State Supplement sponsored by:
1
11
THE NEW ENGLAND EDITION
A Supplement to:
95
1
201 16 9
26
2
1 3
91
89
2
95 3
2 2 7
1
93
495
16
89 4
89
95
202
7
91
9
95
93
2
95 2
93 90
90
7
95 91
7
SHIP WITHIN 48 HOURS
3
84
495 6
84
6
6
195
395
95 91
95
95
®
January 5 2022
SAME DAY PARTS AVAILABILITY 24 HOUR TECHNICAL SUPPORT BACKED BY A 75 YEAR BUSINESS Thousands in Service!
Vol. LX • No. 1
“The Nation’s Best Read Construction Newspaper… Founded in 1957.”
Affordable Price. Premium Service.
CALL 800-367-4937
Your New England States Connection • Kent Hogeboom 315-866-1423 2208 Plainfield Pike • Johnston, RI 02919 401-943-7100 • Fax: 401-647-5041
www.jrvinagrocorp.com info@jrvinagrocorp.com
Reconstruction of Gleasondale Road Bridge Continues With Demo Phase By Ken Liebeskind
Specializing in:
Demolition, Portable Crushing, Material Sales, C & D Recycling, Land Clearing, Heavy Hauling & Trucking
CEG CORRESPONDENT
Call for Pricing
LEED Accredited in Waste Management
2022 EZ-Screen 1200XLS
*Limited time offer. Some restrictions apply. See dealer for details.
LEASE THE EQUIPMENT. OWN THE JOB. 36 MONTH LEASE AS LOW AS
$1,500*/MONTH Authorized Doosan Dealer
Optional 3 Product Conveyor
6’x5’ Double Deck Screenbox Works with 1/2 to 1 3/4 Yd. Loaders, Kohler Diesel, 24” Conveyor Dumps Screened Product 9’ High, Two (2) Year Warranty! $55,900 plus freight.
508-484-5567 (BROCKTON, MA) 978-454-3320 (Dracut, MA) 603-410-5540 (Bow, NH)
Tibbits
Equipment Services, Inc. www.tibbitseq.com
®
KWIK KLEET ts Traction Clea
EZ-SCREEN 248-745-5828
Specialty Construction Equipment SALES • RENTALS • HAMMERS Since 1989
‘05 Caterpillar 928G $36,800
Phil (413) 427-7171 • Largest hammer repair facility in North America • Demolition tools and parts for ALL makes and models
• Exhaust Scrubbers • Perkins Engines • Deutz Engines • Twin Disc/Rockford Clutches
www.foleyengines.com
A Volvo EC210C excavator is among the equipment Kodiak Corp. of Lawrence, Mass., is using on the project.
The reconstruction of the Gleasondale Road Bridge in Stow, Mass., is under way, with preliminary work completed and removal of the existing deck and beams to follow. The Kodiak Corp. of Lawrence, Mass., is the contractor. The project dates back to a 2015 safety inspection that found the deck, beams and northern abutment of the bridge to be beyond repair and in need of superstructure replacement. The bridge was partially closed and is limited to carrying one lane of alternating traffic. Preliminary work included tree removal and utility work in March and April 2021. Utility work began in May and construction began in November. According to MassDOT, one half of the bridge will be worked on at a time, with the eastern side demolished and rebuilt until spring 2022, when the western half will be demolished and rebuilt. With utility relocations complete, demolition of the eastern side of the bridge is under way. Kodiak will remove beams from the temporary barrier, allowing traffic to be maintained.
802-479-9696
Other Screeners Available
www.ez-screen.com
*On approved credit • Financing Available
• Hammer-equipped excavator rentals • Backed by a 75 year family owned business CALL YOUR ONE-STOP HAMMER SHOP™ TODAY!!!
