State Supplement sponsored by:
1
11
THE NEW ENGLAND EDITION
A Supplement to:
95
1
201 16 9
26
2
1 3
91
89
2
95 3
2 2 7
1
93
495
16
89 4
89
95
202
7
91
9
95
93
2
95 2
93 90
90
7
95 91
7
SHIP WITHIN 48 HOURS
3
84
495 6
84
6
6
195
395
95 91
March 20 2019 Vol. L • No. 6
95
SAME DAY PARTS AVAILABILITY
95
®
24 HOUR TECHNICAL SUPPORT BACKED BY A 75 YEAR BUSINESS Thousands in Service!
“The Nation’s Best Read Construction Newspaper… Founded in 1957.”
Your New England States Connection • Kent Hogeboom 1-800-988-1203 2208 Plainfield Pike • Johnston, RI 02919 401-943-7100 • Fax: 401-647-5041
www.jrvinagrocorp.com info@jrvinagrocorp.com
Affordable Price. Premium Service.
CALL 800-367-4937 *On approved credit • Financing Available
$153M Bridge Rehabilitation Begins Ahead of Major Mixmaster Project
Specializing in:
Demolition, Portable Crushing, Material Sales, C & D Recycling, Land Clearing, Heavy Hauling & Trucking Call for Pricing
LEED Accredited in Waste Management
2019 EZ-Screen 1200XLS
Large Enough to Service You; Small Enough to Know You
61 Silva Lane • Dracut, MA 01826
Optional 3 Product Conveyor
6’x5’ Double Deck Screenbox Works with 1/2 to 1 3/4 Yd. Loaders, 25 H.P. Kohler Diesel Engine, 24” Conveyor Dumps Screened Product 9’ High, Two (2) Year Warranty! $42,900 plus freight. Other Screeners Available
EZ-SCREEN
Call Today (978) 454-3320
WE STOCK RUBBER TRACKS for Over 6,000 Models! Some Used Tracks A & GA Available. NJ, TX, WOUSES WAREH
By Cindy Riley
the Route 8 and I-84 interchange in Waterbury, Conn. The Connecticut Department of Transportation (CTDOT) is overseeing the work, which will improve driving conditions Construction is under way on a $153 million project that until the eventual, multi-billion-dollar Mixmaster replaceincludes the rehabilitation of multiple bridges located within ment project begins. “Built in the 1960s, the I-84/Route 8 Interchange is at the end of its serviceable life, without a major rehabilitation effort,” said David Ferraro, CTDOT construction project engineer. “Concrete decks and the substructure throughout the interchange have deteriorated to the point of needing repairs. The Route 8 northbound structure The Maine Dept. of Transportation has outlined a three-year transportais in need of a complete deck replacetion infrastructure work plan, including details about which roads it plans to ment, and Route 8 southbound currently make improvements to. needs five full span replacements. The plan is released annually with an outline of the Maine Department of “In addition to concrete superstructure Transportation’s strategy for road, bridge and other transportation projects and substructure repairs, the project throughout the state. includes structural steel repairs and The work plan includes more than $2.44 billion worth of construction and strengthening, bridge deck joint repairs maintenance, which includes more than 1,900 work items, according to a and replacements, parapet modifications
CEG CORRESPONDENT
• HIGH QUALITY • FAST SHIPPING • GUARANTEED TO FIT • UNDERCARRIAGE PARTS • FLATPROOF SKIDSTEER TIRES • RUBBER PADS FOR STEEL TRACKS
888-888-1248
www.ez-screen.com
248-745-5828
Cat IT38G, 3.25cy, 7,800 Hrs, Mich Radials 67%, 3rd Valve, Owned for many years, Runs Excellent, No blow by, No leaks, Very Good ..$49,750 or bo
Phil (413) 427-7171 • Largest hammer repair facility in North America • Demolition tools and parts for ALL makes and models • Hammer-equipped excavator rentals • Backed by a 75 year family owned business CALL YOUR ONE-STOP HAMMER SHOP™ TODAY!!!
www.foleyengines.com
Aerials By Don Couture photo
The Connecticut Department of Transportation (CTDOT) is overseeing work, which will improve driving conditions until the eventual, multi-billion-dollar Mixmaster replacement project begins.
CALL 888-81-GORILLA(46745)
Maine Outlines Three-Year Plan for Transportation see PLAN page 14
see BRIDGES page 16