Skip to main content

California 26 December 22, 2019

Page 1

CALIFORNIA STATE EDITION

A Supplement to:

December 22 2019 Vol. I • No. 26

“The Nation’s Best Read Construction Newspaper… Founded in 1957.” Your California Connection – Debbie Hansen – 1-702-239-0348 – dhansen@cegltd.com

Construction Crystal Ball Leading Economists Make 2020 Golden State Predictions

By Giles Lambertson CEG CORRESPONDENT

With 2020 nearly upon us, construction industry executives are wondering what the new year holds for them. They are attending presentations by economists, peering into crystal balls and otherwise anxiously looking into the future. On the other hand, some are just looking to California for insight. The Golden State long has been one of the bellwethers for cultural and economic trends in this country, including commercial and residential building and heavy equipment emission regulations. It follows that what economists see happening in California some-times can be a useful projection of what will be happening eastward across the country.

“The economy is in good enough shape that firms will be booking new orders throughout the state.” Ken Simonson Associated General Contractors

What Do Economists See for 2020? While the economic outlook for next year in California is akin to a weatherperson’s “sunny with a chance of showers,” the emphasis seems to be on the sunny part. For example, Ken Simonson is bullish about California’s 2020 construction prospects. However, the chief economist for Associated General Contractors is not Pollyannaish. While he believes prospects for construction activity in California are good, he says there are crosswinds that might blow the best laid plans off course. “The economy is in good enough shape that firms will be booking new orders see FORECAST page 8

CTION BAR NONE AUC

SACRA AMENTO MONTHLY PU UBLIC AUCTION

PORTLAND MO ONTHLY PUBLIC AUC CTION

Saturday, January J 11th, 2020 @ 9:00am 4751 Power Inn Rd., Sacramento, CA 95826

Friday, January 31st, 20 020 @ 8:30am 1501 N. Schmeer Rd., Portland, rtland, OR 97217


Page 2 • December 22, 2019 • www.constructionequipmentguide.com • California State Supplement • Construction Equipment Guide


Construction Equipment Guide • California State Supplement • www.constructionequipmentguide.com • December 22, 2019 • Page 3

GROW YOUR YOUR BUSINESS WITH THE Q QUALITY YOU EXPECT OF A CAT® MACHINE AND THE UNMATTCHED SUPPORT OF YOUR LOCAL DEALER. GET IN ON THE SAVINGS V TODAY Y.

www.hawthornecat.com San Diego 858-674-7107

www w.holtca.com Centtral Northern California 888-294-9778 -294-9778

www.petersoncat.com Bay Area & Northern California, Oregon, and Southwest Washington Washington ton 844-349-4353

www.quinncompany.com Central & Southern California 888-842-2155

*Financing offers valid from October 1, 2019 to January 31, 2020. 0% for 60 months finance rate with zero down available only on the following new machines manufactured by Caterpillar aterpillar Inc.: Cat Mini Excavators, Compact TTrack Loaders, Multi Terrain Loaders, Skid Steer Loaders and Compact Wheel Loaders (903-908 models only). 0% for 48 monnths with zero down, plus a 3000 hour/3 year Powertrain & Hydraulic Extended Protection Plan only on n the following new machines manufactured by Caterpillar Inc.: Cat Compact Wheel Loaders L (910-914 models only), Backhoe Loaders, Small Dozers, Small Wheel Loadeers and TTelehandlers. elehandlers. TToo be eligible for an Equipment Protection Plan offer (where applicable), the machine hine must be financed with Cat Financial. FFinancing, zero down, and published rate terms are subject to credit approval through Cat Financial for customers who qualify. Buyers are not guaranteed to qualify. Higher rates may apply for buyers with lower credit rating or qualifications. ifications. Offer available only at participating Cat dealer dealers. Flexible payment terms available to those who qualify. Offer is available to customers in the USA only. Offer subject to machine availability. Offer may change without prior notice and additional terms and conditions may apply. Contact your Cat dealer for details. **The two-year standard warranty (2,000 hours or 24 months, whichever occurs first) applies only to new Cat Mini Excavators, Compact Track Loaders, Multi Terrain Loaders and Skid Steer Loaders. © 2019 Caterpillar. All Rights Reserved. CA AT T, CA ATERPILLAR, TERPILLAR, LET’S DO THE WORK, their respective logos, “Caterpillar YYellow”, ellow”, the “Power Edge” and Cat “Modern Hex” trade dress as well as corporate and product identity used herein, are trademarks of Caterpillar and may not be used without permission. www.cat.com / www.caterpillarr.com .com


Page 4 • December 22, 2019 • www.constructionequipmentguide.com • California State Supplement • Construction Equipment Guide

Generator, Engine Sales Leader Started Out as ‘a Dream’ Central California Power is located in Bakersfield, Calif.

California emission standards. Those were three dirty words for many in the construction industry at the turn of the century as the state was at the forefront of a nationwide push to clean up the discharge of the diesel engines it relied so heavily upon. But that was not the case for a Bakersfield, Calif. man who could see an opportunity amidst all that red tape and ultimately built a thriving business around repowering older equipment with up-to- date, tier-compliant engines. Founded in 1982 by Rod Headley as an engine and transmission repair shop to serve the oil field industry, Central California Power (CCP) was started “with $22,000 and a

CCP has a Tier IV final engine for any application.

dream,” according to the former Air Force ground control tech. Over the next three decades CCP became a leader in generator and engine sales and repowers and is the only business in California that will repower any manufacturer’s equipment. “That’s where we really specialize,” said Raul Portugal, CCP director of sales. “That’s really our golden goose egg. We are able to take a Caterpillar, Volvo, Hitachi, Komatsu, Liebherr and any other manufacturer that you commonly see and adapt that to a Tier 4 final compliant engine. Most of our competition runs brand specific.” Originally focusing on California’s oilfields, Headley began diversifying when oil prices started to drop and work in that sector dipped. He took on the highly regarded Marmom Truck line, and shortly thereafter he added Caterpillar and Cummins engines. In 1996 Rod’s son Blake joined his father and quickly became a valued partner. Today Blake oversees the day-today operations and makes sure every repower is completed to customer expectations. Repowering diesel equipment became a bigger part of their business over the next several years but at that time the upgrades were more about advancements in electronics to meet new changing emission compliance standards for oilfield and construction clients.