CALL 888-81-GORILLA(46745)
see GLEASONDALE page 12
Alta Equipment Acquires Ambrose Alta Equipment Group Inc. announced that it has entered into a definitive agreement to acquire the assets of Ambrose Equipment LLC., a privately held equipment distributor Based in Hooksett, N.H., the family-owned Ambrose Equipment and equipment solution provider in the LeeBoy dealer network, offers a full line of leading road equipment products and specialty attachments, as well as service, rentals and replacement parts.
and northeast asphalt equipment dealer for more than 33 years, with locations in New Hampshire and Massachusetts. The acquisition expands Alta’s construction equipment footprint to 39
locations in 10 states. Based in Hooksett, N.H., the familyowned Ambrose Equipment and equipment solution provider in the LeeBoy see ALTA page 6
Page 2 • January 5, 2022 • www.constructionequipmentguide.com • New England States Supplement • Construction Equipment Guide
Call Mark Doty @ 203-823-2316 2010 WIRTGEN 2100
2013 HAMM HD12VV
2005 WIRTGEN W2000
Cat power, 6'5" 15mm drum, rigid conveyor, 60% bottoms, good belting with grade, stk# 26377 ................................................$145.000
stk# 26021, single & dual vibratory, PSI water system, recent service to engine, new seat assy, 4104 Hrs ....................................$22,500
stk# 26376, 7759 hours, Cat, 6’7” drum, good bottoms, grade controls, serviced & ready for work ..................................................$115,000
2004 BOBCAT S750
2019 BOBCAT S740
1997 HITACHI EX300-3C
stk# 26915, c/air, 2 speed, foot controls, 50% rubber, mech coupler ..........................$34,500
stk# 26515, c/air, 2 speed, 12” rubber, 76” bucket, switchable controls, 1240 hrs..$52,500
stk# 27130, C/heat, 32” pads, 48” bucket, newer pumps, very nice original machine ........ ............................................................$29,500
2020 CASE TV450
2006 DEERE 325
2014 JOHN DEERE 410K
stk# 26945, c/air, pilots, 2 speed, RC, Hi Flow, hyd coupler, 84” bucket 80% tracks ..$68,500
stk# 27127, C/air, 2 speed, foot controls, new rubber, mech coupler, standard hyds, serviced and ready for snow ..............................$32,500
stk# 26993, 6851 Hrs, c/air, new front rubber, front coupler, ext hoe, pilots ................$59,500
See Our Complete Inventory at www.wiclark.com
Construction Equipment Guide • New England States Supplement • www.constructionequipmentguide.com • January 5, 2022 • Page 3
New 738 8M purpose p p e-built t h tree han ndler is BIG new ws for tree care speecialists SENNEBOGEN’s “game-changing” tree care handlerrs have raised the bar even higher! Thee new 738 M weighs in at twice the size of 718 M and R-HD models with mo models, ore power and more reach to take on bigger jobs! d with a power grapple The 738 M, fitted saw, is attached to a 75 ft. telescoping boom and stick to t quickly fell or prune trees as high as 1125 ft. to 150 ft. tall. Then it easily cutts, swings and stacks the wood with a single operator to hole job. complete the wh
CUSTOM MENGINE EERED TREE CARE HANDLLERS
PU URPOSE-BUILT
FR ROM THE GR ROUND UP
• Ideal for all tree seervice operators • Used for woodlot thinning, harvesting wood fuel f to clearing storm debris up to o 48" and up to 125' high • All wheel drive or tracked models • Jobsite safety incrreased with trimming, cuttingg, loading and stacking operation ns as all are done from the con nfines of the SENNEBOGEN eleevating and tilting Maxcab
As big and poweerful as it is, the 738 keeps pace with w the 718 M and 718 R-HD machines with precise handling and fasst cycle times to process up to 150 trees per day. From the roadsid de, on embankments or in heavy wood ds, the 738 M is the new game-changger for all land clearing, right-of-way right of way maintenance and heavy tree care operations.
Get th he details on the high effficiency solutio l ion for custom tree rem movall
The New 738 M
www.seennebogen-na.com | +1-7040 347-4910
251 Shakker Road East Longmeadow, MA 01028 (800) 292-63 6351
1980 Berlin Turnpike Berlin, CT 06037 (800) 352-4473
www.tylerequipmentt.com
Page 4 • January 5, 2022 • www.constructionequipmentguide.com • New England States Supplement • Construction Equipment Guide
Bulding for Education...
