New England 1 January 8, 2020

Page 1

State Supplement sponsored by:

1

11

THE NEW ENGLAND EDITION

A Supplement to:

95

1

201 16 9

26

2

1 3

91

89

2

95 3

2 2 7

1

93

495

16

89 4

89

95

202

7

91

9

95

93

2

95 2

93 90

90

7

95 91

7

SHIP WITHIN 48 HOURS

3

84

495 6

84

6

6

195

395

95 91

January 8 2020

Vol. LVII • No. 1

95

SAME DAY PARTS AVAILABILITY

95

®

24 HOUR TECHNICAL SUPPORT BACKED BY A 75 YEAR BUSINESS Thousands in Service!

“The Nation’s Best Read Construction Newspaper… Founded in 1957.”

Your New England States Connection •  Kent Hogeboom 315-866-1423 2208 Plainfield Pike • Johnston, RI 02919 401-943-7100 • Fax: 401-647-5041

www.jrvinagrocorp.com info@jrvinagrocorp.com

Affordable Price. Premium Service.

CALL 800-367-4937 *On approved credit • Financing Available

SPS New England Leads Vital N.H., Maine Infrastructure Project

Specializing in:

Demolition, Portable Crushing, Material Sales, C & D Recycling, Land Clearing, Heavy Hauling & Trucking Call for Pricing

LEED Accredited in Waste Management

2020 EZ-Screen 1200XLS 36 Month lease AS LOW AS

$1,500* / Month Authorized Doosan Dealer

978-454-3320 (Dracut, MA) 603-410-5540 (Bow, NH) Optional 3 Product Conveyor

6’x5’ Double Deck Screenbox Works with 1/2 to 1 3/4 Yd. Loaders, 25 H.P. Kohler Diesel Engine, 24” Conveyor Dumps Screened Product 9’ High, Two (2) Year Warranty! $44,900 plus freight. Other Screeners Available

EZ-SCREEN

www.ez-screen.com

*Limited time offer. Some restrictions apply. See dealer for details.

WE STOCK RUBBER TRACKS for Over 6,000 Models! Some Used Tracks A & GA Available. NJ, TX, WOUSES WAREH • HIGH QUALITY • FAST SHIPPING • GUARANTEED TO FIT

Tunnel placement that will be under the highway for employee access and utilities.

• UNDERCARRIAGE PARTS • FLATPROOF SKIDSTEER TIRES • RUBBER PADS FOR STEEL TRACKS

888-888-1248

Ken Liebeskind

CEG CORRESPONDENT

248-745-5828

Cat IT38G, 3.25cy, 7,800 Hrs, Mich Radials 67%, 3rd Valve, Owned for many years, Runs Excellent, No blow by, No leaks, Very Good ..$49,750 or bo

Phil (413) 427-7171 • Largest hammer repair facility in North America • Demolition tools and parts for ALL makes and models • Hammer-equipped excavator rentals • Backed by a 75 year family owned business CALL YOUR ONE-STOP HAMMER SHOP™ TODAY!!!

www.foleyengines.com

Ground underneath the bridge.

CALL 888-81-GORILLA(46745)

The Piscataqua River Bridge, a through arch bridge that crosses the Piscataqua River and connects Portsmouth, N.H., with Kittery, Maine, is being renovated. Work on the bridge began in June and will be finished in May 2022. The primary contractor on the job is SPS New England/Salisbury, Mass. The bridge, which was built between 1968 and 1972 and opened to traffic in 1972, carries I-95 between Portsmouth and Kittery and the state line is close to the middle of the bridge. This is the first renovation of the bridge since construction was completed. The project will be completed in two phases with Phase 1 from June 2019 to fall 2020 on the outside edges of the bridge and Phase 2 through 2022 with work inside the bridge and onto the travel lanes.

The budget for the job is $53 million, with costs shared by Maine and New Hampshire DOT, the Maine Turnpike Authority and the Federal Highway Administration. The $53 million cost of the project is higher than the initial estimate of $36 million. According to Nina Fisher, deputy commissioner of the Maine Transportation Department, the higher price tag was due to three reasons: work was added to the original plan; increased contract restrictions to reduce traveler impacts dursee PISCATAQUA page 4


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.