, PC flood.” When Tropical Storm Irene hit Vermont Among the areas hardest hit was Waterbury, Construction president and CEO. “This was For more information, visit truly a team effort that included state offi- in late-August 2011, it caused millions of Vt., where 1,500 state workers were dis- www.pcconstruction.com. cials, design partner Freeman French dollars in damage to roads, bridges, build- placed at the Waterbury State Office (This story also can be found on Freeman and many subcontractors coming ings and land. More than 3,500 homes and Complex when flooding damaged buildings. Construction Equipment Guide’s website at “As was the case in many parts of the state www.constructionequipmentguide.com.) together in the aftermath of a devastating businesses were impacted and 500 miles of


Construction Equipment Guide • New England States Supplement • www.constructionequipmentguide.com • April 5, 2017 • Page 9

RUN STRO ONG AND

CLEARR THE W WAY WA AY. Introducing the DXX3380LL-5 — the newest and biggest Doosan® log loader to better ser ve forestr y professionals for shovel-logging and log-loading tasks. With increased durabilit y, more power and enhanced per formance, the DX380LL-5 is ready to help you clear the forest. Au t hor i ze d Doos an De al er

BARRY EQUIPMENT CO., INC. 30 Birch Island Road | Webster, MA 01570

508-949-0005 | www.barr yequipment.com

Doosan® and the Doosan logo are registered trademarks of Doosan Corp. in the United States and various other countries around the world. 17-D004


THE N.I.C.E. COMPANY 9 Rosenfeld Drive, Hopedale, MA Toll Free# 888-717-8096 • www.theniceco.com

We sell NICE machines!

2010 John Deere 220DW Excavator: 3700 Hrs, Angle/Tilt

2013 Komatsu PC490LC-10 Excavator: 4000 Hrs, Medium

Coupler, Outriggers, Aux. Hyd.

Stick, 36” Pads, 72” Bkt, Sitting in GA $179,000

$99,000

2009 Terex TA35 GEN 7 Rock 2015 Volvo L70G Wheel Truck: 4500 Hrs, Fairly New Front Loader: 2500 Hrs, Hyd QC w//Bkt, Tires, Others at 70% Plus

$99,000

2014 Cat 312EL Excavator: 1000 Hrs, Medium Stick, Plumbed, North American Machine

$114,000

AC Cab, Rear View Camera, 20.5x25 $114,000

2015 Cat 313FLGC Excavator: 215 Hrs, New Machine!! Aux Hydraulics $109,000

2014 Komatsu PC138:

2013 Volvo ECR88: 2100 Hrs,

500 Hrs, JRB Coupler, Plumbing, Near New $109,000

Quick Coupler, Aux. Hydraulics

$59,000

WE RENT • WE RENT • WE RENT • WE RENT • WE RENT • WE RENT • WE RENT • WE RENT • WE RENT • WE RENT • WE RENT • WE RENT • WE RENT • WE RENT • WE RENT • WE RENT • WE RENT • WE RENT • WE RENT

WE RENT • WE RENT • WE RENT • WE RENT • WE RENT • WE RENT • WE RENT • WE RENT • WE RENT • WE RENT • WE RENT • WE RENT • WE RENT • WE RENT • WE RENT • WE RENT • WE RENT • WE RENT • WE RENT

Page 10 • April 5, 2017 • www.constructionequipmentguide.com • New England States Supplement • Construction Equipment Guide

ABLE TOOL & EQUIPMENT 149 Rocus Street 410 Burnham Street Springfield, MA 01104 South Windsor, CT 06074 413-363-0780 860-289-2020 www.abletool.net


Construction Equipment Guide • New England States Supplement • www.constructionequipmentguide.com • April 5, 2017 • Page 11

YOU ’ RE IN V IT E D!

