Skip to main content

November 2026 Component Manufacturing Advertiser Magazine

Page 1

A #

328

The

November 2026 #18328

Component Manufacturing dverti$ dverti $ er

Serving the Structural Building Components Industry

“SpeedStack is a Process Organization Marvel” Cover story by LimTek Solutions


A

The

Component Manufacturing dverti$ dverti $ er

Serving the Structural Building Components Industry

Inside

Articles 6 Anna Stamm – Advertiser Forum: Idiosyncrasies and Planning Ahead

10 Joe Kannapell: Truss Design Technology, Part III: Early Computer Use

19 Glenn Traylor:

98 Lesko Financial Services Team: Third Quarter Market Performance

106 Thomas McAnally – TheJobLine: Consider Your Options Before Accepting That Offer

118 Geordie Secord – Design Connections:

What Can You Do About Missing Connectors?

Sales vs. Design: Are You Draining Your Talent Pool?

29 Brett Kinny – Spida Machinery:

126 Bill Krick, PE and Abdur Khan –

Jigging is a Software Problem Now

40 Ed Lim – LimTek Solutions: SpeedStack is a Process Organization Marvel

51 Todd Drummond Consulting, LLC: Before You Invest in Automation

60 Paragon Team: Before You Click Optimize

70 Darren Hamar – 4Ward Solutions: Factory Simulation Helps Catch Costly Errors Before the First Component is Built

81 Garry Roehr – AMT Robotics: “The Goal” – Solving Bottlenecks

89 Carl Villella – Acceptance Leasing: The Strategic Advantage of Payment Deferrals for Equipment Purchases

Alpine: Code Change Ahead: Key Structural Changes in Florida’s New Building Code

136 William Gould, PE – MiTek: Florida’s New Saltwater Coastline Corrosion Rules: What Component Manufacturers Need to Know

146 Simpson Strong-Tie Staff: From Chaos to Cut Lists: How Truss Manufacturers are Using AI to Optimize Plant Operations

160 Christine Wagner – SBCA: SBCA Heads to Charlotte for December Open Quarterly Meeting

188 Joe Kannapell – The Last Word: The Shape of Truss Plates


Design and build faster than ever. From plans, to walls, to panels, and everything Learn more at EagleMetal.com

above. Introducing a new level of design tools, built from the ground up.


A

The

Component Manufacturing dverti$ dverti $ er

Sections

Inside

New & Used Equipment Saws ........................................................................................................9 Truss Equipment ....................................................................................76 Panel Equipment ................................................................................. 114 Trucks & Trailers .................................................................................135 Misc. Equipment ..................................................................................153 Door | Stair | Window Equipment ........................................................153 Calendar of Events .................................................................................. 164 Safety First ............................................................................................... 166 Industry News ..........................................................................................168 Directory ...................................................................................................183 Hiring-Zone - Jobs & Subcontractors ...................................................186

Advertisers

Serving the Structural Building Components Industry

4Ward Solutions Group ............................................................. 16,70,165,190 Acceptance Leasing & Financing ....................................................... 27,83,89 All Points Technical ................................................................................. 17,56 Alpine ............................................................................................... 14,15,126 AMT Robotics .................................................................................. 25,81,115 BuyMetrics .............................................................................................. 49,79 Clark Industries, Inc................................................................................. 26,86 CT Darnell Construction........................................................................ 48,133 Eagle Metal Products ................................................................................. 4,72 Eide Machinery Sales, Inc........................................................................ 24,68 Enventek ................................................................................................ 36,100 Epicore.................................................................................................... 44,140 Fitzgerald Group .................................................................................... 55,191 Hiring-Zone ........................................................................ 27,79,125,153,186 HOLTEC USA .......................................................................................... 2,88 Hundegger, Inc....................................................................................... 38,102 LimTek Solutions............................................................................. 1,22,40,74 MiTek ................................................................................................ 8,136,187 Panels Plus ............................................................................................. 94,121 Paragon ................................................................................................. 7,60,96 Precision Equipment Truss Trailers ................................. 23,45,59,67,143,145 Simpson Strong-Tie ................................................................... 12,64,146,173 Spida USA .............................................................................. 28,29,66,78,120 The Hain Company .......................................................... 17,45,56,63,143,159 The JobLine ........................................................25,47,106,111,118,135,153,167 Timber Products Inspection ................................................................... 18,158 Todd Drummond Consulting, LLC................................................... 50,51,132 Triad | RUVO | Merrick Machine .......................................................... 91,134 Truss Machine Works ............................................................................ 34,122 Vekta Automation .................................................................................... 13,62 Wasserman & Associates ...............................9,23,45,48,57,65,75,77,84,87,92, 93,95,103,104,105,111,112,113,114, 117,123,131,143,153,155,157 West Fraser............................................................................................... 21,80 Wolf X Machina.......................................................................................... 103 Wood Tech Systems ................................... 25,27,35,37,39,47,54,57,58,59,63, 65,67,69,73,75,76,79,82,83,85,97,101,103,110,111, 113,115,116,117,121,124,125,130,131,133,152,154,155,156,157

Published Monthly Publisher Thomas McAnally twm@componentadvertiser.org

Editor Anna L. Stamm 800-289-5627 x 3 anna@componentadvertiser.org

Distributed FREE Via e-mail subscription Download PDF or Read on line at www.componentadvertiser.com News of Interest and Advertising inquiries can be submitted to: anna@componentadvertiser.org An Open Forum for many sources. Deadline 20th of each month. Articles, Trade Names, and Logos are the property of their respective owner or creator unless otherwise noted Disclaimer: We reserve the right to refuse any advertisement or material that we deem not in the interest of the industry or the Advertiser. Permission to use content is the responsibility of the contributor including permissions to use any likeness of persons. The Advertiser is provided “As Is” including typographical errors, omissions, and mistakes both intentional and unintentional.

Believe it at your own risk! Copyright 2008-2026

Component Manufacturing Advertiser The

Advertiser

7586 Becks Grove Road Freetown, Indiana 47235

no reproduction in whole or in part without permission from the component manufacturing advertiser Archive Copies Available On Line www.componentadvertiser.com


A

Th e

Component Manufacturing dverti$ dverti $ er

Don’t Forget! You Saw it in the

Adverti$$er

Advertiser Forum

November 2026 #18328 Page #6

Idiosyncrasies and Planning Ahead Anna L. Stamm Director of Communications and Marketing Component Manufacturing Advertiser.

M

oving to North Carolina this fall, I found a house in place I never expected to live – a planned community. They’re very popular for retired people, but I’m not retired. Even so, the house checked nearly all of the boxes on my search list, and the benefits of this planned community were a bonus.

My new house, however, has one very distinct feature that makes no sense in a community intended for mature residents – you cannot walk into it without climbing stairs. The front porch has two slate steps up to the front porch. The garage has three wooden plank stairs into the house. But once inside, everything is zero barrier, and the master bathroom could even accommodate a wheel chair if needed. So, that led me to wonder – why on earth did they make entry into the house require stairs?

Sense vs. Aesthetics From a neighbor, I learned the answer. When this particular neighborhood was opened for development, the edict was that all houses must have steps onto the porch. Folks who built here could choose their house from a portfolio that included multiple builders, but they all had to deliver a similar aesthetic. Was this the smartest choice for new residents? I don’t think so. Does it serve a functional purpose? I hope not. I hope it’s not because someone was secretly worried about flooding and that’s why the houses are raised! If I were still living in Wisconsin, I would have been opposed to these slate steps – trying to keep ice off of them would be a challenge! But, here in coastal NC, my incidence of snow and ice should be much lower. I’m also leaving behind the numerous tornado warnings of Oklahoma…but I expect to pay more attention to the path of hurricanes instead. What you expect in a house (and a job) will vary between regions, for both frivolous and good reasons.

Thank you to Carlton Riffel at Paragon for interviewing me on The Common Chord. It was great talking about what makes our industry so meaningful and our connections so important.

PHONE: 800-289-5627

Read/Subscribe online at www.componentadvertiser.com

FAX: 800-524-4982


INTRODUCING WHAT’S NEW Now it’s time to put innovation to work

BID WITHOUT BOTTLENECKS

DEFEND AGAINST DOWNTIME

Quickly assess project complexity, uncover critical insights, and move from plans to proposals faster.

Keep production moving through preventative maintenance, technical training, and automation services.

MII.COM/ V IS AR A

MII.COM/GUARDI AN


A

Th e

Component Manufacturing dverti$ dverti $ er

Don’t Forget! You Saw it in the

November 2026 #18328 Page #9

Adverti$$er

NEW SAWS! NEW!

NEW!

NEW! Monet DeSauw DeRobo Linear Saw

Monet DeSauw FWA 500 Floor Web Cutter • • • • • •

• • • • • • • •

Push Button Powered Blade Angulations Single Push Button Setting for 2 Blades per Side Electronic Digital Readouts Backup Mechanical Indicators Cuts 4 Angle Webs, Cantilever Webs (2 piece webs) & Square Blocks Magazine Lumber Feed for 3x2, 4x2 and 6x2 Lumber 12 1/2” to 48 1/2” Length Capacity (7” Minimum on Square Blocks) 60 Pieces per Minute (4) Internal 16” Blades & (1) External 16” Cut-Off Blade Pneumatic Blade Brake on External Blade Dust Hoods Belt Waste Conveyor (under saw) Add $4,300 for 12’ Incline Waste Conveyor (adjacent to saw) Add $2,100 for Extra Set of Blades 480 Volt / 3 Phase FOBMO Call For Pricing

•

• • • • • • • • • • • • •

Automated (Truss Design Software Download) or SemiAutomated (Touch Screen Entry) Operation All Movements are Computer & PLC Controlled Comprehensive Setup Screens Display Each Piece with Setup Data 22” x 40 Tooth Blade on PAE Cut 1 or 2 Boards up to 20’ (2 Second Plunge Cut) Cut Chords, Webs, Rafters, Wedges & Stair Stringers Cut Long Scarfs by MultiPlunging Servo Positioning on Infeed, Angle & Outfeed Pusher Over Travel Protection Ink Jet Printer Lumber Optimization Program Belt Waste Conveyor 480 Volt / 3 Phase / 60 Amp Includes 5 Day Onsite Installation & Training Optional Monet DeSauw Live Deck, Bunk Feeder & Incline Belt Waste Conveyor FOB MO

Call For Pricing

Monet DeSauw DeSawyer 2000 Automated Saw • • • • • • • • • • • • • • • • •

Touch Screen User Interface with Backup Mechanical Controls 3 Operating Modes: Auto, SemiAuto & Manual All 20 Axes of Movements are Computer & PLC Controlled Comprehensive Setup Screens Display Each Piece with Setup Data Anti-Collision & Optimizing Programming Auto Calibration Productivity & Time Tracking Maintenance Diagnostics Variable Speed Conveyor (0-50 Flights per Minute)with Powered Hold Downs (1) 30” x 80 Tooth Blade (27 3/4” Scarf on PAE) (4) 16” x 40 Tooth Blades (13 1/2” Scarf on Centerline) Pneumatic Blade Brakes on all 5 Blades 16 1/2” to 20’ Length Capacity (11” Minimum on Square End Blocks) Vibrating Waste Conveyor Under Saw 480 Volt / 3 Phase Includes 4 Day Onsite Installation & Training Add $2,900 for Extra Set of Blades Optional Live Deck, Label Printer, Ink Jet Printer, Catcher Display & Incline Belt Waste Conveyor.

Call For Pricing FOB MO

Buy Factory Direct From Wasserman & Associates at the same price as the Manufacturer, and get the added support and care you need to be up and running FAST! WE’LL EVEN HELP SELL YOUR USED EQUIPMENT TOO!

800-382-0329 | www.wasserman-associates.com

PHONE: 800-289-5627

Read/Subscribe online at www.componentadvertiser.com

FAX: 800-524-4982


A

Th e

Component Manufacturing dverti$ dverti $ er

Don’t Forget! You Saw it in the

Adverti$$er

November 2026 #18328 Page #10

Truss Design Technology, Part III: Early Computer Use

W

hen engineers Cal Jureit, Walter Moehlenpah, and Bill McAlpine witnessed the impressive launch of the IBM System/360 in July 1964, they surely suspected that computers could bring relief from the increasing burden of special engineering requests. Even though none could afford the System/360, they sought lesser-priced systems that could expedite their work. Jureit and Moehlenpah both signed leases on the engineering-oriented, desk-sized IBM 1130 that used Fortran and came with MIT’s Structural Engineering System Solver (STRESS) analysis program.

By Joe Kannapell

The impact of installing the first-ever computer in design offices that were doing everything by hand is hard to imagine today. At the time, these offices were stressed by a continually escalating level of tedious work. By 1970, Gang-Nail had about thirty people engaged in truss design and Hydro-Air had about twenty, but few if any of their associates had laid eyes on a computer. The majority were draftsmen, who worried that this new contraption would take their jobs. Even the engineers had trepidation, since none had taken a computer course, and they knew they would have to do the work, since local colleges had just started awarding computer science degrees and graduates with engineering backgrounds were in short supply. That’s why someone such as myself with only two years of engineering and computer classes could be hired by Hydro-Air. Fortunately, truss engineers quickly realized that learning computer technology was only one part of the continuing education required to maintain their professional standing. More importantly, though, they realized that well-programmed computers had the potential to spare them from the daily drudgery of their jobs. Among these engineers was Ted Dasher, who had moved from the famed Bell Labs to south Florida where he was fortunate to work with Bob Brooker at Sanford Truss. Together, they created the first fully featured truss program that would go on to power the first stand-alone inhouse truss computer, Lenny Sylk’s Forest Products system. Engineers did find early structural analysis programs, such as STRESS, that could analyze attic frames and other non-triangulated structures they had previously disdained. However, these programs did not design plated joints, and did not take advantage of the uniqueness of wood truss geometry, rendering them overly conservative. As a result, truss engineers were compelled to write their own programs to remain competitive. By the time I arrived at Hydro-Air in 1970, our engineers had already produced a capable program that was stored on a deck of about 900 computer cards. The program loaded in about seven minutes, after which batches of individual truss designs took several minutes each. By early 1972, our IBM 1130 computer was able to process all incoming jobs and still leave plenty of time for running program improvements. During this time, engineers were able to shift their focus from doing hand calculations to checking computer output, thereby verifying the accuracy of the programming. Draftsmen were doing more cutting and pasting than drawing and lettering. The end result was a program that could be shared with fabricators, with the requisite engineering cautions. Continued next page

PHONE: 800-289-5627

Read/Subscribe online at www.componentadvertiser.com

FAX: 800-524-4982


A

Th e

Component Manufacturing dverti$ dverti $ er

Don’t Forget! You Saw it in the

Adverti$$er

November 2026 #18328 Page #11

Even before plate suppliers had computers, Camilla Hurwitz was hard at work writing code, using time-sharing to acquire the necessary computer time. This mid-1960s innovation gave small users near parity with much larger ones, and Camilla gained a jump on the entire truss industry from her office at Woodtech, a small fabricator in suburban St. Louis, MO. While the big guns were equivocating on hardware, Camilla was writing the first-ever cutting program on a Western Union teletype so she could avoid doing cutting lists by hand. While Woodtech had obtained Gary Sweatt’s Clary manual when they bought their component saw, Camilla had learned that there was a better way during her pursuit of a PhD in chemistry. When the Clary Corporation realized the potential of her work, they negotiated a buyout with Camilla and her husband Dan, a professional structural engineer, and moved them to the Dallas, Texas area. After a short stint there, Dan and Camilla left Clary amicably, and, in 1970, incorporated On-Line Data in Richardson, TX, becoming the first to offer cutting lists via time-sharing. On-Line Data’s program quickly gained customers throughout the truss industry, and compelled the plate and engineering suppliers to follow suit. Gang-Nail was the first to respond, seemingly outflanking On-Line by offering both engineering design and cutting programs. However, even some Gang-Nail plate customers, like Trussway, retained On-Line Data’s program, since they had already mastered it, and also because On-Line Data’s program could cut nearly any planar structure through a capability that later became Sketchpad. Subsequently, when Hydro-Air offered a similar methodology, they were initially barred from providing it due to infringement of On-Line Data’s copyrighted input form. While Hydro-Air overcame that limitation, this early skirmish was but the first of many in the coming software competition. All of these time-sharing applications were line-input based, with designated fields for each data item. Users filled out a form and then typed the data from these fields, separated by commas, onto a teletype machine. Jobs could be stacked vertically, as they were delineated by a # on the first line. Initially, users punched a paper tape offline, set a telephone handset into an acoustic coupler that converted digital signals into audio tones, initiated a connection to the time-sharing computer, and then fed the paper tape back into the teletype. Then, jobs were stacked in the mainframe’s input queue and processed as a batch when time was available. Users had no direct interaction with the remote computer, and they faced a delay of several hours in receiving the results. But, regardless of how awkward this sounds today, having access to a computer gave designers the opportunity to obtain much better results, a far cry from calling in or faxing design requirements. By the end of the 1970s, however, designers finally got to work on a dedicated computer workstation.

