Skip to main content

New England 1 January 8, 2020

Page 1

State Supplement sponsored by:

1

11

THE NEW ENGLAND EDITION

A Supplement to:

95

1

201 16 9

26

2

1 3

91

89

2

95 3

2 2 7

1

93

495

16

89 4

89

95

202

7

91

9

95

93

2

95 2

93 90

90

7

95 91

7

SHIP WITHIN 48 HOURS

3

84

495 6

84

6

6

195

395

95 91

January 8 2020

Vol. LVII • No. 1

95

SAME DAY PARTS AVAILABILITY

95

®

24 HOUR TECHNICAL SUPPORT BACKED BY A 75 YEAR BUSINESS Thousands in Service!

“The Nation’s Best Read Construction Newspaper… Founded in 1957.”

Your New England States Connection •  Kent Hogeboom 315-866-1423 2208 Plainfield Pike • Johnston, RI 02919 401-943-7100 • Fax: 401-647-5041

www.jrvinagrocorp.com info@jrvinagrocorp.com

Affordable Price. Premium Service.

CALL 800-367-4937 *On approved credit • Financing Available

SPS New England Leads Vital N.H., Maine Infrastructure Project

Specializing in:

Demolition, Portable Crushing, Material Sales, C & D Recycling, Land Clearing, Heavy Hauling & Trucking Call for Pricing

LEED Accredited in Waste Management

2020 EZ-Screen 1200XLS 36 Month lease AS LOW AS

$1,500* / Month Authorized Doosan Dealer

978-454-3320 (Dracut, MA) 603-410-5540 (Bow, NH) Optional 3 Product Conveyor

6’x5’ Double Deck Screenbox Works with 1/2 to 1 3/4 Yd. Loaders, 25 H.P. Kohler Diesel Engine, 24” Conveyor Dumps Screened Product 9’ High, Two (2) Year Warranty! $44,900 plus freight. Other Screeners Available

EZ-SCREEN

www.ez-screen.com

*Limited time offer. Some restrictions apply. See dealer for details.

WE STOCK RUBBER TRACKS for Over 6,000 Models! Some Used Tracks A & GA Available. NJ, TX, WOUSES WAREH • HIGH QUALITY • FAST SHIPPING • GUARANTEED TO FIT

Tunnel placement that will be under the highway for employee access and utilities.

• UNDERCARRIAGE PARTS • FLATPROOF SKIDSTEER TIRES • RUBBER PADS FOR STEEL TRACKS

888-888-1248

Ken Liebeskind

CEG CORRESPONDENT

248-745-5828

Cat IT38G, 3.25cy, 7,800 Hrs, Mich Radials 67%, 3rd Valve, Owned for many years, Runs Excellent, No blow by, No leaks, Very Good ..$49,750 or bo

Phil (413) 427-7171 • Largest hammer repair facility in North America • Demolition tools and parts for ALL makes and models • Hammer-equipped excavator rentals • Backed by a 75 year family owned business CALL YOUR ONE-STOP HAMMER SHOP™ TODAY!!!

www.foleyengines.com

Ground underneath the bridge.

CALL 888-81-GORILLA(46745)

The Piscataqua River Bridge, a through arch bridge that crosses the Piscataqua River and connects Portsmouth, N.H., with Kittery, Maine, is being renovated. Work on the bridge began in June and will be finished in May 2022. The primary contractor on the job is SPS New England/Salisbury, Mass. The bridge, which was built between 1968 and 1972 and opened to traffic in 1972, carries I-95 between Portsmouth and Kittery and the state line is close to the middle of the bridge. This is the first renovation of the bridge since construction was completed. The project will be completed in two phases with Phase 1 from June 2019 to fall 2020 on the outside edges of the bridge and Phase 2 through 2022 with work inside the bridge and onto the travel lanes.