Schools in Newport Will Get New Facility, Additions By 2022 The schematic plan for a new Rogers High School in Newport, R.I., is still undergoing changes, with the most notable of the recent alterations being a planned new building for the school district’s administrative offices and staff, the Daily News reported Dec. 16. Kyle Lentini, of Downes Construction Co., the project manager of new school construction on behalf of the city, updated Newport’s School Building Committee (SBC) on the status of a pair of school construction projects — the new high school and an eight-room two-story addition to nearby Pell Elementary School. The latter appears on track to open in the fall of 2022.
school district office that must be cleared. This makes the whole issue less complicated.” The Newport school district is now working on applications to RIDE for future reimbursement of the funding needed for additions to the new high school plan. Popular Classroom Programs to Return When the Stage I and Stage II applications were submitted to the state for the new high school in 2019 and 2020, space for the automotive and cosmetology programs were not included because RIDE was no longer recognizing them as career and technology education programs supported by the state. However, due to a desire in the community to continue those career pathways, classrooms for
Design in Progress SLAM Collaborative Inc., of Newport Public Schools rendering Glastonbury, Conn., is The proposed new Rogers High School. currently tasked with drawing up plans for the cations to RIDE for the September 2022, after which connew Rogers High School additional work. The Stage struction could begin. under state guidelines I application must be subThe building of the new Rogers approved in 2020. mitted by Feb. 15 and, if High School is expected to take 21 The SBC is scheduled the state approves it, the months, until the end of June 2024. to vote Jan. 24 on whether Stage II application would After the move-in period during to submit the schematic be submitted several the summer of 2024, students will design to the Rhode Island months later. enter the finished school the folDepartment of Education According to the Daily lowing September. (RIDE). Before that hapNews, Joseph da Silva, the pens, the updated plan will lead architect of Newport’s All A-Okay On Pell be presented to the comSchool Building Authority, Elementary Addition munity during a meeting toured the city Dec. 20 with The construction of the Pell that has not yet been SLAM architects and a Elementary addition is well under scheduled. team from Gilbane way — on time and on budget — “The high school will Construction, which will Lentini told Newport school offibe designed so there can oversee construction of the cials. The steel frame of the addibe future additions,” said new high school. tion has been completed and the Colleen Burns Jermain, With the schematic concrete floor slabs have been superintendent of the Newport Public Schools rendering design at 60 percent com- poured, he said, while staging is Newport Public Schools. Joseph DeSanti, project director of Downes Construction Co., will oversee the pleted, there is still time to going up for the exterior walls and The system’s adminis- build of the new Rogers High School. make changes, Bolan told masons will be laying the brick trative offices, including the Newport Daily News. facade. that of Jermain, are “Nothing has really been The Daily News reported there housed in the current high school. those courses will be included in always in the first set of designs, However, that space is needed for the new school’s design. Also, the she said, but one which came with designed for the outside of the are some measures added to the building yet,” she said. “Most like- school’s construction that were not arts and graphics courses, said city has revamped the cosmetol- a $3 million price tag on it. But an additional practice field, ly, it will be brick,” adding that a included in the original design, like Rebecca Bolan, co-chair of the ogy program to include business city’s SBC. management, a move that is and a track and field for sports like metal exterior originally was safety doors, so they will be “A separate administrative expected to receive state approval the hammer throw, also was identi- planned, but proved to be too cost- included in the new State I and II fied as a need. ly. A stone exterior is a possibility applications for reimbursement. building would be put in a deep as well, explained Bolan. “The hammer throw is a real as well. The new portion of Pell corner of the west parking lot,” she There also is a need for an addiFinal design development of the Elementary will have temporary said. “It is cheaper to build it sepa- tional track and field area and a safety issue,” she said. new high school is now scheduled heating inside so interior work can rately because you don’t have to practice field at Rogers High Time Left to Make to take place between January and continue throughout the winter. follow all the same regulations School not found in the original Design Changes the end of April. Construction doc- The building is expected to be needed for a school. There is also a plans. A “premium athletic field” Lentini said his firm is working uments and final specifications ready for students to move into in safety issue because there are a lot that included a soccer field and a more individuals coming into a track around the outside was on new Stage I and Stage II appli- would be drawn up by mid- the fall of 2022.
Construction Equipment Guide • New England States Supplement • www.constructionequipmentguide.com • January 5, 2022 • Page 5
Cut your big g jobs down to size. Go beyond scooping, carr ying and loading. The impressive digging and high tractive power of Doo D san® wheel loaders help you take on the most challenging material-handling tasks. Powered by a Tier 4 diesel engine, you’ll penetrate tough materials, tilt and lift with ease, and carr y more in ever y cycle. It’s your ticket to making harder work easier, longer days more enjoyable and ever y minute more productive and profitable. Stop in fo for details on Doosan wheel loaders tod o ay y..