OPEN OPEN

SA AT TURDAY Y,, MAY AY Y 6, 2017 7,, 8 A.M. – 4 P P..M. ell Spinners cot “Canalig i ator” m. – Noon Welcome

HO OUS SE Doosa

®

DX235 LCR-5 2-WAY HYDRAULIC AND BUCKET

DX140 LC 2-WAY HYDRA AND BUCK

C

DX225 LC-5 2-WAY HYDRA RAULIC AND BUCKET K New Hamp Massach

2

93 110 3

95

2 2

1

A ut hor ized D oos o an Dealer

95 2

Boston on 90

Equipment East 61 Silva Lane • Dracut, M 978-454 -3320 • w w w.equipm

*Bring your busin iness card to enter the lar a ge door prize dr Winner will be contacted by phone and need nott be present to win. Doosan® and the Doosan lo ogo are tradem a arks of Doosan Corp. 17-D006


Page 12 • April 5, 2017 • www.constructionequipmentguide.com • New England States Supplement • Construction Equipment Guide

Connecticut Highway Toll Bill Clears Legislative Committee HARTFORD, Conn. (AP) A bill that could lead to electronic tolls along Connecticut’s highways is moving through the General Assembly. The Transportation Committee voted 1916 on March 17 in favor of the latest bill. It now awaits further action in the House of Representatives. Lawmakers have been debating for years whether to install tolls as a way to generate much-needed revenue for state transportation needs. Proponents say they’re needed because the state gas tax is not generating

Hydraulic Cranes 8 to 600 Ton Daily & Hourly Services

enough revenue. Opponents said residents are already paying too much in taxes. Some lawmakers say their constituents don’t trust the General Assembly to spend the toll revenues on transportation needs. Under this year’s bill, the state gas tax would be reduced by 2.5 cents over five years to help alleviate having to pay a toll. (This story also can be found on Construction Equipment Guide’s website at www.constructionequipmentguide.com.)

www.astrocrane.com

Fully Insured 200 Codman Hill Rd., Boxborough, MA 01719 978-429-8666

POWERSCREEN FOR SALE!

DISPLAY ADS/ CLASSIFIEDS Classified Rates: 30 Words or Less for $40.00. Each Additional Word is $1.16. For just an additional $20 your ad can be posted on our online searchable database for 30 days. Ad runs for 2 (two) insertions - no changes in second insertion. PLEASE ENCLOSE PAYMENT WITH ORDER and mail to: 470 Maryland Drive• Fort Washington, PA 19034

215/885-2900 • Fax 215/885-2910 Toll Free 1-800/523-2200 CRANE INSPECTIONS FLAT RATE INSPECTIONS All Types, Any Model Cranes

Under 2000 hours w/ Grizzly EXCELLENT condition. Can be transported on road! 12’ high, 3 products.

OSHA Inspected and Certified Certified OSHA and ANSI Full-Time Inspectors

Place Your Business Card for... only $50 only $45 only $40

an issue an issue an issue

Call now to reserve your space!

800-225-8448 * pre-payment required

‘12 Wacker Neuson 9503, 10 Ton Wheel Excavator with Wain Roy Bucket, Very good condition, 1,650 hours........$86,000.

NCCCO Crane Operator Training

CLOSE TO YOUR JOB SITE

Mobile Tower Self Erecting Tower Overhead Articulated Knuckleboom Service Truck Rigger 1 & 2 Signal Person

RENTMACHINES.COM

Trained at our location in PA or NJ or your location.

Able Tool & Equipment abletool.net 860-289-2020

DAILY AND WEEKLY

Dielectric Testing

C - 617.438.9200 T - 617.354.7580

$300* $585* $1040*

TRAINING

EQUIPMENT RENTALS

Call Chuck Mabardy

3 months 6 months 12 months

EXCAVATORS

Call 800-325-6455 Stephenson Equipment Visit our website: www.stephensonequipment.com

CATERPILLAR® GENIE® CHALLENGER® SCREEN MACHINE®

All trainers NCCCO Certified Call 215-639-2579 Atlantic Crane Inspection Services Visit us atwww.atlanticcrane.com

Keep Up With All the Industry News Subscribe to

Construction Equipment Guide Today! Toll Free 800/523-2200


Construction Equipment Guide • New England States Supplement • www.constructionequipmentguide.com • April 5, 2017 • Page 13


Page 14 • April 5, 2017 • www.constructionequipmentguide.com • New England States Supplement • Construction Equipment Guide

