New England 1 January 9, 2018

Page 1

State Supplement sponsored by:

1

11

THE NEW ENGLAND EDITION

A Supplement to:

95

1

201 16 9

26

2

1 3

91

89

2

95 3

2 2 7

1

93

495

16

89 4

89

95

202

7

91

9

95

93

2

95 2

93 90

90

7

95 91

7

SHIP WITHIN 48 HOURS

3

84

495 6

84

6

6

195

395

95 91

January 9 2019 Vol. L • No. 1

95

SAME DAY PARTS AVAILABILITY

95

®

24 HOUR TECHNICAL SUPPORT BACKED BY A 75 YEAR BUSINESS Thousands in Service!

“The Nation’s Best Read Construction Newspaper… Founded in 1957.”

Your New England States Connection •  Kent Hogeboom 1-800-988-1203 2208 Plainfield Pike • Johnston, RI 02919 401-943-7100 • Fax: 401-647-5041

www.jrvinagrocorp.com info@jrvinagrocorp.com

LEED Accredited in Waste Management

Large Enough to Service You; Small Enough to Know You

61 Silva Lane • Dracut, MA 01826

6’x5’ Double Deck Screenbox Works with 1/2 to 1 3/4 Yd. Loaders, 25 H.P. Kohler Diesel Engine, 24” Conveyor Dumps Screened Product 9’ High, Two (2) Year Warranty! $42,900 plus freight. Other Screeners Available

EZ-SCREEN

www.ez-screen.com

Call Today (978) 454-3320

WE STOCK RUBBER TRACKS for Over 6,000 Models! Some Used Tracks A & GA Available. NJ, TX, WOUSES WAREH • HIGH QUALITY

‘Missing Move’ Flyover Ramp Work to Improve Providence Traffic Flow The reconstruction of the Route 6 & Route 10 Interchange in the Olneyville area, just west of downtown Providence, began this fall and will lead to the replacement of seven of the nine bridge structures and the creation of a “missing move” flyover ramp to improve regional traffic flow. The $410 million project, which includes $248 million in construction costs, is The $410 million project, the largest construction contract in Rhode Island Department of which includes $248 million in Transportation history, involving an interchange that serves as an east-west construction costs, is the largest regional link between interstates 295, 95 and 195, accommodating 100,000 trips construction contract in Rhode per day. Island Department of The design-build project is being built by 6/10 Transportation history, involving an interchange that serves as an east-west regional link between interstates 295, 95 and Constructors, a joint venture with Barletta Heavy Industries 195, accommodating 100,000 trips per day. see PROVIDENCE page 18

Bridges Work Begins Over Merrimack River

• FAST SHIPPING • GUARANTEED TO FIT • UNDERCARRIAGE PARTS • FLATPROOF SKIDSTEER TIRES • RUBBER PADS FOR STEEL TRACKS

888-888-1248

248-745-5828 Cat IT38G, All pins and bushing are tight, 3.25 cy, 9700 hrs, 3rd valve, good Michelin 20.5R25, Nice machine strong engine and tranny ...... ........$49,500 or bo Phil (413) 427-7171 • Largest hammer repair facility in North America • Demolition tools and parts for ALL makes and models • Hammer-equipped excavator rentals • Backed by a 75 year family owned business CALL YOUR ONE-STOP HAMMER SHOP™ TODAY!!!

www.foleyengines.com

*On approved credit • Financing Available

CEG CORRESPONDENT

Call for Pricing

Optional 3 Product Conveyor

CALL 800-367-4937

By Ken Liebeskind

Specializing in:

Demolition, Portable Crushing, Material Sales, C & D Recycling, Land Clearing, Heavy Hauling & Trucking

2019 EZ-Screen 1200XLS

Affordable Price. Premium Service.

CALL 888-81-GORILLA(46745)

Work is under way on the ramps; realigning the roadway; $102 million project to replace improving the roadway drainage the bridges that carry traffic on Isystem; constructing pier protec495 over the Merrimack River in tion barriers for existing bridge Haverhill. piers at the River Street (Exit 49) Early construction activities and Route 125 Connector (Exit included clearing and erosion 48) overpasses; and improving controls along I-495 including signage and pavement markings. the median and areas adjacent to In order to minimize the the I-495 northbound bridge and Construction of the I-495 northbound bridge is impacts on the traveling public slopes. and the local community, expected to be completed by 2020. Current construction activities MassDOT will maintain three for the new I-495 northbound bridge include in-water work, lanes of travel in each direction on I-495 north and southwhich consists of driving piles for the temporary access tres- bound during peak commuting hours throughout constructle and drilling shafts for the bridge foundation. tion. Construction of the I-495 northbound bridge is expected For more information, please visit mass.gov to be completed by 2020. The new I-495 southbound bridge /i-495-haverhill-bridge-replacement-project. will be constructed beginning in 2020. The full project is (This story also can be found on Construction expected to be completed in 2022. Equipment Guide’s website at www.constructionequipThe project also includes widening and reconstructing mentguide.com.)


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.
New England 1 January 9, 2018 by Construction Equipment Guide - Issuu