Next Month: Computers Come In-House PHONE: 800-289-5627

Read/Subscribe online at www.componentadvertiser.com

FAX: 800-524-4982


Truss solutions from idea to installation. © 2026 Simpson Strong-Tie Company Inc. M-T-CM25-HARD

Transform your truss operation with an integrated solution from Simpson Strong-Tie. The industry leader in truss plates now brings you a full suite of software, equipment, hardware and services to drive truss component manufacturing from idea to installation. Start with CS Director™, CS Truss Studio™, CS EWP Studio™ and CS Producer™ for design, layout, production and project management. Use our powerful Monet DeSauw industrial saws to cut webs, chords, stair stringers, rafters and wedges with speed and precision. Specify the optimal ® connectors, anchors and Strong-Drive structural fasteners for every project. You can also complement your team with our professional truss design services at any time. Altogether, you have a smart solution made to increase productivity, ensure high quality and take your business to the next level. To learn more, contact your representative at (800) 999-5099 or visit us online.

go.strongtie.com/cm


/ INTELLIGENT, FASTER, SAFER, FRAME FABRICATION & HANDLING

FRAME SMARTER Vekta Framing Solutions — nailing every facet of framing.

ENGINEERING, SERVICE & SUPPORT

/ V E K TAU S A .C O M


“Find good people and grow old with them.” – Bill McAlpine, Co-founder of Alpine

Strong relationships. Trusted partners. Passionate teams. Here’s to six decades of innovative, solution-forward component manufacturing—and the customers who inspire it.

BUILD MORE. | alpineITW.com


In 1966, we designed 200 trusses for three customers. Since then, our team has helped build millions of homes in North America through high-quality component manufacturing.

A lot has changed in 60 years, but our commitment to partnership has always been at the core of what we do.

At Alpine, our team fosters lasting relationships with customers and collaborates on solutions. Our industry innovations have been driven by challenges we’ve seen component manufacturers face. We truly want to see everyone succeed.

Like the plaque in our Orlando office reads, “Find good people and grow old with them.” So here’s to six decades of innovative, solution-forward component manufacturing—all thanks to our team members and customers who made it possible.

BUILD MORE. | alpineITW.com


A

Th e

Component Manufacturing dverti$ dverti $ er

Don’t Forget! You Saw it in the

Adverti$$er

November 2026 #18328 Page #17

ALL POINTS TECHNICAL

Engineering Talent

Truss / Panel / EWP

CAD · BIM · Revit

Design, Estimating & Engineering professionals on demand

4 Yr Degree specialists in structural & framing systems

And Planswift-ready teams for complex technical drawings

◆ GLOBAL REACH ◆

USA • Vietnam • India • Panama • Honduras

Global Delivery

Reduce Overhead

Faster Turnaround

NO-COST CONSULTATION

Nearshore & offshore talent across 5 countries — your time zone

Increase capacity without growing your fixed cost base

Increase clock speed — more projects, more profits

SOLUTIONS 4 DESIGN

The Gold Standard in Global Staffing & Technical Solutions

Scale Faster. Build Smarter.

Contact us today to reduce overhead, boost capacity & gain market share

Dave Walstad | All Points Technical

Jarred Fresura | Solutions 4 Design

941-713-4395 • Dave.AllPoints@gmail.com • https://allpointstech.ai/

724-433-4059 • Jarred@s4dz.com • https://s4dz.com/

Work Smarter

Sub Component Nailer Speed Up Your Production of wall panels, windows, doors, and other sub components

Block Sizes: 2x4 & 2x6 framing lumber, any length Nail Cycle Time: 1 nail 1 sec; 2 nail 2 sec; 3 nail 3 sec Machine Set Up Time: 1 sec from any prior set up Air Supply: 125 psi at 30 CFM, nothing less Electrical Supply: 120 VAC Frame: 1/4” steel plates mounted to heavy duty roll top tables and 2x2 skids mounted no install Transfer System: Pneumatic transfer for finished sub component assembly Covers: 3/16” thick aluminum Shipping Weight: 1000 lbs including crate Dimensions: Height 48”, Width 48”, Depth 10” MADE IN AMERICA BY AMERICANS See it in Action!

530-295-8068 PHONE: 800-289-5627

sales@thehaincompany.com

Read/Subscribe online at www.componentadvertiser.com

FAX: 800-524-4982


The truss industry relies on 3rd party quality assurance services to provide random visits to review the plants Quality Assurance program along with their operations. If your plant needs to comply with the IRC, IBC and to those who depend on solid, experienced QA expertise, we ask you to consider selecting Timber Products Inspection, Inc. (TP) as your choice for 3rd party inspections. Proudly serving the forest products industry for over 50 years, TP brings the expertise you need to ensure your business is successful. As a responsible partner, TP delivers to clients, employees, and the industries we serve the confidence to drive value through the effective use of our diverse professional team. TP would like to welcome the following authorized agents to our inspection team, each of whom have many years of experience in the truss industry! •

Al Coffman

•

Jean Hart

•

Curt Holler

•

Chuck Ray

•

Glenn Traylor

•

Elliot Wilson

If you have questions about how you can make this selection, please contact your authorized agent above or Glenn Traylor at 919-280-5905 or trusguy@gmail.com.

https://www.tpinspection.com/ https://www.tpinspection.com/auditing-services/truss


A

Th e

Component Manufacturing dverti$ dverti $ er

Don’t Forget! You Saw it in the

Adverti$$er

November 2026 #18328 Page #19

What Can You Do About Missing Connectors? By Glenn Traylor

W

hen we talk about tolerances and adjustments to suit the manufacturing process, we acknowledge that building a metal plate connected wood truss is part art, part skill, and mostly perseverance. Plate embedment is very dependent on that process, and we are very dependent on plate embedment for the successful performance of our products. Some manufacturing methods are more reliable than others. Plate placement can be simplified by settings in your software or utilizing lasers or ink jet marking. While increasing fabrication tolerances will provide more room for defects, rotation, or variations to location, one type of defect is not tolerable, has no tolerance, and is totally unacceptable. It’s the missing connector. What does it say to your customer when they receive their product missing connectors? I was pleased to see several companies at the recent BCMC show that are trying to address this ugly occurrence with some automation. But until there is a reasonable, cost-effective, and reliable method, what can we do to help prevent missing connectors from occurring? 1. Perform 100% visual verification that all plates are installed a. There are several methods for workers to accomplish this after the truss is through the finish roller. b. Vertically stacking trusses will allow your truss stacker the opportunity to look at each joint as the trusses as stacked. c. If trusses are horizontally stacked, I have seen methods where a worker on a rolling cart (similar to the creepers used to work under vehicles) rolls under the outfeed rollers. d. Pits are an exceptionally reliable method to back plate and survey a truss. While very few plants use this method, the plants that do have an impeccable track record of catching missing connectors. e. Polished metal mirrors placed under trusses as they exit the finish roller are effective (and metal is better than glass because glass mirrors are easily broken). f. Economical web cameras can be installed to monitor trusses exiting the finish roller. As with all of these methods, the workers in these positions must be attentive to the trusses before or during their exit from the building. Continued next page

PHONE: 800-289-5627

Read/Subscribe online at www.componentadvertiser.com

FAX: 800-524-4982


A

Th e

Component Manufacturing dverti$ dverti $ er

Don’t Forget! You Saw it in the

Adverti$$er

November 2026 #18328 Page #20

2. Improve gantry press table operations a. Close walk-through tables to provide a solid surface counter gantry roller. b. Twice a year, re-level gantry tables with an optical laser. Tables over time become soft or low from repeated pressing. Normally the front of the table requires the most adjustment. Nonlever tables create the perfect opportunity to lose a connector on the back side of the truss, preventing it from being properly pre-pressed. c. Nothing beats a simple hydraulic press system. Plates can still be missed, but that’s extremely rare. 3. Carefully monitor connector counts a. Pre-count connectors. When the count comes up wrong, investigate the problem. b. Keep the floor area under outfeed rollers clean, so when a plate falls off, it’s seen and can be immediately addressed. c. A qualified in-house inspection program will help you monitor if your manufacturing process is effectively preventing missing connectors. d. Field inspections are the worst time to find missing connectors, but if one is discovered, notify everyone involved, and then make prevention a shared priority.

The Bottom Line Missing connectors should never reach the customer. Preventing them requires consistent inspection, dependable equipment, accurate connector counts, and accountability throughout production. Whether a problem is found in the plant, during a field inspection, or through a customer call, use it to identify the cause, communicate the lesson, and strengthen the process. A disciplined approach protects product quality, worker safety, and customer confidence. An ANSI/TPI 1 3rd Party Quality Assurance Authorized Agent covering the Southeastern United States, Glenn Traylor is an independent consultant with over four decades of experience in the structural building components industry. Glenn serves as a trainerevaluator-auditor covering sales, design, PM, QA, customer service, and production elements of the truss industry. He also provides project management specifically pertaining to structural building components, including on-site inspections, expert witness and ANSI/ TPI 1 compliance assessments. Glenn provides new plant and retrofit designs, equipment evaluations, ROI, capacity analysis, and CPM analysis. PHONE: 800-289-5627

Read/Subscribe online at www.componentadvertiser.com

FAX: 800-524-4982


The Auto-Feeding RetroC

The Amazing RetroC by Enventek

A complete wood processing system proven to profitably feed cut lumber to truss plants of all sizes. Easy to use, simple robust automation that is scalable with less labor. A RetroC holds calibration.

Out Produces Any Saw in Batch Cut or Cut by Truss Mode

Auto-Feeding, no upper hold-downs (just 15 automation axes) with electronic braking. Efficient material handling that will significantly increase cut piece production with reduced operating costs and improve truss build times with consistently accurate cut pieces.

The Magic of SpeedCatch - No Catching Labor Catching labor is eliminated with our optional SpeedCatch cart system. Sophisticated SpeedCatch software enhances the efficiency of truss production by effectively collating and organizing the lumber at the truss tables. SpeedCatch upgrades the RetroC to a comprehensive one-person (sawyer) wood processing system.

(416) 888-4457

Edmond.Lim@LimTekSolutions.com

www.LimTekSolutions.com

6021 Yonge St, Unit 1019 Toronto, ON, M2M 3W2


A

Th e

Component Manufacturing dverti$ dverti $ er

Don’t Forget! You Saw it in the

Pricteion! c Redu

Adverti$$er

November 2026 #18328 Page #23

BUILT TO MOVE MORE ~ ENGINEERED TO DO MORE FOR OVER 25 YEARS

GOOSENECK TRUSS TRAILERS 26', 32', 36', & 40' ALSO AVAILABLE WITH SPLIT ROLLERS

HEAVY DUTY TRUCK ROLLER BEDS 26', 28', 30' & 32' available Can be mounted on ALL MAJOR TRUCK BRANDS!

EXTENDABLE TRUSS TRAILERS

38'-53',42'-60',50'-70'' & 53'-80' SIZES AVAILABLE (Shown with optional Headache Rack)

2014 Alpine ALS 4.0HB Linear Saw • High Performance Linear Feed Saw (with Beveling) • High Performance L1 & L2 Motors and Gear Boxes • Servo Blade Motor with 20.5" Blade • Touchscreen Monitor • Mattthews Ink Jet Printer • Automated Infeed System • Outfeed Queue System • Waste Conveyor • Spare Servo Blade Motor • Taken out of service in "working condition" in June 2026 • Excludes Dust Collector

STANDARD TRUSS TRAILERS 40', 48' & 53’ SIZES AVAILABLE 46' NON-HYDRAULIC & 48' HYDRAULIC TRUSS/ WALL PANEL STEP DECK TRAILERS (Shown with optional Headache Rack)

NEW FLATBED FORKLIFT MOUNT

HD Truck Bed, Standard & Extendable

• Split roller option on Goosenecks • 6 Paint colors Standard • Exclusive patented strap locks • Wireless remote • Rollers - Powder-coated & • Sliding Winch System Galvanized Standard • Custom engineered & designed

2 YEAR WARRANTY PLAN YOUR 2027 ~ BUILD WITH US TODAY Shawn Kuck - Sales Manager NA

$115,000 NOW $109,500 FOB MN

800-382-0329 | www.wasserman-associates.com PHONE: 800-289-5627

Read/Subscribe online at www.componentadvertiser.com

701-941-2017 or 1-800-237-5161

sales@precisionequipmfg.com FAX: 800-524-4982


New Legacy Robbins Gantry

Klaisler Recessed

Universal™ Gantry

Upgrade Or Expand Your Line With New-Legacy Gantries

Alpine Easy Rider

Replace your old gantries or expand your production with industry trusted equipment. NewLegacy Gantries fit perfectly in your existing line. Replace outdated equipment or enhance your system with proven models: Alpine Easy Rider, Klaisler Standard & Recessed Track, Robbins ‘NoRail,’ and Universal™ Gantries for nearly every application.

Compliment Your Legacy Gantry With: Safety Upgrades

Operator Platforms

Custom Control Panels

Grow with Legacy. Build with Confidence.

Machinery ~ Supplies Since 1927

Eide Machinery Sales, Inc

www.eidemachinery.com

(612) 521-9193


A

Th e

Component Manufacturing dverti$ dverti $ er

Don’t Forget! You Saw it in the

November 2026 #18328 Page #25

Adverti$$er The

JobLine.com

Truss Design Skills Evaluation $39,997 FOB LA

$145.00 Measures 9 areas of Skills and Experience Compare Results to National Averages Identify Strengths and Areas For Improvement

Available On-Line 2005 Alpine ALS 276C Linear Saw 2005 Alpine ALS 276C Linear Saw: Cuts wall and truss parts from lumber depths 2×4 through 2×12, 60”+ scarf cuts, internally optimizes material (up to 11 7/8″ x 1.5″ EWP) Includes 20 foot idler roller infeed conveyor and 15 foot idler roller outfeed conveyor, and under-saw scrap conveyor with belt-type incline. All servo controlled functions, Microsoft Windows 10 Pro o/s (can be upgraded to Windows 10 LTSC for additional cost), 7.5 HP motor with 20” carbide tipped blade. Includes digital manual and Zebra brand label maker, model 105SL. No ink printer is included. 220 volt, 3 phase, 100 Amp electrical required. 125 PSI air required.

765-751-9990

PHONE: 800-289-5627

Test your design team to have a better understanding of your department strengths and areas for improvement.

Use your team's results to measure against potential new hires!

For Additional Information email: twm@thejobline.com

www.woodtechsystems.com

Read/Subscribe online at www.componentadvertiser.com

FAX: 800-524-4982


CONSIDERING EQUIPMENT? CONSIDER CLARK. EZ-SET AUTO JIGGING EXCLUSIVE & PATENTED DESIGN Automatic Truss Jigging System to drastically reduce setup times. Allows for 100% embedment on the table, with top & bottom chord pucks in the same slot. TopSider or standard configurations available for conventional kick-leg, walk-thru, or our new trackless 8' and 10' continuous table systems. Systems for other roller & hydraulic gantries are coming soon. Available in new machine installations or for retro-fitting your existing table. The TopSider is exclusively applicable for “kick or flip leg” style truss presses such as the Tri-Axis & Lumbermater® Lumbermater® is a registered trademark of Illinois Tool Works, Inc., or ITW.

FEATURES / APPLICATIONS • Capable of 100% On-Table Nail Plate Embedment • Two Pucks Per Slot • 24", 26", and/or 30" Spacing • Compatible with all current major design software • Multiple Simultaneous Layouts LOCAL 417-235-7182 • US TOLL FREE 800-743-9737 WWW.CLARK-IND.COM / GENERAL@CLARK-IND.COM

EQUIPMENT FOR TRUSS & COMPONENT MANUFACTURERS


A

Th e

Component Manufacturing dverti$ dverti $ er

Don’t Forget! You Saw it in the

Adverti$$er

November 2026 #18328 Page #27

SAWS

Pricteion! c Redu

2017 Lauderdale Hamilton 24" Up-Cut Saw with 16' TigerStop • 10 HP (480 Volt/3 Phase) Lauderdale Hamilton Up-Cut Saw with 24” Blade • 6” x 13 1/2” Capacity • Foot Pedal Operation • Dust Outlet • TigerStop 16’ Programmable Stop • Automatic Positioning of Stop via Simple and Intuitive Controls • Infeed/Outfeed Plastic Top Tables with stands • Excludes: Dust Collector and Adjacent Computer in Orange Cabinet $13,500 NOW $10,900 FOB NE Wasserman & Associates 800-382-0329 www.wasserman-associates.com

Job Board Turn Key Platform Post and Manage Multiple Jobs and Multiple Candidates New Application Notices and Internal Candidate Messaging Keeps your search confidential Manage on Your Phone or Computer

For Additional Information

A

The

Building Component Manufacturing Industry

Component Manufacturing dverti$er

Serving the Structural Building Components Industry

twm@Hiring-Zone.com Visit our website: www.Hiring-Zone.com

“Serving the Component Industry Since 1996”

Now offering short term Working Capital Loans

Start smarter... Grow faster... Achieve more... Keep More of Your CASH Eliminate Yearly Financial Reporting

Low Fees Fixed Payment Programs No Additional Collateral

cvillella@acceptlease.com | www.acceptlease.com 894 Beaver Grade Road, Suite #304 - Moon Township, PA. 15108

Phone: 412-262-3225 Fax: 412-262-1154

MANUFACTURERS’

REPRESENTATIVES

NEW!