Canaan • Cornwall • Litchfield • New Hartford • New Milford • Washington • Darien • Greenwich • Stamford • East Lyme • Old Lyme • Connecticut... Plainfield • Fairfield • Hartford • Norwich •Stratford • Trumbull •Canaan • Cornwall • Litchfield • New Hartford • New Milford • Washington • Darien • Greenwich • Stamford • East Lyme • Old Lyme • Plainfield • Fairfield • Hartford • Greenwich •Canaan • Cornwall • Litchfield • New Hartford • New Milford • Washington • Darien • Greenwich • Stamford • East Lyme • Old Lyme • Plainfield • Fairfield • Hartford • Norwich •Stratford • Trumbull •Canaan • Cornwall • Litchfield • New Hartford • New Milford • Washington • Darien • Greenwich • Stamford

‘Constitution State’ Highway Projects Let

The Connecticut State Department of Transportation received bids for transportation-related improvement projects. Following is a list of some of the projects let. Town/District: Salem Proposal Number: 003 - 0120-0092 Project: Safety improvements on Route 85 from Shady Brook picnic area to Skyline Drive. Contractors and Bid Amounts: • R.E.D. Technologies LLC — $1,194,595 • Paramount Construction LLC — $1,287,562 • B & W Paving & Landscaping LLC — $1,321,971 • Tilcon Connecticut Inc. — $1,368,030 • King Construction Inc. — $1,449,831 • Waters Construction Company Inc. — $1,516,516 • C.J. Fucci Inc. — $1,649,540 Town/District: Newtown Proposal Number: 005 - 0096-0203 Project: Rehabilitation of Bridge No. 06693 I-84 westbound over Pole Bridge Brook. Contractors and Bid Amounts: • C.L.H. & Son Inc. — $248,096 • Guerrera Construction Company Inc. — $249,133 • Dayton Construction Company Inc. — $288,438 • PJF Construction Corporation — $356,139 • Baier Construction Company Inc. — $848,490 Town/District: Stonington Proposal Number: 001 - 0137-0158 Project: Replacement of Bridge No. 02934 — Route 234 over Anguilla Brook. Contractors and Bid Amounts: • B & W Paving & Landscaping LLC — $1,844,631 • New England Infrastructure Inc. — $1,979,397 • Hemlock Construction Company Inc. — $2,179,670 • New England Road Inc. — $2,183,525 • J.H. Lynch & Sons Inc. — $2,296,874 • Arborio Corporation — $2,345,513 • New England Building & Bridge Company — $2,566,603 • Northern Construction Service LLC — $2,597,018 • The Brunalli Construction Company — $2,690,561 • John Rocchio Corporation — $2,797,439 Town/District: District 2 Proposal Number: 001 - 0172-0451 Project: Horizontal curve treatments on local roads in various locations. Contractors and Bid Amounts: • Discount Fence of Connecticut LLC — $781,612 • Hi-Way Safety Systems Inc. — $875,025 • The NY Conn Corporation — $875,040 • Mohegan Associates Inc. — $1,183,540 Towns/Districts: Waterbury and Watertown Proposal Number: 002 - 0151-0329 Project: Replacement of metal bin retaining walls along

Route 8. Contractors and Bid Amounts: • Waters Construction Company Inc. — $5,915,855 • McNamee Construction Corporation — $5,948,189 • Guerrera Construction Company Inc. — $6,653,119 • New England Infrastructure Inc. — $6,864,577 • Empire Paving Inc. — $6,984,581 • Rotha Contracting Company Inc. — $7,125,481 • Arborio Corporation — $7,287,322 • Northern Construction Service LLC — $7,499,389 • The Brunalli Construction Company — $7,616,387 • Manafort Brothers Inc. — $7,820,964 • Baier Construction Company Inc. — $7,996,172 Town/District: Newtown Proposal Number: 002 - 0096-0197 Project: Replacement of Bridge No. 03271 Route 302 over an unnamed brook. Contractors and Bid Amounts: • Dayton Construction Company Inc. — $1,923,757 • Nagy Brothers Construction LLC — $1,985,972 • Hemlock Construction Company Inc. — $2,081,029 • Mizzy Construction Inc. — $2,235,978 • Guerrera Construction Company Inc. — $2,398,901 • Complete Construction Company — $2,408,685 • McNamee Construction Corporation — $2,677,055 • New England Infrastructure Inc. — $2,965,109 Town/District: Bolton Proposal Number: 005 - 0012-0096 Project: Construction of Charter Oak Greenway shared use path.

