Skip to main content

New England 3, February 2, 2022

Page 1

State Supplement sponsored by:

1

11

THE NEW ENGLAND EDITION

A Supplement to:

95

1

201 16 9

26

2

1 3

91

89

2

95 3

2 2 7

1

93

495

16

89 4

89

95

202

7

91

9

95

93

2

95 2

93 90

90

7

95 91

7

SHIP WITHIN 48 HOURS

3

84

495 6

84

6

6

195

395

95 91

95

95

®

February 2 2022

SAME DAY PARTS AVAILABILITY 24 HOUR TECHNICAL SUPPORT BACKED BY A 75 YEAR BUSINESS Thousands in Service!

Vol. LX • No. 3

“The Nation’s Best Read Construction Newspaper… Founded in 1957.” Your New England States Connection • Kent Hogeboom 315-866-1423 2208 Plainfield Pike • Johnston, RI 02919 401-943-7100 • Fax: 401-647-5041

www.jrvinagrocorp.com info@jrvinagrocorp.com

Affordable Price. Premium Service.

CALL 800-367-4937 *On approved credit • Financing Available

Demolition Crews Proceed Carefully to Avoid Premature Collapse of Old Span

Specializing in:

Demolition, Portable Crushing, Material Sales, C & D Recycling, Land Clearing, Heavy Hauling & Trucking Call for Pricing

LEED Accredited in Waste Management

2022 EZ-Screen 1200XLS

Visit Equipment East for a demo. Authorized Doosan Dealer

Optional 3 Product Conveyor

6’x5’ Double Deck Screenbox Works with 1/2 to 1 3/4 Yd. Loaders, Kohler Diesel, 24” Conveyor Dumps Screened Product 9’ High, Two (2) Year Warranty! $59,900 plus freight.

508-484-5567 (BROCKTON, MA) 978-454-3320 (Dracut, MA) 603-410-5540 (Bow, NH)

Tibbits Equipment Services, Inc. www.tibbitseq.com

802-479-9696 KWIK KLEET ts Traction Clea

EZ-SCREEN 248-745-5828

Specialty Construction Equipment SALES • RENTALS • HAMMERS Since 1989

• Exhaust Scrubbers • Perkins Engines • Deutz Engines • Twin Disc/Rockford Clutches

www.foleyengines.com ‘05 Caterpillar 928G $36,800

• Largest hammer repair facility in North America • Demolition tools and parts for ALL makes and models • Hammer-equipped excavator rentals • Backed by a 75 year family owned business CALL YOUR ONE-STOP HAMMER SHOP™ TODAY!!!

Phil (413) 427-7171

CEG CORRESPONDENT

Operations to rebuild the Belden G. Bly Drawbridge, a $99.3 million Massachusetts Department of Transportation (MassDOT) project awarded to SPS New England Inc., are proceeding.

The drawbridge, formerly known as the Fox Hill Drawbridge and renamed in 1985 to honor a former member of the Massachusetts House of Representatives, carried traffic on Route 107 (Salem Turnpike/Western Avenue) over the Saugus River, linking the municipalities of Saugus and Lynn, north of Boston. It was closed to traffic see BRIDGE page 10

®

Other Screeners Available

www.ez-screen.com

By Irwin Rapoport

CALL 888-81-GORILLA(46745)

MassDOT, Local, State Leaders Fete New Municipal Grant Programs Surrounded by lines of snow clearing apparatus, approximately 30 people gathered Jan. 18 inside the Anthony Colonna Public Works Building in Framingham to celebrate the Massachusetts Department of Transportation’s upcoming municipal grant programs — some with upcoming application due dates. Throughout the state, millions of dollars have been doled out for new public spaces like sidewalks and streets, as well as for improving or maintaining existing infrastructure. “Municipal programs have always been a lifeline for cities and towns in Massachusetts, which the Baker-Polito administration has expanded dramatically,” noted Jonathan

Gulliver, MassDOT’s highway administrator. Gulliver said what began as a single program has expanded to five, resulting in a “$178 million investment” in the state. MetroWest Daily News in Framingham reported that among the attendees at the event were Lt. Gov. Karyn Polito; Cassandra Gascon, the state’s community grants program administrator; Framingham Mayor Charlie Sisitsky; City Councilor-at-Large Janet Leombruno; and Rep. Maria Robinson and Rep. Jack Patrick Lewis of the Massachusetts see GRANTS page 4


