Skip to main content

California 16, July 31, 2022

Page 1

CALIFORNIA STATE EDITION

A Supplement to:

July 31 2022 Vol. III • No. 16

“The Nation’s Best Read Construction Newspaper… Founded in 1957.” Your California Connection – Sharon Swanson – 1-760-518-4336 – sswanson@cegltd.com

Beachfront Fixes Granite’s Coastal Projects Help Prevent Disasters

Granite Construction solved two problems in Encinitas by building a new sea wall at Pismo Beach to prevent erosion and flooding, as well as constructing a new rail undercrossing near El Portal Street, which now provides Californians with a safe and legal way to cross over the train tracks.

By Chuck MacDonald CEG CORRESPONDENT

Granite Construction is finishing two unusual projects this summer that showcase its engineering and construction chops. Both projects will provide safer access to locals as they access California’s most prized possession — beaches. Some beaches have tricky obstacles that make access dif-

ficult. In Encinitas, Calif., San Diego County, the obstacle was a busy railroad track. On Ocean Boulevard in Pismo Beach, a beach access was old wood stairs descending precarious rocks. The price for the two projects totaled $12.1 million. At the Pismo Beach location, Mother Nature seems intent on reclaiming the sand and degrading the rocky bluff. Granite, however, had other ideas.

SACRAMENTO ONLINE EQUIPMENT AUCTION

The city of Pismo Beach awarded a contract to Granite to build a sea wall where the bluff was eroding, replace the beach access stairs, replace an existing storm drainpipe and add a sidewalk for visitors. The beach is well known for its striking rock formations, kayak-friendly location and tide pools that entertain visitors. Unique million-dollar homes cling to nearby bluffs see GRANITE page 4

WOODBURN ONLINE EQUIPMENT AUCTION

Saturday, September 10th, 2022 @ 8:30am Friday, September 30th, 2022 @ 8:30am 4751 Power Inn Rd., Sacramento, CA 95826 17129 Highway 99E NE, Woodburn, OR 97071

www.barnoneauction.com | (866) www.BARNONEAUCTION.com 866 372 - 372- -1700 1700


Page 2 • July 31, 2022 • www.constructionequipmentguide.com • California State Supplement • Construction Equipment Guide

AUTHORIZED DOOSAN DEALER

FO N TA N A

S A N TA FE S P R I N G S

909-822-2200 14635 Valley Blvd Fontana, CA 92335

562-777-0775 10918 Shoemaker Ave Santa Fe Springs, CA 90670

www.scottequip.com

B U I LT- I N D U R A B I L I T Y.

POWERED BY INNOVATION. The rugged Doosan® DL250-5 is designed to stand up to punishing jobsites while offering operators the comfort they need to push forward.

Visit Scott Equipment for a demo. ©2022 Hyundai Doosan Infracore. All rights reserved. Hyundai Doosan Infracore is an affiliate of Hyundai Heavy Industries Group. The Doosan trademark, , is used under license from Doosan Corporation.


Construction Equipment Guide • California State Supplement • www.constructionequipmentguide.com • July 31, 2022 • Page 3

®

FIND DING GEENUINE CAT PARTS A HAS NEVER BEEN EEASIER. EASIER

FROM FILTERS F T TO ATT T ACHMENTS A S, WE’LL KEEP K YOU UP P AND RUNNING. NG 1.4 MILLION N PARTS A AT YOUR FINGERTIPS S

REAL-TIME R PRICING

24 / 7 PARTS A ACCESS

FAST A & EASY C CHECKOUT

omees to parts, there is only one link P Parts.Cat.com atin ng revenue. That is why we make ly any part you need in inventory or avaailable within

SINCE 1931 www w.hawthoornecat.com San Diegoo County 800-4377-4228

www w.holtca.com Ceentral Northern California 800-452-5888

SINCE 1936 www.petersoncat.com Bay Area & Northern California, Oregon, and Southwest Wa Washingtoon 844-349-4353

SINCE 1919 1 www.quinncom mpany.com Central & Southeern California 888-842--2155

© 2022 Caterpillar. All Rights Resserved. CA ATT, CA ATTERPILLAR, LET’S DO THE WORK, W their respective logos, “Caterpillarr Yellow”, the “Power Edge” and Cat “Moddern Hex” trade dress as well as corporatee and product identity used herein, are trademarks of Caterppillar and may not be used without permisssion. www.cat.com / www.caterpillar.com


