California 18, August 30, 2020

Page 1

August 30 2020 Vol. I • No. 18

“The Nation’s Best Read Construction Newspaper… Founded in 1957.” Your California Connection – 1-800-523-2200 – www.cegltd.com

El Centro’s Imperial Improvement Two Volvo EC480E excavators, a Cat 345B excavator and a Link-Belt 470X excavator – with 1,100 FTP breakers – perform demo work on the $44 million Interstate 8/Imperial Avenue Interchange project.

By Irwin Rapoport CEG CORRESPONDENT

Granite Construction Inc. is continuing to make progress on the California Department of Transportation’s (Caltrans) $44 million, multi-year project to reconstruct the inter-

change at Imperial Avenue and Interstate 8 (I8) in the city of El Centro. The initiative will remove the existing bridge and eastbound on- and off-ramps, then reconstruct the structure and the on- and offramps in both directions, construct a new entrance loop ramp from southbound

Imperial Avenue to eastbound I-8 and create access to the city’s upcoming extension of southbound Imperial Avenue to city areas south of I-8. The state’s Regional Improvement Program is providing $42 million of the cost, with $2 million from the Federal Highway

SACRAMENTO ONLINE EQUIPMENT AUCTION

Priority Projects Program. The project was designed internally by the Caltrans Division of Design in coordination with Project Engineer Dimitar Peev, Design Manager Kazim Mamdani and Edward Mercado (structures division). see IMPERIAL page 6

WOODBURN ONLINE EQUIPMENT AUCTION

Friday, October 23rd, 2020 @ 8:30am Saturday, October 10th, 2020 @ 8:30am 4751 Power Inn Rd., Sacramento, CA 95826 17129 Pacific Highway, Woodburn, OR 97071

www.barnoneauction.com | (866) www.BARNONEAUCTION.com 866 372 - 372- -1700 1700


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.