Skip to main content

New England 2 January 22, 2020

Page 1

State Supplement sponsored by:

1

11

THE NEW ENGLAND EDITION

A Supplement to:

95

1

201 16 9

26

2

1 3

91

89

2

95 3

2 2 7

1

93

495

16

89 4

89

95

202

7

91

9

95

93

2

95 2

93 90

90

7

95 91

7

SHIP WITHIN 48 HOURS

3

84

495 6

84

6

6

195

395

95 91

January 22 2020 Vol. LI • No. 2

95

SAME DAY PARTS AVAILABILITY

95

®

24 HOUR TECHNICAL SUPPORT BACKED BY A 75 YEAR BUSINESS Thousands in Service!

“The Nation’s Best Read Construction Newspaper… Founded in 1957.”

Your New England States Connection •  Kent Hogeboom 315-866-1423 2208 Plainfield Pike • Johnston, RI 02919 401-943-7100 • Fax: 401-647-5041

www.jrvinagrocorp.com info@jrvinagrocorp.com

Affordable Price. Premium Service.

CALL 800-367-4937 *On approved credit • Financing Available

Through the Center of Town: Rail Spans Yield to Temp Bridges, Then Tunnel By Ken Liebeskind

Specializing in:

Demolition, Portable Crushing, Material Sales, C & D Recycling, Land Clearing, Heavy Hauling & Trucking

CEG CORRESPONDENT

Call for Pricing

LEED Accredited in Waste Management

2020 EZ-Screen 1200XLS 36 Month lease AS LOW AS

$1,500* / Month Authorized Doosan Dealer

978-454-3320 (Dracut, MA) 603-410-5540 (Bow, NH) Optional 3 Product Conveyor

6’x5’ Double Deck Screenbox Works with 1/2 to 1 3/4 Yd. Loaders, 25 H.P. Kohler Diesel Engine, 24” Conveyor Dumps Screened Product 9’ High, Two (2) Year Warranty! $44,900 plus freight. Other Screeners Available

EZ-SCREEN

www.ez-screen.com

*Limited time offer. Some restrictions apply. See dealer for details.

WE STOCK RUBBER TRACKS for Over 6,000 Models! Some Used Tracks A & GA Available. NJ, TX, W USES

WAREHO

• HIGH QUALITY • FAST SHIPPING • GUARANTEED TO FIT • UNDERCARRIAGE PARTS • FLATPROOF SKIDSTEER TIRES • RUBBER PADS FOR STEEL TRACKS

see TUNNEL page 4

Conn. GOP Leader Doubts Tolls Can Pass Legislature; Funding Bill in Limbo

888-888-1248

248-745-5828

Cat IT38G, 3.25cy, 7,800 Hrs, Mich Radials 67%, 3rd Valve, Owned for many years, Runs Excellent, No blow by, No leaks, Very Good ..$49,750 or bo

Phil (413) 427-7171 • Largest hammer repair facility in North America • Demolition tools and parts for ALL makes and models • Hammer-equipped excavator rentals • Backed by a 75 year family owned business CALL YOUR ONE-STOP HAMMER SHOP™ TODAY!!!

www.foleyengines.com

A hammer and loader are demolishing a concrete foundation to prepare for construction of a new drainage system for the downtown rail corridor.

The Vermont Agency of Transportation (VTrans), in collaboration with the town of Middlebury, is undertaking a project to replace two nearly 100-year-old rail bridges in the center of Middlebury with a tunnel. Kubricky Construction, Wilton, N.Y., is the lead contractor on the job, which began in 2017, continued through the 2018 and 2019 construction seasons, and will be completed in 2021 with much of the work set to take place in a 10-week period in the summer of 2020.

CALL 888-81-GORILLA(46745)

HARTFORD, Conn. (AP) The Republican leader of the Connecticut Senate said Jan. 13 he doubts a transportation bill that includes tolls can be passed in the General Assembly, despite optimism expressed by Democratic Gov. Ned Lamont. Senate Minority Leader Len Fasano, of North Haven, told reporters that tolls have been “talked about forever” at the state Capitol, and a bill still isn’t ready for a vote. Lamont and supportive legislative Democrats are hoping to finally pass a transportation plan with truck-only bridge tolls before the General Assembly convenes its regular

session on Feb. 5. “I don’t know why we’re wasting more and more time,” Fasano said. “They need to stop pretending they can pull the deal off because they can’t. And they need to be honest with the public and say we’re done. We tried. It was a good shot. But let’s now move to what’s real, and let’s get this transportation fixed. That’s what has to be done.” Fasano contends a GOP transportation proposal, which involves spending $1.5 billion in state budget reserves to help reduce more expensive borrowing costs, but no tolls, is a better solution.

Democrats took issue with Fasano’s claims there aren’t enough votes to pass a transportation bill that includes tolls. “When Senator [Martin] Looney said the Senate Democratic caucus had a contingent consensus of 18 votes on a transportation plan with tolling only on large trucks with four axles or more, he meant it,” said Kevin Coughlin, the Senate president’s spokesman. “We would appreciate if Senator Fasano would stick to leading his 14-member caucus.” No date has been set yet for a special session.