Doosan® and the Doosan logo are reg is tered t r ademar k s of Doosan Cor p. in the United S t a t e s a n d v a r i o u s o t h e r c o u n t r i e s a r o u n d t h e w o r l d . 1 8 - D 0 0 3. 2
Au thor ized Doos an De aler
Equipment East 61 SiManley lva LaneSt. • D•raBrockton, cut, MA 018MA 26 02301 • 508-484-5567 196 978 -454-Lane 3320 •• w w w.equMA ipm01826 enteas•t.978-454-3320 com 61 Silva Dracut, 1474 Rte 3A • Bow, NH • 603-410-5540 www.equipmenteast.com
Page 6 • January 5, 2022 • www.constructionequipmentguide.com • New England States Supplement • Construction Equipment Guide
The Nice Company, Inc
9 Rosenfeld Drive, Hopedale, M A Toll Free# 508-381-3939 • w w w.theniceco.com
Equipment Sales and Rentals
We sell NICE machines!
2018 Anaconda DF410, 550 hours, 38" x 11" Feeder Belt, Rear & Side Discharge Conveyors, 4' x 10' Double Deck Screen Reduced to $129,000!
2014 Vermeer FT300, 2500 hrs., Mulcher, Cab w AC, Industrial 30XL Winch, Rear View Camera Reduced to $169,000!
YEAR END
DEALS! 2011 Volvo L350F, 9700 hours, spade nose, Runs Good, Very Clean Machine Reduced to $199,000!
2016 Volvo EC350EL, 4500 hours, Aux. Plumbing, 12’ stick, 65” bucket $129,000
PORTABLE ROCK CRUSHING
Ambrose Equipment Represents ‘Go-To’ Asphalt Paving Products Dealer in N.E.
Onsite or Quarry • Making aggregates since 1983
dealer network, offers a full line of leading road equipment products and specialty attachments, as well as service, rentals and replacement parts. “For over three decades, Ambrose has been the ‘go-to’ asphalt paving products dealer in New England,” said Ryan Greenawalt, CEO of Alta. “With the acquisition of Ambrose, Alta Equipment now offers the most diverse road construction equipment portfolio of products and services in the New England region. By expanding our capabilities, OEM relationships within our territories, we continue to execute on our strategy of expanding our parts and service business and diversifying our offerings to customers.” Ambrose Equipment generated approximately $35 million in revenue and had adjusted EBITDA of approximately $3.1 million for the trailing 12month period ended August 2021. Terms of the acquisition will be dis-
Call us today ROCK CRUSHING • (860) 491-2283 GOSHEN, CT
www.FAYWRIGHTINC.com
ALTA from page 1
“With the acquisition of Ambrose, Alta Equipment now offers the most diverse road construction equipment portfolio of products and services in the New England region.” Ryan Greenawalt Alta Equipment Group
closed upon closing. The transaction is expected to close before year-end, subject to customary conditions. About Alta Equipment Group Inc. Alta owns and operates one of the largest integrated equipment dealership platforms in the United States. Through its branch network, the company sells, rents and provides parts and service support for several categories of specialized equipment, including lift trucks and aerial work platforms,
cranes, earthmoving equipment and other material handling and construction equipment. Alta has operated as an equipment dealership for 37 years and has developed a branch network that includes more than 55 total locations across Michigan, Illinois, Indiana, New England, New York, Ohio, Virginia and Florida. Alta offers its customers a onestop-shop for most of their equipment needs by providing sales, parts, service and rental functions under one roof. For more information, visit www.altaequipment.com.
