Skip to main content

Portafolio Proyectos Destacados

Page 1

PROJECT PORTFOLIO Abril 2022


Consost in brief

Saúl Ramírez Co-Founder & CEO

Consost is a design and construction company with a special focus on sustainability and dedicated to the development of geotechnical solutions, infrastructure, civil works, hospitality, residential and institutional projects. Founded in 2011 as a family business, our purpose is to build and develop sustainable and safe solutions for a better society and built environment. Versatility, passion for what we do, and integrity are the main drivers for our company`s growth.

Pablo Mora Co-Founder & Project Manager


Residential

Encino 47 Liberia Guanacaste

Teahouse Nosara Guanacaste


Teahouse Nosara Guanacaste

Casa MaRu Nosara Guanacaste


Hospitality

Hotel Planet Hollywood Papagayo Guanacaste


Oikoumene Ochomogo Guanacaste

Airstreams by the Sea Nosara Guanacaste


Geotechnical

Slope Stabilization & Road Reconstruction Calle Vargas Sabanilla Alajuela


Scour Countermeasures Buena Vista River Guatuso Alajuela


Slope Stabilization & Road Reconstruction Guatuso Alajuela


Slope Stabilization & Road Reconstruction Calle Obando Puriscal San José


Slope Stabilization & Road Reconstruction El Cura– Los Camacho – Los Cruz Tarrazú San José


Mechanically Stabilized Earth Walls Ruta 1 Limonal-Cañas Guanacaste


Slope Stabilization with GreenTerramesh System Nosara Guanacaste


Slope Stabilization with Soil Nailing, Gabion Walls & Erosion Control Blankets Santa Rosa de Oreamuno Cartago


Soil Nailing & Stormwater Management Hotel Secrets Papagayo Guanacaste


Soil Stabilization & Stormwater Management Hotel Planet Hollywood Guanacaste


Soil Stabilization & Scour Countermeasure Skypark High Living San José


Infrastructure


Urban Drainage System & Road Construction Guatuso Alajuela

Aljibe Hotel Planet Hollywood Papagayo Guanacaste


Institutional

Northern Fire Station Barrio Amón San José


Southern Fire Station- Catedral- San José


Border Wall at AyA Potable Water Storage Plant Calle Lajas Escazú- San José


Erosion Control and Sedimentation Control at ICE Power Substation Plant Tarbaca- San José


Sustainability

NFH Ojochal Puntarenas


Recycling & Community Center Chira Isla Chira LF2R – PACIFICACIÓN Puntarenas

Oikoumene Ochomogo Guanacaste

Green Infrastructure LF2R La Fortuna Alajuela


22.00 21.00 20.00

Base Case

Emissions (kg CO2-eq/m2/yr) Stage

19.00 18.00

Module Base Case

17.00

Emissions kgCO2-eq/m2/yr

16.00

NFH Ojochal

15.00 14.00 13.00 12.00 11.00 10.00

NFH v2

9.00 8.00 7.00 6.00 5.00 4.00 3.00 2.00

Product Transport Gate-to- Site Construction Process Replacement (incl. Transport) Operational Energy Use Operational Water Use Decontruction/Demolition Transport Site-to-Waste Mgmt. Center Waste Processing Total

A1-A3 A4 A5 B4 B6 B7 C1 C2 C3

5.31 0.39 0.15 1.87 9.11 0.84 0.39 0.12 1.16 19.34

NFH Ojochal 6.81 0.19 0.17 -0.55 3.51 0.60 0.55 0.04 0.34 11.65

NFH v2 2.54 0.12 0.08 0.62 3.36 0.60 0.20 0.03 0.29 7.84

1.00 0.00 -1.00

A1-A3

A4

A5

B4

B6

B7

C1

C2

C3

Building Sub-Component 10.00

Base Case

NFH Ojochal

9.00

Emissions kgCO2-eq/m2 /yr

8.00 7.00 6.00 5.00

NFH v2

4.00 3.00

Groundwork and Foundations Superstructure Outer walls Inner walls Floor Structure Outer Roof Fixed Inventory Stairs and Balconies EE (kg CO2eq/m2/yr)

EE (kg CO2-eq/m2/yr) NFH Base Case NFH v2 Ojochal 0.99 0.85 0.85 1.38 0.33 0.26 1.86 2.10 0.50 1.28 1.68 0.90 2.24 0.55 0.28 1.05 1.59 0.64 0.52 0.30 0.30 0.07 0.15 0.16 9.39

7.54

2.00 1.00 0.00 -1.00

A1-A3

A4

A5

B4

C1

C2

C3

Life Cycle Assessment, NFH Ojochal

3.88


Bicipúbli Cartago- Cartago

Super Perro Dog Park- Barrio Escalante- San José


Clients


Contact consost.com Tel: +506 2260 1265 E-mail: info@consost.com San José, Costa Rica


Turn static files into dynamic content formats.

Create a flipbook
Portafolio Proyectos Destacados by Consost - Issuu