The budget for the job is $53 million, with costs shared by Maine and New Hampshire DOT, the Maine Turnpike Authority and the Federal Highway Administration. The $53 million cost of the project is higher than the initial estimate of $36 million. According to Nina Fisher, deputy commissioner of the Maine Transportation Department, the higher price tag was due to three reasons: work was added to the original plan; increased contract restrictions to reduce traveler impacts dursee PISCATAQUA page 4


Page 2 • January 8, 2020 • www.constructionequipmentguide.com • New England States Supplement • Construction Equipment Guide

2018 JOHN DEERE 50G

1988 KOMATSU PW210-1

2016 BOBCAT T590

260 Hrs, Stk# 25217 ............................$62,500

c/heat, Komatsu diesel, hyd swinger / coupler and 36” bucket, Stk# 25472 ................$35,500

1613 Hrs, cab/air, single speed, 80% tracks, one owner, Stk# 24965 ........................$45,000

16’ DANIELS POWER ANGLE PLOW

2015 JOHN DEERE 344K

ROCKLAND 6.5 YARD LIGHT MATERIAL / SNOW BUCKET

has JRB 416 hooks, like new condition, stk# 24730 ..................................................$15,000

3870 Hrs, air, hyd cplr, 2 yd gp bucket, serviced and ready for work! Stk# 25586 ..$72,000

416 hooks, like new, stk# 25420............$7,500

2017 BOBCAT S650

2013 CATERPILLAR 262D

2015 GEHL V270

323 Hrs, Skid Steer Loader, Stk# 25421 .......... ............................................................$42,500

c/air, EH controls, GP bucket, good condition, Stk# 24947 ..........................................$33,500

c/air, pilots, 82” bucket, 650 hrs, Stk# 25361 .. ............................................................$32,500

See Our Complete Inventory at www.wiclark.com


Construction Equipment Guide • New England States Supplement • www.constructionequipmentguide.com • January 8, 2020 • Page 3

C

Contact your local dealer:

Tyler Equipment Corporation 1980 Berlin Turnpike Berlin, CT 06037 800.352.4473 251 Shaker Road East Longmeadow, MA 01028 800.292.6351

WITH THE RIGHT TOOLS TO INVEST, YOU CAN PUT THE RIGHT TOOLS TO WORK.

www.tylerequipment.com

Volvo Financial Services offers 0% for 24-months on select Volvo D-Series excavators and G-Series wheel loaders. Low-interest rates and high-quality equipment create the perfect combination for your business. Contact your local Volvo dealer today to get the right tools for you. Final approved transaction terms are subject to standard VFS credit underwriting guidelines and advance policy. VFS reserves the right to amend or cancel the program at any time without notice. Approvals will state the program terms and any other conditions deemed appropriate by VFS.

L

Push boundaries.


Page 4 • January 8, 2020 • www.constructionequipmentguide.com • New England States Supplement • Construction Equipment Guide

Maine, N.H. Share Costs on Piscataqua River Bridge Job

Jan 8, 2019

March 12, 2019 PISCATAQUA from page 1

ing and after construction; and an increase in construction costs due to labor shortages. Work includes replacing the bridge surface, repairing concrete on the deck area beneath the bridge surface and replacing joints, drains, exterior bridge rails and the concrete overhang of the deck. The electrical system will be upgraded with 41 new street lights installed. Highway work north of the bridge on the Maine Turnpike will be completed and the bridge will be prepped to accommodate an Intelligent Transportation System. Work on the turnpike will include reconstructing shoulders and replacing median barriers. To date, the deck fascia and barrier on the Maine southbound approach has been removed and replaced and the fascia deck on the northbound shoulder area is being removed. The Piscsataqua Bridge is one of the most important bridges in Maine and is heavily used, with 74,000 vehicles crossing in both southbound and northbound directions and up to 130,000 vehicles in the summer. When the bridge was constructed in 1972, engineers envisioned a 100-year lifetime. For details on the construction efforts, including lane closure updates, visit https://www.buildingabettergateway.com/piscataqua-river-bridge/. 

April 25, 2019

CEG

Undergirding of bridge April 2019

Under the bridge.