Changing Focus As clean air became a major concern in the construction industry, the company’s focus began to shift. A major turning point was in 2004 when Headley got involved with a program alongside an environmental consulting firm, housing developer and the local air district. The plan was to reduce diesel emissions and cut costs for environmental permits. CCP would supply and install the new low emission engines paid by the housing developers and the new emissions tracked by the local air district. Less emissions means the developers paid less for their permits to operate. Over the life of the five- year project, CCP’s upgrade of the equipment power plants resulted in an 800 to 1,200-ton reduction in pollutants annually. CCP was awarded the Beautiful Bakersfield Award in 2007 for its help in reducing these harmful emissions. In 2006 CCP started working directly with the San Joaquin Valley Air Pollution Control District for funding made available through emission reduction grants from the California Air Resources Board. These programs subsidize the replacement costs for the engines. Fund processing can take 6 to 12 months, but will cover 65 percent of engine and installation costs.

A Komatsu PC1100, before (L) and after repowering.

see CCP page 16


Construction Equipment Guide • California State Supplement • www.constructionequipmentguide.com • December 22, 2019 • Page 5

Visit us at ConExpo BL414

NOW AVAILABLE

2 YEARS

OR 2000 HR WARRANTY Quality Machines You Can Count On

Dealer for California & Nevada

0% Interest Financing for 36 Months Easy In-House Financing $29,600

$55,900

$115,500 $44,500

$26,500

$54,500

$46,500

hablamos en español • Call Mike (909) 821-5448 Call us today for your Purchase & Rental needs: Excavators • Skid Steers • Dump Trucks • Wheel Loaders • Asphalt Rollers • Water Trucks • Water Trailers • Light Towers • Telescopic Forklifts

SUNWARD DEALER OF CALIFORNIA Michael Madrid SO CAL SALES AND RENTAL “We Sell & Rent Opportunity”

202 W. Minthorn Street • Lake Elsinore, CA 92530

(951) 471-2037 or Call Michael Direct 24/7 at (909) 821-5448

www.socalequipmentinc.com

Visit us at ConExpo BL414


Page 6 • December 22, 2019 • www.constructionequipmentguide.com • California State Supplement • Construction Equipment Guide

UCR’s Largest Expansion Project Is Currently Underway By Cindy Riley CEG CORRESPONDENT

Work is under way on a new living-learning, mixed-use community that represents the University of California, Riverside’s (UCR) largest-ever expansion. The multiphase redevelopment effort known as the North District is part of a move to increase on-campus student housing, with construction taking place at the same time as the school’s Dundee-Glasgow project. “We’ve had demand for some time,” said Andy Plumley, UCR Stan Lim/UCR photo

The multiphase redevelopment effort known as the North District is part of a move to increase on-campus student housing, with construction taking place at the same time as the school’s DundeeGlasgow project.

Stan Lim/UCR photo

North District Phase 1 earthwork involves excavating and stockpiling 20,000 cu. yds., and over-excavating and re-compacting 13,000 cu. yds. for building pads. This includes general cut, fill and compact of 25,000 cu. yds., as well as loading and hauling 30,000 cu. yds.

associate vice chancellor, Auxiliary Services. “This is the result of 16 percent growth in our student population for the last five years, and very little growth of off-campus options in the same time period. “The challenge is always to ensure what you are building today is sustainable for the future. This means flexible spaces that can easily be modified for unknown uses. It also means buildings and systems that have the latest in sustainable practices for water and energy.” The cost of the DundeeGlasgow project is $160 million, compared with $22 million for North District Phase 1. Plumley said the Dundee residence halls will serve primarily first-year students. “Residence hall housing is the best housing for new students, as it provides the greatest level of support. We have converted double rooms into triples to provide hous-

ing for an increasing number of new students. We have also not been able to offer any residence hall spaces to returning students to ensure availability for new firstyear students.” Glasgow Dining, meanwhile, will provide services to residential students at A-I, Pentland Hills and Dundee. “This facility will replace the AI venue, which has reached the end of its useful life and has had a limited footprint to expand. In addition to providing residential meals, Glasgow will also house our catering operation and provide commissary services to all dining facilities inclusive of a bakery. While a lot larger than A-I, we will be able to operate this facility with only a few more additional employees. Students are excited to see more housing added and an opportunity to return to the residence halls. They are also looking forward to the new dining, and what can be

provided in the new building.” Plumley said regarding the North District, the 50-acre site located on the north side of the UCR campus, “While we have been able to accommodate new students via residence hall triples, we have not had any options for our returning students. We have had waiting lists for our apartments of at least 2,500. The North District will provide 1,500 beds in fall 2021, and there are other phases planned. This property will primarily serve non-freshmen undergraduate students.” Jacqueline Norman, UCR campus architect, said the construction comes not a moment too soon. “In recent years, while UCR has increased its housing, there has remained unmet student demand due to significant enrollment growth. These projects will reflect how the campus envisions itself for the next 50 years. They will establish a distinctive living-learning, mixed-use community that intentionally creates a sense of place, with new student housing being aligned with appropriate residential life programs that provide a balance of privacy and community to enhance the overall academic experience for UC Riverside students.” With a requirement to meet the university policy of a minimum of LEED-Silver, both projects are expected to achieve Gold certification. Norman said the Dundee-

