State Supplement sponsored by:
1
THE NEW ENGLAND EDITION
11
A Supplement to:
95
1
201 16 9
26
2
1 3
91
89
2
95 3
2 2 7
1
93
495
16
89 4
89
95
202
7
91
9
95
93
2
95 2
93 90
90
7
95 91
7
SHIP WITHIN 48 HOURS
3
84
495 6
84
6
6
195
395
95 91
95
95
®
March 16 2022
SAME DAY PARTS AVAILABILITY 24 HOUR TECHNICAL SUPPORT BACKED BY A 75 YEAR BUSINESS Thousands in Service!
Vol. LX • No. 6
“The Nation’s Best Read Construction Newspaper… Founded in 1957.” Your New England States Connection • Kent Hogeboom 315-866-1423 2208 Plainfield Pike • Johnston, RI 02919 401-943-7100 • Fax: 401-647-5041
www.jrvinagrocorp.com info@jrvinagrocorp.com
Affordable Price. Premium Service.
CALL 800-367-4937 *On approved credit • Financing Available
Crews Restore Structural Integrity of Drawbridge Over Housatonic River
Specializing in:
Demolition, Portable Crushing, Material Sales, C & D Recycling, Land Clearing, Heavy Hauling & Trucking Call for Pricing
LEED Accredited in Waste Management
2022 EZ-Screen 1200XLS
Visit Equipment East for a demo. Authorized Doosan Dealer
Optional 3 Product Conveyor
6’x5’ Double Deck Screenbox Works with 1/2 to 1 3/4 Yd. Loaders, Kohler Diesel, 24” Conveyor Dumps Screened Product 9’ High, Two (2) Year Warranty! $59,900 plus freight.
508-484-5567 (BROCKTON, MA) 978-454-3320 (Dracut, MA) 603-410-5540 (Bow, NH)
Tibbits Equipment Services, Inc.
www.tibbitseq.com
802-479-9696 ®
KWIK KLEET ts Traction Clea
Other Screeners Available
EZ-SCREEN www.ez-screen.com
248-745-5828
Specialty Construction Equipment SALES • RENTALS • HAMMERS Since 1989
The Washington Bridge is the longest drawbridge on the Boston Post Road, a steel trunnion-bearing bascule drawbridge that is 859 ft. in length and 43 ft. in width, featuring two lanes in each direction for vehicular traffic and a sidewalk for pedestrians.
By Ken Liebeskind • Exhaust Scrubbers • Perkins Engines • Deutz Engines • Twin Disc/Rockford Clutches
www.foleyengines.com ‘05 Caterpillar 928G $36,800
CEG CORRESPONDENT
• Largest hammer repair facility in North America • Demolition tools and parts for ALL makes and models • Hammer-equipped excavator rentals • Backed by a 75 year family owned business CALL YOUR ONE-STOP HAMMER SHOP™ TODAY!!!
Phil (413) 427-7171
CALL 888-81-GORILLA(46745)
The renovation of the Washington Bridge, which carries U.S. Route 1 over the Housatonic River in Milford and Stratford, Conn., began in mid-August 2021 and is set for completion in late November 2022. Mohawk Northeast of Plantsville, Conn., is the contractor. According to the Connecticut Department of Transportation (CTDOT), “The work on the bridge is for the rehabilitation of the concrete and structural steel members to restore the structure integrity and extend the operational life
of the bridge. The existing structural steel, concrete and mechanical and electrical systems are in need of repair. As a result, major structural steel movable span repairs will take place to restore areas of section lost to rust and pitting. “Substructure and superstructure concrete are in a similar state, therefore repairs to the abutments, wingwall, piers, arches, deck and prestressed deck units will also commence. This scope of work will include identifying and removing areas of degraded concrete and replacement with new concrete. see DRAWBRIDGE page 14