NEW!

New Monet FWA-500 CA Automated Floor Web Saw Price Based on Configuration FOB MO Additional Information Here 765-751-9990 PHONE: 800-289-5627

www.woodtechsystems.com

Safety Speed Manufacturing Model 6400 Panel Saw Safety Speed Manufacturing model 6400 vertical panel saw, 3 HP worm drive motor, 64 inch crosscut, 1 3/4" inch maximum thickness, accuracy within 1/64th of an inch, 90" tall x 10-foot-wide welded steel frame with integrated stand and linear V-guides, enclosed counterweight system, adjustable vertical and horizontal rules. Quick changes from vertical to horizontal cutting. Includes machined aluminum material rollers, hold down bar, wheels, quick stop gauges and material hold downs. Dust collection ready. Options available include lower frame extensions, digital readouts, laser guide, stop bar, vacuum and midway fence.

765-751-9990

Read/Subscribe online at www.componentadvertiser.com

www.woodtechsystems.com FAX: 800-524-4982


8

GlideAway The Future of Truss Production The GlideAway is a fully automated nailplate positioning and pressing machine designed for the production of prefabricated trusses.

7 3 6

4

5

Its intelligent design eliminates the manual process of nailplate placement and pressing during truss assembly, freeing up operator time and delivering significant efficiency gains for your truss plant. 1 2

3

Truss jigging Horizontal powered ejection system/ transfer rollers - automatically transfers trusses from tables to transfer rollers then onto staging bays Integrated robotic automation - selects correct nailplate & transfers to press head ready for the required joint and places in correct location and orientation

4

Handles a wide range of standard industry nailplates

5

Optimized chute layout

6

Capable of handling most common truss configurations

7

Compatible with wide range of standard industry data exports

8

Finishing Roller

2

2 1

Achieve Accurate, Repeatable Nailplate Placement on Every Truss. That means dependable results and greater confidence in the finished product.

E sales@spida.com

T +1 866 647 7771

spida.com


A

Th e

Component Manufacturing dverti$ dverti $ er

Don’t Forget! You Saw it in the

Adverti$$er

November 2026 #18328 Page #29

Jigging is a Software Problem Now By Brett Kinny Machinery Software Manager

S

pec sheets for truss assembly machinery describe the press: tonnage, roller diameter, table length. They say less about the software, yet on an automated table the software decides where the pucks go, where the truss sits, how much of the table is in use, and what happens when the next truss does not fit.

Where the Time Goes On a manual table, setting up a truss means reading the drawing, measuring off to each joint and setting pucks along the rails with a tape and a chalk line. For a run of identical trusses, that is done once. For a schedule of one-offs, it is done for every truss, and every measurement is a chance to be wrong. Setup is also where experience concentrates. Knowing which heel to lock first, how much camber to allow on a scissors truss, where a long truss will and will not fit: this sits with one or two people on a shift. In a recent survey of US manufacturers, nearly four in five named labor availability as their biggest external challenge.* When that pressure reaches a truss plant, setup knowledge is among the hardest things to replace.

* CADDi, 2026 Manufacturing Outlook Study, conducted with SME and Mercury Research LLC, fall 2025. Of 195 US manufacturing professionals at management level or above, nearly 80% identified labor availability as their biggest external challenge. Continued next page

PHONE: 800-289-5627

Read/Subscribe online at www.componentadvertiser.com

FAX: 800-524-4982


A

Th e

Component Manufacturing dverti$ dverti $ er

Don’t Forget! You Saw it in the

Adverti$$er

November 2026 #18328 Page #30

What the Software has to Solve Setup. The first job is to take setup out of the tape measure and into the design file, so the pucks position themselves from the truss geometry and the operator selects the truss rather than measuring it. The table constraints. A fixed jig station is a fixed size. Trusses shorter than it leave surface unused; trusses longer than it cannot be built there. On a long table split between two stations, rails belong to one side or the other, and a truss that needs a few more rails than its station owns is stuck. Placement. Fully automatic placement is fast, but operators sometimes need to override it: a heel on a particular line, or a truss hard against the one already on the table. Training. When each assembly machine runs its own software, an operator trained on one table is not trained on the next, and a plant that adds a machine has to train its crew again.

How TandemOne Handles It TandemOne is the software we build in-house for Spida machinery. When a truss is loaded, the software checks it against the table first: span, height, member thickness, and whether the plates it calls for are stocked. The pucks then run out along their rails to positions calculated from the truss geometry, each placed where it bears on a member without fouling another. Camber is handled per rail: the software reads the design camber line at each rail’s position and offsets that puck by the result, with the amount separately adjustable for top and bottom pucks. If the truss is rotated or flipped, the camber follows it, and the value at each puck can be shown on screen. If the table has a laser projector, members and plates are drawn on the lumber. By default, the truss lands where it costs the least rail travel. The operator can override that. The truss can be snapped to the left or right heel, the apex, the table center or either edge, or to a reference mark the operator has placed on the bed. It can be loaded from the left or the right, mirrored end for end, flipped, rotated about a point, or dragged freely, with the software keeping it on the bed and clear of any other truss.

Continued next page

PHONE: 800-289-5627

Read/Subscribe online at www.componentadvertiser.com

FAX: 800-524-4982


A

Th e

Component Manufacturing dverti$ dverti $ er

Don’t Forget! You Saw it in the

Adverti$$er

November 2026 #18328 Page #31

The last alignment can be remembered and applied to the next truss.

On a standalone table, more than one truss can be on the bed at once, and the software finds the gap for each.

Rail sharing deals with the boundary between stations. On a long table running two TandemOne stations, each owns a range of rails and can see on screen who owns the rest.

A truss that reaches past its station’s last rail requests the rails it needs. The other station sees the exact range and a yes or no prompt.

Continued next page

PHONE: 800-289-5627

Read/Subscribe online at www.componentadvertiser.com

FAX: 800-524-4982


A

Th e

Component Manufacturing dverti$ dverti $ er

Don’t Forget! You Saw it in the

Adverti$$er

November 2026 #18328 Page #32

Released rails behave as the requesting station’s own and are handed back the same way. If the other station is unattended, a force takeover claims them without waiting.

Ownership is command rights only: nothing moves on handover, and any puck motion still needs a confirmation prompt.

A rail with a fault can be switched out of service while the rest of the table keeps running.

Where a joint would sit over a rail, an ejector, or a walkway, the screen flags that a bridge is needed before pressing.

Each completed truss is reported with its members, its plates, and the time it spent on the table.

Continued next page

PHONE: 800-289-5627

Read/Subscribe online at www.componentadvertiser.com

FAX: 800-524-4982


A

Th e

Component Manufacturing dverti$ dverti $ er

Don’t Forget! You Saw it in the

Adverti$$er

November 2026 #18328 Page #33

One Application, Three Machines The same application runs the jig stations on the TrussMaker, the Roller Plant, and the GlideAway – a modern touchscreen interface throughout. The operator taps a truss to load it, drags it to where it should sit, taps a rail to request it, and answers a yes or no prompt when a decision is needed. The everyday actions are a handful of gestures, and they are the same on every machine. That keeps training short. At a recent installation for a new customer, a sixteen-yearold new hire was running the jig station unsupervised after three to four hours, and a plant that adds a machine carries its crew’s training with it. It also narrows maintenance risk: there is one codebase to test, and a fault found and fixed on a GlideAway station is fixed on every Roller Plant station in the same release.

Seeing It TandemOne runs in a simulated environment without machine hardware. That lets us demonstrate it with a plant’s own job files, and lets operators learn the screen before a machine is installed. To arrange a demonstration, contact the Spida sales team.

PHONE: 800-289-5627

Read/Subscribe online at www.componentadvertiser.com

FAX: 800-524-4982


Faster plates

More Trusses

The Plate Picker™ uses

Click Here to see the Plate Picker™ in action!

a nesting algorithm to tightly pack and sequence plates in the exact order needed for assembly.

Or visit our website at www.trussmachineworks.com Magazine system covers 95-99% of plate sizes needed

Robotic placement insures no wasted space in bins

Sorting schemes include truss type, per truss, dense pack, and more

Modular design sized for your plant

Integrates with skate-wheel receiver or conveyor to table

P: 269-815-8844

|

E: sales@machineworks.llc

|

A: 7260 1st Street • Eau Claire, MI 49111


A

Th e

Component Manufacturing dverti$ dverti $ er

Don’t Forget! You Saw it in the

Adverti$$er

November 2026 #18328 Page #35

SAWS

2018 Spida Plate Marker with DeWalt Saw • 20' of Steel Framed Table with Plastic Top • Spida Automated 20' Length Stop/ Plate Positioner • Auto Plate Positioning with Manual Marking • Control Cabinet Enclosure with Touch Screen Computer • DeWalt Model DWS780 Miter Saw • Support Table for DeWalt Saw • 10' Infeed Roller Conveyor • Excludes Dust Collector & Spida Annual Support Fee $19,900 NOW $18,900 FOB ND Wasserman & Associates 800-382-0329 www.wasserman-associates.com

1994 Timbermill Model MH5G-20 Component Saw Five blades cut lumber from 2″ x 4″ through 2″ x 12″, 4″ x 2″ lengths from 12 inches to 20 feet, including four-angle floor webs from 18 inches. All powered movements. Saw includes (1) 30″, (2) 20″ and (2) 14″ blades, analog scales, chain-drag scrap conveyor with chain-drag scrap incline, and an extra set of blades. Additionally this saw includes an extensive spare parts inventory including: Contacts/Starters, fuses, push buttons, limit switches, crank handles, scales/rulers/dials, angulation, conveyor, and saw motors, universal joints, and arms for outfeeds. 480 volt, 3 phase electrical required. $17-924 FOB NC Wood Tech Systems 765-751-9990 www.woodtechsystems.com

2005 Hundegger SC-1 Linear Saw Additional Information Here

$57,990.00 FOB NH

765-751-9990

Mid-90's TimberMill 6-20 SSD Component Saw • Six Blades cut 4x2 and 2x4 through 2x12 from 12” up to 20’ • Powered Angulation & Carriage • Single Side Digital Setup • Chain Drag Waste & Incline Conveyor • 480 Volt / 3 Phase $23,500 FOB MO Wasserman & Associates 800-382-0329 www.wasserman-associates.com

M ACdverti$er

Th e

omponent

anufacturing

Serving the Structural Building Components Industry

Like Money in the Bank. Service you can count on! PHONE: 800-289-5627

www.woodtechsystems.com

2004 Alpine ALS 276C Linear Saw $39,990 FOB OH 1994 Holtec Bunk Saw Station 20-ft long fixed frame with steel alignment stands, and rough-top waste conveyor belt. Cuts bunks of lumber up to 16-ft long with a 40″ x 44″ cross-section, in a single pass. Includes guide frame, manual / analog length measurement, manual rack & pinion gantry movement, an automated oiler (has a leak that needs repair) for the saw bar, one 0.404″ pitch chain, and OEM “longlife” saw bar. Also includes a flat conveyor under saw & an incline. (NOTE: This saw is not best suited for PET studs, instead great for precut bunks, and nominal cut EWP). $19,897 FOB GA Wood Tech Systems 765-751-9990 www.woodtechsystems.com

Cuts wall and truss parts from lumber depths 2×4 through 2×12, 60”+ scarf cuts, internally optimizes material (up to 11 7/8″ x 1.5″ EWP) Includes 20 foot OEM auto-infeed conveyor and 15 foot OEM outfeed conveyor, and under-saw scrap conveyor with belt-type incline. All servo controlled functions, Microsoft Windows XP OS, 7.5 hp motor with 20” carbide tipped blade. Includes spare infeed/outfeed belt and any available spare parts. No printer is included. The door latch needs to be repaired. 220v / 3 ph power, 125 PSI air required. 765-751-9990 www.woodtechsystems.com

Read/Subscribe online at www.componentadvertiser.com

FAX: 800-524-4982


A

Th e

Component Manufacturing dverti$ dverti $ er

Don’t Forget! You Saw it in the

Adverti$$er

November 2026 #18328 Page #37

$164,795 FOB MD

2022 L-M Verticut 2000 Precision End Trim Saw The V2k comes equipped with a 15 HP 460/230 volt High-E three phase TEFC motor driving a Double ended Premium “Stellite” inlaid saw bar with a spring loaded chain tensioner and an automatic oiler. The Powered Carriage option uses a Servo Motor to control a touch screen HMI display used to interface with the Servo Carriage Drive coupled to the V-Wheel powering the carriage along a precision track. Squaring the material to be cut is accomplished via an optional live chain deck that moves the lumber into a fixed Precision Ground “Bump Wall” that is controlled hydraulically using a hand valve. Other system options feature the Zipper Duct option, which includes a “JET” JCDC-3 Cyclone dust collector 765-751-9990 PHONE: 800-289-5627

www.woodtechsystems.com Read/Subscribe online at www.componentadvertiser.com

FAX: 800-524-4982


HUNDEGGER lnnovationen fur den Holzbau

HUNDEGGER

_,...,_,

Hundegger leads the way in automation innovation for the truss component industry. Our advanced CAMBIUM software offers cutting-edge automation and digitalization solutions, revolutionizing operations, boosting productivity, and driving sustainable growth for manufacturers like you.

We go beyond standard mechanization; we champion true

Automation. The Hundegger TD-II isn't just a saw-it's a

REVOLUTIONIZE YOUR TRUSS MANUFACTURING WITH THE HUNDEGGER TD-II

transformative, comprehensive solution designed to streamline your production process. From retrieving lumber to optimizing, nesting, stacking, destacking, sorting, buffering, and precise delivery, our system ensures peak efficiency and productivity, tailored specifically to truss component manufacturing.

Harness the power of data with Hundegger's advanced CAMBIUM TACTICAL software. It meticulously tracks and optimizes your production, ensuring more automated operations and significant productivity gains. We provide state-of-the-art automation and control solutions that set the industry standard. Our focus on industrial automation and robotics positions Hundegger as the leader in enhancing performance and efficiency in truss component manufacturing and beyond. Hundegger products are essential for future-proofing your business. Elevate your productivity and secure your competitive edge with our advanced technologies and automation solutions, meticulously designed to meet the unique demands of component manufacturers today and tomorrow.

Don't get left behind. Invest in the future with true automation from Hundegger and see your business thrive.

om .

.


A

Th e

Component Manufacturing dverti$ dverti $ er

Don’t Forget! You Saw it in the

November 2026 #18328 Page #39

Adverti$$er

NEW!

New Monet DeSawyer ESC (Servo Controlled) Component Saw Monet DeSauw model Desawyer ESC enhanced servo-controlled ( ESC) component saw with touch screen user interface with backup mechanical controls. Includes three operating modes: Auto (download setups from LAN or USB), Semi-auto (touch screen setup entry), and Manual (backup push-button switches for powering all movements). Includes over-travel protection, comprehensive setup screens, auto sequencing, auto-calibration and pneumatic brakes on all five () blades. One (1) 30” blade and four (4) 16” blades. Manual cut limits are 18” min., 11” min. square edge blocks, 20’ max cut. Belt under-saw waste conveyor. Voltage: 480 volt/3 phase/60 Amp. Air: 50 PSI at 5 CFM. One-year warranty included. Can be paired with a model PD-6 lumber feed system at an additional cost. Heavy duty 80 RIV chain feed system. 16’ wide x 20’ long x 36” deck height. Transfers 3’ to 20’ lumber. Includes auto-feed control, foot pedal override, forward & reverse, variable speed control with HD double-bearing construction. Other additional-cost options include, inkjet marking, label printing, backside screen display, spare blades and incline scrap conveyor.

$386,000 FOB MO

765-751-9990 PHONE: 800-289-5627

www.woodtechsystems.com Read/Subscribe online at www.componentadvertiser.com

FAX: 800-524-4982


A

Th e

Component Manufacturing dverti$ dverti $ er

Don’t Forget! You Saw it in the

Adverti$$er

November 2026 #18328 Page #40

SpeedStack is a Process Organization Marvel

Edmond Lim, P.Eng. LimTek Solutions Inc.