Glasgow and North District architecture are guided by the UCR physical design framework and will consist of a vocabulary responsive to climate and site conditions. “The perceived scale of the multi-story buildings will be reduced through the use of articulated volumes and careful building material application. Exterior building materials will consist of a combination of stucco, UCR brick and metal panels. Shaded arcades will enhance pedestrian focused courtyards and surrounding pathways, as well as provide informal gathering space.” In addition, recessed windows and extended roof overhangs will provide needed protection from the sun. The corners of the buildings will be highlighted by metal-clad multi-story lantern spaces that internally are social gathering spaces for the residents. “Glasgow Dining is expressed largely as a transparent volume that invites residents in, and offers expansive views out to the nearby Box Spring Mountains,” said Norman. “A metal trellis both shades the glass façade, as well as an upper exterior outdoor dining terrace, which is enclosed with UCR brick. “The two buildings that comprise North District Phase 1 are sited along an extension of Aberdeen Drive to form a significant new pedestrian mall. The first

floor of both buildings includes a variety of residential life amenities to support and galvanize student life. Included are multipurpose rooms, classrooms and multifunctional spaces, a resident lounge, as well as fitness rooms. Many of these spaces can be directly accessed from the Aberdeen Mall, as well as from the interior of the project, to allow ease of access and to support engaging indoor-outdoor connectivity.” The projects represent a new scale of housing at UCR, with buildings that are five to seven stories tall that will be more densely situated than previous residence halls on campus. “This allows us to use our land more efficiently and sustainably, but also to create dynamic spaces that can effectively support the program and greater campus community.” Norman called the public-private partnership a good fit. “The method of P3, or privatized project development, allows the university to receive maximum financial benefits, while at the same time reducing the project risk and financial exposure. P3 project costs are generally lower, and the delivery is faster. A primary benefit of P3 is that UCR is not responsible for the financing of the project; therefore does not count against the university’s debt capacity.” American Campus Communities construction manager Roger Babbitt noted that both projects have presented issues that had to be addressed. “For Dundee/Glasgow, the challenges were the existing underground utility infrastructure that needed to be relocated. This required extensive planning and coordination for shutdowns and to tie-in work. For North District, the project required demolition of 90 existing houses and associated underground utilities that needed removal prior to earthwork starting.” North District work involved razing the World War II-era complex known as Canyon Crest Family Student Housing. Outdated and in need of constant water, sewer, and electrical system repairs, Canyon Crest closed in summer 2017. see UCR page 15


Construction Equipment Guide • California State Supplement • www.constructionequipmentguide.com • December 22, 2019 • Page 7


Page 8 • December 22, 2019 • www.constructionequipmentguide.com • California State Supplement • Construction Equipment Guide

Predictions: While California’s Economy Strong Enough to “We know that it is tough to build residences in California, there’s no doubt about that. Builders make good profits on it, but it’s a high risk to enter this market.” Christopher Thornberg Beacon Economics LLC

FORECAST from page 1

throughout the state,” Simonson said. “But unfavorable population trends and harmful trade policies may dim the outlook.” For those very reasons, the Dodge Data and Analytics forecast predicts fewer project starts in 2020 nationally than were experienced this year. However, Christopher Thornberg, founder of Beacon Economics LLC in Los Angeles and a seasoned observer of California’s economic performance, is more sanguine about the state’s construction activity in the new year. “This state is going to be just fine. The construction industry is in a great place. The economy is doing great.” Still, both men offer cautionary counsel

about the ongoing labor shortage. Simonson cited an AGC survey that came out in August in which three-quarters of 85 California-based contractors said they planned to expand their workforce in the following 12 months. Another 12 percent of the contractors said they wouldn’t be laying off anyone in the next year. So, the ranks of the 900,000 people currently working in California construction very well may grow. “However, finding those new workers will not be easy,” Simonson said. There’s the disclaimer. The ongoing problem is that too few Californians are interested in being hired for construction jobs. As in every other region of the country, finding craftspeople, equipment operators

and salaried personnel has become a chronic headache for California contractors. Nearly 70 percent of California respondents in the AGC survey reported difficulty in filling skilled positions and were pessimistic about filling them in the new year. This is somewhat baffling considering that pay for construction industry workers in the Golden State averaged more than $70,000 in 2019, which is slightly more than the average pay for all private-sector employees in the state, according to the Bureau of Labor Statistics. In 2018, the last full year of data, construction wages and salaries in California totaled more than $62 billion. “Labor availability is one of the biggest issues for the nation’s construction industry,” Thornberg said, “and labor issues are acute in this state. California has its crazy prevailing wage rules, but developers don’t complain much because they’re just happy to have manpower on the job.” ** The root of the problem, of course, is that

“The impact of the trade dispute is mainly nonexistent. There’s not a shred of evidence that there has been any impact on our economy. Christopher Thornberg Beacon Economics LLC

recent generations of Americans have shown less interest in the building trades than have previous generations. In California, the problem is exacerbated by economic forces that may be driving potential new-hires from the state. According to a 2019 online survey by PR firm Edelman, more than half (53 percent) of Californians are contemplating moving away — with millennials (63 percent) leading the exodus. A wholesale move from the state by millennials would only ratchet up the hiring challenge for construction industry human resource executives. The soured Californians in the survey cited a high cost of living and high taxes. A median home in the state at the end of 2018 was $547,000 compared to the nationwide median price of $224,000. In addition, the state has the highest top marginal tax rate of 12.3 percent, according to the Federation of Tax Administrators. Simonson riffed on the exodus this way: “Extremely expensive housing, intolerable commutes and difficult conditions for starting or operating a business have driven out many working-age individuals. The frequent wildfires, power outages and other natural and manmade disruptions to normal life may have contributed to the outmigration.” On the other hand, Thornberg pooh-poohs the flight stories. “I tell you, in general, for every one of those stories, if you dig a little deeper there is something else going on. Places like California — and Seattle and NYC and London and other dense urban areas — they all are extremely highly competitive, yet companies flock there anyway. Now, could you see a situation where you push things too far and have a real problem? I guess.” The economist goes on to compare California and Kansas, where a conservative Republican governor, Sam Brownback, oversaw deep tax cuts in 2012 to infuse the rural state’s economy with new business energy. The economic renewal initiative ulti-