Construction Equipment Guide • New England States Supplement • www.constructionequipmentguide.com • January 8, 2020 • Page 5

Commanding power.. Pro oven ve reli e ability. Boost your performance and save time digging, loading trucks and more thanks to the best-in-class hydraulics of Doosan® excavators. You can rely on consistent power deliver y to the arm and bucket to confidently take on tough digging conditions that slow other machines down. And increased swing torque helps you easily swing uphill and backfill fasterr,, with better results. Experience Doosan Strong today y.. Stop in ffo or a demo.

Doosan® and the Doosan logo are reg istered t r ademar k s of Doosan Cor p. in the United S t a t e s a n d v a r i o u s o t h e r c o u n t r i e s a r o u n d t h e w o r l d . 1 8 - D 0 0 3. 7

Au thor ized Doos an De aler

Equipment East 661 1 SSilva ilva LaLane ne • D•raDracut, cut, MA MA 018201826 6 • 978-454-3320 91474 78-454 3 3 2 0 • w w w . e q u i p m e n te a s t .com Rte 3A • Bow, NH • 603-410-5540 www.equipmenteast.com


Page 6 • January 8, 2020 • www.constructionequipmentguide.com • New England States Supplement • Construction Equipment Guide

The dealership is located at 489 Foote St. in Middlebury, Vt.

Doosan Adds G. Stone Commercial as New Vt. Dealer Doosan Infracore North America LLC has expanded its dealer network with the addition of G. Stone Commercial as an authorized sales, service, parts and rental provider of Doosan equipment. The company now offers its customers a wide range of Doosan equipment: crawler excavators, log loaders, wheel excavators, material handlers, wheel loaders and miniexcavators. The dealership is located at 489 Foote St. in Middlebury, Vt., and will provide support for customers in the region. G. Stone Commercial began selling tow trucks, wreckers and trailers in the early 2000s before expanding its business to include construction equipment rental serv-

ices, used commercial truck sales and used equipment sales. They also offer a complete parts and service department, road service and hydraulic repair service, including hose making and hydraulic cylinder repair. The dealership is a sister store to G. Stone Motors. “People turn to G. Stone Commercial and G. Stone Motors due to us having a combination of over 50 years in business and a great reputation for taking care of the customer after the sale,” said Darcy Stone, owner of G. Stone Commercial. “We are also one of the few dealerships that will still take trades of any nature as long as we can resell them.”

New England News Briefs Maine The ferry terminal that passengers use for trips to Vinalhaven island will be under construction until the spring so it can accommodate a new boat. The Maine Department of Transportation said the improvements to the Vinalhaven ferry terminal include modifying the ferry pen to make way for a new, larger ferry that is currently under construction. The agency says the terminal work started in November and is expected to be finished by April 1. The project is expected to cost a little more than $4 million. Local companies are working on both the terminal improvements and the construction of the ferry.

G. Stone Commercial works with a variety of markets, including construction, agriculture, landscaping, homeowner, utilities, recycling and industrial services, mining and forestry. “Our customers will get to experience firsthand the superior product that is being produced by Doosan,” Stone said. “I felt that adding Doosan to our lineup would be a great benefit to our customers and to our whole organization. Doosan is a forefrontthinking company that focuses on the ease of customer usability.” Doosan is pleased to continue growing its dealer network in the northeast to provide customers with productive equipment for a

variety of markets and applications. “We look forward to partnering with Darcy Stone and the staff at G. Stone Commercial,” said Adam Howard, regional director, Doosan Infracore North America LLC. “As we continue to grow the Doosan dealer network in North America, we are pleased to add a great new partner to provide sales, service and parts to our customers in Vermont.” For more information, contact G. Stone Commercial at 802/388-9599 or visit https://dealer.doosanequipment.com/middlebury. 