Contractors and Bid Amounts: • Guerrera Construction Company Inc. — $9,287,991 • Schultz Corporation — $9,696,641 • E.T. & L. Corporation — $9,720,235 • Empire Paving Inc. — $9,953,215 • Arborio Corporation — $9,990,839 • SPS New England Inc. — $10,331,907 • VMS Construction Co. — $10,438,499 • Daniel O’Connell’s Sons Inc. — $10,529,344 • Northern Construction Service LLC — $10,728,929 • Tilcon Connecticut Inc. — $11,069,952 • Paganelli Construction Corporation — $11,887,951 Town/District: Bridgeport Proposal Number: 004 - 0301-0167 Project: East Bridgeport rail yard roadway improvements. Contractors and Bid Amounts: • Empire Paving Inc. — $2,847,705 • Waters Construction Company Inc. — $3,103,848 • Guerrera Construction Company Inc. — $3,446,597 • Dayton Construction Company Inc. — $3,573,311 • Complete Construction Company — $3,621,395 • Laydon Industries LLC — $3,939,140 • McNamee Construction Corporation — $5,244,274 Town/District: District 2 Proposal Number: 002 - 0172-0459 Project: Installation of centerline and shoulder rumble strips. Contractors and Bid Amounts: • Surface Preparation Technologies LLC — $219,351 • McNamee Construction Corporation — $291,413


Construction Equipment Guide • New England States Supplement • www.constructionequipmentguide.com • April 5, 2017 • Page 15

DOOSAN DELIVERS

The Doosan lineup of heavy equipment offers strong performance in the areas that matter most — from powerful bucket forces on excavators to superior payload capacities on articulated dump trucks and exceptional lifting capabilities on wheel loaders. And with our unbeatable warranty, dedicated dealer support and versatile attachment selection, one thing is certain: Doosan delivers. Call or visit your local authorized dealer today and see the Doosan difference. Authorized Doosan Dealers

Equipment East, LLC 61 Silva Lane • Dracut, MA 01826 • 978-454-3320 • www.equipmenteast.com

Barry Equipment Co., Inc. 30 Birch Island Road • Webster, MA 01570 • 508-949-0005 • www.barryequipment.com

F&W Equipment 164 Boston Post Road • Orange, CT 06477 • 203-795-0591 • www.fwequip.com

Central Equipment Company 45 Dempsey-Greaves Lane • Stillwater, ME 04489 • 207-827-6193 • www.centralequipmentco.com

Doosan and the Doosan logo are registered trademarks of Doosan Corp. in the United States and various other countries around the world. 15-D008


Page 16 • April 5, 2017 • www.constructionequipmentguide.com • New England States Supplement • Construction Equipment Guide

Swing Span Superstructure to Be Barged MassDOT’s Board From ‘Bama to Beverly for Replacement OKs Contract to Replace Bridges BRIDGE from page 1

shutdown of rail service for Contract 2 and the navigational channel for the removal and replacement of swing spans, as well as the coordination of the work to be completed within the 28-day shutdown of Contract 2. “The Swing Span Superstructure will be fabricated in Alabama and will be floated out on a barge to Beverly for replacement,” Battiston said. G & G Steel is fabricating the swing span. Battiston noted that a Gantry System will be used to remove and replace the swing span superstructure. “The existing swing span structure was jacked to determine the dead load weight,” she said. HNTB Corporation was selected as the engineering firm responsible for the design of the overall project. As part of the rehabilitation/replacement of the Beverly Drawbridge, the approach spans are planned to be rehabilitated consisting of concrete pile repairs. Also, full replacement of the steel superstructure swing span is to occur, including full replacement of mechanical components which include the hydraulic rail system, bridge wedges and swing span motor and mechanisms. The full project scope has been split into two contracts, with the first contract to include approach span rehabilitation and the second to include the swing span superstructure/mechanical component replacement. The contractor for Contract 1 is Middlesex Corp., and notice to proceed was given on Aug, 5, 2015. Final completion is set for Feb., 28, 2018. Work is continuing with concrete pile repair work within the navigational channel and north and south abutment repairs.

By Klark Jessen MASSDOT

As part of the rehabilitation/replacement of the Beverly Drawbridge, the approach spans are planned to be rehabilitated consisting of concrete pile repairs.