Page 2 • February 2, 2022 • www.constructionequipmentguide.com • New England States Supplement • Construction Equipment Guide

Call Mark Doty @ 203-823-2316 2010 WIRTGEN 2100

2013 HAMM HD12VV

2005 WIRTGEN W2000

Cat power, 6'5" 15mm drum, rigid conveyor, 60% bottoms, good belting with grade, stk# 26377 ................................................$145.000

stk# 26021, single & dual vibratory, PSI water system, recent service to engine, new seat assy, 4104 Hrs ....................................$22,500

stk# 26376, 7759 hours, Cat, 6’7” drum, good bottoms, grade controls, serviced & ready for work....................................................$115,000

2004 BOBCAT S750

2019 BOBCAT S740

1997 HITACHI EX300-3C

stk# 26915, c/air, 2 speed, foot controls, 50% rubber, mech coupler ..........................$34,500

stk# 26515, c/air, 2 speed, 12” rubber, 76” bucket, switchable controls, 1240 hrs..$52,500

stk# 27130, C/heat, 32” pads, 48” bucket, newer pumps, very nice original machine ........ ............................................................$29,500

2020 CASE TV450

2006 DEERE 325

2014 JOHN DEERE 410K

stk# 26945, c/air, pilots, 2 speed, RC, Hi Flow, hyd coupler, 84” bucket 80% tracks ..$68,500

stk# 27127, C/air, 2 speed, foot controls, new rubber, mech coupler, standard hyds, serviced and ready for snow ..............................$32,500

stk# 26993, 6851 Hrs, c/air, new front rubber, front coupler, ext hoe, pilots ................$59,500

See Our Complete Inventory at www.wiclark.com


Construction Equipment Guide • New England States Supplement • www.constructionequipmentguide.com • February 2, 2022 • Page 3

New 738 8M purpose p p e-built t h tree han ndler is BIG new ws for tree care speecialists SENNEBOGEN’s “game-changing” tree care handlerrs have raised the bar even higher! Thee new 738 M weighs in at twice the size of 718 M and R-HD models with mo models, ore power and more reach to take on bigger jobs! d with a power grapple The 738 M, fitted saw, is attached to a 75 ft. telescoping boom and stick to t quickly fell or prune trees as high as 1125 ft. to 150 ft. tall. Then it easily cutts, swings and stacks the wood with a single operator to hole job. complete the wh

CUSTOM MENGINE EERED TREE CARE HANDLLERS

PU URPOSE-BUILT

FR ROM THE GR ROUND UP

• Ideal for all tree seervice operators • Used for woodlot thinning, harvesting wood fuel f to clearing storm debris up to o 48" and up to 125' high • All wheel drive or tracked models • Jobsite safety incrreased with trimming, cuttingg, loading and stacking operation ns as all are done from the con nfines of the SENNEBOGEN eleevating and tilting Maxcab

As big and poweerful as it is, the 738 keeps pace with w the 718 M and 718 R-HD machines with precise handling and fasst cycle times to process up to 150 trees per day. From the roadsid de, on embankments or in heavy wood ds, the 738 M is the new game-changger for all land clearing, right-of-way right of way maintenance and heavy tree care operations.

Get th he details on the high effficiency solutio l ion for custom tree rem movall

The New 738 M

www.seennebogen-na.com | +1-7040 347-4910

251 Shakker Road East Longmeadow, MA 01028 (800) 292-63 6351

1980 Berlin Turnpike Berlin, CT 06037 (800) 352-4473

www.tylerequipmentt.com


Page 4 • February 2, 2022 • www.constructionequipmentguide.com • New England States Supplement • Construction Equipment Guide