Construction Equipment Guide • New England States Supplement • www.constructionequipmentguide.com • January 5, 2022 • Page 7
PAYMENTS S AS LOW AS $99 99 A MONTH* THE SNOW LEASE IS BACK. Ma ake higher lease payments in the winter while you’re you’r turning cold wet snow into cold hard cash. Keep your machine working g year round with lowered payments the other 7 months of the year as low as $99 a month. *All applications are subject to credit review and approval. Security deposit may be requuired based on applicant’s credit. Five (5) “ON-SEASON” (November - March) increased payments and seven (7) “OFF-SEASON” F-SEASON” (April - October) reduced payments per year based on 5-year/5,000 hour lease terms. First payment d iin advance due d andd mustt bbe an “ON “ON-SEASON” SEASON” payment.t Mi Minimum i “OFF “OFF-SEASON” SEASON” payyment is $99 + applicable taxes. Offer valid only on specific models. Offer may change without prior notice, and additional ti l terms t andd conditions diti may apply. l Call C ll for f complete l t details. d t il
800-Go2-ALT TA A | AltaEquipNE.com
Page 8 • January 5, 2022 • www.constructionequipmentguide.com • New England States Supplement • Construction Equipment Guide
South Boston’s Washington Village Begins Construction The first phase of construction on the Washington Washington Village’s first phase of development is Village project in South Boston has officially gotten part of an approximately one million-sq-ft. master under way, according to Samuel & Associates, a plan that will introduce retail, residential and comBoston real estate development company. mercial uses, as well as space open to the community The project is part of a long-awaited redevelopand anticipated to be utilized year-round. ment of a former industrial site, encompassing 5 Peter Palandjian, chairman and CEO of acres, into a mix of uses that will bring together the Intercontinental, noted that his company is “honored community. and thrilled” to be involved in a project that will help This initial phase of the enterprise — which is reinvigorate the South Boston neighborhood. being developed in a joint venture with Boston’s Core “With union jobs and a thoughtfully designed Investments Inc., and Brighton’s Intercontinental multi-use complex, this project represents the potenReal Estate Corp. — will include the construction of tial that exists in Andrew Square,” he explained. “We a mixed-use building with 214 rental homes, includare excited to help realize that potential.” ing 37 income-based units, and 20,000-sq.-ft. of The Real Estate Times noted that the new developground floor retail and restaurant space at the interment also is designed to reduce the surrounding section of Old Colony Avenue and Dorchester Street. neighborhood’s dependence on vehicular travel in Washington Village’s centerpiece will be a public accordance with the mission and vision of the park created to provide a neighborhood amenity that Dorchester Avenue Corridor Plan. The building itself immediately establishes the site within the Andrew has been designed to consider the Boston’s greenSquare community, Boston Real Estate Times report- The Washington Village project in South Boston is part of a long- house gas reduction goals and will be certified LEED ed. The streetscape built in Phase 1 will feature awaited redevelopment of a former industrial site, encompassing 5 Gold. upgraded sidewalks, crosswalks, landscaped areas acres, into a mix of uses that will bring together the Andrew Square “The corner of Dorchester Street and Old Colony and new streets — all to promote walking and biking community. Avenue is being transformed into a vibrant section of Andrew Square,” said Linda Zablocki, president of as healthy and safe options. Andrew Square Civic Association. “Washington Village will “We’re excited to get shovels in the ground and make this Village progress.” David Pogorelc, the founder and CEO of Core bring all good things for those who wait. And boy, have we transformative project a reality,” said Peter Sougarides, the principal at Samuels & Associates. “Beyond the much-need- Investments, added, “Washington Village has as an outstand- waited.” Her comments were echoed by Pattie McCormick, vice ed new housing at various price points, the plan creates new ing place in the history of the neighborhood, and I am streets and new public open spaces that will be the beginning delighted to celebrate the realization of this reimagined proj- president of the neighborhood association: “We feel like the ect. This first phase of Washington Village is a key step in 2004 Red Sox, on the verge of something special. Core of the transformation of this former industrial area. “The project team would not have reached this important renewing Dorchester Avenue in South Boston for the 21st Investments assembled the team and Samuels is bringing home the trophy. This will be a momentous project for the milestone without the invaluable feedback and support of the century.” Just a short walk from the Massachusetts Bay future of South Boston, and we are excited to see it get off Andrew Square community, and we look forward to working with our neighbors as additional phases of Washington Transportation Authority’s (MBTA) Andrew Station, the ground.”