Rhode Island

Connecticut

Rhode Island’s Department of Transportation recently celebrated the early completion of a crucial bridge. The $10.8 million Oxford Street Bridge project wrapped up in two months, way ahead of schedule. The bridge is short but critical to the area since it carries 160,000 vehicles a day on Interstate 95, according to the Department of Transportation. The agency said the work was conducted one lane at a time and the workers used prefabbed beans and deck to complete it quickly. “We have gone in the last four years from less than 50 percent of our projects being on time and on budget, to now as we stand here, over 90 percent of our projects are like this one,” said agency director Peter Alviti. The department credits the use of design-build type of construction management in helping reduce delays and allow for schedule changes and allow for more economical and timely completions.

Connecticut Gov. Ned Lamont and Democratic legislative leaders are planning to vote in early January on a proposal to upgrade the state’s infrastructure. The Democratic governor and the lawmakers announced they have agreed to convene a special session of the General Assembly next month to vote on the transportation plan and a major state bonding bill. There had been expectations of a possible vote next week on the transportation proposal, which will likely include a dozen bridge tolls for just trucks. “We are committed to investing in transportation without recklessly raiding the rainy day fund,” the Democrats said in a joint statement. That was a reference to a Republican transportation funding plan that relies partly on Connecticut’s budget reserves, which the GOP contends would be a good alternative to truck tolls.


Construction Equipment Guide • New England States Supplement • www.constructionequipmentguide.com • January 8, 2020 • Page 7

TH HE STRENGTH H TO

DO M D MO ORE E

No two days are the same. You need streng th and flexibility, powe w r and agility.

YOU NEED DOOSAN. Stop in and d learn how to do more with Doosan® crawler excavators. e A u t h o r i ze d D o o s a n D e a l e r

Barry Eq quipment Co. 30 Birch Island Road Webster,, M MA 01570 57 www.barrye equipment.com 508-949-00 005 Doosan® and the Doosan logo are registered trademarks of Doosan Corp. in n the United States and various other countries arou und the world. 17-D013


Page 8 • January 8, 2020 • www.constructionequipmentguide.com • New England States Supplement • Construction Equipment Guide

CALL FO OR SPECIAL WINTER PRICING G!

The Nice Company, Inc

9 Rosenfeld Drive, Hopedale, M A Toll Free# 888-717-8096 • w w w.theniceco.com

Equipment Sales and Rentals

We sell NICE machines!

Wheel Loader Sale

2011 CAT 906H, 1600 hours ................$49,000

2012 CAT 908H, 3850 hours ................$49,000

2014 Komatsu WA470, 7350 hours, Ride control ..................................................$119,000

2004 Komatsu WA450, 28,000 hours, Hyd. QC, GP bucket ......................................$36,500

2015 Komatsu WA380-7, 7600 hours, AC/Heat, Auto Lube System, 7.75 Yard GP Bucket, No Forks ..................................$89,000

2015 Volvo L70G, 3300 hours, Hydraulic QC w Bucket, AC,Rear View Camera, 20.5 x 25 .... ..............................................................$99,000

2006 Terex TXL300-2, 6600 hours, 2 new tires, 4 yard machine, work ready! ........$49,000

2004 Komatsu WA320L-5, 6400 hours, Very clean, Runs Good! ................................$49,000


Construction Equipment Guide • New England States Supplement • www.constructionequipmentguide.com • January 8, 2020 • Page 9

®


Page 10 • January 8, 2020 • www.constructionequipmentguide.com • New England States Supplement • Construction Equipment Guide

PORTABLE ROCK CRUSHING

208 Holland Road Brimfield, MA 01010

Sales Contact: R.J. Poirier rjpoirier@rjpoirier.com 413-245-3882 Fax: 413-245-3522

C

www.rjpoirier.com

Onsite or Quarry • Making aggregates since 1983

R.I. to Receive an Additional $50M for Bridge Upgrades U.S. Sen. Jack Reed, a senior member of the Senate Appropriations Committee and ranking member of the panel’s Transportation, Housing and Urban Development (THUD) subcommittee, announced that Rhode Island will benefit from an additional $50 million for bridge improvement and repair projects. Reed authored the spending law and during his tenure, has secured almost $350 million to upgrade Rhode Island’s infrastructure. On Dec. 23, Reed and Peter Alviti, Rhode Island Department of Transportation director, discussed investing in projects that will improve Rhode Island’s infrastructure, as