Maine Awards Contract for Rainbow Arch Bridge Replacement For those wanting to get some of MDOT image the last photos of coastal Maine’s A digital rendering of the new Falls Bridge. Falls Bridge in the winter, now is the time to do so. The scenic and historic bridge, built in 1926 to span the reversing falls off Maine Rt. 175 in South Blue Hill, will soon be taken down and replaced with a modern structure. The Maine Department of Transportation (MaineDOT) on Jan. 4 awarded a bid to Pittsfield-based Cianbro Corp. for the Falls Bridge Replacement project, according to MaineDOT Bridge Manager Andrew Lathe. bow arch bridges that remain in Maine. Funding for the effort will come partially “I anticipate a pre-construction meeting in the near future, but have no other updates at from the federal government, MaineDOT this time,” Lathe told the Ellsworth noted. A citizen-run website called hisAmerican. “Construction will begin later toricbridges.org describes the Falls Bridge as this winter [or] spring.” Whether to repair or replace the Falls an “impressive, ornate example in a beautiBridge has been a topic of discussion on the ful setting.” Indeed, the 94-year-old span has been a Blue Hill peninsula and with MaineDOT for two decades. Lathe has said previously that continuing source of inspiration for artists, a rehabilitation would provide the current photographers, residents and tourists. bridge a lifespan of 50 years, but a new Kayakers and surfers navigate the rapids of the reversing falls over Salt Pond, a tidal bridge would last about 100 years. At numerous meetings over the years, basin. Daredevils jump from the bridge into some peninsula residents lobbied for a rehab the waters, while beachcombers know there of the historic structure, one of just two rain- are treasures to be seen from the shores of

the pond at low tide. Falls Bridge’s Beauty Only Skin Deep The state has noted that the bridge has advanced deterioration with heavy cracking in areas of concrete. Several embedded stones at the base of the structure show signs of movement, and the underside of the bridge has extensive cracking and heavily corroded steel, according to a MaineDOT report. The Ellsworth American reported that in 2019, the transportation department announced, via a phone call to the Blue Hill Select Board, that the decision had been

made to replace the bridge instead of rehabilitating the structure. The new bridge, which Lathe described as consisting of five “precast concrete girders with exterior girders supporting an aesthetic fascia panel,” will accommodate pedestrians and bicyclists. Provisions made to facilitate recreation on a new bridge has been an ongoing request from area residents who attended public hearings about the structure over the past 18 years. The replacement span will feature two 11ft.-wide traffic lanes and a pair of four-ft.wide shoulders for walkers and bikers, MaineDOT bid documents show. Currently, there is just enough room for two lanes of vehicle traffic to pass each other on the bridge. The Falls Bridge will be closed to traffic for roughly 60 days during construction, and for one month before the closure and three months following the closure, the bridge will be restricted to a single lane of one-way alternating traffic. “Accelerated bridge construction techniques will be used to minimize the shutdown duration,” MaineDOT stated. 

Single Mass. Municipal Grant Program Evolves Into Five GRANTS from page 1

Legislature. Polito recalled that the first executive order that Gov. Charlie Baker signed when he took office in 2015 was “No. 554: Creating the Community Compact Cabinet,” which established a group chaired by Polito to make connections, set standards, and gather feedback from municipalities, in part because “cities and towns are at the front lines of delivering services to the citizens of the Commonwealth,” according to a summary of the order. “We made a commitment to our cities and towns that we were going to prioritize and work with you and make sure that we’re exchanging and sharing information,” Polito told the gathering. “It’s through that relationship that we learned how to make sure that these programs ... not just that they’re a resource, but they work for you, that they’re efficient, that they’re quick and easy to apply to so that we get the funds into your hands to do meaningful work in your community.” Polito added that Framingham has received $2.4 million in municipal grants from MassDOT since 2016. “We’re always on the lookout for how we

can leverage state and federal money to help us,” said Bill Sedewitz, acting director of the Framingham’s Department of Public Works (DPW) after the lieutenant governor’s remarks. Framingham Receives Complete Streets Grant In a press release, Framingham officials announced Jan. 18 that the city’s DPW and the Planning and Community Development Department are the recipients of a $400,000 Complete Streets grant. The Complete Streets Funding Program gives municipalities grants for more accessible travel like transit, walking and biking. The monies will cover the first construction phase for improvements on Loring Drive and Western Avenue, including new sidewalks and curb ramps. Funding also will be used to install a new crosswalk that will connect the new sidewalks to the MetroWest Regional Transit Authority bus stop near 110 Western Ave. A second construction effort will include building designated bike lanes and performing road resurfacing, but that work will require a second round of funding, which the city will request, Framingham officials said in the news release.