Shaheen Presses Biden to Ramp Up Infrastructure Spending U.S. Sen. Jeanne Shaheen of New Hampshire has urged the Biden administration to expand outreach and to advance planning grants as soon as possible to help states, cities and towns make the most of the new federal infrastructure law, the Union Leader in Manchester, N.H., has learned. As a lead negotiator for the bipartisan $550 billion Infrastructure Investment and Jobs Act (IIJA), Shaheen recently wrote a detailed wish list to Mitch Landrieu, Biden’s infrastructure czar, after she met with New Hampshire city and town officials on the matter. Landrieu was the former mayor of New Orleans who got high marks for his administration’s response to Hurricane Katrina. “The local stakeholders will be the ones who truly deliver on the promise of this law for the communities they serve,” Shaheen wrote. “However, their success depends heavily on the extent of outreach and coordination provided by the administration.” According to the Union Leader, Shaheen said Landrieu’s office should hold informational sessions, grant workshops and adver-
tise heavily to make sure the programs get full participation across the country. The state’s senior senator also put a pitch in for the Biden administration to approve New Hampshire projects for many discretionary competitive grants under the fiveyear bill, such as for bridge repair and rural road construction. State officials estimate this law gives New Hampshire a 51 percent increase in federal highway and bridge aid programs. But it did not change the traditional highway formula, which continued to give the state one of the smallest per capita grant amounts in the country. “I encourage you to recognize and facilitate the role these competitive grants can have in filling the unmet needs of small states like New Hampshire and ensuring that federal assistance is distributed equitably among the states,” Shaheen noted in her letter to Landrieu. Some of the law’s critics maintain it did not do enough to identify “shovel ready” projects that would stimulate the economy. State Transportation Commissioner
Victoria Sheehan told the New Hampshire Executive Council her office was awaiting “further guidance” from the Biden administration about many of the grant programs. The council is expected to vote soon on whether to accept $177 million in federal highway, bridge and electric vehicle charging aid from this law over the next two years. Sheehan has asked to use those grants to hire more than two dozen temporary staffers to help her agency get more work out quickly. The increase also will allow the state to move projects up to the next 10-year highway program that the Legislature will consider next spring, she explained. Much of that additional work can be done, Sheehan said, because the projects are at or near the end of final engineering design; this extra cash will help pay for construction, she noted. Sens. Maggie Hassan and Shaheen were among 11 Democrats who worked with 11 Senate Republicans on details of the final infrastructure package. The New Hampshire Union Leader reported that the final bill includes $5 billion
to help communities such as Merrimack, Bedford, Litchfield and Londonderry deal with drinking water contamination from socalled “forever chemicals,” along with other communities trying to eradicate arsenic in their water. Shaheen urged Landrieu to ensure the program permit this assistance not only for public systems, but for those people who rely on private wells for drinking water. “With more than 40 percent of people in New Hampshire and roughly 15 percent of people nationwide relying on residential wells, it is important that the historic investments in safe drinking water help all families,” she added. Londonderry Town Administrator Kevin Smith applauded Shaheen for being instrumental in getting this aid into the final deal. “In Londonderry, it will be critical that our town is able to access a portion of this funding to mitigate PFAS [per- and polyfluorinated substances] contamination in residential wells and thus provide clean drinking water for all of our citizens,” he explained to the Manchester news source.
Construction Equipment Guide • New England States Supplement • www.constructionequipmentguide.com • January 5, 2022 • Page 9
WE’RE IN THE BUSINESS OF KEEPING YOU IN BUSINESS.
DISCOVER THE ASV GENUINE PARTS & SERVICE ADVANTAGE. ASV Genuine Parts are specifically engineered and guaranteed to maintain the integrity of your ASV machine. They’re designed, built, tested and re-tested to ensure equipment performance and reliability always stay at an all-time high – because less downtime for your machine means more uptime for you. Contact us now to learn more!
© 2021 ASV Holdings, Inc.
Page 10 • January 5, 2022 • www.constructionequipmentguide.com • New England States Supplement • Construction Equipment Guide
Ove 40 Us r Hamm ed in Sto ers ck!
Construction Equipment Guide • New England States Supplement • www.constructionequipmentguide.com • January 5, 2022 • Page 11
H.O. Penn Renting Eassyy g Made M
Web
Mobile
888-REENTT--CAT AT www.ho openn.com
Phone
Page 12 • January 5, 2022 • www.constructionequipmentguide.com • New England States Supplement • Construction Equipment Guide
Kodiak Utilizing Cat Equip.