Page 2 • January 22, 2020 • www.constructionequipmentguide.com • New England States Supplement • Construction Equipment Guide

2018 JOHN DEERE 50G

2012 ROADTEC RX700E-3

2016 BOBCAT T590

260 Hrs, Stk# 25217 ............................$62,500

5125 Hrs, Stk# 25590 ........................$125,000

1613 Hrs, cab/air, single speed, 80% tracks, one owner, Stk# 24965 ........................$45,000

16’ DANIELS POWER ANGLE PLOW

2015 JOHN DEERE 344K

ROCKLAND 6.5 YARD LIGHT MATERIAL / SNOW BUCKET

has JRB 416 hooks, like new condition, stk# 24730 ..................................................$15,000

3870 Hrs, air, hyd cplr, 2 yd gp bucket, serviced and ready for work! Stk# 25586 ..$72,000

416 hooks, like new, stk# 25420............$7,500

2017 BOBCAT S650

2015 LEEBOY 685B

2015 GEHL V270

323 Hrs, Skid Steer Loader, Stk# 25421 .......... ............................................................$42,500

Kubota, 10’ Blade, Front Blade, Rear Ripper, 500 Hrs, Stk# 26198 ............................$85,000

c/air, pilots, 82” bucket, 650 hrs, Stk# 25361 .. ............................................................$32,500

See Our Complete Inventory at www.wiclark.com


Construction Equipment Guide • New England States Supplement • www.constructionequipmentguide.com • January 22, 2020 • Page 3

C

Contact your local dealer:

Tyler Equipment Corporation 1980 Berlin Turnpike Berlin, CT 06037 800.352.4473 251 Shaker Road East Longmeadow, MA 01028 800.292.6351

WITH THE RIGHT TOOLS TO INVEST, YOU CAN PUT THE RIGHT TOOLS TO WORK.

www.tylerequipment.com

Volvo Financial Services offers 0% for 24-months on select Volvo D-Series excavators and G-Series wheel loaders. Low-interest rates and high-quality equipment create the perfect combination for your business. Contact your local Volvo dealer today to get the right tools for you. Final approved transaction terms are subject to standard VFS credit underwriting guidelines and advance policy. VFS reserves the right to amend or cancel the program at any time without notice. Approvals will state the program terms and any other conditions deemed appropriate by VFS.

L


Page 4 • January 22, 2020 • www.constructionequipmentguide.com • New England States Supplement • Construction Equipment Guide

Kubricky Construction Leads Tunnel Work in Middlebury TUNNEL from page 1

Two subcontractors on the job are ECI Construction, Dillsburg, Pa., and Maine Drilling & Blasting, Windham, Maine. The bridges over the rail line that were built in 1920-21 are deteriorated and were recommended for replacement by bridge inspectors with VTrans. For more than 25 years, VTrans bridge inspection reports documented the ongoing deterioration of both bridges — concrete cracking, delamination and spalling had occurred on all bridge components, embedded steel reinforcement was rusted and exposed, there was leakage through the deck and full depth holes on the Merchants Row sidewalk had to be patched. The agency decided to remove both bridges in the summer of 2017 and install temporary bridges until permanent structures are built. Both the Main Street and Merchants Row bridges were demolished in Kubricky is constructing a new town Maine Drilling & Blasting drilling July/August 2017 and travel was restored sewer line as part of the project. minipiles in the rail corridor. within four weeks. The decision to replace the bridges with a tunnel was made after bridge rehabilitation was rejected. “No part of the existing bridge decks and supporting structures are considered salvageable and rehabilitation would not improve two current deficiencies that affect rail — the curved track and insufficient height for today’s standard double-stack freight railcars,” VTrans stated in a release. The organization noted that a tunnel offers better safety, drainage and aesthetics and will allow trains to pass through town with less noise. “The 360-foot tunnel that will replace the Main Street and Merchants Row bridges will address several deficiencies now facing Maine Drilling & Blasting is installing casing inside minipiles and grouting; local company Nop’s supplied the the railroad,” VTrans said. “Currently, crane and local company the bridges do not have enough vertiCarrara supplied the grout. cal clearance for double-stack rail cars. By lowering the rail bed approximately four feet, clearance can be also are installing minipiles and increased to 21 feet without impacting sheet piling to support the eastern the grade of the road and sidewalks and western abutments of the rail above. The tunnel will also enable the line when it is lowered this summer. alignment of the rail to change, softenJim Gish, Middlebury’s commuing the curve that currently exists, nity liaison for the bridge replaceallowing better horizontal clearance ment project, said the bridges were for trains. Drainage improvements replaced by Mabey modular steel and covering the track will reduce the bridges in 2017. risk of icing problems that have been “They were put up to stand for severe in some winters as well as A Robbins tunnel-boring machine is used to bore three years and will be replaced by underground lines connecting drainage system pits. ponding that occurs.” the tunnel in 2020,” he said. The 360 ft. long tunnel will have at In 2020, track and temporary Kubricky, ECI and Maine Drilling & bridge removal is scheduled for May 27 to least a 21 ft. clearance height for trains. The current vertical clearance for the Main Street Blasting built a new drainage system in 2018 Aug. 5. Tunnel construction will occur and and Merchants Row bridges is less than 18 and began installing new town water and utilize more than 300 concrete pieces. sewer and storm water lines in 2019. They Roadway reconstruction and railroad track ft.