Construction Equipment Guide • California State Supplement • www.constructionequipmentguide.com • December 22, 2019 • Page 9

Spur More Construction, Unfavorable Trends Dim Outlook

mately failed and was rolled back in 2017. Thornberg cited that Midwestern episode as the antithesis of the coastal state’s hightax and regulatory policies. However, he does not conclude that the coastal state’s “hypergovernment” model is superior. “My point is, there is a happy medium, a place between the People’s Republic of California and the capitalism nirvana of Kansas. Both models have problems. Right now, though, California is looking better than Kansas.” ** The two economists differ on the impact on California of the international trade friction wrought by President Trump’s tariffs and other efforts to restructure the country’s market relationships with other countries. Simonson sees the conflict as a “threat” to construction growth in the state. “The economies of many states depend in part on imports and exports, but California is particularly exposed, especially to trans-Pacific trade,” he said. He points to an array of vulnerable pressure points, from agricultural products to transportation to tourism. Thornberg doesn’t see it that way at all. “I’ll tell you why. The impact of the trade dispute is mainly nonexistent. There’s not a shred of evidence that there has been any impact on our economy. There’s been no real decline in imports and exports in the last year. Yes, we are buying less from China, but we’re buying more from other parts of the world.” Data-gatherers including economists have noted that the Golden State’s economic growth has regularly outperformed the country as a whole for some time. A Wells Fargo report, for example, call the California economy “incredibly resilient.” Within that economy, the state’s construction economy has expanded, too, four percent over the past 12 months. Yet homebuilding remains an uneven economic driver. Not only is it possibly threatened by residents moving from the state, it is hamstrung somewhat by government poli-

“Extremely expensive housing, intolerable commutes and difficult conditions for starting or operating a business have driven out many working-age individuals.” Ken Simonson Associated General Contractors

cies that Thornberg said have led to “systematic underbuilding of homes for years. Consequently, we have a massive undersupply. We know that it is tough to build residences in California, there’s no doubt about that. Builders make good profits on it, but it’s a high risk to enter this market.” The homebuilding risk may be rising. Legislators have mandated that, beginning in 2020, construction of new single-family and multifamily structures of three or fewer stories must include solar panels. While the state’s Energy Commission predicts the panels will save a homeowner $19,000 over 30 years, the required panels are expected to add about $10,000 to the cost of each singlefamily residence. “That will slow homebuilding some, there’s no doubt about that,” Thornberg said. “It’s interesting that in a time of housing scarcity, government is out there trying to make it even harder. There seems an inability for political leaders on both sides of the aisle to get their heads wrapped around reality.” ** In the end, despite evident misgivings about some national and state policies, the two economists believe the state will be OK in the new year. As Simonson put it: “California contractors have good reason to be optimistic about opportunities in 2020. Most project types and regions should post

growth.” Thornberg essentially agreed, but he acknowledged that California’s hegemony as a trendsetter is at risk. The state’s reputa-

tion as the place from which economic and cultural ideas ripple outward may be up for grabs, particularly in the current political climate. “In this atmosphere nationally,” the Los Angeles economist said, “I don’t know if that (trendsetting reputation) will continue. I sure don’t get that feeling given the politics of the day. California is almost a dirty word. I’m not sure that the state will continue to be seen as a leader.” He blamed both sides for current heightened political debates. “Today’s hyper-partisan politics bothers me, with two parties lobbing one-liners to their radical bases and whatever sounds good becomes a party platform. That’s not how you run a country. It worries me.”  CEG


Page 10 • December 22, 2019 • www.constructionequipmentguide.com • California State Supplement • Construction Equipment Guide

Construction Equipment Guide • California State Supplement • www.constructionequipmentguide.com • December 22, 2019 • Page 11

LIFETIME E FRAME & STRUCTUR RE WARRANTY TY

LIFETIME BOOM, FRAME A & ARM GUARANTEE E

T Ne The Nw

EC200 0 ELL

Baker kersfield Bakersfield, CA A 661 387 6090 661.387.6090 Corona Corona, CA 951.277.7620

D Designed forr Yo our Need ds

Fresno Fresno, CA 559.834.4420 Sacramento Sacramento,, CA A 916.504.2300

24 HOUR R PARTS GUARANTEE* EE**

ACTIVECARE RE DIRECT 24/7/365 MONITORING NG

2ND AND D 3RD YEAR R ADDITIONAL AL WARRANTY TY

BUY-FI SMART CREDIT

San Diego Lakeside, CA 619.441.3690 San Leandro San Leandro, CA 510.357.9131 Turlock Turlock, l k CA 209.410.6710

Rates as lo ow w as

0% for 36

FUEL EFFICIENCY CY GUARANTE EE

*

months

Th he new EC200EL is purpose-buiilt to take on your tough jobs, day in and day out. Right now, ta ake advantage of special bundle financing f and receive extended warranty w coverage for up to th hree years. Discover the power an nd performance you need combined with fuel efficiency y and a lo ow cost of ownership today at yo our local Volv Volvo Construction Equipment uipment & Services Ser location.