Shared Streets, Spaces Although the Shared Streets and Spaces program has only been around since last June, it has already awarded $33 million to more than 150 municipalities and transit authorities. The program is intended to fund quick projects for public spaces, like improvements to bus stops and sidewalks, and the installation of parklets and bikeshare stations. “It was the municipalities that came to us and said we can better use parking lots and sidewalks and areas of our streets to open up outdoor dining so that people feel comfortable getting out and supporting our businesses,” Polito told MetroWest. The deadline for applying for the next round of Shared Streets and Spaces grants is March 1. All municipalities and transit authorities are eligible to submit proposals. Municipal Small Bridge Grants to Return Polito also noted that Massachusetts is relaunching the Municipal Small Bridge Program, with Feb. 1 set as the date the commonwealth will begin accepting applications. “We learned in our travels that many of

these small bridges that, fortunately, are owned by cities and towns, and culverts that go with them, are very costly to maintain or improve,” she said. “If they go out of use, they can be very disruptive to getting kids to school safely, having businesses thrive, and just allowing your community [to] connect people and places for emergency purposes.” Two Other Road Programs in Place A duo of additional programs that were mentioned Jan. 18, MetroWest noted, include the Municipal Pavement initiative, which Polito said can be especially helpful for smaller communities experiencing difficulties supporting their existing road infrastructure. The other is the Local Bottleneck Reduction program, aimed at “hotspots” for traffic, although only signaled intersections owned and operated by the municipality are eligible for that grant. “As the lieutenant governor said, [these grants] help us do things that we can’t accomplish with our own local budgets,” Sisitsky said in his remarks. “The ability to work with the state and get these programs going helps everybody, [including] all of our residents and [those] that visit our communities.” 


Construction Equipment Guide • New England States Supplement • www.constructionequipmentguide.com • February 2, 2022 • Page 5

AUTHORIZED DOOSAN DEALER

DRACUT

BROCKTON

BOW

978-454-3320 61 Silva Lane Dracut, MA 01826

508-484-5567 196 Manley St. Brockton, MA 02301

603-410-5540 1474 Rte 3A Bow, NH 03304

www.equipmenteast.com

DESIGNED TO DOMINATE. POWERED BY INNOVATION. Punishing jobsites require rugged machines. New -7 Series wheel loaders are redesigned to help you load more material, carry with confidence and get more done. Visit Equipment East for a demo. ©2021 Hyundai Doosan Infracore. All rights reserved. Hyundai Doosan Infracore is an affiliate of Hyundai Heavy Industries Group. , is used under license from Doosan Corporation. The Doosan trademark,


Page 6 • February 2, 2022 • www.constructionequipmentguide.com • New England States Supplement • Construction Equipment Guide

Lexington, Kentucky | www.linkbelt.com

, and much more • 20° tilting operator ’s cab with • Upper Cameras – winch operation and swing • Carrier Cameras and right turn

Ver e mont 802--658-1700 Massachusettss 508-499-1950 Pennsylvania 717-795-0700 New Yoork 3155-676-2008 www.woodscrw.com

B U Y

•

L E A S E

•

R E N T


Construction Equipment Guide • New England States Supplement • www.constructionequipmentguide.com • February 2, 2022 • Page 7

Experience th he Progr ro re ess.

Liebherr Wheel Loaders L o ® L 550 XPo ow wer - L 586 XPo ow wer® XP Power® is the new generatio on of Liebherr’s large wheel loa aders. Liebherr XPower® is an n integrated, innovative mach hine concept that sets new sttandards in terms of reliabilityy, pe performance, erformance robust design an nd comfort. comfort The XPower® po owerrr-split split driveline combines hydrostatic with mechanical drrive and ensurre es maximum effficiencyy,, whatever the applica ation. The Liebherr-Power rr--Efficiency (LPE) System of the XPower® ® wheel loaders adjusts the power p to the job for fuel savings of up p to 30 percent - so you hand dle more, re fasterr.

www.heeavymachinesinc.com PORTLAN ND, ME 2401 Broadway, Bldg #3 S Portland S. P tl d, d ME 04106 877-202-12275 | 207-550-0014

SKOWHEGAN, ME 159 North Av Ave. Sk h Skowhegan, ME 04976 888-875-3954 | 207-858-0051


Page 8 • February 2, 2022 • www.constructionequipmentguide.com • New England States Supplement • Construction Equipment Guide

The Nice Company, Inc

9 Rosenfeld Drive, Hopedale, M A Toll Free# 508-381-3939 • w w w.theniceco.com

Equipment Sales and Rentals

We sell NICE machines!