reinstallation also will occur by Aug. 5. Additional work in 2020 includes welded rail construction, railroad surface and final grading and the initial planting of vegetation. In 2021 there will be final paving and landscaping. “All the prep work that was done over the last three years comes into play as they excavate and rebuild the rail line and replace the bridges with the tunnel,” Gish said. “The precast concrete will be put in place piece by piece to create the tunnel and supporting lines for the rail line on the side of the tunnel.” When the rail lines are rebuilt, freight trains hauling fuel oil, gasoline and other materials will have safer passage through Middlebury and Amtrak trains will be able to stop in Middlebury. Amtrak Ethan Allen service currently runs between New York City and Rutland and this work paves the way for trains to come through Middlebury, Gish said. Middlebury residents and visitors will have to endure road closures during the 10week construction period this summer. “Merchants Row will be closed end to end and Main Street/Route 30 will be closed in the downtown area and all traffic detoured,” Gish said. “But VTrans and Kubricky are committed to keeping access to downtown buildings open, so we encourage people to come downtown and shop locally during this period.” During the construction this summer, Neighbors Together, a community action group, will oversee a special sale on Wednesdays to promote patronage of downtown shops, among other special events planned to promote downtown shopping. The events, which are being supported by Better Middlebury Partnership, seeks to minimize the impact of construction. In 2021 there will be intermittent short term lane closures on Main Street and Merchant’s Row to facilitate site grading and landscaping and the Triangle Park area will be closed for landscaping. The road closures pose temporary difficulties to area drivers, but the town of Middlebury will benefit from the project. The $75 million construction tab will be picked up by the Federal Highway Administration (95 percent) and VTrans (5 percent), Gish noted. “Middlebury is paying the price with five years of construction in our town but we get the benefit of a major infrastructure improvement and we’ll reclaim the town green that was lost to the railroad when it was first built,” he said.  CEG


Construction Equipment Guide • New England States Supplement • www.constructionequipmentguide.com • January 22, 2020 • Page 5


Page 6 • January 22, 2020 • www.constructionequipmentguide.com • New England States Supplement • Construction Equipment Guide

6HOI (UHFWLQJ 2SWL :LGWK 7HFKQRORJ\ 2SHUDWHV DW ƒ2XW RI /HYHO )RXQGDWLRQ &RQWUDFWRU¡V 7HOHFUDZOHU RI &KRLFH

ZZZ (PSLUH&UDQH FRP 1HZ (QJODQG 6DOHV -XVWLQ 0HOYLQ

6$/(6 3$576 6(59,&( 5(17$/6

Baker Files $74.2M Budget Bill to Address Infrastructure The Baker-Polito Administration filed a $74.2 million supplemental budget bill to address ongoing critical funding needs, including $18 million to support MBTA infrastructure and safety investments, $10 million for school improvements and $4.2 million for investments in clean drinking water. These proposals were previously proposed in bills filed by the administration for Fiscal Year 2019 (FY19) and are now being refiled for Fiscal Year 2020 (FY20). “This legislation will provide additional resources to enhance the safety of MBTA infrastructure, improve local schools and support testing for PFAS contamination in drinking water supplies,� said Gov. Charlie Baker. “We look forward to working with the Legislature to pass this bill into law and deliver these much-needed investments.� “Our Administration is committed to supporting growth and development for our community partners throughout the Commonwealth,� said Lt. Gov. Karyn Polito. “These meaningful investments support public transit, health care and education priorities in a responsible manner and provide needed funding for local municipalities across Massachusetts.� The bill provides the MBTA with $18 million, which, with the $32 million authorized

“This legislation will provide additional resources to enhance the safety of MBTA infrastructure ‌â€?

Charlie Baker

Massachusetts Governor

in the FY19 final supplemental spending bill, allows for a total of $50 million to support additional staff, contractors and other resources necessary to expedite the completion of critical capital projects, enable proactive inspections to detect and address safety and reliability issues before they impact service, and implement enhanced maintenance procedures to ensure the reliable operation of MBTA vehicles and infrastructure. The bill authorizes $4.2 million to test drinking water supplies for potential polyfluoroalkyl substances (PFAS) contamination. This testing will support state and local efforts to determine the scope of the problem and to identify best solutions, and supplements the $4.2 million authorized in the FY19 final supplemental bill. The bill also proposes transferring $10 million to the Twenty-First Century Education Trust Fund. This request reframes

Baker’s 2018 recommendation that the legislature transfer $50 million into a fund for school improvement. The recently enacted Student Opportunity Act established the Twenty-First Century Education Trust Fund “to address persistent disparities in achievement among student subgroups, improve educational opportunities for all students, share best practices for improving classroom learning and support efficiencies within and across school districts.� “The Commonwealth is expected to have sufficient revenues to finance these appropriations and measures in Fiscal Year 2020,� said Secretary of Administration and Finance Michael J. Heffernan. “This supplemental spending proposal continues the Baker-Polito Administration’s focus on improving public infrastructure, services and programs in a reliable and fiscally disciplined way.�

The supplemental spending bill also includes: • $16.3 million and a related authorizing section to ratify a recently concluded collective bargaining agreement • $12.3 million (for a total of $16.3 million including FY19 funding) for Safety Net Provider Hospitals to mitigate the cost of providing care to un- and underinsured patients • $5.4 million for service improvements for men who are civilly committed for substance use treatment under Section 35 of Chapter 123 of the General Laws • $5 million to support high school students enrolled in Early College programs that give thousands of Massachusetts students, especially firstgeneration college-goers, access to college completion and career success • $3 million for the Community Compact program to support grants for cities and towns that have entered compacts with the Commonwealth to support public interests and develop mutual standards for governing effectively In total, the supplemental budget bill consists of $74.2 million in supplemental appropriations, at a net state cost of $68.1 million. 


Construction Equipment Guide • New England States Supplement • www.constructionequipmentguide.com • January 22, 2020 • Page 7

ON SE

LECT N

EW CA T COM

PACT E Q

UIPME

NT

CONTA CON TACT H.O. O PENN PENN TO LEEARN MORE ABOU UT THIS GREAT A T O OFFER ON NEW CAT AT COMPA PACT EQU UIPMENT WITH A 2-Y -YEAR STA TANDARD D WA WARRANTY. Y.* ®

WWW.HOPENN.COM

844-C CAT AT-1923

)LQDQFLQJ RႇHUV YDOLG IURP -XQH WR )HEUXDU\ IRU PRQWKV ¿QDQFH UDWH DYDLODEOH RQO\ RQ WKH IROORZLQJ QHZ Z PDFKLQHV PDQXIDFWXUHG E\ &DWHUSLOODU ,QF &DW & 0LQL ([FDYDWRUV &RPSDFW 7UDFN /RDGHUV 0XOWL 7H 7HUUD DLQ /RDGHUV 6NLG 6WHHU /RDGHUV DQG &RPSDFW :KHHO : /RDGHUV PRGHOV RQO\ 7R 7R EH HOLJLEOH IRU DQ (TXLSPHQW 3URWHFWLRQ 3ODQ RႇHU ZKHUH DSSOLFDEOH WKH PDFKLQH PXVW EH ¿QDQFHG ZLWK &DW )LQDQFLDO )LQDQFLQJ DQG SXEOLVKH HG UDWH WHUPV DUH VXEMHFW WR FUHGLW DSSURYDO WKURXJK &DW )LQDQFLDO IRU FXVWRPHUV ZKR TXDOLII\ %X\HUV DUH QRW JXDUDQWHHG WR TXDOLI\ +LJKHUU UDWHV PD\ DSSO\ IRU EX\HUV ZLWK ORZHU FUHGLW UD DWLQJ RU TXDOL¿FDWLRQV )OH[LEOH SD\PHQW WHUPV DYDLODEOH D WR WKRVH ZKR TXDOLI\ 7KLV RႇHU FDQQR RW EH FRPELQHG ZLWK DQ\ RWKHU RႇHUV 2ႇH HU VXEMHFW WR PDFKLQH DYDLODELOLW\ 2ႇHU PD\ FKD DQJH ZLWKRXW SULRU QRWLFH DQG DGGLWLRQDO WHUPV DQG D FRQGLWLRQV PD\ DSSO\ 7KH WZR \HDU VWDQGDUG ZDUUDQW\ KRXUV RU PRQWKV ZKLFKHYHU RFFXUV ¿UVW DSSOLHV RQO\ WR QHZ &DW 0LQL ([FDYDWRUV &RPSDFW 7UDFN /RDGHUV 0XOWL 7H 7HUUDLQ /RDGHUV DQG 6NLG 6WHHU /RDGHUV


Page 8 • January 22, 2020 • www.constructionequipmentguide.com • New England States Supplement • Construction Equipment Guide

Looking Back Looking Back at Construction in New England From the Mid 20th Century By Edgar A. Browning SPECIAL TO CEG

see HISTORY page 14

Maine DOT photos

In Maine A Thew Lorain 75 shovel is on a Rogers trailer headed down Cadillac Mountain in Acadia National Park, Maine, in the 1930s. The single axle dump trucks appear to be Internationals. The one in the rear is loaded with an air compressor for traction. It is chained to the trailer to add braking force on the steep decline. The shovel is owned by Green & Wilson of Waterville, Maine. Library of Congress photo

In Connecticut

In Connecticut

HCEA photo: R. G. LeTourneau Collection

Keith Haddock photo

A. I. Savin Construction Co. of East Hartford, Conn., snatch loading a LeTourneau Super C with a LP Carryall using shop modified Caterpillar D8 tractor while grading the Rentschler Field airport in East Hartford, Conn., during August 1944.