vcesvolvo..com

*Fiinance Guidelines/Conditions: The offering finance company for this progrram am is Volvo Volvo Financial Services (VF VFS), and the trrans ransaction is subject to to VF VFS credit approval. val. Dealer must rec ceivve e VF VFS approval val and contrract act must be funded on or before e 12-3 12-31-20 12 31 2019 for units to to qualifyy. y. Final rat ratte and tterms erms are subject bject to t credit review and underwriting by VF VFS, and all cussttomers omers may not qualifyy. VF VFS reserves the right tto o amend or canc c el this progrram am at any time without notice. Valid Valid for U.S. S. dealers and trrans ansactions. Progrram am may not be c combined with th any other offer unless explicitly permittted ed by b VF VFS. Any dea aler specific progrrams ams will supersede this offerr.. This progrram am c cannot be combined with the Conquest Excavvat ator progrram. am. ** Some restrictions applyy. For For a list of terms t and conditions, visit sit www w.volv volvoce.com/parts24.


Page 12 • December 22, 2019 • www.constructionequipmentguide.com • California State Supplement • Construction Equipment Guide

After $370M Investment, Expect Smoother Drive on I-5 By Lori Tobias CEG CORRESPONDENT

A $370 million project to improve and expand 67 mi. of I-5 through Sacramento will lead to smoother roadways, added capacity and an overall improved drive, but it’s going to get worse before it gets better. For now, construction crews are doing much of the major work at night when there are fewer vehicles on the road. But daytime lane closures can’t be entirely avoided and in the next year or so drivers will feel the pain. “It will go from four lanes in each direction to two lanes, depending on the kind of work being done,” said Caltrans spokesman Dennis Keaton. “Once you have those daytime lane closures in place you are going to have serious traffic backup. It will add 30 to 40 minutes on top of the normal commute. It won’t happen for one to one-and-a-half years. So we’re trying to get the word out. We’re planning ahead. Some employers may allow employees to work at home, or change their shift hours so they are not caught in this commute time where it is going to be down to two lanes from both directions.” Work began in July 2019, with the official groundbreaking held in August. The project is expected to continue through late 2022, but could go longer if weather delays become necessary. The funding is provided by three sources, the bulk of it — $280 million from federal SHOPP monies, with additional funding from SB1, aka, the Californian gas tax, and Sacramento County taxes. In addition to the rehabilitation of roadway, the project will build 23 mi. of carpool and bus lanes, add additional sound walls and improve the existing electrical and drainage. The 23-mi. stretch was put in place in the 1970s and is damaged, creating a poor ride for motorists, Keaton said. Caltrans began public outreach on the project in South Sacramento County as much as six years ago. “Right now, the preliminary work is working on structures, having K-Rails put into place so shoulder work can be done,” Keaton said. “A lot of the nighttime work is trying to get slab replacement done. There is a lot of the shoulder and drainage and electrical that can be done behind K-Rails. Some of it’s been put into place already. There has been some lane shifts so there is more room for the heavy equipment working on these structures. There are 25 minute delays in some areas where it narrows down because it is just a new configuration.” The project also includes several bridges, one, a pedestrian overhead crossing that has to be demolished and rebuilt because it is not ADA compliant. That work will require one

A $370 million project to improve and expand 67 mi. of I-5 through Sacramento will lead to smoother roadways, added capacity and an overall improved drive.

or two nights of complete I-5 closures when crews demolish the existing structure. Aside from managing the heavy volume of traffic, one of the big considerations is the urban environment and proximity to residences. “You have to take into account not only how you can get this project completed in a timely manner, but you are trying not to be too big an inconvenience to the traveling public. Because it is urban, you have to take into consideration the noise of the heavy machinery that is going to be used for the bridge structures. Typically, much of the heavy equipment is operated during the daytime, especially the pile work. That constant pounding around those structures has to happen during the day. “That’s the delicacy of it. Managing traffic and not being a noise disturbance at night time. Sometimes you just can’t avoid it because of the nature of the work. It’s going to take patience on the residents. Some of these residences’ back yards are right up against the sound walls.”  CEG

In addition to the rehabilitation of roadway, the project will build 23 mi. of carpool and bus lanes, add additional sound walls and improve the existing electrical and drainage.


Construction Equipment Guide • California State Supplement • www.constructionequipmentguide.com • December 22, 2019 • Page 13

TAK KE IT TO T THEE NEXT LEVEL. LEVEL *Excludes S70 Bobcat skid steers, MT55 & MT-85 mini track loaders.

Bobcat Company inventted the world's first true compact loader. And we've been improving on it ever since. The latest lineup of Bobcat® comppact track loaders is the best generatiion yet. Come and see how the best compact loader on the market outperforms thee competition.

BSW

Berchtold Equipment

Bobcat of the Bay

www.BobcatSouthWest.com

www.berchtold.com

www.totalequipmentandrental.com

3000 Pegasus Drive Bakersfield, CA 93308 661-323-7817

Bobcat of Fremont

Miramar Bobcat, Inc.

South Coast Bobcat, Inc.

Valley Bobcat, Inc.

9370 Miramar Road San Diego, CA 92126 858-566-4600

1783 N. Batavia Street Orange, CA 92865 714-998-5445

9324 San Fernando Road Los Angeles, CA 91352 818-768-8300

Inland Bobcat, Inc.

Bobcat of Los Angeles, Inc.

