New England 2 January 23, 2019

Page 1

State Supplement sponsored by:

1

11

THE NEW ENGLAND EDITION

A Supplement to:

95

1

201 16 9

26

2

1 3

91

89

2

95 3

2 2 7

1

93

495

16

89 4

89

95

202

7

91

9

95

93

2

95 2

93 90

90

7

95 91

7

SHIP WITHIN 48 HOURS

3

84

495 6

84

6

6

195

395

95 91

January 23 2019 Vol. L • No. 2

95

SAME DAY PARTS AVAILABILITY

95

®

24 HOUR TECHNICAL SUPPORT BACKED BY A 75 YEAR BUSINESS Thousands in Service!

“The Nation’s Best Read Construction Newspaper… Founded in 1957.”

Your New England States Connection •  Kent Hogeboom 1-800-988-1203 2208 Plainfield Pike • Johnston, RI 02919 401-943-7100 • Fax: 401-647-5041

www.jrvinagrocorp.com info@jrvinagrocorp.com

Specializing in:

Demolition, Portable Crushing, Material Sales, C & D Recycling, Land Clearing, Heavy Hauling & Trucking Call for Pricing

LEED Accredited in Waste Management

2019 EZ-Screen 1200XLS

Large Enough to Service You; Small Enough to Know You

61 Silva Lane • Dracut, MA 01826

Optional 3 Product Conveyor

6’x5’ Double Deck Screenbox Works with 1/2 to 1 3/4 Yd. Loaders, 25 H.P. Kohler Diesel Engine, 24” Conveyor Dumps Screened Product 9’ High, Two (2) Year Warranty! $42,900 plus freight. Other Screeners Available

EZ-SCREEN

www.ez-screen.com

Call Today (978) 454-3320

WE STOCK RUBBER TRACKS for Over 6,000 Models! Some Used Tracks A & GA Available. NJ, TX, WOUSES WAREH • HIGH QUALITY • FAST SHIPPING • GUARANTEED TO FIT • UNDERCARRIAGE PARTS • FLATPROOF SKIDSTEER TIRES • RUBBER PADS FOR STEEL TRACKS

Affordable Price. Premium Service.

CALL 800-367-4937 *On approved credit • Financing Available

Ludlow’s Baystate Blasting Helps Clear the Way for Construction New England is known for many things… the colorful autumn leaves, snowy winters, a powerful football team … and rocky ground conditions that challenge contractors on most projects. At a minimum, nearly Tony Vital (L), genevery site involves hammers eral manager, and and excavators, and unfortuScott Brouthers, nately way too often the site lead blaster, both of calls for drilling and blasting. Baystate Blasting, Most contractors are not celebrate another equipped to handle their own successful blast. blasting; they have found that it is not cost effective for them to make the investment in the crushing and screening processing plants necessary to produce aggregate on site. Some, however, are set up to handle their own aggregate processing once the blast has occurred and it has been a common practice on New England building sites for decades to process the rock that is blasted or excavated into aggregate

Baystate drills for a new foundation at the Crown Colony Apartments.

materials that are either re-used on site or are sold to area contractors and municipalities. Enter Baystate Blasting, a family-owned drilling, blasting, crushing and processing service that is headquartered in Ludlow, Mass. Founded in 2003, Baystate prides itself on being flexible and mobile enough to offer turn-key solutions see BAYSTATE page 16

SPS New England to Use Bridge Lateral Slide Technique for New Span in Mass.

888-888-1248

By Ken Liebeskind

248-745-5828

CEG CORRESPONDENT

www.foleyengines.com Cat IT38G, All pins and bushing are tight, 3.25 cy, 9700 hrs, 3rd valve, good Michelin 20.5R25, Nice machine strong engine and tranny...... ........ $49,500 or bo w Phil (413) 427-7171

• Largest hammer repair facility in North America • Demolition tools and parts for ALL makes and models • Hammer-equipped excavator rentals • Backed by a 75 year family owned business CALL YOUR ONE-STOP HAMMER SHOP™ TODAY!!!

CALL 888-81-GORILLA(46745)

The nearly 70-year-old Route 44 over Route 24 Bridge in Raynham, Mass., is structurally deficient and functionally obsolete with a two-span continuous structure of approximately 103 ft. (west span) and 121 ft. (east span).

The $24 million replacement of the nearly 70-year-old Route 44 over Route 24 Bridge in Raynham, Mass., is under way with selective clearing, drainage modifications, permanent and temporary ramp modifications, and the removal of the existing Route 44 median performed by SPS New England, the prime contractor. The bridge is structurally deficient and functionally obsolete with a two-span continuous structure of approximately 103 ft. (west span) and 121 ft. (east span). SPS is partnered with design firm VHB in this design/build project that will replace the existing bridge see BRIDGE page 10


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.
New England 2 January 23, 2019 by Construction Equipment Guide - Issuu