I

n truss manufacturing, productivity depends on more than cutting lumber quickly — it depends on delivering the right material to the right table in the right sequence.

Enventek’s SpeedStack software brings order to this critical handoff, helping plants combine the efficiency of batch cutting with the organized flow of a truss-by-truss process. SpeedStack can enhance any saw’s throughout. The following example shows how SpeedStack coordinates lumber picking, cutting, catching, and cart staging to keep production moving. To a trained eye, the mix of boards on the live deck shown here appears to be a cut-by-truss batch: chords and webs for complete truss sets running through a single saw. Most truss plants would avoid this batching scheme because it can overwhelm forklift lumber pickers. Instead, they might cut each unique truss in a mini-batch on a linear saw using lumber optimization and stretching, or cut the chords on a component saw and the webs on a linear saw. Either approach introduces inefficiencies at the truss tables, where crews must re-sort the cut pieces or combine material from separate saws. Likewise, most plants would not attempt to catch and stack cut lumber behind the saw in an organized left, right, and middle sequence for every truss set. Coordinating that process on the fly is nearly impossible for a lumber catcher.

Continued next page

PHONE: 800-289-5627

Read/Subscribe online at www.componentadvertiser.com

FAX: 800-524-4982


A

Th e

Component Manufacturing dverti$ dverti $ er

Don’t Forget! You Saw it in the

Adverti$$er

November 2026 #18328 Page #41

With Enventek SpeedStack behind the saw, the rear display guides the catcher as each piece comes off the saw. In the example shown here, the boards outlined in red are currently being ejected, while the green boards have already been cut and stacked on the cart as shown. Here, the catcher is being directed to stack lumber for the left and right sides of the truss.

In front of the tables, the lumber is clearly organized for the left, right, and middle sections of each truss. Enventek’s innovative SpeedStack software directs catchers to place every board on the correct cart. The result is a highly efficient, productive cutting operation: the saw effectively batch-cuts while also cutting by truss. Because the lumber is collated across multiple carts in front of the tables, it arrives organized and stacked as though the batch had been cut by truss. Continued next page

PHONE: 800-289-5627

Read/Subscribe online at www.componentadvertiser.com

FAX: 800-524-4982


A

Th e

Component Manufacturing dverti$ dverti $ er

Don’t Forget! You Saw it in the

Adverti$$er

November 2026 #18328 Page #42

The process begins with a detailed yet straightforward paper pick list (and/ or WiFi tablet). The list specifies the lumber required, including 4 pieces of 8-foot 2x6 MSR1650, 4 pieces of 5-foot 2x4 #2, 4 pieces of 5-foot 2x4 Stud, 4 pieces of 12-foot 2x6 MSR1650, 4 pieces of 16-foot 2x8 M23 SP, 4 pieces of 10-foot 2x4 MSR1650, 12 pieces of 10-foot 2x4 #2, 8 pieces of 8-foot 2x4 MSR1650, 1 piece of 10-foot 2x4 MSR1650, and 3 pieces of 10-foot 2x4 #2, as shown on this picklist. Following the pick list, the lumber is built up against the forklift mast in a standard sequence and count. The first column contains 4 pieces of 8-foot 2x6 MSR1650, 4 pieces of 5-foot 2x4 #2, and 4 pieces of 5-foot 2x4 Stud. The second column contains 4 pieces of 12-foot 2x6 MSR1650 and 4 pieces of 16-foot 2x8 M23 SP as shown in the partial pick (below left).

Continuing with the remaining columns assembled according to the pick list, the completed pick consists of 10 columns stacked 12 pieces high as shown (above right). The same finished configuration is shown (at right) on the paper pick list. Enventek SpeedStack turns what is traditionally a difficult, laborintensive handoff into a coordinated, repeatable system. By combining efficient batch cutting with truss-by-truss organization, it keeps lumber flowing from the saw to the tables in the correct sequence, reducing sorting, material handling, and delays. The result is a standardized cutting operation that improves sawing productivity and boosts table output by delivering collated lumber organized for the left, right, and middle sections of each truss setup. Inside and out, LimTek Process Organization Technology will help you squeeze out more truss production and deliver quality trusses with shorter lead times to better service your customers by organizing your truss fabrication processes to maximize your investment in automation. When you’re ready to Feed Your Beast and see these efficient and effective systems for yourself, let us know! https://limteksolutions.com/#solutions

PHONE: 800-289-5627

Read/Subscribe online at www.componentadvertiser.com

FAX: 800-524-4982


SAVE THE DATE! June

2027

15-17

WORKSHOP Calgary, Alberta

The Westin Calgary 320 4th Avenue SW Calgary, AB, Canada, T2P 2S6

Hotel Deadline: May 21

Tuesday, 6/15

Banff National Park Social Hour Independent Dinner Wednesday, 6/16

Educational Sessions Plant Tour Hosted Dinner Thursday, 6/17

Educational Sessions Roundtable

want to increase discussion “andIf you collaboration with your partners, this workshop’s a great one to attend. Plus, anytime you can find something in your industry that’s both fun and informative, you’re crazy to not attend it.” —Matthew Cunningham, US LBM

My biggest takeaway was the “connections…meeting people from all different walks of the industry. Being able to sit with people from mills and wholesalers and pick their brain on something we use so much of…it’s just invaluable.” —Cody Roberts, Carnes Forest Products

Learn more & register at

MSRLUMBER.ORG/WORKSHOP

Follow us


The ERP Your Business Can Build On Connect every part of your operation with an ERP built to help building materials businesses work smarter and grow stronger.

LEARN MORE


A

Th e

Component Manufacturing dverti$ dverti $ er

Don’t Forget! You Saw it in the

November 2026 #18328 Page #45

Adverti$$er

HSF

Hain Systems Framer

T

he Hain Systems Framer (HSF) will help you build square and accurate wall panels for residential or commercial construction applications. It will help you cut building costs by saving time and improving your quality. It’s a reliable, efficient and proven Electrical Supply: 110 VACsimple design. The HSF is based on a proven design with over 20 years of actual production system that features a ruggedly 1/4 HP, 110ItVAC, Linearfully Actuator useMotor: and maintenance experience. comes assembled and is designed for portable job site framing or in-plant permanent Highly Accurate: +/- .010 Inches installation. The table has many optional attachments and will support Mylar Tape wall layout or any other type of layout. The Stop Rail: 2 x 4 x 1/4 Aluminum Extrusion optional gun rails can also be retro-fit to any table. Stops: Jig Bored Steel Stop Blocks:

Internal Components: Details: Dimensions: Table Construction:

Air Supply:

Machine Billet Aluminum Hardened, Ground and Polished Steel and Billet Aluminum Length: 5Structural feet (60”) to 60 feet (720”) Thick-wall Steel Tubing, Jig Welded for Accuracy Height: 12 inches 90Depth: psi (10 12 CFM Air Flow Recommended) inches

If you are looking for the fastest, mostVAC consistent way to measure and cut your product, Electrical Supply: 120

then the Hain Measuring System (MEA) is your answer. The MEA changes from one length

Powder Graythe operator’s position on the line. It t any lengthCoat: instantly, up to 60’,Industrial without changing is also highly accurate (+/- .010) and quickly moves from one length to the next in Dimensions: Height: 43”

seconds. The MEA is designed for quick and easy setup and is simple to use. Even a first

time user will be productive with little or no16’ training required. It can adapt to any saw and or 20’ Length: can be mounted to any surface so that you can integrate the MEA with your existing

Adjustable to 10’ or 8’ operation to 12’ and Width: setup. The MEA is versatile allowing “left” or 8’ “right” handed

measurement in “feet and inches” or “inches” depending on your preference. The MEA is Shipping Weight: 3000 lbs also available in a “Skid Mounted” version.

theHAINCOMPANY 6125 Enterprise Drive, Unit 92 | Diamond Springs, CA 95619 530.295.8068 | sales@thehaincompany.com

STANDARD & EXTENDABLE TRUSS TRAILERS 40', 48' 53' Standard Sizes 38'-53', 42'-60', 50'-70' & 53'-80' Extendable Sizes

Electrical Supply: Motor: Highly Accurate: Stop Rail: Stops: Stop Blocks: Internal Components: Dimensions:

If you are looking for the fastest, most consistent way to measure and cut your product, then the Hain Measuring System (MEA) is your answer. The MEA changes from one length t any length instantly, up to 60’, without changing the operator’s position on the line. It is also highly accurate (+/- .010) and quickly moves from one length to the next in seconds. The MEA is designed for quick and easy setup and is simple to use. Even a first time user will be productive with little or no training required. It can adapt to any saw and can be mounted to any surface so that you can integrate the MEA with your existing setup. The MEA is versatile allowing “left” or “right” handed operation and measurement in “feet and inches” or “inches” depending on your preference. The MEA is also available in a “Skid Mounted” version.

theHAINCOMPANY 6125 Enterprise Drive, Unit 9 | Diamond Springs, CA 95619 530.295.8068 | sales@thehaincompany.com

2004 Alpine ALS 276 Linear Saw

2 YEAR WARRANTY PLAN YOUR 2027 ~ BUILD WITH US TODAY ALL TRAILERS AVAILABLE WITH GALVANIZED OR POWDER-COATED ROLLERS STANDARD

(Shown with Optional Headache Rack)

STANDARD WITH AIR-RIDE SUSPENSION, PNEUMATIC PIN LOCKS, LOAD CONTROL & REAR BUMPER

BUILT TO MOVE MORE ~ ENGINEERED TO DO MORE FOR OVER 25 YEARS

1-800-237-5161

sales@precisionequipmfg.com

PHONE: 800-289-5627

110 VAC 1/4 HP, 110 VAC, Linear Actuator +/- .010 Inches 2 x 4 x 1/4 Aluminum Extrusion Jig Bored Steel Machine Billet Aluminum Hardened, Ground and Polished Steel and Billet Aluminum Length: 5 feet (60”) to 60 feet (720”) Height: 12 inches Depth: 12 inches

$40,000 Pricteion! c Redu • Servo Controlled Single Blade Linear Saw • 7.5 HP Motor (230 Volt/3 Phase) with 20" Blade • Touch Screen Computer • Ink Jet Printer • 20' Infeed & Outfeed Roller Tables

NOW $35,000

FOB HI • Waste Conveyor (under outfeed conveyor) • Extra Programmed Computer • New L1 and L2 Belt • 2 Extra Blades

800-382-0329 | www.wasserman-associates.com

Read/Subscribe online at www.componentadvertiser.com

FAX: 800-524-4982


Off-Site. On-Air.

The only industry-specific podcast for component manufacturers

Start Listening Today sbcacomponents.com


A

Th e

Component Manufacturing dverti$ dverti $ er

Don’t Forget! You Saw it in the

Adverti$$er

November 2026 #18328 Page #47

CONFIDENTIAL BUSINESS ACQUISITION OPPORTUNITY

BUILDING COMPONENT MANUFACTURER FOR SALE An established operation with decades in the building components industry. Multiple building component product lines Established workforce and in-house design capabilities Manufacturing, material handling, and delivery equipment Manufacturing and warehousing facilities Additional information available to qualified buyers under a confidentiality agreement.

The

JobLine.com

Thom McAnally | 800-289-5627 x1 twm@thejobline.com

2016 Hundegger TurboDrive II Linear Saw Hundegger Turbo Drive II with Cambium software configured for EWP (wood I-beam) cutting of material to 17″ in width, in lengths from 6′ to 60′, with stacked material processing, and an extended outfeed table for up to 42′ cut material. Saw features a 5.5 kW finger mill with vertical combi-support for 2 tools, bronze gildings, automatic small part, front-side ejection, stacked timber (soft-start) processing with Inkjet 4 rearstacked print heads, and operator console with active cooling unit. OEM Installation required. Gripper arm needs repair that can be done during re-installation.

$109,997 FOB OK www.woodtechsystems.com

765-751-9990 PHONE: 800-289-5627

Read/Subscribe online at www.componentadvertiser.com

FAX: 800-524-4982


A

Th e

Component Manufacturing dverti$ dverti $ er

Don’t Forget! You Saw it in the

Adverti$$er

November 2026 #18328 Page #48

Pricteion! c Redu

2008 Alpine ALS 286A Linear Saw

Design That Drives Production

• Servo Controlled Linear Saw • Touch Screen Computer (Windows XP) • Automated Infeed Deck • Infeed/Outfeed Roller Tables • Outfeed Queue Rollers

• Ink Jet Printer • Belt Waste Conveyor • 230 Volt / 3 Phase • Available March 2026 • Video available upon request

$59,500 NOW $47,500 FOB MN 800-382-0329 | www.wasserman-associates.com

A truss plant isn’t just about square footage. It’s about efficiency, safety, and flow. CT Darnell Construction’s design-build approach delivers: • Facilities tailored to your operation and equipment • Smarter layouts for safer load-ins and faster turns • Integrated storage and optimized SKU management With nearly 40 years of LBM experience and more than 4,500 completed projects, we build turnkey truss facilities designed to perform from day one.

CT-Darnell.com | 800-353-0892 Visit CT-Darnell.com to see our latest truss project in action. © WTD Holdings, Inc., 2026. All rights reserved.

PHONE: 800-289-5627

Read/Subscribe online at www.componentadvertiser.com

FAX: 800-524-4982


A

Th e

Component Manufacturing dverti$ dverti $ er

Don’t Forget! You Saw it in the

Adverti$$er

November 2026 #18328 Page #49

SAWS

Pricteion! c Redu Pricteion! c Redu

Striebig Optisaw, model Optisaw Automatic (Type # 5164) vertical panel saw station, with angled frame supporting material being cut: Max. cutting height (vertical) 5′-4″, max. cutting length (horizontal) 15′-1″, max. cutting thickness 2.36″. Both vertical and horizontal analog measuring scales on frame. Cutting head manually rotates from vertically to horizontally for rip vs. cross-cutting, adjustable spacers for repetitive cuts, 5.25 HP saw motor, 9.84″ diameter blade, guide bearings for travel , push button controls, e-stop button and dust extraction hose (no vacuum included). Overall footprint of station 19′-1″ wide x 4′7″ deep x 7′-10″ height. Sold for $36,000 new. 208 volt, 3 phase electrical required. $14,490 NOW $7,997 FOB AZ Wood Tech Systems 765-751-9990 www.woodtechsystems.com

2000 Alpine AutoMill Component Saw 2000 Alpine AutoMill model 343H, (5) blade component saw, cuts lumber from 2×3 through 2×12, from 18″ to 20′, 4-angle floor webs from 18″. Includes powered length and angulation, digital readouts, (1) 32″, (3) 18″ & (1) 20″ blade, shaker under-saw scrap conveyor, incline, PC with Windows 98 o/s, and outfeed conveyor. Decommissioned in 2018. Stored indoors. 480 volt ,3 phase electrical required. $10,497 NOW $5,997 FOB ON Wood Tech Systems 765-751-9990 www.woodtechsystems.com

Name Encoder Encoder Encoder Encoder Encoder Encoder Encoder Encoder Encoder Encoder Encoder Drive Board Drive Board

Brand

Qty.

Used?

Part No. / Description

Dynapar

Function

Model #

Serial #

H220360110022

Up / Down

344B

344B01013

Dynapar

2

New

H220360110422 PS

Up / Down

Dynapar

7 7

New New

H220360110422

Pricteion! c Redu

Alpine List Price Est. Market Value / List $521.31

$939.60

$469.80

$3,288.60

$641.05

$2,564.20

4

New

H221000110422

Carriage

1

New

H221000110422 PS

Carriage

$641.05

H221000110022

Carriage

$534.65

Dynapar

3

New

$3,649.17

$469.80

Dynapar Dynapar

$641.05 $1,603.95

Dynapar

6

New

HC52550009000

$845.88

$5,075.28

Dynapar

3

New

H220060110022

$534.65

$1,603.95

Dynapar

1

New

H220060110422 PS

$529.57

$529.57

Dynapar

2

New

H220060110422

$529.57

$1,059.14

$661.28

$661.28

Dynapar

1

New

HR6250360900

Minarik

5

Rebuilt

115 Volt

Minarik

5

Rebuilt

230 Volt

Touch Screen Monitor

2

New

7585DT-2 Open Frame Display 12.1"

Drive

Servostar

2

Rebuilt

Drives feeder chains

Cord for PC

Alpine

1

New

$0.00 $0.00 $0.00 $0.00 $0.00

Computer

1

New

Programmed - Came from Alpine

Modbus

3

New

TSX C USB MBP

$0.00 $0.00

Servo Motor

3

New

MT304A1

$446.00

$1,338.00

Servo Motor

1

New

MT302A1

$1,188.00

$1,188.00

E-Stop Control Cable

Telemecanique

1

New

XY2CE2A196H7

$440.61

$440.61

Selector Swith

Allen Bradley

2

New

800EM-SM22

$36.71

$73.42

$169.71

$169.71

Selector Swith

Allen Bradley

1

New

800MR-NH2QB

ICE Block / Contactor

Finder

5

New

40.31 10 Amp 250 Volt 24 Volt D.C.