Bridge deck and steel removal will take two to three weeks and then work under the bridge will begin with excavation of the northern and southern abutments. GLEASONDALE from page 1
Bridge deck and steel removal will take two to three weeks and then work under the bridge will begin with excavation of the northern and southern abutments. Then, Kodiak will build formwork and pour concrete for the new abutments. Starting in spring 2022, the steel beams will be replaced on the bridge’s eastern side. While the demolition and replacement of the east side of the Gleasondale Road bridge takes place, the west side remains open to traffic and pedestrians. When the demolition and replacement of the west side takes place in the summer and fall of 2022, traffic and pedestrians will be rerouted to the newly built east side of the bridge. The new bridge will have two 10-ft. travel lanes, two 5-ft. bicycle lanes, two 6-ft. sidewalks and new crash-tested railings at the back of the sidewalk, according to Jeff Dietrich, a planner of Howard Stein Hudson, Worcester, Mass., the engineering firm on the bridge reconstruction project. Dietrich and Michael Splain, assistant bridge engineer of the Massachusetts Department of Environmental Protection, spoke about the project at a Zoom meeting on Sept. 1. They said the project acknowledges the environmental significance of the Assabet River, over which the bridge is suspended. “We’ll be staging equipment to make sure no materials are dropped into the river,” Dietrich said. The design also maintains the current footprint and does not interfere with surrounding property or homes. “We’ve been made aware of all the septic tanks and wells in the area to ensure we’re not impacting those in any way,” Dietrich said.
The construction equipment Kodiak is using on the project includes a Caterpillar 315F L excavator.
The Gleasondale Road Bridge carries Route 62 over the Assabet River and is an important commuter and trucking route between Stow and Hudson and an important corridor for emergency response among several towns. The construction equipment Kodiak is using on the project includes a Caterpillar 315F L excavator, a Volvo EC210C excavator and a Cat 226D skid steer. Traffic will be maintained over the bridge with no overnight work or closures during the demolition. The contract budget is $4.3 million, primarily funded by federal dollars, according to Kristen Pennucci, a MassDOT spokesperson. The job is scheduled to be completed in November 2022. CEG
Construction Equipment Guide • New England States Supplement • www.constructionequipmentguide.com • January 5, 2022 • Page 13
Equipment East, LLC 61 Silva Lane Dracut, MA 01826 978-454-3320
Barry Equipment Co., Inc. 30 Birch Island Road Webster, MA 01570 508-949-0005
F&W Equipment 164 Boston Post Road Orange, CT 06477 203-795-0591
Central Equipment Company 45 Dempsey-Greaves Lane Stillwater, ME 04489 207-827-6193
www.equipmenteast.com
www.barryequipment.com
www.fwequip.com
www.centralequipmentco.com
Page 14 • January 5, 2022 • www.constructionequipmentguide.com • New England States Supplement • Construction Equipment Guide
NEW ENGLAND SUPPLEMENT ADVERTISER INDEX ALTA EQUIPMENT COMPANY ........................................7 ARGUS INDUSTRIAL COMPANY ....................................1 BARRY EQUIPMENT CO. INC. ......................................16 DOOSAN NORTHERN NEW ENGLAND ......................13 EQUIPMENT EAST ........................................................1,5 FAY & WRIGHT EXCAVATING INC ..................................6 FOLEY INC - WORCESTER ............................................1 GORILLA HAMMERS........................................................1 H O PENN MACHINERY CO INC ..................................11 HEAVY MACHINES INC....................................................9 J R VINAGRO CORPORATION........................................1 M G EQUIPMENT ............................................................1 MILTON CAT....................................................................12 PETERSON ATTACHMENTS ........................................10 ROGERS BROTHERS CORPORATION ........................15 SHAWMUT EQUIPMENT CO INC ..................................10 T-QUIP SALES & RENTAL INC ......................................10 THE N.I.C.E. COMPANY ..................................................6 THE W. I. CLARK COMPANY ..........................................2 TIBBITS EQUIPMENT SERVICES INC ............................1 TYLER EQUIPMENT CORPORATION ............................3 The Advertisers Index is printed as a free editorial service to our advertisers and readership. Construction Equipment Guide is not responsible for errors or omissions.
