Georgia 24, November 18, 2020

Page 1

State Supplement sponsored by:

441

59

75

Cornella 19

Rome 85 27

Athens

GEORGIA STATE EDITION

A Supplement to:

441

Atlanta

20

Madison Augusta

85

20

Griffin 1

129

Milledgeville

75

La Grange

Macon

301

185 19

16

Dublin

Swainsboro Oak Park

Columbus

Statesboro

341 441 16

Lyons Americus

Savannah

McRae

301

1

Cordele

27 82

Dorchester

341

Cuthbert

75

Albany

84

Douglas Tifton

82

95

82

Blakely

Pearson 27 84

Moultrie

19 319

Bainbridge

84

Valdosta Thomasville

®

Waycross Brunswick 82

SHIP WITHIN 48 HOURS

1 441

SAME DAY PARTS AVAILABILITY 24 HOUR TECHNICAL SUPPORT BACKED BY A 75 YEAR BUSINESS

November 18 2020

Thousands in Service!

Vol. XXI • No. 24

“The Nation’s Best Read Construction Newspaper… Founded in 1957.” Your Georgia Connection: Rich Olivier, Atlanta, GA • 1-800-409-1479

DDI Construction at Camp Creek Parkway, I-285 in Fulton County CMES Inc. constructed its first diverging diamond interchange (DDI) as part of the Georgia Department of Transportation’s $13 million Camp Creek Parkway (SR 6) project at I-285 in the city of East Point (Fulton County), an initiative that began on July 6, 2018, to help reduce congestion and improve safety for motorists. “The project addressed increasing traffic by improving traffic flow and mobility, will help to reduce the number of traffic incidents and will provide a distinctive gateway for the area,” said Tori Brown, district communications officer, GDOT District 7 of the Metro Atlanta Office. “This was the seventh DDI constructed in Georgia. Traffic analysis had shown increasing numbers of crashes and routine traffic congestion at the interchange. “Improvements for this interchange were identified and evaluated by GDOT’s Office of Traffic Operations, as well as the Office of Planning through its Metro Atlanta Operational Planning Study, which found that both of the I-285 off-ramps to SR 6 tend to back up onto I-285 during the peak period,” she added. “In addition, the DDI was designed with truck and tractor-trailer traffic in mind — cars and trucks will move through the DDI more efficiently. Dedicated pedestrian walkways now provide safer access through the DDI.” The work zone covered the interchange of I-285 and SR 6/Camp Creek Parkway and those at N. Commerce Drive at SR 6/Camp Creek Parkway and Desert Drive at SR 6/Camp Creek Parkway. All four intersections were signalized prior to construction. The SR 6/Camp Creek Parkway was a four-lane principal arterial with shoulders and a median; the bridge over I-285 was six lanes wide, including two travel lanes and one left turn lane in each direction; and I-285 was an eight-lane urban interstate principal arterial with rural shoulders and barrier separated median. The DDI altered the configuration by reconstructing the outside shoulder on both sides and adds 7 ft. to the north side of see PARKWAY page 6

Affordable Price. Premium Service.

CALL 800-367-4937 *On approved credit • Financing Available


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.