5494 Via Ricardo Riverside, CA 92509 951-788-3030

13728 Alondra Blvd. Carritos, CA 90703 562-926-2342

1410 W. Betteravia Rd. Santa Maria, CA 93455 805-922-7905

43801 Osgood Rd. Fremont, CA 94539 510-897-4123

Bobcat of Santa Rosa 3675 Santa Rosa Ave. Santa Rosa, CA 95407 707-595-3261

Bobcat of Contra Costa Bobcat , the Bobcat logo and the colors of the Bobcat machine are registered trademarks of Boobcat Company in the United States and various other countries. ®

2035 E. Leland Road Pittsburg, CA 95466 925-318-4465


Page 14 • December 22, 2019 • www.constructionequipmentguide.com • California State Supplement • Construction Equipment Guide

New Technology…

Level 10 Construction First to Use SpeedCore System in Calif. Sunnyvale-based Level 10 Construction announced that erection of its new downtown San Jose project, 200 Park Ave., may take significantly less time using a new hybrid core system. Level 10 Vice President Casey Wend, who is overseeing 200 Park Ave., says the project will be the first in California to use “SpeedCore,” a new hybrid core system. As described by the American Institute of Steel Construction: “SpeedCore is a revolutionary concrete-filled composite steel plate shear wall (CF_CPSW) core. With this system, erection will take an estimated 40 percent less time to complete than it would with a traditional cast-in-place reinforced concrete core. “Erection of the hybrid core begins with pre-fabricated panels consisting of two structural steel plates held in place with cross-connecting tie rods. After erection, these panels are filled with concrete, creating a unique sandwich-style structure that provides strength and stability along with the

“After erection, these panels are filled with concrete, creating a unique sandwich-style structure that provides strength and stability along with the benefits of rapid erection. Additionally, SpeedCore is a non-proprietary system, meaning many American steel fabricators can produce the panels.” Casey Wend Level 10 Construction

benefits of rapid erection. Additionally, SpeedCore is a non-proprietary system, meaning many American steel fabricators can produce the panels.” 200 Park Ave. is the first new speculative office project in downtown San Jose in 10

years. The new 19-story office building will have 16 levels of Class A flexible work space, with three levels of above-ground parking and four levels of below-ground parking. Total rentable square footage is 875,000. Gensler is the architect for 200 Park Ave.

Magnusson Klemencic Associates is the structural engineer. Level 10 Construction is a full-service general contractor with offices throughout California, including Sunnyvale, San Francisco and San Diego. Ranked as the number two Top Contractor in Silicon Valley by the Silicon Valley Business Journal, Level 10 is focused on providing innovative facilities to the corporate, healthcare, education, hospitality, technology and life science, as well as mixed-use residential markets. Level 10 offers a full range of services including preconstruction, design-build and integrated project delivery, self-performed concrete work, MEP and commissioning services, BIM services, green construction and Lean construction practices. Level 10’s core mission is to build at the highest level, consistently providing excellent customer service while delivering quality projects on time and on budget. For more information, visit www.level10gc.com 

Road Machinery LLC Hires New Cat 308 CR Available Vice Pres. of California Operations at Hawthorne Cat Sloan Brooks, president and COO of Road Machinery LLC, announced the hiring of David Dean as vice president of California operations. Dean comes to Road Machinery with 40 years of experience in the equipment distribution business and brings a wealth of knowledge to further the growth of the California market. Road Machinery sells, services and rents construction, farming, mining and forestry equipment from Komatsu; compacting and paving equipment from Dynapac and Carlson; attachments from NPK, Hensley, Terramac and JRB corporation as well as other products like rock screens, crushers and water towers. “We are excited to bring David on to further strengthen our team in California. David brings direct and local strategy and decision making

David Dean

to our market presence as we move into 2020 and beyond,” Brooks said. Phoenix, Ariz., based since 1955 with 14 branches extending throughout California, Road Machinery LLC specializes in construction and mining heavy equip-

ment including re-manufacturing facilities for diesel engines, transmissions, electrical rotating devices and hydraulic cylinders. For more information, call 800/989-7121 or visit www.roadmachinery.com. 

Hawthorne Cat, the exclusive Cat equipment dealer in San Diego, the Hawaiian Islands and the Pacific Region, announces new delivery of the Cat 308 CR Mini-Hydraulic Excavator, known for its best-in-class performance, operator experience and serviceability. The latest 308 compact radius model delivers maximum power and performance in a mini design to help you work in a wide range of applications. Moving around the job site is easier than ever with the exclusive Cat Stick Steer travel mode and easy-to-use controls. The upgraded cab also is equipped with an LCD monitor and customizable settings to control hydraulic performance and responsiveness as well as operator preferences. The Cat 308 CR Mini-Hydraulic Excavator delivers up to 20 percent more performance in lift, swing, travel and multifunction to help you get the job done more efficiently. Plus, you can save money with up to 10 percent lower operating costs, improved fuel efficiency and longer service intervals. “Our Next Generation Cat Mini-Excavators improve the standards of performance with several industry-first features,” said Ross Farmer, Corporate Machinery sales manager. “The Cat 308 CR Mini-Hydraulic Excavator’s maximum performance and optimal operator experience make it the perfect machine to expand your heavy-duty fleet.” For more information, call 800.437.4228 or visit https://www.hawthornecat.com/. 