Page 4 • July 31, 2022 • www.constructionequipmentguide.com • California State Supplement • Construction Equipment Guide

Granite Builds Sea Wall By Blending Concrete Into Bluff GRANITE from page 1

area where the stairwell will be built.” Designers gave special attention to the drainpipe that will deliver rainwater and other clean water to the beach. Granite had to dig out the old drainpipe and relocate it. Called a “periscope drain,” the new drain will have a bend to slow the speed of the water, then feed into a 36-in. pipe that is encased in concrete. The pipe will be protected by temporary shoring shields, a smaller version of the protection that keeps earth from collapsing a culvert. Safety considerations are vital with heavy drilling equipment perched on the side of a sea wall. Workers drilled micro piles to serve as outriggers for the crane to make sure it stayed in place. Many of the piles were a mere 5 ft. away from the edge of the bluff. Because some of the bluffs had eroded over the years, workers used temporary shoring to make it possible to insert the permanent piles. “It’s only fun when the job gets hard,” joked Fassett. Workers will use colored concrete in finishing the project ensuring that the sea wall will be not only practical, but also will blend in with the grandeur of the view of the Pacific Ocean.

overlooking the ocean, so the city is interested in strengthening the sea wall near these homes and maintaining the view. Granite took a step beyond just fulfilling the contract by choosing to bring in an artist to “sculpt” the concrete to blend with the rock in the existing bluff. Granite subcontracted with Condon-Johnson & Associates Inc. (CJA) to drill the shafts, often called cast in drilled hole (CIDH) piles. Once the terrace deposits and rock were removed, workers inserted into the holes an epoxy coated steel reinforcing cage. This cage provides the structural capacity to the pile and the hole is then filled with concrete. There are 32 each 36-in. CIDH piles at 8 ft. on center for the main wall(s) and an additional 17 each 24in. CIDH piles for the stairway and wall five. While the concrete in the CIDH piles hardened, workers drilled holes between the piles, inserted strand anchors and placed cement grout into them forming concrete “nails” or tiebacks. Together with the CIDH piles and 18 in. structural shotcrete face, the tiebacks will hold the earth in place and prevent the bluffs from eroding any further. “The concept of the job is to seamlessly blend the concrete work into the bluff,” said Raymond Fassett, project manager of CJA. “It will not look like a common concrete wall but will be an architectural treatment that will look like rock. The final form will consist of five separate walls, then have a kick-out Crews lower a Geax DTC40 piling rig onto the beach. Workers drilled an additional 17 piles for the stairway and wall five. Workers apply some of the finishing touches for the crossing under the active railroad tracks. The steps and ramps will provide safe access for beachgoers, shoppers and students.

El Portal Undercrossing Granite Construction used construction creativity to solve another beach problem in Southern California. This one is in Encinitas, Calif. where parents, teenagers and elementary school students often crossed railroad tracks that carry approximately 40 passenger and freight trains daily. These tracks have been an integral part of the community since before 1900. People cross these tracks to reach the beach as see GRANITE page 10


Construction Equipment Guide • California State Supplement • www.constructionequipmentguide.com • July 31, 2022 • Page 5

PIRTEK Power Inn

4191 Power Inn Road, Suite D Sacramento, CA 95826

916-737-7777

PIRTEK San Leandro

1997 Burroughs Ave San Leandro, CA 94577

510-568-5000

PIRTEK SFO

San Francisco, CA

650-532-9200


Page 6 • July 31, 2022 • www.constructionequipmentguide.com • California State Supplement • Construction Equipment Guide

Construction Equipment Guide • California State Supplement • www.constructionequipmentguide.com • July 31, 2022 • Page 7

Fuel efficiency e claims are just that. With Volvo, you get a rock-solid guarantee. Lots of equipment co ome with claims of improving fuel efficiencyto save you money — but that’s all talk unless a company is willing g to put its money where its mouth is. We are with the Volvo Fuel Efficiency Guarantee. When you purchase eTrack subscription and e select new Volvo machines and activate your four-year free CareT one-year free ActiveCare® Direct subscription, you’ll get the guarantee. If your machine’s fuel efficiency and productivity don’t meet the model-rated fuel efficiency levels, we’ll reimburse a portion of the additional fuel.* Talk to your nearest VCES location today to learn more. Ta *Terms and conditions apply. View fuel consumption figures at volvoce.com/NAfuel.

