State Supplement sponsored by:
1
11
THE NEW ENGLAND EDITION
A Supplement to:
95
1
201 16 9
26
2
1 3
91
89
2
95 3
2 2 7
1
93
495
16
89 4
89
95
202
7
91
9
95
93
2
95 2
93 90
90
7
95 91
7
SHIP WITHIN 48 HOURS
3
84
495 6
84
6
6
195
395
95 91
March 4 2020
Vol. LI • No. 5
95
SAME DAY PARTS AVAILABILITY
95
®
24 HOUR TECHNICAL SUPPORT BACKED BY A 75 YEAR BUSINESS Thousands in Service!
“The Nation’s Best Read Construction Newspaper… Founded in 1957.”
Your New England States Connection • Kent Hogeboom 315-866-1423 2208 Plainfield Pike • Johnston, RI 02919 401-943-7100 • Fax: 401-647-5041
www.jrvinagrocorp.com info@jrvinagrocorp.com
Affordable Price. Premium Service.
CALL 800-367-4937 *On approved credit • Financing Available
Latest Accelerated Bridge Construction Project Proceeds in Massachusetts
Specializing in:
Demolition, Portable Crushing, Material Sales, C & D Recycling, Land Clearing, Heavy Hauling & Trucking
P. Gioioso & Sons of Hyde Park, Mass., is the lead contractor on the Weymouth and Abington project with D&R Contracting of Melrose, Mass., focusing on the road paving.
Call for Pricing
LEED Accredited in Waste Management
2020 EZ-Screen 1200XLS 36 Month lease AS LOW AS
$1,500* / Month Authorized Doosan Dealer
978-454-3320 (Dracut, MA) 603-410-5540 (Bow, NH) Optional 3 Product Conveyor
6’x5’ Double Deck Screenbox Works with 1/2 to 1 3/4 Yd. Loaders, 25 H.P. Kohler Diesel Engine, 24” Conveyor Dumps Screened Product 9’ High, Two (2) Year Warranty! $44,900 plus freight. Other Screeners Available
EZ-SCREEN
www.ez-screen.com
*Limited time offer. Some restrictions apply. See dealer for details.
WE STOCK RUBBER TRACKS for Over 6,000 Models! Some Used Tracks A & GA Available. NJ, TX, WOUSES WAREH
CEG CORRESPONDENT
• HIGH QUALITY • FAST SHIPPING • GUARANTEED TO FIT • UNDERCARRIAGE PARTS • FLATPROOF SKIDSTEER TIRES • RUBBER PADS FOR STEEL TRACKS
888-888-1248
248-745-5828
www.foleyengines.com • Largest hammer repair facility in North America • Demolition tools and parts for ALL makes and models • Hammer-equipped excavator rentals Cat IT38G, 3.25cy, 7,800 Hrs, Mich Radials 67%, 3rd Valve, Owned for many years, Runs Excellent, No blow by, w No leaks, Very Good ..$49,750 or bo
Phil (413) 427-7171
Ken Liebeskind
• Backed by a 75 year family owned business CALL YOUR ONE-STOP HAMMER SHOP™ TODAY!!!
CALL 888-81-GORILLA(46745)
The Route 18 road widening and bridge reconstruction project in Weymouth and Abington is the latest Accelerated Bridge construction project in Massachusetts, which includes others in the Accelerated Bridge Program, an eight year $3 billion campaign that targeted more than 500 bridges across the state. P. Gioioso & Sons of Hyde Park, Mass., is the lead contractor on the Weymouth and Abington project with D&R Contracting of Melrose, Mass., focusing on the road paving. Construction began in the fall of 2017 with a completion of late 2022 scheduled. The budget for the job is $68 million with the bulk being paid by the Federal Highway Administration with the balance
from state and local funding. Kristen Pennucci, MassDOT spokesperson, said the contractors are currently working on road widening and site work at the bridge. Drainage basins are completed and drainage work to tie into the basins is ongoing. Partial demolition of the bridge was completed in August 2019 during a weekend vehicular shutdown. Drilled shafts are currently being installed for the new bridge. All new utility poles have been installed and a majority of utility relocation has been completed along the entire corridor. The contractors will continue working on road widening and rebuild the bridge and its associated components for use in its temporary and permanent locations. Then final paving will be completed along see BRIDGE page 16
The new bridge is scheduled for completion in August 2021, according to Chris Evasius, a MassDOT assistant construction engineer.