Construction Equipment Guide • California State Supplement • www.constructionequipmentguide.com • December 22, 2019 • Page 15

2014 Cat 420F, 3030 Hrs, 2WD, Enclosed ROPS, 4in1, Canopy, Ride Cntrl, Extendahoe w/QC, Rear Aux

2010 Case 586, 2607 Hrs, 5K, Cummins Eng, SS, Stilt, 2WD, Serviced and Ready To Work ............................................................$31,500

2013 Freightliner Cascadia DD13, Super 10, 245k Mi, New Demo Box w/Hyd Gate, New Tarp Sys, Carb Compliant ........................................................................................................$104,500

2013 Freightliner M2 106, Cummins, 152K Mi ISC, Def, Carb Comp, Dpf, A/T, Morgan 20’ Body....................................................$39,500

2013 Bobcat T650, Stk# SS-18-2815, 1384 Hrs, Open ROPS, S/N: A3P016496, Tracks 90% ....................................................$36,500

2013 SANY SRC865, 575 Hrs, Cummins QSB6.7, 250HP, 113' Four Section main boom, 30.2'-52.5' extension ........................$189,500

1993 Gradall 534D-10-45, 320 Hrs, New Hour Meter, Outriggers................................$24,500

2015 JD 310SK, 3262 Hrs, 4WD OROPS, Ride/Pilot Cntrls, Aux Hyd, Hammer Ready, 4in1 Frt Bucket ..................................$43,500

1992 Cat RC60, 5328 Hrs, 6K, Perkins Dsl, SS, 4SPD, Forward & Reverse Shuttle, 21’ HI ............................................................$17,500

More Than $180M Worth of Construction Ongoing at UCR UCR from page 6 water wagon and several water trucks. All Caterpillar equipment used for earthwork The Dundee-Glasgow exterior envelope is projected to be finished by March 2020. Glasgow Dining Hall substantial is includes 623 and 637 scrapers, D6 and D8 dozset for May 2020 completion. In mid-July 2019, work started ers and a 345 excavator. As for the main materials being used, conon the North District project, with students expected to move crete podium and wood frame are the main in September 2021. To date, a number of tasks have already been carried out. structural elements. Brick, plaster and glazing “For Dundee/Glasgow, all structural concrete and steel are the exterior wall elements required. Babbitt said safety is a major concern at all erection has been completed. On the North District project, times for workers on the job. all demolition and building pad work is complete. “Maintaining a safe environment for students, “The Dundee/Glasgow projects are taking place right now. The Glasgow Dining Hall is structurally completed, faculty, the construction crew and the general with roof membrane installed. Dundee South roofing installation and Dundee North roof truss installation are in progress. The North District structural concrete is also in progress, along with under slab plumbing and electrical work.” North District Phase 1 earthwork involves Stan Lim/UCR photo excavating and stockpiling 20,000 cu. yds., and North District work involved razing the World War IIover-excavating and re-compacting 13,000 cu. era complex known as Canyon Crest Family Student yds. for building pads. This includes general cut, Housing. fill and compact of 25,000 cu. yds., as well as public is always our top priority. We take measures to proloading and hauling 30,000 cu. yds. tect, secure and maintain the construction site and work with A variety of heavy machinery is required to general contractors who adhere to all OSHA safety meascomplete the work. For demolition, a total of ures.” seven excavators were on site. Equipment Stan Lim/UCR photo A doctoral research university, UCR serves more than included Volvo 250 and 350, Caterpillar 330, Hitachi 270 and 330, Caterpillar 6 X 6 articulat- Work is under way on a new living-learning, mixed-use communi- 24,000 students, according to the official website. The camed dump trucks, Powerscreen 320SR required ty that represents the University of California, Riverside’s (UCR) pus opened a medical school in 2013, and has an annual statewide economic impact of almost $2 billion.  CEG for onsite crushing, Caterpillar 613 5000-gal. largest-ever expansion.


Page 16 • December 22, 2019 • www.constructionequipmentguide.com • California State Supplement • Construction Equipment Guide

Central California Power Shifts Focus Toward Clean Air

A scraper, after repowering.

Malcom Drillling had a Volvo RTG19 repowered. CCP from page 4

“Soon we were repowering everything from excavators, loaders, dozers, oil workover rigs, harvest tractors to other pieces of equipment,” stated Portugal. “Generally, to replace a large machine can cost upwards of $500,000; to repower is maybe 25 percent of the cost or less.”

An on-road rig is repowered.

Company Growth Always growing, CCP further expanded and became a distributor for Perkins engines in 2006. This proved to be a perfect marriage as Perkins is a leader in the engine aftermarket. It also elevated CCP in the industrial engine field; the first 500 industrial engine repowers CCP completed were on Perkin engines. Today, CCP is the major dealer of Perkins and Volvo Industiral Engines west of the Rockies. Repowering and retrofitting on any machine can be complex, but adding a language barrier to the mix can make it exceptionally challenging. One of most unique challenges CCP has faced was engine work on a German engineered hammer drill for Malcolm Drilling. “It was a 700 horsepower repower and we had 13 days to complete the job. Unfortunately all the service and operator manuals were in German. Not only was it a difficult job, but we also had to completely construct an oil pan from scratch that was internally balanced to fit around the frame-

work of the machine,” said Portugal. With the help of a translator and some good old-fashioned American ingenuity, they were able to finish the job on time. Putting Plans in Place The last missing piece of the puzzle was put in place when CCP acquired the JCB line in September 2018. CCP chose to go with the JCB line due to the machine’s ability to achieve Tier IV final standards without diesel particulate filters, machine durability, unparalleled factory support and a great worldwide reputation. “With our quick responding service department, fully stocked parts depot and JCB’s support, its made a perfect marriage of sorts” said Rod Headly “With the repower programs, not all equipment is cost effective to repower. Some of our customers were requesting new equipment. Instead of turning them away, we saw an opportunity. We realized we would now be in position to offer our customers a full package,” said Portugal. “In the future, we will shift to primarily focus on JCB,” said Portugal “Eventually we know that repowers will fade away as older machines become unrepowerable. Our focus is to transform into a full-blown JCB dealer that also offers engine and transmission work for all manufacturers.” For more information, visit www.gensets.com. 


Construction Equipment Guide • California State Supplement • www.constructionequipmentguide.com • December 22, 2019 • Page 17

NEXT ISSUE CLOSES: January 9, 2020


Page 18 • December 22, 2019 • www.constructionequipmentguide.com • California State Supplement • Construction Equipment Guide

Company Firsts…

Skanska’s New Commercial Development Practice in LA

Once complete, 9000 Wilshire will be a three-story, 40,000-sq.-ft. office building in the heart of one of the most desired submarkets across the country.