Bakersfield 9150 Golden State Hwy. Bakersfield, CA 93308 661 387 6090 661.387.6090

Fresno 4501 E. Volvo Ave. Fresno, CA 93725 559 834 4420 559.834.4420

Redding 4963 Mountain Lakes Blvd. Redding, CA 96003 279 201 4869 279.201.4869

San Leandro 1944 Marina Blvd. San Leandro, CA 94577 510 357 9131 510.357.9131

Corona 22099 Knabe Rd. Corona, CA 92883 951.277.7620

Lakeside 12345 Mapleview St. Lakeside, CA 92040 619.441.3690

Sacramento 8594 Fruitridge Rd. Sacramento, CA 95826 916.504.2300

Turlock 1275 Venture Ln. Turlock, CA 95380 209.410.6710

Find us on social media: facebook.com/volvoces

VolvoCES

volvoces

volvoces

vcesvolvo.com


Page 8 • July 31, 2022 • www.constructionequipmentguide.com • California State Supplement • Construction Equipment Guide

Hawthorne Cat Hosts Students at Enrichment Program Hawthorne Cat, the exclusive Cat equipment dealer in San Diego, the Hawaiian Islands and the Pacific Region, hosted the Junior Achievement of San Diego County (JA San Diego) students from Lincoln High School on June 28, 2022 at Hawthorne’s corporate headquarters as part of San Diego Foundation’s Summer Enrichment Program. The JA San Diego students participated in Hawthorne's Job Shadow Program, which is part of the company’s Community Outreach Program. Students were shown what the core business was about and how other supporting departments, including marketing, parts, service, information technology, credit and accounting, helped run the company. The students also learned about different career opportunities available to them. The San Diego Foundation recently awarded $12.3 million in grants to 90 local nonprofit organizations, including JA San Diego, offering hundreds of summer enrichment programs to San Diego Unified School District students benefiting from academic and socio-emotional development opportunities through another summer session of Level Up SD, in partnership with San Diego Unified School District.

Hawthorne Cat photo

Chris Giannaris with JA San Diego students.

About Junior Achievement of San Diego County Junior Achievement of San Diego County (JA San Diego) empowers young people to own their economic success through Common Core-aligned K-12 programs focused on financial literacy, work readiness and entrepreneurship. These programs enable students to make a connection between what they learn in school and how it can be applied in the real world — enhancing its relevance and increasing students’ awareness of the value of education, the importance of planning for the future and the impact of their decisions. For more information, visit https://jasandiego.org/ to learn more.

About Hawthorne Cat Hawthorne Cat is the authorized dealer of Cat construction and power equipment in San Diego, Hawaii, Guam, Saipan and American Samoa. Hawthorne sells, rents, provides parts and service, training and emission solutions to various industries including general building construction, landscaping, marine, paving and power generation. For more on Hawthorne Cat, visit www.hawthornecat.com 

AGC of California CEO Receives BuildOUT Impact Award Peter Tateishi, chief executive officer of AGC logue meant to foster and further best pracof California (AGC), was awarded a 2022 Built tice sharing among individuals working to Community Impact Award from BuildOUT make their companies more equitable. California to celebrate his contributions to the economic empowerment of LGBTQ+ and allied About Associated General businesses and professionals in construction. Contractors of California AGC, along with AGC Construction Since 1920, the Associated General Education Foundation (CEF), launched a landContractors of California (AGC of mark partnership in 2021 with BuildOUT California) has worked alongside memCalifornia, the world’s first industry association bers to provide advocacy, education, dedicated to the sustainable growth of LGBTQ+ career development and networking owned and certified businesses. Since, Tateishi opportunities to experienced and next genhas challenged the construction community to eration construction and contracting proconsider and implement practices toward greater fessionals. AGC advocates for contractors equity and inclusion, and dedicated AGC of with state and local governments, while California to help build a workforce that reprehelping members connect with industry sents the state’s demographics. leaders through services, innovative proUnder Tateishi’s leadership, AGC of Peter Tateishi, chief executive officer of AGC of California (AGC), receives the grams, and events. Learn more at California launched a Diversity & Inclusion Task 2022 Built Community Impact Award from BuildOUT California. www.agc-ca.org.  Force, a group dedicated to advancing AGC’s commitment to increasing diversity, equity and inclusion, that provides AGC’s state board with actionable input on policies, programs, trainings and best practices respective to workforce, subcontractor and supplier diversity and inclusion. In 2021, the association hosted its first DEI Forum, where nearly 80 executives, managers and individual contributors from across California attended the first meeting. AGC of California also proPeter Tateishi vides training, education, resources and open dia-

“Building a strong workforce requires that we hear diverse voices, which bring vibrant perspectives needed to build a strong California. I am honored to receive this award and committed to continuing to advocate for equity in construction.”


