State Supplement sponsored by:
1
11
THE NEW ENGLAND EDITION
A Supplement to:
95
1
201 16 9
26
2
1 3
91
89
2
95 3
2 2 7
1
93
495
16
89 4
89
95
202
7
91
9
95
93
2
95 2
93 90
90
7
95 91
7
SHIP WITHIN 48 HOURS
3
84
495 6
84
6
6
195
395
95 91
February 6 2019 Vol. L • No. 3
95
SAME DAY PARTS AVAILABILITY
95
®
24 HOUR TECHNICAL SUPPORT BACKED BY A 75 YEAR BUSINESS Thousands in Service!
“The Nation’s Best Read Construction Newspaper… Founded in 1957.”
Your New England States Connection • Kent Hogeboom 1-800-988-1203 2208 Plainfield Pike • Johnston, RI 02919 401-943-7100 • Fax: 401-647-5041
www.jrvinagrocorp.com info@jrvinagrocorp.com
Affordable Price. Premium Service.
CALL 800-367-4937 *On approved credit • Financing Available
Maine Sets Out to Demolish, Replace Cummings Road Bridge Over Turnpike
Specializing in:
Demolition, Portable Crushing, Material Sales, C & D Recycling, Land Clearing, Heavy Hauling & Trucking Call for Pricing
LEED Accredited in Waste Management
2019 EZ-Screen 1200XLS
Large Enough to Service You; Small Enough to Know You Clearing and grubbing of top soil for the first phase of the project has been completed prior to the installation of wick drains under the roadway.
61 Silva Lane • Dracut, MA 01826
Optional 3 Product Conveyor
6’x5’ Double Deck Screenbox Works with 1/2 to 1 3/4 Yd. Loaders, 25 H.P. Kohler Diesel Engine, 24” Conveyor Dumps Screened Product 9’ High, Two (2) Year Warranty! $42,900 plus freight. Other Screeners Available
EZ-SCREEN
Call Today (978) 454-3320
WE STOCK RUBBER TRACKS for Over 6,000 Models! Some Used Tracks A & GA Available. NJ, TX, WOUSES WAREH • HIGH QUALITY • FAST SHIPPING • GUARANTEED TO FIT • UNDERCARRIAGE PARTS • FLATPROOF SKIDSTEER TIRES • RUBBER PADS FOR STEEL TRACKS
888-888-1248
By Ken Liebeskind
CEG CORRESPONDENT
The Maine Turnpike Authority will spend approximately $14 million to replace the Cummings Road Bridge over the Maine Turnpike (I-95) in Scarborough with a three-span steel girder bridge in a project that will demolish the existing bridge while maintaining traffic throughout the project. The
new bridge will support two additional lanes of traffic; provide wider shoulders; and will be raised in elevation to accommodate current vertical clearance requirements for interstate traffic below. CPM Constructors is the contractor awarded the lowbid job that was designed by HNTB. Construction began in early December and will be
Massachusetts General Hospital Plans More Than $1B Expansion in Boston
www.ez-screen.com
248-745-5828
Cat IT38G, 3.25cy, 7,800 Hrs, Mich Radials 67%, 3rd Valve, Owned for many years, Runs Excellent, No blow by, No leaks, Very Good ..$49,750 or bo
Phil (413) 427-7171 • Largest hammer repair facility in North America • Demolition tools and parts for ALL makes and models • Hammer-equipped excavator rentals • Backed by a 75 year family owned business CALL YOUR ONE-STOP HAMMER SHOP™ TODAY!!!
www.foleyengines.com
CALL 888-81-GORILLA(46745)
see BRIDGE page 16
BOSTON (AP) Massachusetts city planners at the Boston Planning & General Hospital said it will spend Development Agency Jan 23. more than $1 billion to expand its Slavin said the development is Boston campus. planned to start in 2020 and be comHospital President Peter Slavin pleted by 2026. announced the plans in a Jan. 22 email, (This story also can be found on saying the hospital will build a 12-story Construction Equipment Guide’s structure for 450 single-bed rooms website at www.constructionequiphoused in a pair of connected towers. mentguide.com.) The new additions will be located Massachusetts General Hospital photo entirely within the hospital’s current The new additions will be located campus, with a facade to go along entirely within the hospital’s current Cambridge Street. campus, with a facade to go along MGH, which is owned by Partners Cambridge Street. Healthcare, filed a letter of intent with