Contract 2 was awarded to JF White Contracting. This contract continues with various work activities on the bridge in preparation of removal of the existing swing span and the float-in of new swing span and testing. This work will require a 28-day shutdown of rail service along the Newburyport/Rockport Commuter Rail Lines proposed for July 10, 2017 through Aug. 6, 2017, with regular train service on Aug. 7, 2017. The new swing span will be supported by the existing pivot pier, and other improvements in the area will include a new electrical room and generator and a remodeled control house. According to J.F. White’s website, work will consist of the complete replacement of the existing steel swing span with a new steel swing span for the two mainline railroad tracks, along with modifications to the existing center pivot pier to accommodate the new swing span superstructure. In addition, the contractor will replace the bridge’s mechanical, electrical, bridge control

and railroad signal components/systems. Also required, will be a partial demolition of the existing pivot pier deck and existing access stairway, along with construction of a new steel support platform on the pivot pier to support the new electric room. Modifications to the existing bridge tender’s control house will include a new control panel and architectural, electrical and railroad signal upgrades. Marine work will involve the installation of new submersed conduits between the control house and the center pivot pier, as well as the removal of the existing swing span and installation of the new swing span. Finally, miscellaneous repairs and replacements to the existing navigation channel timber fender systems and navigation lighting system will take place. (This story also can be found on Construction Equipment Guide’s website at www.constructionequipmentguide.com.) CEG

MMCT Taps East Windsor for New Casino CASINO from page 1

than a quarter mile from one of new commuter stations and will bring transportation oriented development programs to the town. The expected new infrastructure from MMCT and plan of development created by the town, is likely to bring more businesses to East

Windsor. But with this success and business opportunities, the EDC still continues to foster a strategy to keep the rural part of East Windsor, rural. The EDC recognizes quality of life is a main component to a successful town, and the EDC will work to keep the farms and local charm as part of the founda-

tion of East Windsor. It’s the development of business in the right areas that will maintain and support our rural areas and the residents of East Windsor. (This story also can be found on Construction Equipment Guide’s website at www.constructionequipmentguide.com.)

This project, which involves replacing the bridge carrying Route 3 northbound and southbound over High Street in Norwell and the bridge carrying Route 3 northbound and southbound over Route 123, (Webster Street) in Hanover, is expected to begin this summer and be completed by 2020. No long-term lane closures are proposed for this project as construction operations will be completed using short-term overnight lane closures for certain activities such as paving, bridge demolition and beam setting. The contract work will be done in such a way as to have as minimal impact as possible on drivers who travel on Route 3 and the surrounding roads. The scope of work for this comprehensive project involves replacing existing steel bridges; increasing the vertical clearance under the bridges; constructing conventional concrete abutments; realigning Route 3 at each location; and paving areas as appropriate. Additionally, crews and contractors will install new guardrail, relocate utilities and conduct slope work at each location. Construction operations will be completed in four primary stages in order to minimize the impact on the traveling public throughout the three-year project. During these stages, new bridges will be constructed in the median area at each location to accommodate traffic flow while the existing bridge superstructures and roadway approaches on the mainline are demolished and then reconstructed. MassDOT encourages drivers to utilize the appropriate travel resources throughout the duration of this project and make informed decisions regarding travel plans. Those traveling through the area should be mindful of delays and potential traffic impacts, reduce speed, and use caution. MassDOT appreciates the patience of the public as this important project progresses through the construction phases. (This story also can be found on Construction Equipment Guide’s website at www.constructionequipmentguide.com.)


Construction Equipment Guide • New England States Supplement • www.constructionequipmentguide.com • April 5, 2017 • Page 17

CONSTRUCTION AUCTION DAVIS AUCTIONS, INC. SATURDAY, APRIL 22, 2017 • 9:00 A.M. LOCATION: 210 CHESHIRE ROAD, RT. 68, PROSPECT, CT

THINK SUNSHINE!!! Davis Auctions, Inc. will be conducting our next auction of utility and construction equipment and related supplies on April 22, 2017. This auction will consist of excess equipment from the power companies, municipalities and others to be sold in absolute.