Construction Equipment Guide • California State Supplement • www.constructionequipmentguide.com • July 31, 2022 • Page 9

Northern California’s Largest SANY Dealer

Mechanical & Irrigation Solutions, Inc.

Mechanical & Irrigation Solutions, Inc.

3199 E Onstott Road • Yuba City, CA 95591 530-674-7030 misisthebest.com

3199 E Onstott Road • Yuba City, CA 95591 530-674-7030 misisthebest.com

More Tractor for your Money

RENTALS Try before you buy from our extensive rental fleet.

We have all the rental equipment needed to meet the demands of the Farming & Irrigation industry.

Mechanical & Irrigation Solutions, Inc.

Mechanical & Irrigation Solutions, Inc.

3199 E Onstott Road • Yuba City, CA 95591 530-674-7030 misisthebest.com

3199 E Onstott Road • Yuba City, CA 95591 530-674-7030 misisthebest.com


Page 10 • July 31, 2022 • www.constructionequipmentguide.com • California State Supplement • Construction Equipment Guide

El Porto Undercrossing Project Will Ease Dangerous Trek GRANITE from page 4

well as restaurants, shopping areas and a farmer’s market that operates on Sundays. This dangerous trip will no longer be necessary with the completion of the El Portal Undercrossing in the summer of 2022. The city of Encinitas has been working with the San Diego Association of Governments (SANDAG) on building an inviting pathway underneath the tracks that will benefit shoppers, beachgoers, cyclists and diners. Many children attending Paul Ecke Central Elementary School on the east side of the tracks also will have a safer walk to school. SANDAG led capital improvement projects on the North County Transit District’s section of the LOSSAN railway in the County. SANDAG did the oversight for a similar undercrossing built in 2013 about 2 mi. south of the new El Portal Undercrossing. Granite Construction was chosen to handle the construction for the project, including managing various subcontractors. The final aspects of the work required building permanent retaining walls to hold back the dirt from the trains and the new undercrossing. “The job is engineering meets safety meets public art,” said Rob Zappia, Granite’s project manager of the final segment of the undertaking. “We are building the retaining walls for the city, which has an artistic vision for a unique appearance for the walls.” The city plans for an aesthetic look that will mimic a wood texture. The path that leads under the tracks will have a custom architectural finish, lighting fixtures and tile decorations created by local elementary school students. Proximity to Tracks A huge challenge for the job has been operating so closely to live railroad tracks. Unlike in a traditional highway project, workers could not divert the traffic onto an adjoining road. Although plan exists to add a second set of parallel tracks in the future that will carry traffic from Los Angeles to Mexico and back, the trains currently run on a single track. The new bridge built by Granite is designed to support the second set of tracks when it arrives. “About 30 trains pass our job site each shift,” said Zappia. “Generally, our people work for 20 minutes, then wait for 10 minutes for the train traffic. In a normal eight-hour workday, we have a five to five-and-a-half hour window to complete our work. We are not allowed to have any rigging within 25 feet of the outside rail while the train is coming or going. Safety inspectors want to make sure that there is no chance of ‘fouling the track.’” The railroad carries Amtrack, Metrolink,

Granite subcontracted with Condon-Johnson & Associates to drill the shafts.

Some of the piles were drilled from the beach with a smaller drill rig that had to be flown into place each day.