Ironman

1

Arms for Hold Down Chains

2

Live Deck Chain

1

Gearbox

New New New

$0.00

2 sets

$0.00

A section of approx. 3 feet... not a whole chain Left Hand; NH-BMQ-824-50-L-56

Gearbox

Ironman

1

Used

Right Hand; NH-BMQ-821-50-R-56

Gearbox

Grove Gear

2

Used

Carriage - Double Shaft; SP.23UF-2

$0.00 $859.28 $683.74 $400.00

$859.28 $683.74 $800.00

Gearbox

Grove Gear

1

New

Right Hand; 23UF-1

$637.99

$637.99

Gearbox

Grove Gear

1

Used

Double Shaft; 20-UF-2

$1,498.00

$1,498.00

Gearbox

Grove Gear

1

New

Carriage - Double Shaft; (SP)MB23UF-2

$400.00

$400.00

Gearbox

Ironman

New

Angle; NH-FH-826-50-HR-23

Gearbox Gearbox

2

$400.00

$800.00

1

McGill

4

New

CF 1 1/4 S

$27.05

$108.20

Philips

5

New

F15T8/CF

$3.89

$19.45

2

New

BAD GEARBOX FOR PARTS: SP MB26Y-2

$0.00

Used

Computer / Data Cable Lumber Hold Down Springs & Bolts

7

New

Lumber Hold Down Chain Sprocket

1

New

Lumber Chain Sprocket

1

New

Shaker Mount Plate

27

New

Overhead Arm Guide Rollers & Bushings

56

New

Shaker Pan Bushings

3

New

Lumber Stops

2

Saw Brake Rotors Saw Brake Calipers

Angle; SP MB26Y-2

$0.00

Grove Gear Grove Gear

Guide Bearings Cabinet Light Bulbs

Box of Misc. Gearbox Parts

1 Used & 1 New

$1,686.00

Telomatic

New

$0.00

$0.00 $0.00 $0.00 $0.00 Red - Under Shaker

$0.00 $0.00 $0.00

@ end of arms

3

New

2 Large; 1 Small

4

New & Used

2 New; 07280000

$0.00 $0.00 $176.54

$706.16

Misc. Brake Parts / Caliper Mounts

Used

$0.00

Misc. Data Cables

New

$0.00

Saw Blade

3

Retipped & Resharpened 32"

$0.00

Alpine AutoMill RS Parts Alpine AutoMill RS Parts per Uploaded PDF $23,500 NOW $19,500 FOB GA Wasserman & Associates 800-382-0329 www.wasserman-associates.com

2002 Alpine AutoMill RS Component Saw 2002 Alpine AutoMill RS component saw, model 344B. Computer controlled saw sets up in 2 to 19 seconds and downloads from a network or by using a touch screen for ease of operation. Five-head automated component saw works in both automated (downloading files) and semi-automated control via touch-screen input. It has [23] axes of automated movement, enhanced diagnostics, auto management reporting. The RS cuts from 13″ to 20′ long material in size ranging from 2×3″ through 2×12″, includes (2) 17.75″, (5) 18″, (1) 20″ & (1) 32″ blades with air brakes, under-saw shaker scrap conveyor and any available spare parts. 480 volt, 3 phase, 68 Amp electrical required. $39,991 FOB AR Wood Tech Systems 765-751-9990 www.woodtechsystems.com PHONE: 800-289-5627

NEW Hain 20' Powered Measuring System Adapts to Any Saw. Left or Right Hand Operation. Feet & Inches System (Stops at 12” Centers) or Inches System (Stops at 10” Centers). Motor: 1/4 HP Linear Actuator (110 Volt). Stop Rail: 2 x 4 x 1/4” Aluminum Extrusion. Stops: Jig Bored Steel. Stop Blocks: Machine Billet Aluminum. Optional Lengths from 5’ to 60’. Optional Gang Stop. Add $890 per 10’ Section of Heavy Duty Roller Conveyor with Stands $8,990 Wasserman & Associates 800-382-0329 www.wasserman-associates.com Read/Subscribe online at www.componentadvertiser.com

FAX: 800-524-4982


AProtect yourA profits.

Th e

Component Manufacturing dverti$ dverti $ er

Don’t Forget! You Saw it in the

November 2026 #18328 Page #50

dverti$ $er

Know what to improve before deciding what to buy. I use the Theory of Constraints to evaluate your entire operation and identify what limits results.

DOCUMENTED CLIENT RESULT

From losses to above-average profits

in three years, without new equipment. Better employee practices and process improvements. Building Material Supply & Truss Manufacturing

Read the case study

Read the complete case study on LinkedIn.

TODD DRUMMOND

PUBLISHED AUTHOR

CONSULTING LLC

40 years in manufacturing. 25 years consulting. Lean methods • Engineered labor time standards View book on Amazon

Independent advice. Your goals come first.

Let’s discuss what is limiting your operation’s profits. 603-748-1051 | todd@todd-drummond.com PHONE: 800-289-5627

www.todd-drummond.com

Read/Subscribe online at www.componentadvertiser.com

FAX: 800-524-4982


A

Th e

Component Manufacturing dverti$ dverti $ er

Don’t Forget! You Saw it in the

Adverti$$er

November 2026 #18328 Page #51

Before You Invest in Automation

lon Musk’s five rules for improving a process end with automation. That order deserves attention from every executive considering new equipment Todd Drummond or software. When labor is difficult to find, costs are rising, and customer commitments are harder to meet, technology can look like the obvious answer. But an expensive investment can leave the underlying problem untouched if management skips the work that should come first. In plain language, Musk’s five rules are:

E

1. Question the requirements. 2. Remove unnecessary parts or process steps. 3. Simplify and improve what remains. 4. Shorten the cycle time. 5. Automate. The value is in applying these rules in order to the business’s actual needs. That is consistent with how I have always evaluated a client’s operation. Each recommendation must follow from the client’s goals and the evidence, with the entire project process kept as simple and clear-cut as possible. First, question the requirements. Why is an activity necessary? What purpose does another approval serve? What evidence supports the belief that more equipment is needed? These questions must lead to a larger one: What is actually preventing the company from achieving its goals? The Theory of Constraints (TOC) is the cornerstone of my evaluation process because it helps identify that limitation before improvement priorities are set. My evaluation follows the entire project, from customer inquiry through estimating, sales, design, purchasing, scheduling, production, delivery, and final billing. A problem visible in manufacturing may originate in incomplete information or conflicting decisions elsewhere. Understanding those connections helps determine whether the business needs more capacity, clearer management practices, or a different way of organizing the work.

Continued next page

PHONE: 800-289-5627

Read/Subscribe online at www.componentadvertiser.com

FAX: 800-524-4982


A

Th e

Component Manufacturing dverti$ dverti $ er

Don’t Forget! You Saw it in the

Adverti$$er

November 2026 #18328 Page #52

Second, remove unnecessary work. Once we understand what is holding the business back, we can examine which activities consume time without helping it move forward. Repeated data entry, avoidable handoffs, corrections, and unresolved decisions create work throughout the company. Automating them can preserve expenses that could have been eliminated. As unnecessary steps are removed, the controls protecting employees, product quality, and customers must remain effective. Employee practices belong in this examination because constant turnover and vacancies create recurring training, mistakes, and interruptions. Before deciding that automation is the answer to a labor problem, management needs to understand why dependable employees leave and how that instability affects the work. Otherwise, the company may purchase equipment while leaving a major source of lost capacity unresolved. Third, simplify and improve what remains. Employees should understand what must happen, who is responsible, and what information is required before work moves forward. Clear responsibilities, effective training, and sound management practices allow people to perform consistently. This also helps protect the capacity of the constraint identified during the evaluation, because less of its available time is lost to confusion and preventable problems. A Case Study for Transforming Profits Through Employment Practices: Improving those fundamentals brought positive changes to Building Material Supply & Truss Manufacturing. In 2018, the company was losing money and had little available for new equipment. Following my recommendations, they improved employee pay and management practices, adopted Lean methods, and implemented my time standards. Turnover ceased being a significant problem, costs fell, and margins improved without price increases. Over three years, they moved from negative profits to net profits above industry averages without buying new equipment. Substantial capital improvements came afterward. Their experience shows why the first three rules deserve serious attention before an automation proposal becomes the priority. This is also the practical message of my published book, “Lean Manufacturing Made Obvious.” Improvement should make work easier to understand, teach, and sustain throughout the company. A method that depends on constant explanation or intervention still needs attention. Simplicity makes it easier for employees to succeed and for management to see where performance is breaking down. Fourth, shorten the cycle time. With unnecessary work removed and the remaining methods improved, the next question is where greater speed will improve the business’s result. As I explained in my previous article on bottlenecks, making an individual department faster may accomplish little if completed work is still limited elsewhere. TOC keeps this rule focused on the point governing overall flow.

Continued next page

PHONE: 800-289-5627

Read/Subscribe online at www.componentadvertiser.com

FAX: 800-524-4982


A

Th e

Component Manufacturing dverti$ dverti $ er

Don’t Forget! You Saw it in the

Adverti$$er

November 2026 #18328 Page #53

Begin by making better use of the capacity already available at that point. Remove avoidable interruptions, ensure information and resources are ready, and coordinate surrounding activities to support it. Then determine whether additional capacity is needed. Follow the work through completion to verify the benefit. As one constraint is relieved, another may become the next priority. Labor time standards make that evaluation more useful. They connect expected labor requirements to defined methods and operating conditions, helping management assess workload, staffing, and scheduling. Compare estimated time with actual results and investigate meaningful differences. This gives leadership a stronger basis for judging whether a process change or equipment investment delivers the expected improvement. Fifth, automate. By this stage, management should understand which work must remain, how it should be performed, and what benefit automation needs to provide. Some automation will be the right investment. It may relieve a capacity limitation, reduce labor requirements, improve consistency, or make difficult work safer. Evaluate those benefits alongside implementation, training, maintenance, and the demands placed on the rest of the business. The financial case should distinguish between benefits. Recovered labor hours provide capacity, but payroll savings require an actual reduction in payroll expense. Additional production capacity creates a sales opportunity when demand and the rest of the operation support it. Automation outside the main constraint can still be justified, provided its expected return reflects the benefit it will actually deliver. I will never recommend automation that I do not believe is the best fit for the client’s needs and goals. I begin without a predetermined solution or vendor preference and compare proposed investments with practical alternatives. I receive no referral compensation from plate or equipment vendors. My responsibility is to provide the client with an independent assessment, clear priorities, and an understandable explanation of the trade-offs. Through Todd Drummond Consulting, I bring 40 years of manufacturing experience and 25 years of full-time consulting to this evaluation. My services combine TOC, practical Lean methods, and industrial engineering principles, including truss manufacturing time standards available with or without an on-site consultation. If you are considering a purchase or struggling with recurring delays, contact todd@todd-drummond.com or 603-748-1051. Tell me what you want to improve, and we can discuss where to begin. Also pending is TWE, the Truss WorkMinute Estimator, with a tentative December 1, 2026 release target. TWE is being developed to give component manufacturers greater plate-vendor flexibility and automated WorkMinutes alongside familiar production and financial measures, with an AppWright connection supporting the broader management workflow. Development and validation remain underway. Contact me if you would like to discuss whether TWE fits your operation or learn about beta participation.

PHONE: 800-289-5627

Read/Subscribe online at www.componentadvertiser.com

FAX: 800-524-4982


ACTUALLY, WE CAN SAY QUITE A LOT WITH LASER ACCURACY. To see meaningful labor savings, quality improvement and production gains, SL Lasers with their easy-to-see green light are nothing short of illuminating. They enhance worker accuracy and productivity, regardless of experience or primary language. They can reduce tedious setup time by up to 70%. No complex training or costly service agreements are required. And SL Lasers integrate seamlessly with any component design software and are quickly installed over existing equipment. We’ve been trailblazers in wood component laser projection since its very beginning, and we’re still delivering more rapid ROI for roof truss, wall and floor panel producers every day. Contact our enlightening team at Wood Tech Systems to see how SL Laser can deliver for you.

Newly enhanced projection speed improves optics, while advanced cooling of the diode ensures greater reliability of the heads.

SL Laser heads are simple to mount and easily installed over your existing assembly equipment with minimal disruption to operation.

Lasers improve the accuracy and productivity of any labor force, regardless of experience or primary language.

765-751-9990 www.woodtechsystems.com Wood Tech Systems is a registered trade name of Wood Truss Systems, Inc.


A

Th e

Component Manufacturing dverti$ dverti $ er

Don’t Forget! You Saw it in the

Adverti$$er

November 2026 #18328 Page #55

SAWS

Pricteion! c Redu

! W E N 2023 Northfield Model 410 Upcut Saw NEW 2023 Northfield model 410 upcut saw available for immediate shipment. 90/90 degree cuts to 4″ x 10″ capacity (fence forward position) to 2″ x 14″ (fence rearward position). Saw is configured for material from left to right, with 3″ x 6″ air operated cylinder, filter, regulator, lubricator, 10 HP motor, enclosed steel base with cast iron table, magnetic starter and adjustable operating speed from 20 to 60 CPM. Includes optional two-palm controls, additional 4″ dust outlet, NEMA 12 electrics with fused disconnect and two 18″ diameter 60 tooth blades with 1″ diameter bore. 460 volt, 3 phase electrical required. $18,630 FOB MN Wood Tech Systems 765-751-9990 www.woodtechsystems.com

2005 Alpine ALS 276C Linear Saw 2005 Alpine ALS 276C linear-feed saw (Refurbished in 2015). Cuts wall and truss parts from lumber depths 2×4 through 2×12, 60”+ scarf cuts, internally optimizes material (up to 11 7/8″ x 1.5″ EWP). Includes 15-foot idler roller infeed conveyor, 15-foot idler roller outfeed conveyor, and under-saw scrap conveyor with belt-type incline. All servo-controlled functions, Microsoft Windows 10 OS, 7.5 hp motor with 20” carbide tipped blade. Includes any available spare parts. No printer is included. 230v, 3 ph power, 70A electrical required. Includes step-down transformer. 125 PSI air required. $39,991 NOW $35,997 FOB OR Wood Tech Systems 765-751-9990 www.woodtechsystems.com PHONE: 800-289-5627

2022 Spida Sprint S600 Wall Panel Saw • Automated Wall Panel Component Cutting & Marking as directed by your Wall Panel Design Software • S600 Up-Cut Saw (Square Cut Only) • 7.5 HP / 3 Phase Braked Saw Motor with 24" Blade • Enclosed Hood & 2 Hand Control for Operator Safety • 20' of Steel Framed/Plastic Top Table with Automated Length Stop/Plate Positioner • 20' Infeed Steel Framed/Plastic Top Table • Industrial Touch Screen Computer • Ink Jet Printer marks Wall Member Locations, Wall ID & Job Name • Spare Parts • Excludes: Dust Collector, Installation/ Training & Annual Technical Support Fee $60,000 NOW $55,000 FOB WI Wasserman & Associates 800-382-0329 www.wasserman-associates.com

Used TCT EZ Trimmer • Model CT041-2000 • 2x3, 2x4 & 2x6 Capacity • Double 45 Degree Bevels on Pitches from 0/12 thru 12/12 • Cycle Time: 15 Pieces / Minute • Air: 9 CFM at 80 PSI • Electrical: 230 Volt / 3 Phase /20 Amp / 5 HP Motor $11,500 FOB AZ Wasserman & Associates 800-382-0329 www.wasserman-associates.com Read/Subscribe online at www.componentadvertiser.com

FAX: 800-524-4982


A

Th e

Component Manufacturing dverti$ dverti $ er

Don’t Forget! You Saw it in the

Adverti$$er

November 2026 #18328 Page #56

ALL POINTS TECHNICAL

Engineering Talent

Truss / Panel / EWP

CAD · BIM · Revit

Design, Estimating & Engineering professionals on demand

4 Yr Degree specialists in structural & framing systems

And Planswift-ready teams for complex technical drawings

◆ GLOBAL REACH ◆

USA • Vietnam • India • Panama • Honduras

Global Delivery

Reduce Overhead

Faster Turnaround

NO-COST CONSULTATION

Nearshore & offshore talent across 5 countries — your time zone

Increase capacity without growing your fixed cost base

Increase clock speed — more projects, more profits

SOLUTIONS 4 DESIGN

The Gold Standard in Global Staffing & Technical Solutions

Scale Faster. Build Smarter.