C. W. Blakeslee & Sons Inc. of New Haven, Conn., using a gasoline-powered Bucyrus-Erie 32-B shovel equipped with a one yard dipper to excavate a building basement in Newtown, Conn., ca. 1930s. The single dump truck in the far left background is an International Harvester.

In New Hampshire Milford Historical Society photo: Bernice Perry Collection

Frank Palazzi & Sons of Johnson, R.I., and Palazzi Corporation of Concord, N.H. held a $660,000 contract for 2.75 mi. of the Everett Turnpike in Hooksett, N.H. A Link-Belt K-370 shovel is loading a Euclid 56FD 15-ton end dump with earth on Aug. 26, 1955.


Construction Equipment Guide • New England States Supplement • www.constructionequipmentguide.com • January 22, 2020 • Page 9

CRUSHING EQUIPMENT, PARTS & SERVICE

2017 Irock RDS-15 Closed Circuit Impactor - NEW RDS-15 horizontal impact crushing plant. As the name suggests, the RDS — rapid deployment system provides exceptional portability and rapid setup time. Ideal for processing smaller materials such as reclaimed asphalt pavement (RAP) or Concrete demo. Powered by a Caterpillar 350hp engine, 5x14 double deck screen can process up to 350 tons per hour. The entire plant is self-contained, with on-board power supplying full plant operation. Please call if interested

30x60 Electric Stacking Conveyor - NEW Electric Radial Stacking Truss Conveyor. Super strong and over built. Their conveyors are made right here in Ct. by Ace/Milroy Company Using all quality components. Come check them out!

2001 JOHN DEERE 400C ARTICULATED DUMP TRUCK - Fully rebuilt 410hp Mercedes Benz Engine, Fresh paint and great rubber. Has Allison HD4560 Transmission, 6x6 Machine weighs 62722lbs Empty. This machine is ready to work. $78,000 2016 TEREX M390 - The Terex M 390 Wash plant is a high capacity mobile washing unit that has been engineered for quick installation and ease of relocation making it ideal for applications including sand, gravel, coal and crushed stone.

Telsmith T300 Cone Crusher - Used low hr Telsmith T300 Cone Crusher. This cone has been designed for maximum uptime and productivity while delivering 300HP performance and a crushing capacity output range from 125 to 400 Mt/hr in tough or abrasive mining applications. Comes with full Trac 10 automation. Call for more info today!

2017 JP550 Grizzly Scalping Stand - Keep the BIG nuggets from tearing your screener apart with our JP550 Scalping Stand. Custom built for your application. Back your machine in and start bailing material without worries. Call today for more information.

2015 Irock TC-20 Tracked Impactor - Used TC-20 track impact crusher combines a large feeder, high-performance four-bar impactor and heavy-duty components for exceptional efficiency, reliability and precision. The TC-20 produces a uniform, cubical product, and hydraulically adjustable aprons provide better control over sizing. The unit has the versatility to process soft to medium rock, recycled concrete and recycled asphalt. The rotor measures 40 inches by 56 inches and can process a variety of materials up to 24 inches in diameter. A 440-horsepower Caterpillar® C-13 ACERT Tier 3 engine powers the impact crusher, which can process up to 500 TPH. 800 hrs on machine, come watch it run today!

2014 Irock TS-512 Tracked Screener - Used less than 1200hrs Heavy-duty design. The unit features high portability, three hydraulic folding side conveyors allow easy transport and quick set-up. 100horsepower CAT® C4.4 to sort up to three different product sizes at rates up to 400 TPH. Three hydraulic, folding side conveyors allow easy transport and set-up times of 10 minutes or less. 14foot hydraulic tipping grid enables simplified discarding of larger material.The heavy-duty, high-energy, two-bearing, 12-foot by 5-foot screen box offers 112 square feet of screening area.

Ace Equipment Sales, Inc. and Milroy and Company LLC 171 Tolland Turnpike (Route 74) • PO Box 535 • Willington, CT 06279

Call CJ (413) 896-0793 • (860) 429-2793 Go to www.acecrushers.com for a complete listing and description of our new and used equipment.


Page 10 • January 22, 2020 • www.constructionequipmentguide.com • New England States Supplement • Construction Equipment Guide

The Nice Company, Inc

9 Rosenfeld Drive, Hopedale, M A Toll Free# 888-717-8096 • w w w.theniceco.com

Equipment Sales and Rentals

We sell NICE machines!

Wheel Loader Sale

2011 CAT 906H, 1600 hours ................$49,000

2012 CAT 908H, 3850 hours ................$49,000

2014 Komatsu WA470, 7350 hours, Ride control ..................................................$119,000

2004 Komatsu WA450, 28,000 hours, Hyd. QC, GP bucket ......................................$36,500

2015 Komatsu WA380-7, 7600 hours, AC/Heat, Auto Lube System, 7.75 Yard GP Bucket, No Forks ..................................$89,000

2015 Volvo L70G, 3300 hours, Hydraulic QC w Bucket, AC,Rear View Camera, 20.5 x 25 .... ..............................................................$99,000

2006 Terex TXL300-2, 6600 hours, 2 new tires, 4 yard machine, work ready! ........$49,000

2004 Komatsu WA320L-5, 6400 hours, Very clean, Runs Good! ................................$49,000

CALL FO OR SPECIAL WINTER PRICING G!