North County Transit District traffic as well as freight. So, retaining walls and bridges must be sturdy to handle the weight and vibration resulting from the trains. As a part of this project, contractors will be installing guard rails to prevent foot traffic across the rails. While working around the track proved difficult, the shoring part of the retaining wall went according to plan. Workers excavated approximately 1,500 cu. yds. of dirt to make way for the retaining walls. The team then drove H beams as deep as 60 ft. to serve as footings for the walls. Sheet laggings (massive steel plates) fit between the H beams to hold the dirt in place temporarily while the retaining walls were being built. Finally, the sheet laggings were removed allowing the dirt to settle back against the retaining wall. “The process went well,” said Brittany Sattler, Granite engineer. “The soil was sandy, a Type C material, but it held in place as we had planned. We were able to pull the lagging and the H piles out then haul them to another location away from the work zone.” The equipment used to extract the piles was an ABI rig with a hydraulic vibrator. The drill bit clamped on the top of each pile and slowly pulled the H pile out as a dentist might remove an enormous tooth. The vibrator on the equipment loosened the ground just enough for the pilings to be removed. In addition to building the retaining walls, workers did grading for stairs leading to the undercrossing. A late addition to the plan was finalizing a temporary crosswalk that had proven popular during the construction. The retaining walls, steps, sidewalks, curbs, gutters and other structures will require approximately 1,000 cu. yds. of concrete. The final phase of the work was built on the ambitious first steps of the El Portal Undercrossing that began in early 2021. Granite and partners, including Mahaffey Drilling, built the new railroad bridge of precast concrete supported on 16 piles each approximately 50-ft. deep. Workers welded into place bent caps on top of the piles to form the platform of the new bridge. Steel girders were used to further strengthen the structure and provide sufficient support to sustain the train traffic that would be traveling over the new bridge. Workers lined the bridge platform with waterproofing material to keep moisture from corroding the bridge in the future. Train traffic was halted over three weekends in February 2021 so the workers could labor around the clock to accomplish these tasks. Once the bridge was rebuilt, workers returned the ballast and sub-ballast to the trackbed then rebuilt the tracks. The tracks were tested and trains rolling again by 5 a.m. each Monday.  CEG

(All photos Construction.)

courtesy

of

Granite


Construction Equipment Guide • California State Supplement • www.constructionequipmentguide.com • July 31, 2022 • Page 11

Small but mighty.

LIMI

T E D WA R R A N T Y

('&%$# " ( ! $ '! ' !' ' ' ' ' ' ' ' ' ' It s 25 - hp engine , t hree - point hitch and st and ard re ar and d mid - mount P TOs make it ' ' ' ' ' ' ' ' ' ' ' ' ' a cinch to m aneuver, and a simple du al - ped al t r ansmission eliminates shif t lever s and ' ' ' ' '

# t o g e t he h e r b l ue e

S m a l l b u t m i g h t y — a n d r e a d y t o p r o v e i t s e l f . S t o p b y t o d ay t o s e e a WO RK M A STE R™ 25S or o le arn more at newholland.com .

new ho l la n d . com

Scott Equipment www.scottequip.com 14635 Valley Blvd. 10918 Shoemaker Ave. Fontana, CA 92335 Santa Fe Springs, CA 90670 (909) 822-2200 (562) 777-0775 © 2020 CNH Industrial America LLC. All rights reserved. New Holland is a trademark registered in the Unnited States and many other countries, owned by or licensedd to CNH Industrial N.V., its subsidiaries or affiliates.


Page 12 • July 31, 2022 • www.constructionequipmentguide.com • California State Supplement • Construction Equipment Guide

EXTREM T ME S STRE ENGT TH

The JCB X-series exxccav avaattors are here, delivering th t e perffo ormance yyo ou need to get the job done and the dependability yyo ou need to drivvee down costs. The X-series excaavvaattors are the result of yyeears of development and thousands of hours of testing. Longer service intervals, efffo ortless control and industry-leading operaattor comffo ort are just part of the JCB X-series experience … backkeed b byy a naattionwide dealer and parts distribution network yyo ou can count on. To learn more about the new JCB X-series exca To avvators visit w w w.jcb.com or contact your JCB dealerr.. YOUR FAMILY OF LOCAL JCB DEALERS

N&S Tractor

Central California Power JCB 19487 Broken Ct, Shafter, CA 93263 (661) 589-2870 www.ccp-jcb.com

1960 Highway 20 Colusa, CA 95932 (530) 458-2166 2173 Blossom Street Dos Palos, CA 93620-2313 (209) 392-2161

600 S. State Highway 59 Merced, CA 95341-6928 (209) 383-5888

SoCal JCB

20280 Main St. Stratford, CA 93266 (559) 947-3301

1340 W. Charter Way 1215 West Glenwood Ave Stockton, CA 95206 Turlock, CA 95380-5703 (209) 944-5500 (209) 634-1777 www.nstractor.com

/JCBNA

@JCBNA

827 North Tehama St Willows, CA 95988 (530) 934-3382

14675 Valley Blvd. Fontana, CA 92335 (866) 522-7225

3056 Colusa Highway Yuba City, CA 95993 (530) 923-7675

14480 Alondra Blvd. La Mirada, CA 90638 (866) 522-7225 www.socaljcb.com

JCBNA 5833


Turn static files into dynamic content formats.

Create a flipbook
California 16, July 31, 2022 by Construction Equipment Guide - Issuu