State Supplement sponsored by:
GEORGIA STATE EDITION
A Supplement to:
SHIP WITHIN 48 HOURS SAME DAY PARTS AVAILABILITY 24 HOUR TECHNICAL SUPPORT
®
BACKED BY AN 85 YEAR BUSINESS
January 21 2026
Thousands in Service!
Vol. XXVIII • No. 2
“The Nation’s Best Read Construction Newspaper… Founded in 1957.” Your Georgia Connection: Rich Olivier, Atlanta, GA • 1-800-409-1479
Affordable Price. Premium Service.
CALL 800-367-4937 *On approved credit • Financing Available
A Link-Belt 218 HSL crawler crane is positioned to lower concrete sound walls into place.
By Irwin Rapoport CEG CORRESPONDENT
Phase II of the $45.8 million “Spiderweb” project debuted in April 2025 when crews from C.W. Matthews Contracting Co. began constructing a new five-lane, approximately 216-ft.-long bridge over Norfolk Southern Railway tracks on Buena Vista Road in South Columbus. The project also involves replacing the existing bridge over Bull Creek with a new eight-lane, approximately 321-ft.-long bridge. Additionally, the project includes the construction of two new roundabouts at nearby intersec-
tions. The project is expected to be completed in 2027, following a 24-month closure of the intersection connecting Buena Vista to local roads, which began on April 7, 2025. The $5.3 million Phase I, which began in August 2020, was awarded to Robinson Paving Co. That project was completed in August 2023. “[That] included the roundabout at Annette [Avenue] and Martin Luther King [Boulevard], the new signal at Annette and the majority of the utility relocations,” said Vance Beck, the Columbus Consolidated Government’s director of engineering.
Both phases of the project, which were funded by the Georgia Department of Transportation (GDOT) and the Transportation Special Purpose Local Option Sales Tax (TSPLOST), are being managed by the city of Columbus. Columbus residents passed the TSPLOST in 2012. The closure of the intersection, referred to locally as the “spiderweb,” is expected to save $5 million by shortening the construction time by a year. “There’s always utility problems that arise or weather,” said Beck, “but [the closure] is slated to be a two-year project.” see GDOT page 6
Page 2 • January 21, 2026 • www.constructionequipmentguide.com • Georgia State Supplement • Construction Equipment Guide
5710 Riverview Rd SE Mableton, GA 30126 (404) 696-7210
COWIN.COM | 1-800-239-2694
750 Hurricane Shoals Rd NE Lawrenceville, GA 30043 (770) 627-0910
Construction Equipment Guide • Georgia State Supplement • www.constructionequipmentguide.com • January 21, 2026 • Page 3
Page 4 • January 21, 2026 • www.constructionequipmentguide.com • Georgia State Supplement • Construction Equipment Guide
The JCB Teeleskid is four machines in one and the world’s only skid steer with a telescop pic boom. Imagine what th hat does for efficiency. Actually, don’t imagine it. Instead, give the Tele e eskid a try and see how much more youu can accomplish. Visit JC CB.com to learn more.
www.wesprojcb.com 1501 Atlanta Industrial Way NW Atlanta, GA 30331 (678) 402-6867
5493 Goshen Springs Rd Norcross, GA 30093 (470) 847-4700
Construction Equipment Guide • Georgia State Supplement • www.constructionequipmentguide.com • January 21, 2026 • Page 5
6 TONS O OFF COMPACT POW WER The new Cat® 306 CR Next Generation Mini Excavator deliveers maximum power and performance in a mini sizze to help you work in a wider rangee of applications.
SAFER OPERATION
OSTS • UP TO 10% LOWER TOTAL OWNERSHIP CO
are just a few of the safety featurees built into the machine.
• UP TO 20% MORE PERFORM ANCE
SIMPLE SERVICE
ALL-DAY AY COMFORT & EASE OF OPERA AT TION Your choice of a sealed or pressurized cab is equipped with an improved air conditioning system, adjustable wrist rests and a suspension seat to helpp keep you working comfortably all day long. Controls are easy to use, and the intuitive Next Generation monitor provides customizable machine operator preferences and easy to read machine information.
EXCLUSIVE STICK STEER TRAVEL MODE Maneuvering on the jobsite is even easier with the Cat Stickk Steer option. Switch from traditional travel controls with levers and pedal to joystick ccontrols with a push of a button.
Maintenance is quick and easy onn the Cat 306 CR. Routine check poiints are easy to access at ground level with groupped service points and robust servicce panels.
LOWER OPERA AT TING COSTS S & BLADE OPTIONS mp, the Cat 306 CR was designed to reduce operating with a variable displacement pum blade, angle blade or Extra Tool Carrier (XTC).