Contact us today to reduce overhead, boost capacity & gain market share

Dave Walstad | All Points Technical

Jarred Fresura | Solutions 4 Design

941-713-4395 • Dave.AllPoints@gmail.com • https://allpointstech.ai/

724-433-4059 • Jarred@s4dz.com • https://s4dz.com/

Work Smarter

Sub Component Nailer Speed Up Your Production of wall panels, windows, doors, and other sub components

Block Sizes: 2x4 & 2x6 framing lumber, any length Nail Cycle Time: 1 nail 1 sec; 2 nail 2 sec; 3 nail 3 sec Machine Set Up Time: 1 sec from any prior set up Air Supply: 125 psi at 30 CFM, nothing less Electrical Supply: 120 VAC Frame: 1/4” steel plates mounted to heavy duty roll top tables and 2x2 skids mounted no install Transfer System: Pneumatic transfer for finished sub component assembly Covers: 3/16” thick aluminum Shipping Weight: 1000 lbs including crate Dimensions: Height 48”, Width 48”, Depth 10” MADE IN AMERICA BY AMERICANS See it in Action!

530-295-8068 PHONE: 800-289-5627

sales@thehaincompany.com

Read/Subscribe online at www.componentadvertiser.com

FAX: 800-524-4982


A

Th e

Component Manufacturing dverti$ dverti $ er

Don’t Forget! You Saw it in the

Adverti$$er

November 2026 #18328 Page #57

SAWS

2019 Spida Gen 8 Apollo Saw with Automation Saw with automation features a 17″ touch screen, with Win.7 O/S for truss cutting software. Cuts automated angles from 10 to 170 degrees, cross-cut maximum depth of up to 5.9 inches, with scarf cuts of up to 36 inches long. Automated turntable for setting angles and length stop/pusher. Saw features a 7.5 HP, 3ph motor, with direct drive of its 17.7-inch diameter blade, includes stroke limiter, plexiglass cutting shield, MDF profiled cutting bench top with a dust collection port. 48″ x 72″ tubular steel saw frame. Includes 20-ft. in-feed, 10-ft. outfeed roller conveyor, material in from the left to right outfeed of cut material. 230 / 460 volt, 3 phase electric required. $49,490 FOB BC Wood Tech Systems 765-751-9990 www.woodtechsystems.com

Pricteion! c Redu 2006 Alpine TimberMill 4-14 Web Saw • Roof & Floor Truss Web Saw • Cut 4x2 and 2x4 thru 2x8 Lumber from 11” to 14’ • (4) 16” Blades powered by 5 HP Motors • Powered Angulation & Carriage (setup with pointers & scales) • Chain Drag Waste & Incline Conveyor • 480 Volt / 3 Phase • Video available upon request $39,500 FOB CO Wasserman & Associates 800-382-0329 www.wasserman-associates.com

M ACdverti$er

The

omponent

anufacturing

Serving the Structural Building Components Industry

December 2020 Spida Sprint S600 Wall Panel Saw • Automated Wall Panel Component Cutting & Marking as directed by your Wall Panel Design Software • S600 Up-Cut Saw (Square Cut Only) • 7.5 HP / 3 Phase Braked Saw Motor with 24" Blade • Enclosed Hood & 2 Hand Control for Operator Safety • 20' of Steel Framed/Plastic Top Table with Automated Length Stop/Plate Positioner

• 10' Infeed Steel Framed/Plastic Top Table • 24" Industrial Touch Screen Computer • Ink Jet Printer marks Wall Member Locations, Wall ID & Job Name • Dust Collector • Current use is a low volume shop • Excludes: Installation/Training & Annual Technical Support Fee

$79,000 NOW 65,000 FOB MO

800-382-0329 | www.wasserman-associates.com

!

W E N

2016 MiTek MatchPoint BLADE™

New Simpson Strong-Tie EasyFrame Saws A fast method for cutting and marking structural wood components for use in wall panels and trusses. It features high resolution printing on the dimensional lumber and an internal optimization program to reduce waste. The marking system marks the framing layout in sequence using InkJet printing. There are three models available: the EasyCut Angle 24, EasyCut Straight 24, and the Chop Saw version. All three models provide high-resolution printing and optimization. Each comes with an EasyFrame infeed and outfeed, which can be adjusted in length to fit your needs using 2-ft and 6-ft modules.

Model: 89060-501R, Includes a 16′ infeed AutoDeck for processing up to 16′ long 2×3 through 2×12 material with a Left to Right feed in a “U” configuration. The Blade features a 16-valve front face printer, and is wall panel ready with an optional edge printer. Includes an optional skewed out-feed conveyor, and standard 90º waste conveyor. The saw also includes many available spare parts. 230v/3Ph power, working air pressure as specified by the OEM.

$87,495 FOB OH

Price Based on Configuration

765-751-9990 PHONE: 800-289-5627

www.woodtechsystems.com

765-751-9990

Read/Subscribe online at www.componentadvertiser.com

www.woodtechsystems.com FAX: 800-524-4982


A

Th e

Component Manufacturing dverti$ dverti $ er

Don’t Forget! You Saw it in the

November 2026 #18328 Page #58

Adverti$$er

Terminailer

NEW!

Price: $237,900 FOB: ND

The Terminailer all but shatters the stereotypical myth that sub-component equipment is essentially peripheral – unimportant. And it does so by quickly and accurately driving far more framing nails in your wall panel jobs than ever before. Whether in your shop or in the field, one operator sets the pace for production and quality, which reduces labor costs and other aspects of overhead.

The new Terminailer V.8 improves on the previous generation Terminailer in several key ways: All new HMI/Software

Reengineered air system

• Siemens Pivoting HMI Touchscreen display to operate from either side • On-screen tutorial for all menu items • Operator now controls functions such as process speed, nail spacing, nail patterns, etc. • Simplified input commands Nail Feed Complete Redesign • All new frame to allow for redesigned nail coil placement with direct feed path • EverWin PN90-PAL industrial tools now standard equipment • New nail guides with spring-loaded tensioners • Nail coils move with vertical travel of the nail guns

• SMC “Soft–Start” Pneumatics • Simplified air for control to all components: lift– cylinders, triggers, stop–gate, etc. • Direct air supply to each nail gun for improved nailing performance • All pneumatic elements are clearly labeled for EZ service and adjustment Overall Features • Pharmaceutical grade assembly, industrial grade durability • “Block–wheel” redesign for 3X increased applied force • Approximately 1,200# of applied clamping force resulting in straighter finished • Subcomponents from even the poorest lumber • Larger doors for easier access to interior elements including coil–nail spools

Terminailer is an event-driven, sub-component assembler that will quickly and accurately drive 30% to 70% of the framing nails in any wall panel job. In your shop or in the field, one operator sets the pace for production and quality. The Terminailer functions independent of design software, requires zero set-up time when switching between any configuration, and requires no special operator training. The Terminailer is easy to move around the shop so its location can evolve as your shop evolves. With all of the nailing occurring in the closed main chamber, nail injuries and nail location misfires are eliminated, making your plant that much safer. With nearly ten years of development from people that know machinery, it is assembled to exacting standards, well supported, and it is easily maintained with shelf-item parts. Terminailer: vetted, tested, and ready to drive maximum productivity for you. Be sure to check out our videos below for a quick review of this revolutionary machine! 208 volt, 3-phase, 21 (full load) Amps, 60 Hz electrical required. 50 SCFM @ 100 PSI air required. Net weight 7,000 lbs..

765-751-9990 PHONE: 800-289-5627

www.woodtechsystems.com Read/Subscribe online at www.componentadvertiser.com

FAX: 800-524-4982


A

Th e

Component Manufacturing dverti$ dverti $ er

Don’t Forget! You Saw it in the

November 2026 #18328 Page #59

Adverti$$er

SAWS

GOOSENECK ROLL OFF TRUSS TRAILERS 26', 32', 36' & 40' available, Split Rollers optional

Hydro-Air / DePauw Combi-Cut Floor Web Saw Five-blade floor truss web saw featuring four internal angulating saw blades plus external cutoff blade. Designed for highproduction cutting of floor truss webs from 2×4 lumber in flat 4×2 orientation. Powered blade angulation with mechanical length adjustment, lumber hold-down system and integrated waste conveyor. Published Combi-Cut specifications indicate approximately 8″ to 5′ overall cutting length capacity and four-angle floor web cutting down to approximately 12″. Five 14″ carbide-tipped saw blades. Older industrial push-button controls. 208v, 3 phase power. $11,995 FOB CA Wood Tech Systems 765-751-9990 www.woodtechsystems.com

New Monet Power Deck Infeed Decks Heavy-duty, 5-chain feed system to bring material to the infeed of the component saw. 16′ wide x 20′ long x 36″ high. Transfers 6′ to 20′ lumber lengths. Option for 6-arm Power Deck available at an additional cost. Features auto-feed advance, foot pedal override forward and reverse, variable speed control, double bearing construction, softstart and soft-stop and e-stop cable. Base price shown. 480 volt, 3 phase, 15 Amp electrical required. (Prices start at $31,000.) Wood Tech Systems 765-751-9990 www.woodtechsystems.com

A

The

2 YEAR WARRANTY PLAN YOUR 2027 ~ BUILD WITH US TODAY ALL TRAILERS AVAILABLE WITH GALVANIZED OR POWDER-COATED ROLLERS STANDARD (Shown with Additional Top Roller Option)

STANDARD WITH HYDRAULIC LOAD CONTROL & MANUAL PIN LOCKS, ELECTRIC OVER HYDRAULIC DISC BRAKES, TOP ROLLER

Component Manufacturing dverti$er

Serving the Structural Building Components Industry

BUILT TO MOVE MORE ~ ENGINEERED TO DO MORE FOR OVER 25 YEARS

1-800-237-5161

sales@precisionequipmfg.com

2016 Alpine AutoMill HP Component Saw Alpine AutoMill HP, model 349C component saw. Servo controlled computerized saw sets up in 2 to 19 seconds and downloads from a network, or by using a touch screen for ease of operation. Five-head automated component saw works in both automated (downloading files), semiautomated control (via touch-screen input) or manual mode. It has (23) axes of automated movement, enhanced diagnostics, and auto management reporting. The HP cuts from 2′-6″ to 20′-0″ long material in size range from 2×3″ through 2×12″, and 4-angle floor webs from 2′-0″. Includes [3] 18″, [1] 20″ and [1] 30″ blades with air brakes, Windows 7 o/s and under-saw scrap conveyor. The Windows 7 o/s can be upgraded to a version of Windows 10 that will be supported until 2032, at an additional expense.

$129,997 NOW $79,997 FOB OR 765-751-9990 PHONE: 800-289-5627

Also includes over $8,000 in spare parts. 480 volt, 3 phase, 100 Amp electrical required. 90 PSI @ 69 SCFM air required. www.woodtechsystems.com

Read/Subscribe online at www.componentadvertiser.com

FAX: 800-524-4982


A

Th e

Component Manufacturing dverti$ dverti $ er

Don’t Forget! You Saw it in the

Adverti$$er

November 2026 #18328 Page #60

Before You Click Optimize By the Paragon Team

A

sk a designer why a shop avoids a particular web configuration and you may get a very specific answer. The production crew finds it awkward to assemble. A certain cut creates problems. The preferred alternative uses material the shop always has on hand. You may also hear, “That’s how we’ve always done it.”

Both answers deserve a closer look when setting up optimization. Years of experience go into a plant’s design practices, but the reasoning behind those practices does not always make it into the software. Some lives in the design manager’s head. Some gets passed along during training. Some remains in place long after anyone remembers why it was adopted. In our previous article, “Finding Real Value in Every Truss,” we explore how lumber grades, web configurations, and plate placement create opportunities within a truss. Putting those opportunities to work starts with deciding which choices your shop wants to consider. Here are five questions worth discussing before you click optimize.

Is It a Requirement or a Preference? “We don’t use that” can mean several things. It might describe a genuine equipment limitation, an unavailable material, or a customer requirement. It might also describe a familiar approach that the crew prefers. Those distinctions matter. Structural requirements must remain satisfied, and actual production limitations need to be respected. Preferences deserve a clear explanation and, where appropriate, room for exceptions. Consider a shop that prefers to limit the number of lumber grades moving through production. Is an additional grade completely off the table? Or would the shop consider it for a substantial order with enough repetition to justify stocking it? Being precise gives designers a clearer basis for evaluating alternatives. It also prevents a reasonable preference from becoming a blanket restriction by default.

What Problem Does the Rule Solve? Before changing an established practice, ask the people who work with it. A preference for familiar plate orientations may come from experience with placement errors. A restriction on certain web arrangements may reflect assembly difficulties that are not obvious on a drawing. Those are useful details to capture. Try to describe the concern in concrete terms. Where does the difficulty occur? How often? Does it affect every component of that type or only certain conditions? Sometimes the discussion will confirm that a restriction belongs in place. Other times, it may reveal that the original concern involved equipment the shop no longer uses or a process that has since improved. The goal is to preserve the experience behind the rule while making sure the rule still serves its purpose. Continued next page

PHONE: 800-289-5627

Read/Subscribe online at www.componentadvertiser.com

FAX: 800-524-4982


A

Th e

Component Manufacturing dverti$ dverti $ er

Don’t Forget! You Saw it in the

Adverti$$er

November 2026 #18328 Page #61

When Would You Accept an Exception? A preference is easier to apply when everyone understands its limits. Suppose your shop generally avoids adding another plate size to inventory. Would that position change for a large, repetitive project? Who would review the purchasing and production implications before approving it? The answer does not have to be a complicated formula. It might be a simple instruction to bring certain alternatives to the production manager before proceeding. An agreed review process lets designers explore worthwhile options without having to renegotiate shop practices on every job. It also keeps an exception made for one project from quietly becoming the standard for the next.

Who Needs a Say? Optimization preferences deserve input from purchasing, design, and production. Purchasing can explain which materials are reliably available and which create ordering complications. Designers can identify restrictions that repeatedly narrow their options. Production can explain what makes an apparently economical design difficult to build. Put the same example in front of all three. Ask what each person would want to know before approving it. The resulting discussion should produce decisions someone can document: which materials are acceptable, which practices are preferred, which conditions warrant review, and who approves exceptions. That gives the design team something more dependable than a collection of individual opinions.

When Should Settings Be Revisited? Once preferences are established, assign someone responsibility for keeping them useful. A change in equipment, stocked materials, purchasing arrangements, or production methods is a good reason to revisit the relevant settings. Recurring feedback from the floor deserves attention, too. Keep a short record of why significant restrictions exist. A future designer or manager should be able to understand the decision without tracking down the person who originally made it. That record also makes reviews easier. The team can check whether the original reason still applies.

Put Your Experience to Work These conversations provide useful groundwork for working with Paragon D.A.N. Clear priorities help designers evaluate the alternatives it explores and decide which results fit their operation. Much of that judgment already exists within your team. Taking time to document it makes it easier to apply consistently, teach to new employees, and reconsider when conditions change. Before your next optimization run, choose one familiar shop rule and ask why it exists. The answer may confirm a good practice or give your team a useful place to start improving.

PHONE: 800-289-5627

Read/Subscribe online at www.componentadvertiser.com

FAX: 800-524-4982


/ SCALABLE LIFTING & STACKING OF FINISHED FRAMES & TRUSSES

STACK SMARTER Vekta StakPro range — eliminating bottlenecks, error and injury risk.

STAKPRORANGE

ENGINEERING, SERVICE & SUPPORT

/ V E K TAU S A .C O M


A

Th e

Component Manufacturing dverti$ dverti $ er

Don’t Forget! You Saw it in the

Adverti$$er

November 2026 #18328 Page #63

SAWS

Pricteion! c e R du

MANUFACTURERS’

REPRESENTATIVES

NEW!

