Case Studies
Student Accommodation Block
Nottingham, £375,550
Works consisted of the rip out and installation of 48nr kitchens and 128nr bathrooms including the associated M&E works across 5 student blocks located in various parts of the site.
• Lifecyle works • Minimal disruption for ‘summer stayers’ • No use of powered lifts • Handed over blocks one at a time • Construction phase plans, H&S etc • Site inspections and reports • Floor laying • Decorative works • Fire alarm install • Upholstery works
Council Property Upgrades
Leicester, £2,000,000
There is a statutory obligation to keep housing stock in a safe condition, consequently, the council has a policy to either rewire or upgrade the fixed electrical installation in its social housing stock approximately every thirty years.
• Reactive and planned EICR reports in both domestic and non-domestic properties • Full rewires • Upgrades • Minor repairs • Rewiring of communal area lighting, using steel conduit • Supply and installation of low energy, low maintenance LED luminaries • Emergency responses and repairs • Improvement of existing installations • Maintenance of existing electrical installations • Kitchen and bathroom upgrades • General joinery and decorating • General building and roofing works • Disabled ramps
National Pub Chain
East Midlands, £3,500,000
We undertake a wide range of reactive, planned maintenance & repairs in commercial properties across our region which include:
• Full rewires • M&E upgrades • Minor repairs • Glazing repairs/window installations • Emergency responses and repairs – 4hr or 24hr SLAs with our first time fix rate currently at 98% • Improvement of existing installations • Maintenance of existing electrical/heating installations • Kitchen and bathroom refurbs • General joinery and decorating • General building and roofing works • Drainage surveys and remedial works • Disabled ramps • Structural/damp surveys • Planned projects with a 10-day turnaround time from receipt of order to starting on site