2018 Anaconda DF410, 550 hours, 38" x 11" Feeder Belt, Rear & Side Discharge Conveyors, 4' x 10' Double Deck Screen Reduced to $129,000!

2014 Vermeer FT300, 2500 hrs., Mulcher, Cab w AC, Industrial 30XL Winch, Rear View Camera Reduced to $169,000!

Happy New Year! 2013 Deere 470G LC, 3500 hours, 12'7" Stick, AC, Counterweight Removal System $169,000

2016 Volvo EC350EL, 4500 hours, Aux. Plumbing, 12’ stick, 65” bucket $129,000

United Ag & Turf Expands to 63 Deere Agriculture, Turf Locations United Ag & Turf NE LLC has acquired Harvest Equipment locations in Vermont: Theriault Equipment in Presque Isle, Maine, All Power Equipment in Granby, Mass., and Tom’s Lawn and Garden Equipment Inc. in Portsmouth, R.I. The merger brings United Ag & Turf’s footprint to 63 John Deere Ag & Turf stores, plus an additional 14 locations of John Deere Construction & Forestry dealerships operated by its sister company, United Construction & Forestry. “We are excited about the opportunity to serve even more farmers, landowners and businesses throughout the Northeast,” said Eric Driscoll, CEO of United Ag & Turf NE and United Construction & Forestry. “It’s an honor to put our United name on these dealerships. We look forward to building lasting relationships that are rooted in trust and service with our new customers and in the new communities we serve.” Scott Miller, president of United Ag & Turf NE said, “This is an exciting organization to be a part of and an incredible opportunity for us to continue to expand

the John Deere brand in the Northeast. We are committed to investing heavily in the region, with three new facilities opening in 2022 and continual updating and upgrading operations so we can deliver on our promise of best-in-class equipment and an extra-ordinary customer experience.” The acquisition adds approximately 100 additional employees to United Ag & Turf NE. “Our business is rapidly growing with tremendous career growth opportunities,” continued Miller. “We welcome these new employees to our United team and hope others outside our organization consider jumping onboard early to discover an exceptional career trajectory. “United staff, customers and their communities will all benefit from this acquisition with a stronger, more diversified network of dealerships,” concluded Miller. “With our future plans to expand parts inventories and have more equipment available throughout our locations, there is tremendous opportunity for everyone.” For more information, visit www.unitedagandturf.com/ne. 


Construction Equipment Guide • New England States Supplement • www.constructionequipmentguide.com • February 2, 2022 • Page 9

SPRING IS RIGHT RIIGHT AROUND THE CORNER TIME TO DIG. Introducing the new JCB 35Z-1, the zero tailswing, 7,840 lb. mini excav vator. The new 35Z-1 is one of the New Generation Stage V machines with no need for electronic control, aftertreatment or E EGR. It has zero tailswing for easy and safe maneuverability, especially in confined spaces and 100% steel bodywork. 800-Go2-ALT TA A | AltaEquipNE.com


Page 10 • February 2, 2022 • www.constructionequipmentguide.com • New England States Supplement • Construction Equipment Guide