Contact our dealership today to t learn more about the newestt 6-ton 6-t mini excavator in the market..
BIG PERFORMANCE IN A MINI DESIGN Increased lifting, swinging and travel and multi-functional peerformance help you get the !
800.282.1562 | Y YanceyBros.com
Page 6 • January 21, 2026 • www.constructionequipmentguide.com • Georgia State Supplement • Construction Equipment Guide
GDOT’s ‘Spiderweb’ Project Calls for Bridge Replacement GDOT from page 1
One initiative goal is to reduce congestion in a half-mile area near a railroad crossing that has caused delays due to passing trains and motorists’ deviations to use alternative routes. Beck agreed with local complaints, noting that trains entering the Columbus railyards often cause significant traffic delays for motorists traveling to midtown and downtown Columbus. The project has eliminated the Norfolk Southern Railroad at-grade crossing on Buena Vista Road near Martin Luther King Jr. Boulevard. Additionally, it replaced a second bridge over Bull Creek near St. Marys Road and Buena Vista Road due to safety concerns. Nearby roads, including Ilges Road, Morris Road and MLK Jr. Blvd., also received substantial upgrades. Phase I, particularly its utility relocations, was needed to prepare for the bridge construction. Crews also demolished a school, a warehouse, a Circle K and a parts store. CHA Solutions designed both Phases I and II. “CHA coordinated with Norfolk Southern Railroad to minimize disruptions to rail operations,” according to the CHA Solutions web page. “We conducted an in-depth traffic study, which resulted in the incorporation of three signal designs, three roundabouts and a connector road. The project’s staging complexity necessitated the installation of four temporary signals. We also completed subsurface utility engineering [SUE] inspections in the utilityheavy corridor. The project also required two sizable retaining walls. “This relocation enhances corridor safety and alleviates congestion associated with the train crossings,” it added. “The addition of murals celebrating Columbus’ heritage beautify the corridor, while multiuse trail connectivity fosters links between the Dragonfly trail network, schools, parks, churches and residences.” The plan proved to be complicated. “We had to go back and revise the construction plans and remove some redundant items that had already been completed,” Beck said. “We got that done. Of course, we wanted GDOT to vet those plans, and we got all of that.” C.W. Matthews is working in a large, unfettered construction site, which provides equipment operators with plenty of room to maneuver and for construction materials
The new bridge begins to take shape in Columbus.
to be stored on site, Beck said. Early on, operations weren’t disrupted by the rail traffic as crews were able to work on both sides of the new bridge. Brennan J. Hoy, a project engineer of the Columbus Consolidated Government, said that the new bridge foundations are based on pre-stressed concrete piles. “Wick drains were utilized to help accelerate construction,” he said. “The clearance height for the new bridge over the Norfolk Southern rail will be approximately 22 feet. Bridge abutments are being constructed using mechanically stabilized earth [MSE] walls. Heavy equipment, such as cranes, have been crucial in order to demolish the existing Bull Creek bridge and install the new deep foundations for the bridges.” Excavation operations were critical in preparing the construction site for the approaches, the siting of the columns
Crews from C.W. Matthews Contracting Co. are constructing a new five-lane, approximately 216-ft.-long bridge over Norfolk Southern Railway tracks on Buena Vista Road in south Columbus.
on both sides that will play a key role in holding up the deck and in erecting a concrete panel sound wall, Hoy said. The excavation operations, handled by excavators and loaders, created level spaces for the drill rigs to operate. Once complete, the drill rigs prepared the spots for the long, prefabricated concrete columns that were placed with the help of the crawler cranes. With the columns installed, crews placed the concrete sound wall panels, although there is plenty of work remaining to complete the bridge, Hoy said. Crews are using a wide variety of equipment on the project — multiple large cranes, including a Link-Belt 218 crawler crane, dozers, excavators, loaders, drill rigs, motor graders and other large pieces. CEG (All photos courtesy of Columbus Consolidated Government.)
Phase II of the $45.8 million “Spiderweb” project debuted in April 2025.
Construction Equipment Guide • Georgia State Supplement • www.constructionequipmentguide.com • January 21, 2026 • Page 7
MADE FOR
AMERICA SERVICE THAT’S T
LOCAL SCHEDULE A
DEMO TODAY
sanyamerica.com
SY35U
©2023 SANY America, Inc.
770-819-6600 42 240 MLK Jr. Drive SW Attlanta, GA 30336 A
centra alatlantatractor.com
Page 8 • January 21, 2026 • www.constructionequipmentguide.com • Georgia State Supplement • Construction Equipment Guide