Call us today

(2) 2015 CAT 988K, 9 Yd, High Lift, 50% Tires ..CALL 2016 CAT 980M, Agg Handler, GP, Low Hrs ......CALL

ROCK CRUSHING•(8 ) 4 - GOSHEN, CT

www.FAYWRIGHTINC.com

2015 CAT 336FL, Coupler, Bucket ......................CALL 2013 CAT 836H, CAT U-Blade ............................CALL 2011 CAT D8T, 8U w/Twin Tilt, S/S, ARO............CALL 2011 CAT D9T, 9U w/Twin Tilt, S/S Ripper..........CALL

“We’ve got to make smart, forward-looking investments with the limited dollars available.” Jack Reed

Rhode Island Senator

Hydraulic Cranes 8 to 600 Ton Daily & Hourly Services www.astrocrane.com

Fully Insured 200 Codman Hill Rd., Boxborough, MA 01719 978-429-8666

Place Your Business Card for... 3 months 6 months 12 months

$300* $585* $1040*

only $50 an issue only $45 an issue only $40 an issue

Call now to reserve your space! 800-225-8448 * pre-payment required

well as help create jobs. “We’ve got to make smart, forward-looking investments with the limited dollars available. This appropriations package will help improve Rhode Island’s infrastructure and makes critical investments in highways, bridges, airports, public housing, and other public assets that benefit citizens and businesses alike,” said Reed. “This bill will put people to work upgrading our infrastructure. It will enhance safety, reduce congestion, and help the state attract private investment to drive our economy forward.” RIDOT will receive an extra $50 million — the maximum amount allowable — to help finance the rehabilitation of six bridges: • The Huntington Viaduct, which carries Route 10 over I95, Wellington Avenue and the rail corridor. • The West Elmwood Railroad Bridge, which carries I-95 over the rail corridor north of Exit 16. • The bridge that carries Route 10 over Elmwood Avenue. • Two ramp bridges near the Huntington Viaduct. • A bridge that carries I-95 over an old freight rail corridor. RIDOT expects the design work to take place in 2020 and construction to be under way in 2022. Estimates are the bridge work should be complete by 2024. “I will continue to be an unrelenting advocate for Rhode Island’s priorities and do everything I can to direct federal funding to the state,” said Reed. 


Construction Equipment Guide • New England States Supplement • www.constructionequipmentguide.com • January 8, 2020 • Page 11

2012 Link-Belt HTC-86100 140’ Boom, 35’ Jib, Block, Ball, CAT C13 Engine, ZF Transmission, 4750 hours, 28,000 miles, stk10641 $429,500

2015 Merlo 45.21 Roto, 10,000 lb. Lift Capacity, Max. Lift Height 68’2”, 4WD, 3 Steer Modes, 48” Forks, Hyd Winch, AC, 1853 Hrs, stk8469 ......................................$179,500

2015 National 800D, 110’ Boom, Calibrated for Jib, SFO, Peterbilt 348, 350HP, 781 Hours, 39,237 miles, stk8170.. ..........................................................................$239,500

2007 National 1300H, 110’ Boom, SFO, 22’ Wood Bed, Sterling LT9513, 1555 Hrs, 113,034 Miles, stk10212 ...... ..........................................................................$135,000

2016 Link-Belt TCC750, Block, Ball, Mfg Ext. Warranty, 2433 Hrs, stk8695 ....................................................$POR

2012 National NBT45, 127’ Boom, Ball, Tag Axle, Eaton Fuller Trans, Peterbilt 365, 380HP, 7487 Hours, 53,399 Miles, stk10519..................................................$299,500

