State Supplement sponsored by:
1
11
THE NEW ENGLAND EDITION
A Supplement to:
95
1
201 16 9
26
2
1 3
91
89
2
95 3
2 2 7
1
93
495
16
89 4
89
95
202
7
91
9
95
93
2
95 2
93 90
90
7
95 91
7
SHIP WITHIN 48 HOURS
3
84
495 6
84
6
6
195
395
95 91
January 8 2020
Vol. LVII • No. 1
95
SAME DAY PARTS AVAILABILITY
95
®
24 HOUR TECHNICAL SUPPORT BACKED BY A 75 YEAR BUSINESS Thousands in Service!
“The Nation’s Best Read Construction Newspaper… Founded in 1957.”
Your New England States Connection • Kent Hogeboom 315-866-1423 2208 Plainfield Pike • Johnston, RI 02919 401-943-7100 • Fax: 401-647-5041
www.jrvinagrocorp.com info@jrvinagrocorp.com
Affordable Price. Premium Service.
CALL 800-367-4937 *On approved credit • Financing Available
SPS New England Leads Vital N.H., Maine Infrastructure Project
Specializing in:
Demolition, Portable Crushing, Material Sales, C & D Recycling, Land Clearing, Heavy Hauling & Trucking Call for Pricing
LEED Accredited in Waste Management
2020 EZ-Screen 1200XLS 36 Month lease AS LOW AS
$1,500* / Month Authorized Doosan Dealer
978-454-3320 (Dracut, MA) 603-410-5540 (Bow, NH) Optional 3 Product Conveyor
6’x5’ Double Deck Screenbox Works with 1/2 to 1 3/4 Yd. Loaders, 25 H.P. Kohler Diesel Engine, 24” Conveyor Dumps Screened Product 9’ High, Two (2) Year Warranty! $44,900 plus freight. Other Screeners Available
EZ-SCREEN
www.ez-screen.com
*Limited time offer. Some restrictions apply. See dealer for details.
WE STOCK RUBBER TRACKS for Over 6,000 Models! Some Used Tracks A & GA Available. NJ, TX, WOUSES WAREH • HIGH QUALITY • FAST SHIPPING • GUARANTEED TO FIT
Tunnel placement that will be under the highway for employee access and utilities.
• UNDERCARRIAGE PARTS • FLATPROOF SKIDSTEER TIRES • RUBBER PADS FOR STEEL TRACKS
888-888-1248
Ken Liebeskind
CEG CORRESPONDENT
248-745-5828
Cat IT38G, 3.25cy, 7,800 Hrs, Mich Radials 67%, 3rd Valve, Owned for many years, Runs Excellent, No blow by, No leaks, Very Good ..$49,750 or bo
Phil (413) 427-7171 • Largest hammer repair facility in North America • Demolition tools and parts for ALL makes and models • Hammer-equipped excavator rentals • Backed by a 75 year family owned business CALL YOUR ONE-STOP HAMMER SHOP™ TODAY!!!
www.foleyengines.com
Ground underneath the bridge.
CALL 888-81-GORILLA(46745)
The Piscataqua River Bridge, a through arch bridge that crosses the Piscataqua River and connects Portsmouth, N.H., with Kittery, Maine, is being renovated. Work on the bridge began in June and will be finished in May 2022. The primary contractor on the job is SPS New England/Salisbury, Mass. The bridge, which was built between 1968 and 1972 and opened to traffic in 1972, carries I-95 between Portsmouth and Kittery and the state line is close to the middle of the bridge. This is the first renovation of the bridge since construction was completed. The project will be completed in two phases with Phase 1 from June 2019 to fall 2020 on the outside edges of the bridge and Phase 2 through 2022 with work inside the bridge and onto the travel lanes.
The budget for the job is $53 million, with costs shared by Maine and New Hampshire DOT, the Maine Turnpike Authority and the Federal Highway Administration. The $53 million cost of the project is higher than the initial estimate of $36 million. According to Nina Fisher, deputy commissioner of the Maine Transportation Department, the higher price tag was due to three reasons: work was added to the original plan; increased contract restrictions to reduce traveler impacts dursee PISCATAQUA page 4