Gilbane Building Company Will Renovate TD Garden Gilbane Building Company has been selected to serve as construction manager for the second phase of TD Garden's extensive renovation and expansion project in Boston. Gilbane was selected for the second phase after having successfully completed the first phase of work, which included an enhanced spectator experience by creating a new “front door” entrance while providBuilding Company has been selected to ing multiple new restaurants and Gilbane serve as construction manager for the second amenity spaces, improved theater- phase of TD Garden's extensive renovation and type seating and advanced audio- expansion project in Boston. visual technology. Designed by SCI Architects, the second for the additional loads. “The Gilbane team is thrilled to continue phase renovations include upgrades to existing visitor locker rooms, performer rooms, our partnership with TD Garden,” said Craig bathrooms and shower facilities, a new laun- Skurka, senior project executive and director dry room, staff locker rooms, a first-aid of the Boston Interiors Group for Gilbane. room and the addition of an ADA accessible “We look forward to delivering the second phase of renovations at this landmark venue section on the fifth floor at the Sportsdeck. Design-assist utilities upgrades include all just as we did the first — with a commitment new building systems in the renovated to client satisfaction and safety with minimal spaces, including ultraviolet germicidal and interruptions to ongoing operations.” Phase two renovations of TD Garden are dehumidification systems in the locker and laundry areas, as well as an upgraded scheduled to be complete by September Daktronics Game Clock system. The scope 2022. For more information, visit also includes extensive plumbing rough-in expansion in the occupied spaces to account www.gilbaneco.com.
Lane Construction Finishes Energy Job in Connecticut The Lane Construction Corporation has completed a year-long project to take advantage of renewable energy with the installation of a 1,666 module-array on the roof, property and carports in the parking lot of its corporate office in Cheshire, Conn. The system is expected to produce more than 760,000 kilowatt-hours of renewable energy annually (98 percent of the electricity used in the office), thus avoiding more than 540 metric tons of carbon dioxide emissions, the annual carbon dioxide equivalent of taking 117 cars off the road. Installing this system is a step toward reducing Lane’s carbon footprint and it will create savings on energy bills for decades to come. The project also included the installation of four electric vehicle (EV) chargers, free to employees and visitors who drive electric cars. When in full electric mode, an electric car produces zero emissions. Smog and greenhouse gas emissions are also greatly reduced, even when considering the electric-
ity generation needed to power the vehicles. (Drive Clean, 2021). “Not only are we looking forward to the financial benefits of going green, we’re also thankful for the opportunity to do our part for the environment by taking these important steps to reduce our CO2 emissions,” said Robert Hoffman, director of mechanical at Lane. This socially responsible project is the first solar installation project for Lane, which is owned by parent company Webuild Group. The project is in support of the group’s sustainability strategy, which identifies infrastructural sustainability and construction site sustainability as the two pillars upon which the group’s commitment and reputation are fully based. Webuild’s business is strongly oriented towards developing and building infrastructure that directly contributes to advancing the main Sustainable Development Goals (SDG-oriented) and transitioning to a lowcarbon economy.
Construction Equipment Guide • New England States Supplement • www.constructionequipmentguide.com • January 5, 2022 • Page 15
TRAILERS TO MEET EVERY HAULING CHALLENGE! Committed to building superior quality, reliability and durability into every trailer.
ROGERS BROTHERS CORPORATION ALBION, PA
The Ultimate in Trailers®
Tyler Equipment 251 Shaker Road East Longmeadow, MA 01028 (413) 525-6351 • (800) 292-6351 Parts: (877) 255-6351
1980 Berlin Turnpike Berlin, CT 06037 (860) 356-0840 • (800) 352-4473 Parts: (860) 356-0848
C.N. Wood Co., Inc. 200 Merrimac St. Woburn, MA 01801 (781) 935-1919
140 Wales Ave. Avon, MA 02322 (508) 584-8484
60 Shun Pike Johnston, RI 02919 (401) 942-9191
www.cn-wood.com
www.tylerequipment.com
For more than 110 years, ROGERS® trailers have stood above the rest in rugged durability, unsurpassed quality and superior design. Contact your local dealer for a quote today.
Page 16 • January 5, 2022 • www.constructionequipmentguide.com • New England States Supplement • Construction Equipment Guide
DESIGNED TO DOMINATE. POWERED BY INNOVATION. Punishing jobsites require rugged machines. New -7 Series wheel loaders are redesigned to help you load more material, carry with confidence and get more done.
Schedule a demo today. AUTHORIZED DOOSAN DEALER
D E ALER N AM E Dealer Phone Dealer Addr Dealer Addr Dealer Web Address
©2021 Hyundai Doosan Infracore. All rights reserved. Hyundai Doosan Infracore is an affiliate of Hyundai Heavy Industries Group. , is used under license from Doosan Corporation. The Doosan trademark,