Construction Equipment Guide • New England States Supplement • www.constructionequipmentguide.com • January 22, 2020 • Page 11


Page 12 • January 22, 2020 • www.constructionequipmentguide.com • New England States Supplement • Construction Equipment Guide

Beset By Funding Challenges, Maine Releases New Plan The Maine Department of the system will suffer.” Transportation has released the The biggest project in this 2020 Edition of its Three-Year Work Plan is the replacement of Work Plan. the Madawaska-Edmundston This Work Plan includes all International Bridge. This bridge capital projects and programs, represents a vital link between maintenance and operations Maine and New Brunswick. The activities, planning initiatives, current structure is 100 years old and administrative functions for and has deteriorated to the point calendar years 2020, 2021, and that it is near the end of its useful 2022. It includes 2,051 individlife. ual work items with a total esti“The importance of safe and mated value of $2.59 billion. reliable public transportation The Work Plan largely coninfrastructure and the effect it sists of spreading what used to be has on our state and local econotwo years of capital projects over my cannot be ignored,” said three years to stay within funding The biggest project in this Work Plan is the replacement of the Madawaska-Edmundston International Madawaska Town Manager and cost constraints. Due to cost Bridge. This bridge represents a vital link between Maine and New Brunswick. The current structure is Gary Picard. “The International increases arising from workforce 100 years old and has deteriorated to the point that it is near the end of its useful life. Bridge’s five-ton weight limit challenges, work constraints, and has been financially detrimental other factors, making old projects whole at the beginning of funding for basic needs,” said Commissioner Bruce Van to our town’s largest employer, the Twin Rivers Paper this Work Plan process has required an extraordinary amount Note. “With lower levels of capital project production, we Company, which employs more than 500 workers and conof funding, according to the DOT. The bottom line on this are focusing on essential safety needs, bridges, matching fed- tributes to more than 5,800 indirect jobs throughout the year’s Work Plan is higher than last year’s (largely due to eral funds, and low cost patching of higher-priority roads county. Under the bridge’s current weight limits, all comincreased levels of one-time infusions of federal grant until normal treatments become fiscally possible. The reality mercial traffic from Canada to Madawaska must now be money), higher costs will yield lower levels of capital project is that we are now competently managing a slow decline of rerouted primarily through Van Buren, adding 75 mi. and production in terms of miles of paving, numbers of bridges, our transportation system until bipartisan funding solutions nearly two hours in transit time to each trip. We need a new materialize. The system will not fail immediately, and we bridge.” etc. “This fiscal challenge required us to prioritize even more will do our best to avoid any serious safety impacts, but holdLast year, the legislature created the Blue Ribbon and rely on less-reliable bond and competitive federal grant ing actions only work for a short time, and the reliability of Commission to Study and Recommend Funding Solutions for the State’s Transportation Systems. Commission members have identified an annual unmet funding need of approximately $232 million. Members recommend that after providing sufficient funding, the state gradually reduces its reliance on bonding. The commission is continuing to meet this year to try to identify a nonpartisan solution to MaineDOT’s chronic funding problem. “Not meeting this need is both concerning and disappointing,” said Paul Koziell, president of CPM Constructors Inc. of Freeport. “The Work Plan is comprehensive and mentions lots of projects. However, what projects are not in this Work Hydraulic Cranes Plan as a result of this annual $232-million shortfall and 8 to 600 Ton should be? Think about this when you are driving and hit a crack in the road, a deteriorating road shoulder, or raised bridge joint and then need to bring your car, truck or SUV to Daily & Hourly the garage for yet another front-end alignment. Maine Services deserves better. We need not only to maintain our transportation infrastructure but also to improve it. Regrettably, until www.astrocrane.com there is a willingness to solve this funding shortfall once and Fully Insured for all, this will not be accomplished.” “Businesses in every sector in Maine are eager to recruit 200 Codman Hill Rd., Boxborough, MA 01719 and train tomorrow’s workforce,” said Dana Connors, pres978-429-8666 ident of the Maine State Chamber of Commerce. “That workforce needs to be able to get to and from work safely, and their families need to be able to access educational and recreational opportunities throughout the state. Transportation infrastructure and having transportation choices is important to every single citizen in the state of 3 months $300* only $50 an issue Maine, which means it is important to every single business in Maine, no matter their size, their location, their product or 6 months $585* only $45 an issue service. Transportation is critical to every single one of us. 12 months $1040* only $40 an issue We must make it more cost-effective to move freight, we must expand transit for our aging population, and we must Call now to reserve your space! do so with safety at top of mind. This Work Plan moves us * pre-payment required in the right direction.”

Place Your Business Card for...