Used Hain Quick Rafter Cutter • Reconditioned in December 2020 • Board Sizes: 2x4 and 2x6 • Motors: Two 1 HP / 220 Volt or 440 Volt / 3 Phase • Saw Blades: 7 1/4" Carbide Tipped (set at 45 degrees) • Angle Adjustment: Manual Rotation with Air Brake • Air Supply: 90 PSI • Carriage: Steel Rails with Steel Dual V Rollers • Pedestal: 3/16" Formed Steel • Saw Housing: 1/2" Billet Aluminum • Covers: 10 Gauge (1/8" thick) Steel • Fully Enclosed for Safety $12,500 NOW $9,900 FOB AZ Wasserman & Associates 800-382-0329 www.wasserman-associates.com

OMGA RN700 Radial Arm Saw I n d u s t r i a l - d u t y radial arm saw with 5-ft infeed and 5-ft outfeed, plus protector/guard for special cuts. Features 5 HP motor powering a 14″ diameter saw blade. Saw has a 27-1/2″ maximum crosscut capacity and maximum depth of cut of 4-1/2″ at 90 degrees and 3-3/16″ at a 45-degree bevel. Miter adjustment provides positive stops at 45° left, 0° and 45° right, with manual locking available at intermediate angles; bevel adjustment is from 0° to 45°. Maximum ripping capacity is 36-5/8″. Cutting carriage rides on eight bearings with dust scrapers and interchangeable steel tracks for smooth, accurate operation. Saw head swivels and tilts on both horizontal and vertical axes. 208v, 3 ph power. $5,995 FOB CA Wood Tech Systems 765-751-9990 www.woodtechsystems.com

Monet FWA 500 CA Automated Floor Web Saw In answer to the demands of high-volume customers comes the Monet DeSauw FWA 500 CA (Automated Controls) floor web saw. The 500 CA is perfect for component manufacturers who routinely run floor trusses in high volumes with variable web geometry. Another primary feature is enhanced safety through automation which eliminates the need to open the saw motor cabinets other than for periodic service. The 500 CA includes automation for all blades, including the fixed cut-off blade for minimal waste. Lumber infeed speed is variable up to sixty (60) boards per minute, while the powered carriage utilizes rack and pinion drive with airlock for set accuracy throughout the production run. Your operator will easily download batches to the 500 CA saw from your design software via an ethernet connection to a MS Windows 10 industrial PC with a 17″ monitor housed in a stand-alone console. If you frequently batch floor web cutting, and if enhanced safety with increased productivity are a concern, then an automated Monet FWA 500 CA may be the right selection for you. More information click

765-751-9990

HerePrice based on configuration. www.woodtechsystems.com

Work Smarter

2 Seconds That's all the time it takes

to drill studs for running Romex or other electrical wire in the wall panels

Motor: Heavy Duty 5 HP - 3 phase - 220v or 440 v (Please specify when ordering) Motor carriage bearing and spindle assembly mounted on Blanchard ground steel plate Lineal motion is hardened and ground V bearings and rails Block Sizes: 2 x 4 through 2 x 12 infinite height setting to center Air Supply: 100 psi 10 CFM Drills: 2 wing 3/4'” Carbide Tipped can accommodate smaller or larger Spindles: Alloy Steel polished and ground precision shafting Frame: 2" Steel With Powder Coat Finish Covers: 10 Gauge (1/8" Thick) Aluminum removable Dimensions: Height - 60 inches, Width - 33 inches, Depth - 33 inches Shipping weight: 750 lbs. - (Including crate) MADE IN AMERICA BY AMERICANS

See the Stud Driller in action! Go to https://youtu.be/AnODX5vPesE for a demonstration

530-295-8068 • www.thehaincompany.com PHONE: 800-289-5627

Read/Subscribe online at www.componentadvertiser.com

FAX: 800-524-4982


Software. Equipment. Hardware. Service. Your all-in-one truss component solution. © 2026 Simpson Strong-Tie Company Inc. M-T-CM25-SOFT

Transform your truss operation with an integrated solution from Simpson Strong-Tie. The industry leader in truss plates now brings you a full suite of software, equipment, hardware and services to drive truss component manufacturing from idea to installation. Start with CS Director™, CS Truss Studio™, CS EWP Studio™ and CS Producer™ for design, layout, production and project management. Use our powerful Monet DeSauw industrial saws to cut webs, chords, stair stringers, rafters and wedges with speed and precision. Specify the ® optimal connectors, anchors and Strong-Drive structural fasteners for every project. You can also complement your team with our professional truss design services at any time. Altogether, you have a smart solution made to increase productivity, ensure high quality and take your business to the next level. To learn more, contact your representative at (800) 999-5099 or visit us online.

go.strongtie.com/cm


A

Th e

Component Manufacturing dverti$ dverti $ er

Don’t Forget! You Saw it in the

November 2026 #18328 Page #65

Adverti$$er

SAWS

Pricteion! c e R du

Pricteion! c e R du

NEW! 2012 Vista "Angle Boss" Saw with 20' TigerStop • 2012 Vista Model M-20 AutoSet Cut-Off Saw • 0 to 75 Degree Left & Right Blade Rotation • 10 HP/460 Volt Motor with 20" Blade • 10' Infeed Roller Conveyor & 20' Outfeed Roller Conveyor • 2012 TigerStop (250" Cut Length) • TigerStop Software Version 5.30 • Excludes Dust Collector • Video available upon request • Price in US Dollars $18,880 NOW $12,900 FOB MB Wasserman & Associates 800-382-0329 www.wasserman-associates.com

2004 Manual Apollo Saw • 5.5 HP Motor (3 Phase) with 18" Blade • 6" Maximum Cut Depth with 36" Stroke for Long Scarf Cuts • Minimum Angle of 10 Degress (160 Degree Angular Movement) • Turntable Air Brake • Variable Stroke Limiter & Saw Barrier Guard for Safety • 15' of Roller Conveyor with Stands • New Blade Guard (in box) $11,500 NOW $9,800 FOB NE Wasserman & Associates 800-382-0329 www.wasserman-associates.com

A

The

Component Manufacturing dverti$er

Serving the Structural Building Components Industry

Safety Speed Cut Model 7000 Panel Saw Safety Speed Manufacturing model 7000, vertical panel saw, 3 HP induction motor, 64 inch crosscut, 2-inch maximum thickness, accuracy within 1/64th of an inch, 96" tall x 10-foot-wide welded steel frame with integrated stand and linear V-guides, enclosed counterweight system, adjustable vertical and horizontal rules. Quick changes from vertical to horizontal cutting. Includes machined aluminum material rollers, hold down bar, wheels, quick stop gauges and material hold downs. Dust collection ready. Options available include lower frame width extension to 13-ft, digital readouts, laser guide, stop bar, vacuum, and midway fence.

765-751-9990

www.woodtechsystems.com

! W E N 2007 Alpine ALS 276 Linear Saw Cuts wall and truss parts from lumber depths 2×4 through 2×12, cuts bevels from 90 to 25 degrees, 60”+ scarf cuts, optimizes material, production rates +2000 pieces per 8 hr. shift. Includes 16- foot ICC-brand infeed deck, 20-foot-long infeed roller and 16-foot powered outfeed conveyor, Matthews “Mperia V” series 8000 printer (one 3

½” face) added in 2022, and undersaw belt scrap conveyor. All servo controlled functions. Windows 10 o/s. Includes Servotronix upgrade, recent saw head bushing, bevel motor and gearbox installed in 2024, spare blade, all available spare parts and digital operator’s manual.

$54,997 NOW $40,997 FOB FL

765-751-9990

PHONE: 800-289-5627

www.woodtechsystems.com

FOB Quebec New ASI Radial Arm Saw with Length/Angle Automation • New saw design with double slide • minimizing footprint • Roller slide reducing risks of injury by • lowering the effort pulling the saw • Hybrid aluminum-steel construction • combining the robustness of steel for the • frame with the lightness of aluminum • • for the moving head • High resistance powder coat paint • surface finish • •

Blade travel adjusts automatically depending on the saw angle Saw arbor type 5 HP motor with integrated mechanical brake (575 Volts – 3 phases) Angles from 10° to 110° Head overall travel length of 26in 18in saw blade 5.5in cutting height Complete « wrap-around » blade guard 4in dust collector connection

800-382-0329 | www.wasserman-associates.com

Read/Subscribe online at www.componentadvertiser.com

FAX: 800-524-4982


Meet the TrussMaker. A smarter way to introduce automation to your truss production. 3

Manual Jigging

Fastset Jig

• Hands-on setup • Higher operator involvement • More manual adjustment

Automated Jigging

The TrussMaker

• Software-driven processes • Improved efficiency • Reduced manual labor

The TrussMaker is an automated jig platen press – purpose-built as an alternative to manual jigging. With a practical footprint comparable to manual jigging, it’s a great option for adding automation without the larger space requirements of a full Roller Plant.

E sales@spida.com

T +1 866 647 7771

spida.com


A

Th e

Component Manufacturing dverti$ dverti $ er

Don’t Forget! You Saw it in the

November 2026 #18328 Page #67

Adverti$$er

SAWS

NEW! 2019 Holz-Her Sector 1260 Vertical Panel Saw • 4.0 kW Motor with 10” Blade (2.36 cutting depth) • 230 Volt / 3 Phase • Cutting Length: 14’ / Cutting Height: • Automatic Mode: Plunge, Saw & Return with Variable Speed Control • Top & Bottom Sawing Beams with Pneumatic Arrest • Digital Horizontal Cutting with Motor-Driven Precision Adjustment • Digital Longitudinal Stop with Fine Adjustment • Pneumatic Support Grid • Dust Extraction Port • Like New Condition • A 2016 COIMA FI6000 Dust Collector is available at additonal expense Panel Saw - $21,900 Dust Collector - $7,900 FOB CA Wasserman & Associates 800-382-0329 www.wasserman-associates.com

$15,399 Base FOB MN Pacific Trail 20 HP Bunk / Package Crosscut Saw Heavy-duty industrial crosscut unit saw for cutting complete bunks or packages of dimensional lumber to length. Features 20 HP electric motor, heavy-duty chain saw bar cutting system, hydraulic power unit and operator controls. Includes extended roller conveyor/material handling system for positioning full bunks of lumber. Designed to crosscut an entire package of material in a single pass for efficient lumber processing. 208/400 volt, 3-phase power. $17,995 FOB CA Wood Tech Systems 765-751-9990 www.woodtechsystems.com

Safety Speed Manufacturing Model 7400 XL Panel Saw Ready for long hours of accurately cutting OSB, fiberglass reinforced sheathing, and virtually any other sheathing material specified. The 7400 XL features a quiet 3 HP induction motor, 64 inch crosscut, 2 1/8″ maximum thickness, accuracy within 0.005 inches, 96" tall x 13-foot-wide welded steel frame with integrated stand and linear V-guides, enclosed counterweight system, adjustable vertical and horizontal rules. Quick changes from vertical to horizontal cutting. Includes machined aluminum material rollers, hold down bar, wheels, quick stop gauges and material hold downs. The 7400 XL is dust-collection-ready for easy connection. Options available include digital readouts for vertical cuts, laser guide, stop bar, dust vacuum and midway fence.

765-751-9990

www.woodtechsystems.com

FLATBED WITH FORKLIFT MOUNT MANUFACTURERS’

REPRESENTATIVES

STANDARD - EXTENDABLE & HD TRUCK BED

40', 45' Standard Sizes - 20' & 24' HD Truck Bed Sizes 40'-53', 45'-60' Extendable Sizes 2 YEAR WARRANTY

PLAN YOUR 2027 ~ BUILD WITH US TODAY FORKLIFT MOUNT FITS MAJOR BRANDS - FULL GALVANIZED OPTION AVAILABLE

NEW! New Monet DeRobo Linear Saw New, DeRobo linear saw by Monet organizes "fill" boards to increase optimization of each board, can produce unlimited scarf cuts, cuts 1 or 2 boards at a time and cuts webs, chords, wedges, rafters and open-stair stringers. Works with all major connector plate manufacturer's software. Features include 22 inch blade, left-to-right feed direction standard, lumber push and pull grippers for more accuracy, ink marking on the 1 1/2" face of the incoming boards and small piece capture and delivery to the front of the saw for easy access. Infeed deck and bunk feed are shown as options only. 480 volt, 3phase.

$257,000 FOB MO. 765-751-9990 PHONE: 800-289-5627

www.woodtechsystems.com

STANDARD WITH AIR-RIDE SUSPENSION, SLIDING WINCH & STRAP LOCK SYSTEM, CENTER TIE-DOWN BAR, APITONG DECKING

BUILT TO MOVE MORE ~ ENGINEERED TO DO MORE FOR OVER 25 YEARS

1-800-237-5161

sales@precisionequipmfg.com

Read/Subscribe online at www.componentadvertiser.com

FAX: 800-524-4982


BEFORE: Tee-Lok Track On Floor

AFTER: Trackless System

Transform Your Track On Floor Line To Trackless! An EIS Trackless Upgrade eliminates the floor track, creating a clear workspace for easy assembly of trusses on your WizardPDS® tables.

WizardPDS® Automation

Custom Trackless Upgrade

Compatible or equipped with WizardPDS® Automation

Transform any Track On Floor System to Trackless.

Take your upgrade to the next level. No matter the brand of your current track on floor line, we can retrofit your tables to integrate with a variety of New Legacy Gantries. Whether you’re converting a ‘Tee-Lok’ line to a trackless system or another configuration, the possibilities for customization are endless!

Your table, automated.

We bring the best together! Eide Integrated Systems, LLC

612-521-9193

www.eideintegratedsystems.com


A

Th e

Component Manufacturing dverti$ dverti $ er

Don’t Forget! You Saw it in the

Adverti$$er

November 2026 #18328 Page #69

SAWS

NWH 76" Finish Roller • 76" Long x 24" Diameter Rollers • Throat Opening is adjustable from 1 1/2" to 5 1/2" (currently set at 1 1/2") • Front & Rear Safety Bars • Dual 5 HP Gear Motors with Brakes (3 Phase) • Excludes Roller Conveyor in Photos $26,900 NOW $22,250 FOB TX Wasserman & Associates 800-382-0329 www.wasserman-associates.com

Pricteion! c e R du 2003 Koskovich Auto Omni Component Saw • 5 Blade Automated Component Saw • Cuts 2x3 through 2x12 from 11" to 20'-0" • Computer, Enclosure & Stand • Waste Conveyor (under saw) • Excludes Incline Waste Conveyor (adjacent to saw) • Video available upon request • Add $12,500 for 6 Chain Live Deck $16,500 NOW $12,900 FOB ND Wasserman & Associates 800-382-0329 www.wasserman-associates.com

Used - 2005 Model 305 Infeed Conveyor Designed for use with all component saws. To include: Soft Start ~ Soft Stop Inverter System. Programmable load sensing; Overload / Jamb sensing shut down feature. Gear motor providing conveyor speed of 36' per minute. Forward and reversing controls for location at both ends of conveyor unit. Material capacity range - 4' through 24' lumber. Chain deck pedestals 20' long with cross bracing. Staging area at the saw independent of the live deck system. 30,000lb. Deck capacity. Call for pricing Eide Machinery Sales, Inc. 612-521-9193 www.eidemachinery.com PHONE: 800-289-5627

! W E

N Safety Speed Manufacturing Gypsum Cutter Lose the dust and noise for processing material such as DensGlass®, or other gypsum products with the Safety Speed model VGC 515 cartridge cutting system. Easily process full sheets of gypsum wall panel sheathing of material in widths up to 64". Fully portable, and with NO power or air required, the VGC 515 is dust and noise free to easily score gypsum material that rolls effortlessly to an integral edge used for breaking scored material. Features blade cartridges for quick exchange in less than a minute and uses off-the-shelf utility knife blades. Includes two cutting/scoring cartridges, removable clamping bar, integral counterweight, both left & right measuring tapes, wheels for portability, free-standing 90" tall x 10-ft wide frame and 5-foot Quick Stop system for accurate, repetitive cutting.$6,399 FOB MN Wood Tech Systems 765-751-9990 www.woodtechsystems.com

Used Upcut Saw Used upcut saw, 90-degree cuts only, includes blade cowling and edge fence, 24″ diameter blade with one spare blade, foot pedal control and dust vent throat. 208v / 230v /460v, 3-phase electrical required. $5,990 FOB NH Wood Tech Systems 765-751-9990 www.woodtechsystems.com

M ACdverti$er

Th e

omponent

anufacturing

New SpeedWorx Automated Sheathing Station Reduce labor and operator fatigue by taking advantage of the SpeedWorx automated vertical panel saw. This one-person station cuts wood sheathing sheets up to 50 inches x 10 feet, and up to 2-inch thickness, using a fast 1-button cutting setup with CNC accuracy to 1/32 of an inch (0.03125″). The usage of each sheet is optimized through automated sequencing. The photos of raw materials illustrate the drastic reduction of scrap material thanks to implementing the Rogworx saw station. Visual user interface with standard ‘Auto Fill’ feature makes choosing the job and sheet-cutting order easy to determine. Files are downloadable allowing for minimum waste. Saw station reads WBX file format (Alpine) or EHX file format (MiTek) or CSV files with manipulation. System offers full optimization and sequence panel parts, looking ahead through the job based on your specification. The cutting chamber automatically switches from rip to cross-cutting. All this in a 100-square-foot footprint, approximately 25′ long x 4′ deep, so it can fit within existing facilities. Includes advanced dust collection.