2009 Link-Belt HTC-8690, 35’ to 58’ Fly, 60-Ton Block, 10-Ton Ball, 2 Winches, 39,500 lb. Ctwt., 6,775 hours, stk10497 ............................................................$409,500

2014 National 1300A, 110’ Boom, 44’ Jib, Block, Peterbilt 348, 350HP, stk7639..........................................$249,500

2013 Link-Belt RTC-8065II, 35’-58’ fly, 8.5 ton ball, 40ton block, auxiliary lifting sheave, 5417 hours, stk7694 .. ..........................................................................$389,500


Page 12 • January 8, 2020 • www.constructionequipmentguide.com • New England States Supplement • Construction Equipment Guide

Hillsborough • Rockingham • Cheshire • Merrimack • Coos • Grafton • Sullivan • Carroll • Belknap •Strafford • Hillsborough • Rockingham Hampshire... •New Cheshire • Merrimack • Coos • Grafton • Sullivan • Carroll • Belknap •Strafford • Hillsborough • Rockingham • Cheshire • Merrimack • Coos • Grafton • Sullivan • Carroll • Belknap •Strafford • Hillsborough • Rockingham • Cheshire • Merrimack • Coos • Grafton • Sullivan • Carroll • Belknap •Strafford • Hillsborough • Rockingham • Cheshire • Merrimack • Coos • Grafton • Sullivan • Carroll • Belknap •Strafford • Hillsborough • Rockingham • Cheshire • Merrimack • Coos • Grafton • Sullivan • Carroll • Belknap •Strafford • Hillsborough • Rockingham

‘Granite State’ Highway Projects Let

The New Hampshire State Department of Transportation received bids for transportation-related improvement projects. Following is a list of some of the projects let. County: Lebanon Project: X-A003(201) Scope of Work: Bridge Rehabilitation. Location: Red List Bridge carrying Mascoma Street over I-89 (Bridge No. 103/116). Contractors and Bid Amounts: • Audley, R. S. Inc. — $2,465,683 • Swett, E. D. Inc. — $2,622,981 • Piper R. M. Inc. — $2,631,214 • CPM Constructors Inc. — $2,919,374 • Cold River Bridges LLC — $3,175,334 Scheduled Completion Date: Nov. 20, 2020 County: Laconia Project: X-A001(150) Scope of Work: Bridge rehabilitation and superstructure replacement. Location: Carrying U.S. 3 over NH Railroad (Red List). Contractors and Bid Amounts: • Evroks Corporation — $1,182,310 • Swett, E. D. Inc. — $1,209,267 • CPM Constructors Inc. — $1,278,502 Scheduled Completion Date: May 29, 2020 County: District 5 Project: Non-Federal Scope of Work: Road rehabilitation. Location: Langford Road in Candia and N.H. 121A in Sandown. Contractors and Bid Amounts: • Continental Paving Inc. — $1,402,832 • Pike Industries Inc. — $1,614,471 Scheduled Completion Date: July 31, 2020 Counties: Salem and Manchester Project: A004(435) Scope of Work: Roadway construction. Location: Mainline, State Line to Exit 1 NB and SB. Contractors and Bid Amounts: • Audley, R. S. Inc. — $19,425,189 • Severino Trucking Company Inc. — $22,888,000 Scheduled Completion Date: Aug. 28, 2020 County: Statewide Project: X-A004(828) Scope of Work: Bonded Wearing Course (BWC) project. Location: Statewide. Contractors and Bid Amounts: • All States Asphalt Inc. — $3,466,112 • The Gorman Group LLC — $3,929,593 Scheduled Completion Date: Aug. 28, 2020 County: Ossipee Project: X-MGS-NHS-X-T-0271(032)