Early Consignments:

EQUIPMENT Excavators: (Unused) CAT 301.4C Mini, w/blade & rubber tracks, EROPS, under 10 hrs.; CAT 301.4C Mini, w/blade & rubber tracks, OROPS; CAT 305CR, w/blade, rubber tracks, aux. hyd., A/C, EROPS; 2008 VOLVO ECR88, OROPS; 2006 BOBCAT 442, w/blade & rubber tracks, EROPS; 2004-2005 HITACHI ZX135US, EROPS w/heat & A/C, 6110 hrs; BOBCAT 324 Mini, w/blade & rubber tracks; BOBCAT 341, w/360° rotating clam shell bucket, blade, & rubber tracks, OROPS; HITACHI EX55, w/blade & rubber tracks, OROPS; Wheel Loader: 2004 VOLVO L20B, w/bucket & forks; Loader Backhoe: JCB Mini CX; Wheel Tractors: MASSEY FERGUSON GC2600, w/loader, semisoft cab w/heat, dsl, 4x4, 105 hrs; Lifts: 2000 GENIE S60 Hyd. Boom, dsl, 4x4; 2001 JLG 260MRT 26’, propane, 4wd; JLG 25MSOS 25’, 2wd; Screener: 2009 VIBROSCREEN SCM-115-T Trommel, w/conveyor & remote control, 1059 hrs; Rollers: 2008 BOMAG BW145D3 Vib., Deutz dsl, 56" drum; 2007 HAMM 3518 HT Single Drum Vib.; DYNAPAC CC14 Vib. Smooth Drum, 51” drums, Deutz dsl, 8800#, 1922 hrs; BOMAG 120AD Double Drum Vib.; BOBCAT BCT13 Walk Behind Vib. Trench, Kubota dsl; Forklift: GERLINGER L-18 18,000# cap, gas; MASTERCRAFT MC5056, 3 stage mast, dsl; Misc.: WABCO Grader; CAT 100KW Generator, Cat 3208 dsl eng., 24 +/- hrs.; (New) 2yd Forklift Self Dumping Hopper; (New) 1yd Forklift Self Dumping Hopper; Grapple Buckets; Universal Fit Tilting Bucket; VEHICLES Material Handler: 2003 INT’L 4700 Ext. Cab, w/MTI 805B-47-3 47’ Bucket, ut. body, DT466E, 4 outriggers; (3) 2003 INT’L 4400, w/MTI/MORSE 805B-47-3 Bucket, Reading ut. body, DT466, 4 outriggers; (6) 2003 INT’L 4400, w/MTI 805-50-3 50’ Bucket, Reading Ut. Body, DT466, 4 outriggers;