800-225-8448


Construction Equipment Guide • New England States Supplement • www.constructionequipmentguide.com • January 22, 2020 • Page 13

R O C K S O L I D S E RV I C E · W E C R U S H Y O U R R O C K S 140 Nutmeg Road South South Windsor, CT 06074 51 Veterans Drive Loudon, NH 03307

LARGEST DEALER IN NEW ENGLAND Selling the most advanced Portable Crushing & Screening Plants All of our plants are designed for high productivity and easy movability Save labor, power, maintenance, plant relocation costs, time Gain productivity and profitability Ideal for applications involving hard, abrasive materials Call today for more information

1-800-53-CRUSH Over 100 Machines in Stock

W W W. P O W E R S C R E E N - N E . C O M Family Owned and Operated for over 20 years

Call for Parts Today

R O C K S O L I D S E RV I C E · W E C R U S H Y O U R R O C K S


Page 14 • January 22, 2020 • www.constructionequipmentguide.com • New England States Supplement • Construction Equipment Guide

Looking Back Remembering the Past: Contractors Build Up New England Infrastructure HISTORY from page 8

In Massachusetts Edgar A. Browning photo: Daniel O’Connell’s Sons Collection

Daniel O’Connell’s Sons of Holyoke, Mass., built the largest bridge on the original Massachusetts Turnpike constructed in 1955-1956. The Westfield River bridge is 1,464 ft. long and 250 ft. high spanning a deep river gorge. Here, the only river pier is being poured within a sheet pile cofferdam using a Koehring 34-E concrete mixer and a Bucyrus-Erie 54-B crawler crane wielding a concrete bucket.

In Massachusetts Edgar A. Browning photo Daniel O’Connell’s Sons Collection

D. O’Connell’s contract for the Westfield River bridge was $2,714,414. The bridge deck is being poured in this scene. The contractor set up a batch plant near the site to supply the 12,000 cu. yds. of concrete needed. One of the firm’s Autocars with a Worthington mixer is on the bridge.

In Vermont International Collection photo

In Vermont Vermont State Archive photo

Burnett & Campbell of Burlington, Vt., held a $359,158 contract for a 1.288 mi. road improvement project in Ferrisburg, Vt., during 1958. The contractor here is using a Link-Belt LS-68 shovel and a Caterpillar D6 bulldozer.

Caledonia Inc., formally Caledonia Sand & Gravel, is using an International TD25C bulldozer to push load a fleet of International 295B Pay Scrapers on an I-91 project in Newbury, Vt. The .706 mi. stage one project was awarded for $2,168,000 and is located in Orange County and the town of Newbury. The photo was taken on Oct. 11, 1972.

In Rhode Island Edgar A. Browning photo: Mack Truck Collection

Rhode Island Sand & Gravel of Hillsgrove, R.I., purchased two new Mack LJSWX 10 wheelers in 1952. One of the Mack trucks is being loaded with washed sand with a Michigan 175A tractor shovel.


Construction Equipment Guide • New England States Supplement • www.constructionequipmentguide.com • January 22, 2020 • Page 15

Tier 4 Final RTC-8050 Series II RTC-8065 Series II

75 RT

RTC-8090 Series II

100 RT

120 RT RTC-80130 Series II

RTC-80160 Seriess II

YOUR O #1 SOURCE FOR ROU UGH TERRAIN RENTALS A Ver e mont 802-658-1700 Masssachusetts 508-499-1950 Pennnsylvania 717-795-0700 N Yoork 315-676-2008 New

w .woodscrw.com www

BUY

•

LEASE

Lexington, Kentucky | www.linkbelt.com .

•

RENT


Page 16 • January 22, 2020 • www.constructionequipmentguide.com • New England States Supplement • Construction Equipment Guide

Crews Across Rhode Island Keep Busy in the Winter Months

R

hode Island DOT is starting two big projects within the host communities of Cumberland, Pawtucket and Central Falls — the Broad Street Regeneration Project and the Transit Emphasis Corridor. Here’s a roundup of what the DOT also has been up to lately.

Crews are staging installation and work on retaining walls on the Carolina bridges in Charlestown/Richmond.

Retaining wall work on the Baker Pines Bridge in Richmond.

Concrete placement is scheduled for the Centerville Road Bridge deck in Warwick. Rhode Island DOT continues building the retaining wall for the Route 10 North to Route 6 West flyover ramp and along Route 6 West for the Hartford Avenue and Plainfield Street bridges. The DOT plans to continue demolishing the Broadway Bridge.

Highway lighting and underground conduit installation is scheduled on the Kingston Road Bridge in Richmond.


Construction Equipment Guide • New England States Supplement • www.constructionequipmentguide.com • January 22, 2020 • Page 17

Chappell Tractor 251 NH-125 454 RTE 13 391 Loudon Rd. Brentwood, NH 03833 Milford, NH 03055 Concord, NH 03301 603/642-5666 603/673-2640 603/225-3361 www.chappelltractor.com

Kahn Tractor & Equipment, Inc.

Lorusso Heavy Equipment, LLC

Quality Fleet Service, Inc.