Scope of Work: Pavement rehabilitation. Location: Along N.H. 16 from N.H. 28 northerly 1.1 mi. Contractors and Bid Amounts: • Coleman Alvin J & Son Inc. — $3,834,267 • Sur Construction Inc. — $4,195,720 Scheduled Completion Date: June 25, 2021 County: Plainfield Project: Non-federal Scope of Work: Install slope stabilization. Location: Between route 12A and the Connecticut River. Contractors and Bid Amounts: • Nott’s Excavating Inc. — $1,237,473 • Weaver Bros. Construction Company Inc. — $2,196,327 Scheduled Completion Date: June 19, 2020 County: Jackson Project: X-A003(593) Scope of Work: Bridge rehabilitation. Location: Red List Bridge carrying N.H. 16 over Ellis River (Bridge No. 144/056). Contractors and Bid Amounts: • Piper R. M. Inc. — $1,462,477 • Winterset Inc. — $1,520,759 Scheduled Completion Date: Oct. 30, 2020 County: Lebanon Project: X-A004(559) Scope of Work: Bridge rehabilitation and preservation efforts. Location: I-89 NB and SB over U.S. 4 and N.H. 10. Contractors and Bid Amounts: • Swett, E. D. Inc. — $9,764,986 • Beck & Bellucci Inc. — $11,467,681 Scheduled Completion Date: Oct. 14, 2022

County: Ossipee Project: X-A000(110) Scope of Work: Intersection improvements. Location: At N.H. 41 with N.H. 16 including N.H. 25. Contractors and Bid Amounts: • Coleman Alvin J & Son Inc. — $1,328,552 • Piper R. M. Inc. — $1,416,338 •Weaver Bros. Construction Company Inc. — $1,475,944 Scheduled Completion Date: June 18, 2021 County: Barnstead and Alton Project: X-A000(208) Scope of Work: Reconstruction of intersection. Location: N.H. 28 with North Barnstead Road/North Road. Contractors and Bid Amounts: • Merrill F L Construction Inc. — $4,126,853 • Northeast Earth Mechanics Inc. — $4,345,397 • Weaver Bros. Construction Company Inc. — $4,521,804 • Coleman Alvin J & Son Inc. — $5,054,515 • Sur Construction Inc. — $5,104,961 • Busby Construction Company Inc. — $5,415,981 • Sargent Corporation — $6,692,734 Scheduled Completion Date: June 25, 2021 County: Statewide Project: X-A004(832) Scope of Work: Resurfacing. Location: Tier 2 roadways in District 3. Contractors and Bid Amounts: • Continental Paving Inc. — $4,114,712 • Pike Industries Inc. — $4,751,313 Scheduled Completion Date: Sept. 11, 2020


Construction Equipment Guide • New England States Supplement • www.constructionequipmentguide.com • January 8, 2020 • Page 13

ALL NEW

RT PILOT CONTROLS TRACK LOADER

www.mustang mustang-by y-manitou manitou.com TRACK LOADERS

•

SKID LOADERS

•

ARTICU UL A T E D L O A D E R S

ABLE TOOL & EQUIPMENT www.abletool.net 410 Burnham Street South Windsor, CT 06074 860-289-2020

149 Rocus Street Springfield, MA 01104 413-363-0780


Page 14 • January 8, 2020 • www.constructionequipmentguide.com • New England States Supplement • Construction Equipment Guide

NEW ENGLAND SUPPLEMENT ADVERTISER INDEX ARGUS INDUSTRIAL COMPANY ....................................1 ASTRO CRANE ..............................................................10 BARRY EQUIPMENT CO. INC. ........................................7 BULLETIN BOARD..........................................................10 CHADWICK-BAROSS INC..............................................16 DOOSAN NORTHERN NEW ENGLAND ........................9 EQUIPMENT EAST ........................................................1,5 FAY & WRIGHT EXCAVATING INC ................................10 FOLEY INC - WORCESTER ............................................1 GORILLA HAMMERS........................................................1 J R VINAGRO CORPORATION........................................1 M G EQUIPMENT ............................................................1 MILTON CAT....................................................................13 MUSTANG MFG ..............................................................13 R J POIRIER HEAVY EQUIPMENT................................10 ROGERS BROTHERS CORPORATION ........................15 SUMMIT SUPPLY LLC ......................................................1

PC Construction was honored by the Associated General Contractors of Vermont with a Best Builders Award for the University of Vermont STEM Complex project in Burlington, Vt.