Dump Trucks: 1987 MACK DM600 Tri-Axle; 2004 FORD F450XL SD, DRW, V8 turbo dsl, 4x4; 2003 FORD F350XL SD Ext. Cab, DRW, V8 turbo dsl, 4x4; Bucket Trucks: 2009 INT’L Durastar 4400, w/Terex-Telelect Hi-Ranger SC-45 45’ Bucket, Dakota Ut. Body, Maxxforce DT dsl, 2 outriggers; 2007 INT’L 4400, w/ Terex-Telelect Hi-Ranger SC-45 45’ Bucket, Dakota Ut. Body, DT466, 2 outriggers; 2005 GMC C7500, w/Terex-Telelect Hi- Ranger HR50M 50’ Bucket, Knapheide ut. body, 4 outriggers, 7.2L L6 turbo dsl; 2003 FORD F750XL SD Ext. Cab, w/MTI 829-45-3 45’ Bucket, utility body, 2 outriggers; Flatbed Trucks: 2005 GMC C4500, w/Reading H-12-W-Y rack body, 2013 Fassi Micro M15A.2 corner mtd crane w/stabilizer, Waltco lift gate, V8; 2005 GMC C4500, w/Knapheide rack body, Waltco lift gate; 2001 FORD F550XL SD, w/Reading Stake Body, 2001 IMT 1015 Crane, Powerstroke dal V8, Stabilizer; 1979 CHEV. C60; Welder Truck: 1995 GMC C3500, w/Lincoln SA300 gas welder, 8 cyl; Pickups: 2009 FORD F150XL Ext. Cab, w/tool box, tonneau cover, 4x4; 2009 CHEV. Colorado Ext. Cab, w/A.R.E. Walk In Ut. Cap, 4x4; 2008 FORD F350XL SD, w/Tommy Gate hyd. lift, tool box, & back rack, 4x4; (3)2008 DODGE Dakota Ext. Cab, w/tool box, 4x4; (5) 2008 GMC Canyon SLE, w/fleet side body w/built in tool boxes, 4x4; (2) 2006 GMC Canyon SL Ext. Cab, w/A.R.E Walk In Ut. Cap, 4x4; 2006 DODGE Dakota Ext. Cab; 2005 FORD F350XL SD, w/Tommy Gate, 4x4; (2) 2005 GMC Canyon SL Z71 Ext. Cab, w/tool box, 4x4; 2004 FORD Ranger Ext. Cab; 2004 CHEV. Colorado; 2001 FORD F550XL SD, w/Reading Mechanics Utility Body, Powerstroke dsl V8; SUVs/Vans: 2013 CHEV. Express, w/Bay Bridge Walk In Ut. Body; (3) 2003-2002 FREIGHTLINER MT55 Step Van; (2) 2012-2011 FORD Escape Hybrid; 2011 JEEP Wrangler Rubicon Unlimited, w/winch, 4x4; (4) 2006-2005 GMC Savanna Cargo Van; 2005 CHEV. Equinox LS, AWD; 2004 FORD Escape XLT, 4wd; (4) 2010- 2007 DODGE Caravan; (3) 2005-2003 GMC Safari; Cars: (2) 2007 CHEV. Malibu LS 4 dr Sedan, low miles; Trailers: 1994 FONTAINE 48’ Flatbed; 2004 SAUBER Pole; 2003 UTILITY H Pole; (2) 2001 POSI-PLUS USA 1400 Reel; Misc. Vehicles: (Unused) RAVEN MPV-7100S Multi-Purpose Hybrid Utility, 48V electric drive w/built-in 7100 watt generator, 16 hp gas eng.; 1990 COACHMAN Classic M-340 Motorhome, John Deere chassis, V8, gas; 2009 CLUBCAR 1550 Utility Cart, AWD, gas; EZ-GO CUSTOMIZED Golf CART, w/back seat, lift kit, oversized tires; 110 CC Go-Kart, full suspension, dual seat, reverse, electric start; (2) 4 Wheelers Misc.: Lot of 12’ high Pallet Staging; Engine Hoist; FORD Tail Gates; FORD Rear Bumpers, Utility Body Rear Bumper

This is our early tentative list. We accept consignments up thru Saturday, April 15, 2017. We never know what will be consigned at the last minute – so come to our inspection and find out!

INSPECTION: FRIDAY, APRIL 21, 2017

This is when/where you find out what is really here!!!

9:00 A.M. – 5:00 P.M.

For Online Bidding, Visit Realtimebid.com

Call for more information: DAVIS AUCTIONS, INC. (203) 758-4087 or 1-800-201-4368 www.davisauctionsinc.com

Auctioneer: Reginald Lussier Lyndonville, VT 05851 NH License# 2413 TERMS: CASH OR GOOD CHECKS WITH IDENTIFICATION.

ABSENTEE BIDS ACCEPTED.

Website list frequently updated. If you don't see what you want here, visit www.davisauctionsinc.com for updates.


Page 18 • April 5, 2017 • www.constructionequipmentguide.com • New England States Supplement • Construction Equipment Guide

NEW ENGLAND SUPPLEMENT ADVERTISER INDEX ARGUS INDUSTRIAL COMPANY.................................... 1 ASTRO CRANE.............................................................. 12 BARRY EQUIPMENT CO................................................ 9 BULLETIN BOARD ........................................................ 12 C J MABARDY INC........................................................ 12 C N WOOD CO INC........................................................ 20 CLASSIFIED .................................................................. 12 DAVIS AUCTIONS INC.................................................. 17 DOOSAN NORTHERN NEW ENGLAND...................... 15 E W SLEEPER CO............................................................7 EQUIPMENT EAST...................................................... 1,11 FOLEY MARINE & INDUSTRIAL ENGINE...................... 1 GORILLA HAMMERS........................................................1 J R VINAGRO CORPORATION........................................1 LORUSSO HEAVY EQUIPMENT LLC..............................5 M G EQUIPMENT............................................................ 1 MILTON CAT....................................................................12 MUSTANG DEALER GROUP........................................ 10 NORTHLAND JCB.......................................................... 13 ROGERS BROTHERS.................................................... 19 SUMMIT SUPPLY LLC/MULTI MACHINE........................ 1 T-QUIP SALES & RENTAL INC........................................ 6 THE N.I.C.E. COMPANY................................................ 10 THE W I CLARK COMPANY............................................ 2 TYLER EQUIPMENT CO.................................................. 3 The Advertisers Index is printed as a free editorial service to our advertisers and readership. Construction Equipment Guide is not responsible for errors or omissions.