Semi - Custom Rebuilt Vocational Trucks

“With demand for newly developed space in Beverly Hills far exceeding available space due to a limited supply of new buildings and a less than 10 percent vacancy rate, desire for newly constructed creative office space in the city is extremely high. Clare De Briere Skanska

2005 International 4300…$24,000 W001778, 2,000 Gallon Tank, Manual

2011 International 4400……$64,000 W002646, 4,000 Gallon Tank, Automatic

2013 Freightliner M2…$59,000 W002860, 12’ Dump Bed, Automatic

2014 Freightliner M2 …$92,000 W002880, NEW 16’ Dump Bed, Manual

Two locations in California to Serve You!

14635 Valley Blvd. Fontana, CA 92335

909.822.2200

10918 Shoemaker Ave. Santa Fe Springs, CA 90670

www.scottequip.com

C A L L U S T O D AY !

562.777.0775

Skanska announced the official launch of its commercial development division in Los Angeles, alongside its first acquisition in the market, a fully-entitled commercial development site in Beverly Hills. Located at the intersection of Wilshire Boulevard and Almont Drive, 9000 Wilshire, once complete, will be a three-story, 40,000-sq.-ft. office building in the heart of one of the most desired submarkets across the country. “With demand for newly developed space in Beverly Hills far exceeding available space due to a limited supply of new buildings and a less than 10 percent vacancy rate, desire for newly constructed creative office space in the city is extremely high,” said Clare De Briere, executive vice president of commercial development in Los Angeles. “Our ability to self-finance our projects and leverage our world-class construction team provides us the ability to bring a modern new office building with special, unique tenant space to the heart of Beverly Hills. It will

provide an opportunity for a new tenant to find its home among global leaders like Google, Morgan Stanley, Live Nation and MGM Studios.” With open indoor and outdoor spaces, an 11,000-sq.-ft. rooftop deck and lounge, floor-to-ceiling glass windows wrapping the exterior and a second-floor terrace with a green wall, Los Angeles-based architect Neil M. Denari in collaboration with HLW has created a design mixing utility, style and modernism for Skanska’s new Beverly Hills office building. In line with Skanska’s commitment to be a sustainable developer and builder, 9000 Wilshire also is designed for LEED Gold Certification, with the goal to achieve LEED Platinum. Along with the acquisition of 9000 Wilshire, Skanska is launching its first-ever commercial development practice in Los Angeles, which will be located at the U.S. Bank Tower where Skanska now occupies more 13,000-sq.-ft. of office space. 


Construction Equipment Guide • California State Supplement • www.constructionequipmentguide.com • December 22, 2019 • Page 19

WORLD’S SMALLEST BACKHOE NOW WITH TRACKS – JCB-1CXT

Max Dig Depth: 10 ft 1 in / Gross Engine Power 49 HP / Loader Bucket Breakout: 1,466 lb JCB 1 CXT, a TRACKED BACKHOE is a versatile machine, offering skid-steer and mini excavator performance in one package. The 1CXT provides superior maneuverability, an optional handheld tool auxiliary, as well as a universal quick hitch that is compatible with most of your skid steer attachments. Standard full cab with integrated heating & air-conditioning. Due to its compact size and under 10,000 lbs weight, the 1 CXT is easy to tow in a trailer without a CDL (where local regulations allow). NO DPF / DEF AFTERTREATMENT. Operators environment friendly with easy to use controls and all daily checks and greasing can be carried out at ground level on a JCB backhoe. To learn more about JCB 1CXT, visit www.jcb.com/en-us/products/backhoe-loaders/1cxt

/ /JCBNA

@JCBNA

w w.jcb.com .jcb.com JCBNA www

QMC Central California Power JCB 19487 Broken Ct, Shafter, CA 93263 (661) 589-2870 www.ccp-jcb.com

Meridian JCB 1315 Vinci Avenue Sacramento, CA 95838 916-880-5776 www.meridianutility equipmentsales.com/jcb

SoCal JCB

QMC JCB

14675 Valley Blvd., Fontana, Ca. 92335 866-522-7225 www.socaljcb.com

3820 S. K Street, Tulare, CA 93274 (559) 686-1579 961 E. 3rd Street. Hanford, CA 93230 (559) 582-9393 www.quality-mc.com

1960 Highway 20 Colusa, CA 95932 (530) 458-2166

www.nstractor.com

827 North Tehama St Willows, CA 95988 (530) 934-3382

2173 Blossom Street Dos Palos, CA 93620-2313 (209) 392-2161

1340 W. Charter Way Stockton, CA 95206 (209) 944-5500

3056 Colusa Highway Yuba City, CA 95993 (530) 923-7675

600 S. State Highway 59 Merced, CA 95341-6928 (209) 383-5888

1215 West Glenwood Ave Turlock, CA 95380-5703 (209) 634-1777

N&S Tractor

Terms & Conditions: Pictures shown with optional accessories. For towing policy please consult with your local state transportation office. Offers may change without notice and may not be combined. Additional terms and conditions may apply, please contact your local JCB dealer for details. JCB dealer reserves the right to withdraw, alter or decline any product from sale or any offer without prior notice. Price, if shown, does not include government fees, taxes, dealer freight/preparation, dealer document preparation charges or any finance charges (if applicable). Final actual sales price will vary depending on options or accessories selected.


Page 20 • December 22, 2019 • www.constructionequipmentguide.com • California State Supplement • Construction Equipment Guide


Turn static files into dynamic content formats.

Create a flipbook
California 26 December 22, 2019 by Construction Equipment Guide - Issuu