520 Pond Road North Franklin, CT 06254 860/642-7596 www.kahntractor.com

160 Elm Street Walpole, MA 02801 508/660-7600 www.lhequip.com

548 New Ludlow Road South Hadley, MA 01075 413/213-0632 www.qualityfleetservice.com


Page 18 • January 22, 2020 • www.constructionequipmentguide.com • New England States Supplement • Construction Equipment Guide

NEW ENGLAND SUPPLEMENT ADVERTISER INDEX ACE EQUIPMENT SALES INC ........................................9 ARGUS INDUSTRIAL COMPANY ....................................1 ASTRO CRANE ..............................................................12 BULLETIN BOARD..........................................................12 CHADWICK-BAROSS INC..............................................20 EMPIRE CRANE LLC........................................................6 EQUIPMENT EAST ......................................................1,11 FOLEY INC - WORCESTER ............................................1 GORILLA HAMMERS........................................................1 H O PENN MACHINERY CO INC ....................................7 HYUNDAI CONSTRUCTION EQUIPMENT....................17

Mass. Announces Additional Local Road, Bridge Funding The Baker-Polito Administration announced that $20 million in additional funding will be provided to cities and towns in Fiscal Year 2020 (FY20) for road construction and transportation improvement projects. This funding was included in a supplemental budget recently signed by Gov. Charlie Baker, bringing total funding for FY20 awarded through the Chapter 90 formula to $220 million. With this additional $20 million, the total funding to date provided through the Chapter 90 program during the Baker-Polito Administration is now $1.36 billion. “This funding represents our continued commitment to supporting communities as they address the maintenance and modernization of local infrastructure, which are a critical part of the Commonwealth’s transportation network,” said Baker. “We are pleased to provide this additional transportation funding for local projects in cities and towns across the Commonwealth.” “Municipal officials count on Chapter 90 funding each year for essential projects, and we appreciate the Legislature adopting our

proposal for additional funding in the supplemental budget,” said Lt. Gov. Karyn Polito. “This support will allow community leaders to take action immediately so that projects are ‘shovel ready’ for the spring construction season.” “The Commonwealth is focused on improving the core transportation infrastructure in the state by advocating for Chapter 90 funding and with initiatives such as the Complete Streets Funding Program. The Chapter 90 funding program is one of several examples of the Administration working with municipal leaders to help meet capital needs that the communities identify as critical,” said Transportation Secretary and CEO Stephanie Pollack. “The Administration realizes local leaders often know best what capital improvements are needed at the local level.” Chapter 90 transportation funds support all 351 cities and towns throughout the Commonwealth. Funding for each municipality is predetermined by a formula that includes factors such as population, road miles, and employment.

J R VINAGRO CORPORATION........................................1 M G EQUIPMENT ............................................................1 NORTHLAND JCB ............................................................5 POWERSCREEN NEW ENGLAND................................13 ROGERS BROTHERS CORPORATION ........................19 SHAWMUT EQUIPMENT CO INC ....................................6 SUMMIT SUPPLY LLC ......................................................1 T-QUIP SALES & RENTAL INC ......................................10 THE N.I.C.E. COMPANY ................................................10 THE W. I. CLARK COMPANY ..........................................2 TYLER EQUIPMENT CORPORATION ............................3 WOODS CRW CORP......................................................15 TO BE A PERFECT PARENT.

The Advertisers Index is printed as a free editorial service to our advertisers and readership. Construction Equipment Guide is not responsible for errors or omissions.

There are thousands of kids in foster care who will take you just the way you are.

888. 200. 4005

AdoptUSKids.org


Construction Equipment Guide • New England States Supplement • www.constructionequipmentguide.com • January 22, 2020 • Page 19

TRAILERS TO MEET EVERY HAULING CHALLENGE! Committed to building superior quality, reliability and durability into every trailer.

ROGERS BROTHERS CORPORATION ALBION, PA

The Ultimate in Trailers®

Tyler Equipment 251 Shaker Road East Longmeadow, MA 01028 (413) 525-6351 • (800) 292-6351 Parts: (877) 255-6351

1980 Berlin Turnpike Berlin, CT 06037 (860) 356-0840 • (800) 352-4473 Parts: (860) 356-0848

C.N. Wood Co., Inc. 200 Merrimac St. Woburn, MA 01801 (781) 935-1919

140 Wales Ave. Avon, MA 02322 (508) 584-8484

60 Shun Pike Johnston, RI 02919 (401) 942-9191

www.cn-wood.com

www.tylerequipment.com

For more than 110 years, ROGERS® trailers have stood above the rest in rugged durability, unsurpassed quality and superior design. Contact your local dealer for a quote today.


Page 20 • January 22, 2020 • www.constructionequipmentguide.com • New England States Supplement • Construction Equipment Guide

318 COOPER CIRCLE, PEACHTREE CITY TY, GA 30269

sanyam merica.com

More T M Than M Machin nes IT’S HOW WORK GETS DONE

Chadwick-BaRoss, Inc.

Thompson

15 Katrina Road • Chelmsford, MA 01824 (978) 256-9571 31 James P. Murphy Industrial Highway • West Warwick, RI 02893 (844) 238-7673

51 N. Lisbon Road • Lewiston, ME 04240 (207) 784-6273


Turn static files into dynamic content formats.

Create a flipbook
New England 2 January 22, 2020 by Construction Equipment Guide - Issuu