Drinking Water Facility on Schedule for 2020 Finish A $50 million project now under way in Biddeford has the potential to advance increased mutual aid between water utilities from Portland to Kittery, an effort that has been moving forward since 2005, when utility-sponsored legislation began the process of encouraging regional solutions for public water delivery in Maine. In the wake of the region’s recent drought, The Maine Water Company released the design and construction schedule for a new water treatment facility near the Saco River. The company will file applications for environmental permits in mid 2017, finish design in the fall of 2018, with construction to start once design and permitting is complete. The new facility is expected to be on line and serving customers in the fall of 2020. The current water treatment facility, which serves customers in Biddeford, Saco, Old Orchard Beach and Scarborough, is more than 130 years old and sits in the flood plain of the Saco River. The new facility will be well out of the flood plain, on the western side of South Street in Biddeford. The Maine Legislature passed a law in 2005 that led to the creation of the Southern Maine Regional Water Council (SMRWC), and last fall, the SMRWC released a technical update to a report it originally released in 2008. That original report identified Sebago Lake and the Saco River as bodies of water “that might be expanded as regional supplies are integrated into a regional supply system in the future.” In particular, “A new regional water treatment facility could be constructed along the Saco River, sized to meet the projected needs of the entire region.” Maine Water’s new facility will have an initial capacity to treat 20 million gal. per day. With an eye on regional cooperation, the company is making sure its new facility is expandable. All the water systems in southern Maine currently produce about a com-

bined 40 million gal. of “finished water” per day, but the SMRWC expects demand for public drinking water to grow. “Drought relief is just one benefit of regional connections, there are many others,” said Rick Knowlton, vice president of operations at Maine Water. “During the worst days of the recent drought, we drew just over one per cent of the river’s flow past our intake pipe in Biddeford. The ability of the Saco River to help others in times of drought is significant, and the incremental impact of additional water withdrawals would not be environmentally significant. The river is extremely clean, and it’s plentiful. Its potential to help the region with all its water needs is impressive, and its expanded use would reduce the environmental impact of stressed resources currently being used by some of the southern water systems.” Members of the Southern Maine Regional Water Council include the Portland Water District, Maine Water Company, the Kennebunk, Kennebunkport, Wells Water District, Sanford Water District, South Berwick Water District, York Water District and Kittery Water District. “Our planning is here and now,” Knowlton said. “By building this new facility, we are offering to deliver a major component of the regional water plan. As our project proceeds, we will stay in close contact with all members of the SMRWC, and we will do all we can to facilitate our neighbors’ interest in a regional policy of mutual aid.” Maine Water serves 32,000 customers, or a population of 100,000, in over 20 communities throughout the state of Maine. For more information, visit MaineWater.com. (This story also can be found on Construction Equipment Guide’s website at www.constructionequipmentguide.com.)

Keep Up With All the Industry News Subscribe to

Construction Equipment Guide Today! Toll Free 800/523-2200


Construction Equipment Guide • New England States Supplement • www.constructionequipmentguide.com • April 5, 2017 • Page 19

Tyler Equipment

C.N. Wood Co., Inc.

251 Shaker Road East Longmeadow, MA 01028 (413) 525-6351 (800) 292-6351 Parts: (877) 255-6351

200 Merrimac St. Woburn, MA 01801 (781) 935-1919

1980 Berlin Turnpike Berlin, CT 06037 (860) 356-0840 (800) 352-4473 Parts: (860) 356-0848

www.tylerequipment.com

Avon, MA (508) 584-8484 Johnston, RI (401) 942-9191

www.cn-wood.com


Page 20 • April 5, 2017 • www.constructionequipmentguide.com • New England States Supplement • Construction Equipment Guide

200 Merrimac Street Woburn, MA 781-935-1919

60 Shun Pike Johnston, RI 401-942-9191

102 State Road Whately, MA 413-665-7009

140 Wales Avenue Avon, MA 508-584-8484


Turn static files into dynamic content formats.

Create a flipbook
New England 7 April 5, 2017 by Construction Equipment Guide - Issuu