PC Construction Earns Vt. AGC’s Best Builders Award PC Construction was honored by the Associated General Contractors of Vermont with a Best Builders Award for the University of Vermont STEM Complex project in Burlington, Vt. The award was presented in the Academia, New Construction category for outstanding quality of work and effort. This four-year construction project involved the demolition of two buildings and the construction of two new STEM buildings totaling nearly 185,000 sq. ft. The project took place in three phases: • Phase 1: Demolition of Angell Lecture Hall and construction of Discovery Hall, an 111,000-sq.-ft. teaching and research laboratory building with an 86-ft.-long overhead bridge connecting to UVM’s engineering building. • Phase 2: Demolition of the five-story, 165,000-sq.-ft. Cook Physical Science Building just 30 ft. from the newly construct-

ed Discovery Hall. • Phase 3: Construction of Innovation Hall, a 73,000-sq.-ft. modern classroom and office building with a five-story connector to Discovery Hall. The project included a highly technical scope of work and a large-scale construction project taking place in the center of a busy university campus. As the flagship new facility for the University, the project included 34 teaching and research laboratories, advanced physics laboratories, clean room spaces all connected with intricate architectural details. Extensive coordination was required to enable modern architectural, structural and MEP elements to be procured and constructed successfully. The STEM Complex is the largest construction project the University has undertaken and is key to addressing the acute need for STEM education and industry in the state of Vermont. 

T-QUIP SALES & RENTAL INC ........................................8 THE N.I.C.E. COMPANY ..................................................8 THE W. I. CLARK COMPANY ..........................................2 TYLER EQUIPMENT CORPORATION ............................3 WOODS CRW CORP......................................................11 The Advertisers Index is printed as a free editorial service to our advertisers and readership. Construction Equipment Guide is not responsible for errors or omissions.

This four-year construction project involved the demolition of two buildings and the construction of two new STEM buildings totaling nearly 185,000 sq. ft.


Construction Equipment Guide • New England States Supplement • www.constructionequipmentguide.com • January 8, 2020 • Page 15

TRAILERS TO MEET EVERY HAULING CHALLENGE! Committed to building superior quality, reliability and durability into every trailer.

ROGERS BROTHERS CORPORATION ALBION, PA

The Ultimate in Trailers®

Tyler Equipment 251 Shaker Road East Longmeadow, MA 01028 (413) 525-6351 • (800) 292-6351 Parts: (877) 255-6351

1980 Berlin Turnpike Berlin, CT 06037 (860) 356-0840 • (800) 352-4473 Parts: (860) 356-0848

C.N. Wood Co., Inc. 200 Merrimac St. Woburn, MA 01801 (781) 935-1919

140 Wales Ave. Avon, MA 02322 (508) 584-8484

60 Shun Pike Johnston, RI 02919 (401) 942-9191

www.cn-wood.com

www.tylerequipment.com

For more than 110 years, ROGERS® trailers have stood above the rest in rugged durability, unsurpassed quality and superior design. Contact your local dealer for a quote today.


Page 16 • January 8, 2020 • www.constructionequipmentguide.com • New England States Supplement • Construction Equipment Guide

318 COOPER CIRCLE, PEACHTREE CITY TY, GA 30269

sanyam merica.com

More T M Than M Machin nes IT’S HOW WORK GETS DONE

Chadwick-BaRoss, Inc.

Thompson

15 Katrina Road • Chelmsford, MA 01824 (978) 256-9571 31 James P. Murphy Industrial Highway • West Warwick, RI 02893 (844) 238-7673

51 N. Lisbon Road • Lewiston, ME 04240 (207) 784-6273


Turn static files into dynamic content formats.

Create a flipbook
New England 1 January 8, 2020 by Construction Equipment Guide - Issuu