Crews Build New Permanent Bascule Movable Bridge BRIDGE from page 1

November 2013. The old structure, 210 ft. long, was the oldest cantilever bridge in the country and the oldest Scherzer Rolling Lift under the supervision of the Massachusetts Department of Public Works. Streetcars originally ran across the fourlane bridge. SPS secured the contract in November 2020, and in February 2021, Atlantic Coast Dismantling, LLC (ACD) began its demolition operations, which had excavators placed on barges. The bridge was definitely showing its age. On Dec. 15, 2008, it was closed for several months for repair, which required the MBTA’s 424, 450, 455 and 459 bus routes to be detoured through Austin Square in West Lynn through Ballard Street in Saugus. MassDOT had intended to close the bridge for replacement in early 2013. Problems with the temporary cable-lift draw bridge delayed the project significantly due to a hinge failure on the temporary draw span during what was supposed to have been final testing. The single-lane temporary bridge, which took three years to construct, was opened to traffic at the same time as the bridge closure. “[This bridge] has given us time for the new replacement project to be fully designed, permitted and funded,” said MassDOT. “And it ensured continued access for vehicles and marine traffic while the new permanent bridge is installed.” The overall project is building a new permanent bascule movable bridge — two lanes in each direction, along with bike lanes and sidewalks — on the same alignment as the original 1912 bridge being demolished and immediately west of the existing temporary bridge. The work includes the construction of new approach bridge spans, along with reconstruction of 3,060 ft. of roadway approaches, and significant modifications and upgrades at the intersection of Route 107 with Ballard Street. on the Saugus side, a replacement of the Massachusetts Water Resources Authority (MWRA) water line across the river and an increase to the width of the Saugus River navigation channel Traffic is expected to be shifted onto the new bridge in late 2024 and the fieldwork is expected to be completed in March 2026. MassDOT also determined that the nearby Ballard Street. intersection was operating at a substandard level of service and found deficient accommodation for both pedestrians and cyclers. The temporary bascule movable bridge will remain operational until the new bridge is constructed and fully operational. During most of the project's construction, a minimum of two vehicular travel lanes and one sidewalk will be maintained along Route 107. MassDOT will continue to coordinate construction activities in a manner that minimizes impacts to marine traffic in the area of the project. Prior to the demolition of the bridge, SPS New England did some initial water infrastructure utility operations. Atlantic Coast Dismantling began the demolition on Feb. 1, 2021, and finished its work on Sept. 24, 2021, working Monday to Saturday between 7 a.m. to 11 p.m. “We started with the removal of the existing concrete deck and concrete beams,” said Colin O’Hearn, ACD’s vice president. “Floats were placed under the spans and then the spans were hammered down to the floats. Next, we removed the see BRIDGE page 12

Atlantic Coast Dismantling began the demolition on Feb. 1, 2021, and finished its work on Sept. 24, 2021. The demolition generated 5,500 tons of concrete, 1,500 tons of granite and 100 tons of timber.

The work includes the construction of new approach bridge spans, along with reconstruction of 3,060 ft. of roadway approaches.


Construction Equipment Guide • New England States Supplement • www.constructionequipmentguide.com • February 2, 2022 • Page 11

Equipment East, LLC

Barry Equipment Co., Inc.

F&W Equipment

61 Silva Lane Dracut, MA 01826 978-454-3320

Central Equipment Company

30 Birch Island Road 7 Harry’s Way Webster, MA 01570 Webster, MA 01570 508-949-0005 508-949-0005 1608 John Fitch Blvd South Windsor, CT 06074 860-288-4600

164 Boston Post Road Orange, CT 06477 203-795-0591

45 Dempsey-Greaves Lane Stillwater, ME 04489 207-827-6193

www.fwequip.com

www.centralequipmentco.com

www.equipmenteast.com

www.barryequipment.com


Page 12 • February 2, 2022 • www.constructionequipmentguide.com • New England States Supplement • Construction Equipment Guide

Atlantic Coast Dismantling Leads Mass. Bridge Demolition BRIDGE from page 10

existing granite/concrete piers from the water. Lastly, we removed the existing abutments after the cofferdams were installed. We have performed Phase 1 demolition, which was the removal of the remainder of the existing bridge. ACD previously removed the bascule span for McCourt during the installation of the temporary bridge. ACD will remobilize to the site to remove the temporary bridge piers and approach spans once the new bridge is open to traffic. “The biggest challenge was the condition of the existing bridge,” he added. “The bridge had been closed to traffic since the temporary bridge was opened, so no repairs were performed. We overcame this challenge by carefully demolishing the spans to avoid any unplanned collapse. The use of barges on this project was vital. We would not been able to remove the spans or access the piers without the use of barges. As always, working in the winter on the water provides a lot of challenges. Ice forms on the barges, which causes slipping issues for personnel and equipment. Also, you have to worry about freezing.” The safety of the crews was paramount. “The superintendent performed daily tool box talks and remove the Job Hazard Analysis ([JHA)] with the crew to ensure everyone understood the task at hand,” said O’Hearn. On this project, O’Hearn served as the project manager. “I also put together the demolition plan for the abutment and pier removal,” he said. “Dave Cheney Sr. was our onsite superintendent. Dave and I have worked on a lot of jobs in the past together, and therefore have the ability to work seamlessly. We had a fulltime superintendent, two operators and four laborers on-site during the majority of the demolition. The crew, as usual, performed their duties to the highest standards.” The demolition generated 5,500 tons of concrete, 1,500 tons of granite and 100 tons of timber. “The debris was off-loaded immediately as the work progressed,” said O’Hearn. “ACD also removed an existing woodframed structure prior to the start of the bridge demolition. This structure was in the new roadway alignment and was therefore taken by eminent domain by MassDOT. The existing structure was condemned and had asbestos inside. We had to demolish the building and load out all debris as asbestos containing materials.” ACD crews used a Caterpillar 335, 349 and 374 excavators, Rockland Kryto Klaw buckets and NPK GH-15 and GH-40 ham- The overall project is building a new permanent bascule movable mers. bridge — two lanes in each direction, along with bike lanes and side”The main wear and tear issues that we walks — on the same alignment as the original 1912 bridge.

Operations to rebuild the Belden G. Bly Drawbridge, a $99.3 million Massachusetts Department of Transportation (MassDOT) project awarded to SPS New England Inc., are proceeding.

Crews remove debris from the Belden G. Bly Drawbridge demolition.

encountered were hydraulic leaks, barge leaks and hammer breakdowns,” said O’Hearn. “This job is less than a mile from ACD headquarters. Therefore, we were able to get on top of repairs quickly.” ACD purchases and rents equipment from Milton CAT and other local dealerships. SPS New England has started the construction of the new bridge and is pressing forward. Crews will be using a variety of equipment, which the company purchases and rents from local and regional dealerships.  CEG


Construction Equipment Guide • New England States Supplement • www.constructionequipmentguide.com • February 2, 2022 • Page 13

PORTABLE ROCK CRUSHING Onsite or Quarry • Making aggregates since 1983

Call us today ROCK CRUSHING • (860) 491-2283 GOSHEN, CT

www.FAYWRIGHTINC.com

Ove 40 Us r Hamm ed in Sto ers ck!


Page 14 • February 2, 2022 • www.constructionequipmentguide.com • New England States Supplement • Construction Equipment Guide

NEW ENGLAND SUPPLEMENT ADVERTISER INDEX ALTA EQUIPMENT COMPANY/NITCO LLC ....................9 ARGUS INDUSTRIAL COMPANY ....................................1 BARRY EQUIPMENT CO. INC. ......................................16 DOOSAN NORTHERN NEW ENGLAND........................11 EQUIPMENT EAST ........................................................1,5 FAY & WRIGHT EXCAVATING INC ................................13 FOLEY INC - WORCESTER ............................................1 GORILLA HAMMERS........................................................1 HEAVY MACHINES INC....................................................7 J R VINAGRO CORPORATION........................................1 M G EQUIPMENT ............................................................1 MILTON CAT....................................................................14 PETERSON ATTACHMENTS ........................................13 ROGERS BROTHERS CORPORATION ........................15 SHAWMUT EQUIPMENT CO INC ....................................8 T-QUIP SALES & RENTAL INC ......................................13 THE N.I.C.E. COMPANY ..................................................8 THE W. I. CLARK COMPANY ..........................................2 TIBBITS EQUIPMENT SERVICES INC ............................1 TYLER EQUIPMENT CORPORATION ............................3 WOODS CRW CORP........................................................6 The Advertisers Index is printed as a free editorial service to our advertisers and readership. Construction Equipment Guide is not responsible for errors or omissions.


Construction Equipment Guide • New England States Supplement • www.constructionequipmentguide.com • February 2, 2022 • Page 15

TRAILERS TO MEET EVERY HAULING CHALLENGE! Committed to building superior quality, reliability and durability into every trailer.

ROGERS BROTHERS CORPORATION ALBION, PA

The Ultimate in Trailers®

Tyler Equipment 251 Shaker Road East Longmeadow, MA 01028 (413) 525-6351 • (800) 292-6351 Parts: (877) 255-6351

1980 Berlin Turnpike Berlin, CT 06037 (860) 356-0840 • (800) 352-4473 Parts: (860) 356-0848

C.N. Wood Co., Inc. 200 Merrimac St. Woburn, MA 01801 (781) 935-1919

140 Wales Ave. Avon, MA 02322 (508) 584-8484

60 Shun Pike Johnston, RI 02919 (401) 942-9191

www.cn-wood.com

www.tylerequipment.com

For more than 110 years, ROGERS® trailers have stood above the rest in rugged durability, unsurpassed quality and superior design. Contact your local dealer for a quote today.


Page 16 • February 2, 2022 • www.constructionequipmentguide.com • New England States Supplement • Construction Equipment Guide


Turn static files into dynamic content formats.

Create a flipbook