Pricing upon request FOB MN

Serving the Structural Building Components Industry

765-751-9990 Read/Subscribe online at www.componentadvertiser.com

www.woodtechsystems.com FAX: 800-524-4982


A

Th e

Component Manufacturing dverti$ dverti $ er

Don’t Forget! You Saw it in the

Adverti$$er

November 2026 #18328 Page #70

Factory Simulation Helps Catch Costly Errors Before the First Component is Built By Darren Hamar, 4Ward Solutions Group Offsite Industrial Engineer

S

ilence. It’s one of the worst things a factory owner can hear Monday morning. Instead of the air compressors humming to life, saws calibrating, and forklift back-up alerts echoing throughout the floor, the only thing felt is the deafening reality of a stalled line.

If you’ve owned a factory long enough, you’ll know that one layout decision misstep can cost more than lost downtime and revenue. It can mean missed deadlines, tense client relationships, expensive fixes, or worse. This is exactly what happened with an offsite manufacturer client I worked with recently. While we already had a 3D model in place, they chose to place a new saw without testing it in the model. During a call with them about another project, they mentioned this new saw. I opened their model and told them the column should have to move 2’ to the left for them to get access to the saw motor. They said that’s exactly what happened, and in the 30 seconds it took me to see that, they could’ve saved thousands in lost production and down time trying to move the column instead of planning for it in the beginning. These types of mistakes are more common than we like to admit, no matter how experienced we are (or aren’t). It’s an example of what can happen when capable, intelligent leaders simply aren’t used to leveraging the new technology. Long established as a powerful tool in aerospace and automotive manufacturing, virtual simulation is now available to offsite manufacturing through 4Ward Factory. This innovation modernizes offsite construction plant design, workflow, and throughput.

From Static to Moving Factory The biggest difference between a blueprint, 3D model, and simulation is movement. For decades, the standard has been to use two-dimensional AutoCAD drawings and blueprints when making layout decisions. Blueprints and even 3D models are static. With a 3D model, you can look at it, spin it around, and walk through it, but the factory operation itself isn’t in motion. While these are essential to facility design, they often fail to communicate how a factory will really operate. In contrast, consider simulation like a cartoon. It’s a working operating model where you can watch a piece of lumber as it moves through your specific factory in timed steps as a truss is manufactured. For new facilities, 4Ward provides 3D modeling and simulation for truss manufacturing plants, wall panel operations, and modular construction factories by developing detailed digital models from architectural drawings and planned equipment specifications. For existing factories, a field team member goes on-site to capture the operation with a 3D camera and takes targeted measurements. From there, a working model is created with the building and equipment to scale. This 3D modeling as the first step is invaluable regardless of whether it’s a greenfield or brownfield environment. Continued next page

PHONE: 800-289-5627

Read/Subscribe online at www.componentadvertiser.com

FAX: 800-524-4982


A

Th e

Component Manufacturing dverti$ dverti $ er

Don’t Forget! You Saw it in the

For structural component plants and volumetric modular factories, adding simulation to the 3D model creates a smarter way to visualize workflow improvement. By evaluating changes in equipment placement, staffing, material flow, and production sequencing, manufacturers can identify bottlenecks, test alternative operating scenarios, and better understand how decisions in one area of the factory impact the entire production process.

Adverti$$er

November 2026 #18328 Page #71

Simulation of a truss manufacturing facility: watch it in motion online.

For example, if you add an extra saw to your plant, now you’re creating more wood. Will you need an extra person to run the wood out to the tables? Using simulation allows you to play around with variables so you can accommodate efficiency changes across every step in your process.

Get Easier Buy-In from Investor to Workforce Traditional 2D modeling creates a communication barrier for the majority of people in charge of making these decisions because visualizing a 3D real-world environment doesn’t come naturally to most people. This limitation creates uncertainty between investors, business owners, and operational leaders who need to understand how equipment, materials, and production processes interact so they can make well-informed decisions. Simulation closes the gap between imagining what’s possible and being able to see what’s possible as if you were in the factory watching the workflow run. This is useful for owners who want to use it as part of their grant applications and marketing media to attract and train new hires, investor and lender presentations for new plants or repurposed factories, testing layouts, equipment and staffing changes, or planning greenfield and brownfield facilities before construction begins. As 4Ward Solutions Group CEO Ben Hershey states, “That often means investing in equipment or technology, modifying the workforce, and then introducing these changes into new or existing workflows. Simulation gives owners and operators an unparalleled opportunity to evaluate factory layouts, workflows, and equipment placement scenarios before decisions are made.” To get a simulation of your future or existing plant, the process starts with a discovery call with the 4Ward team. From there, a scoped proposal is presented that includes a 3D model as the foundation. Variables such as time studies are added depending on the goal of the simulation, and pricing varies. Watch an example of a truss plant simulation and contact us to schedule a demo and learn more.

PHONE: 800-289-5627

Read/Subscribe online at www.componentadvertiser.com

FAX: 800-524-4982


Design and build faster than ever. From plans, to walls, to panels, and everything Learn more at EagleMetal.com

above. Introducing a new level of design tools, built from the ground up.


A

Th e

Component Manufacturing dverti$ dverti $ er

Don’t Forget! You Saw it in the

Adverti$$er

November 2026 #18328 Page #73

New Monet DeSawyer 2000 Component Saw

! W

NE $355,000 Location: MO

New, Monet DeSawyer 2000, computerized, five-bladed component saw, sets up in 15 to 17 seconds, can run in manual mode, downloads projects from a network or manually using display screen controls. Features all powered movements, cuts from 15" 90/90 cuts to 20 foot length, 2 x 3" to 2 x 12" lumber depths and internal brakes are standard. Options include enhanced servo controls featuring autocalibration, catcher's display and either shaker or belt scrap conveyor and incline. 440 volt, 3 phase electrical. www.woodtechsystems.com

765-751-9990 PHONE: 800-289-5627

Read/Subscribe online at www.componentadvertiser.com

FAX: 800-524-4982


Feed Any Saw With a Lumber PickLine Dense Lumber Storage SmartConveyor Use Existing Truck and Forklift Paths

Picking Lumber

Picking lumber

The Ingeniously Simple Enventek Lumber PickLine

SmartConveyor

Accelerate Sawing ROI - Feed The Beast!

Upgrade ANY Saw with a Lumber PickLine: Enventek RetroC MiTek Blade Alpine ALS Monet DeRobo…and More!

SmartConveyor

Improve Truss Build Quality and Efficiency

Reclaim Saw Idle Time Increase Saw Output (416) 888-4457

Reduce ForkLift Operating Costs Maximize Yard Space

Edmond.Lim@LimTekSolutions.com

www.LimTekSolutions.com

No More Mini Batches Cull Lumber Out at the PickLine Collate Cut Lumber at the Saw F1 Pit Stop Truss Building

6021 Yonge St, Unit 1019 Toronto, ON, M2M 3W2


A

Th e

Component Manufacturing dverti$ dverti $ er

Don’t Forget! You Saw it in the

November 2026 #18328 Page #75

Adverti$$er

NEW!

2023 Alpine FloorMaster Floor Truss Table

2023 Alpine FloorMaster, side-eject, trackless floor truss gantry model 759J, builds trusses from 12″ to 24″ depth and up to 40′ in length, this machine features power flip from “A” side to “B” side and eject of finish floor truss with pneumatic skate-wheel ejectors. Includes ontable splice option, built-in fixed camber, plate pockets for easy access to connector plates, 24” dia. Gantry roller with dual-safety bars. air clamping, dual 6′ park areas, and 10 HP drive. 480v, 30 Amp, 3 phase electrical required.

New Monet 5-head, floor truss web saw, cuts 4-angle, 4×2 floor truss webs from 13 inches and 90-90 blocks from 7 inches, to 4 foot long maximum length. Features 10-board magazine feed, powered, fixedquadrant angulation, manual carriage standard, scrap conveyor and cut-off blade. Options available for longer carriage length, incline scrap conveyor, and choice of shaker or belt scrap conveyor. 440 volt, 3 phase, 60 Amp electrical. 50 PSI air at 5 CFM required.

765-751-9990

765-751-9990

177,990 FOB TX

www.woodtechsystems.com

Equipment Wanted! Saws

Trucks & Trailers

• Automated Component & Linear Saws (2010 & Newer) • Monet DeSauw or TimberMill Manual Component Saws • Floor Web Saws • Spida (Apollo) Saws with Truss Automation • Bunk Cutters

Modular Equipment

Truss Equipment • Roller Gantry & Hydraulic Press Systems • Finish Rollers • Truss Stackers • Floor Truss Machines • Lumber Splicers • Jack Tables • C-Clamp Presses

$83,000 FOB MO www.woodtechsystems.com

Pricteion! c Redu

• Stretch Roll-Off Trailers • Gooseneck Roll-Off Trailers • Pacific Automation or MiTek Mobile Home Press

Contact Wasserman & Associates for a Fair Market Value Assessment of your Used Equipment Operational, Needs Work, and Parts Only equipment will be considered!

800-382-0329 | www.wasserman-associates.com PHONE: 800-289-5627

New Monet FWA 500 Floor Web Saw

• 10 Each - Standard 20 Ton Track Mounted Heads with 10" x 10" Platens (refurbished in 2011) • 6 Each - 2011 Double 40 Ton Track Mounted Heads with 10" x 15" Platens • 2 Each - 2021 Double 40 Ton Track Mounted Heads with 10" x 15" Platens • 2 Each - 10 HP Two Stage Hydraulic Systems with Controls (230 Volt / 3 Phase) • Track System for 55' Scissor & Flat Bottom Trusses • 1 E a c h - P e a k H e a d Tr a c k (perpendicular to base line)

Clark Industries Multi-Head Roof Truss Pressing System • 2 Each - Movable Bottom Chord Tracks (to adjust for pitch) • 8 Each - Floating Tracks for Top Chord Head • Clamping Package: Peak, End Stop, Camber Stops & Air Clamps • Air & Hydraulic Manifolds with Quick Connectors for Heads • Pneumatic Pop-Up Skatewheel Ejectors (for truss removal) • 56' Powered Transfer Roller with Stands • 26 Each - 14' Powered & Idle Exiting Rollers with Stands

$89,900 NOW $59,900 FOB AR

800-382-0329 | www.wasserman-associates.com

Read/Subscribe online at www.componentadvertiser.com

FAX: 800-524-4982


A

Th e

Component Manufacturing dverti$ dverti $ er

Don’t Forget! You Saw it in the

November 2026 #18328 Page #76

Adverti$$er

189′ Side-Eject Klaisler Tracked Gantry (A)

189′ Side-Eject Klaisler tracked gantry system features (29) continuous top, 3/4″ steel tables, to make a 189′ build surface. Includes (2) klaisler gantry roller heads, (29) ejectors, (27) transfer rollers, and (65) powered conveyor rollers. Also includes a Klaisler finish roller press vwith (2) 5 HP motors. Gantry heads are 230/460v and 208/230/460v 3 phase power. FRP is 208-230/460v, 3 phase power.

$263,995 FOB CA 765-751-9990 PHONE: 800-289-5627

www.woodtechsystems.com Read/Subscribe online at www.componentadvertiser.com

FAX: 800-524-4982


A

Th e

Component Manufacturing dverti$ dverti $ er

Don’t Forget! You Saw it in the

Adverti$$er

November 2026 #18328 Page #77

800-382-0329 Pricteion! c Redu

2005 Pacific Automation Roof Gantry 14RT with Wizard Jigging • • • • • • •

14’ x 24” Diameter Gantry Roller (Model 14RT) 7 1/2 HP Motor (208 Volt / 3 Phase) 14’ x 64’ Steel Slotted Top Table with End Eject Rollers (Raised Track) Park Section and Uplift Ramp Section Wizard (GEN 1) Automated Jigging (32 Rails) Add $40,000 2005 Pacific Automation 14’ Finish Roller Prices are in US Dollars

$250,000 NOW $213,750 FOB Alberta Canada www.wasserman-associates.com PHONE: 800-289-5627

Read/Subscribe online at www.componentadvertiser.com

FAX: 800-524-4982


Software That Brings Machine, Operator and Output Together Designed, developed, tested and supported in-house, Spida software connects equipment, operators and production data to help your plant run with greater visibility, reliability and control.

From Job Data to Factory Flow In modern frame and truss manufacturing, performance depends on more than steel, motors and mechanics. Software plays a critical role in how jobs are loaded, equipment is set up, operators interact with machinery and production keeps moving. At Spida, software is built into the machinery experience from the start.

TandemOne brings key functions together in one suite of software, helping your team move from job data to machine setup, cutting, assembly and reporting more quickly, accurately and confidently.

JOB HANDLING

TRUSS ASSEMBLY

BATCHING

REPORTING

CUTTING

DIAGNOSTICS

FRAME ASSEMBLY

Software Built Around Production – Designed for Real Factory Use

E sales@spida.com

T +1 866 647 7771

spida.com


A

Th e

Component Manufacturing dverti$ dverti $ er

Don’t Forget! You Saw it in the

Adverti$$er

November 2026 #18328 Page #79

2022 Wescana Finish Roller Press

Wescana WFR16, 16-ft final roller with 24″ diameter rollers. Twin 5 HP drive systems (10 HP total), with dual safety bars and dual e-stop buttons. 460V, 14A, 3-phase electrical required.

$54,995 FOB MT

www.woodtechsystems.com

765-751-9990

TRUSS EQUIPMENT

Building Component Manufacturing Industry

Job Board Turn Key Platform Post and Manage Multiple Jobs and Multiple Candidates New Application Notices and Internal Candidate Messaging Keeps your search confidential Manage on Your Phone or Computer

For Additional Information

twm@Hiring-Zone.com Visit our website: www.Hiring-Zone.com PHONE: 800-289-5627

66′ Side-Eject Tracked TeeLok Roof Truss Gantry 66′ x 14′ side-eject, tracked roof truss line includes one gantry head with 18″ diameter roller gantry powered 7.5 HP motor and gantry rail. Features continuous top steel, slotted tables Also includes (2) 8′ park stations and ejectors every 6′. Transfer rollers are included, but conveyor roller and finish roller press are not included. Will be taken out of commission and ready to ship December 2026. 240v, 3 phase power. $68,990 FOB GA Wood Tech Systems 765-751-9990 www.woodtechsystems.com Read/Subscribe online at www.componentadvertiser.com

FAX: 800-524-4982


THE MOST

TRUSSED NAME IN LUMBER

Why do so many manufacturers rely on West Fraser for mechanically graded lumber? With over 30 North American mills, 14 of which produce MSR, we run a highly dependable supply chain in both SYP and SPF. Our ability to identify higher grade lumber imparts predictable strength and consistency to high-performing trusses and other products. Why not let our high production standards support yours?

Truss us – we won’t let you down.

STRENGTHINLUMBER.COM


A

Th e

Component Manufacturing dverti$ dverti $ er

Don’t Forget! You Saw it in the

Adverti$$er

November 2026 #18328 Page #81

“The Goal” – Solving Bottlenecks

I

n 1984, I read a book called “The Goal” by Goldratt & Cox; the theory of constraints articulated in the book was formative in my thinking as an Industrial Engineer. I was surprised to learn that my son’s co-op employer gave it to him as required reading a couple of years ago as he was completing his Mechanical Engineering Technologist designation. This caused me to re-read it and appreciate again its timeless approach on improving any process.

By Gerhard (Garry) Roehr, P.Eng.

The “AHA” moment in the book occurs when a scout troop led by the protagonist Alex Rogo, who is the father of one of the boys, sets out on their first day trek. It rapidly becomes apparent that they will not make camp by nightfall. Alex observes that the line of hikers is constantly stretching out with the fastest boys at the front waiting for the boys at the back to catch up. His solution is to re-arrange the boys by placing the slowest at the front. As they resume their hike, the bottleneck is no longer out of sight and becomes everyone’s focus. They then work on solving the problem and soon the contents of the slowest boy’s backpack are redistributed which speeds up the pace of the whole group. Like a fast hiker leaving the rest of the group behind, creating more space between hikers, we find that the framing station on the wall panel line creates framed walls waiting for their turn at the sheathing station. I have been to several factories that have told me they are short of space because they need lots of room for the work in process in front of the sheathing station. They want to make sure that their framers do not have to wait for the sheathing station and lose productivity, but in the end, they still wait when the conveyor between stations fills up. When we speed up the sheathing station and make it faster than the framing station, the work in process disappears, the whole line speeds up, and we need less space between stations. When automation eliminates shiners and rework, the need for a separate inspection station disappears as well. Now the extra factory space can be used for other things that generate sales and margin dollars. The first step in automating a pre-fab factory is usually buying a saw to cut and mark components. This makes good sense as good quality at the start of the operation affects everything that follows. The next step should be to automate the sheathing station. We have designed our HyperLeap and ForwardLeap Sheathing Stations to solve this age-old constraint and speed up the entire process. Reach out anytime to share stories of solving bottlenecks and discussing how we can help. PHONE: 800-289-5627

Read/Subscribe online at www.componentadvertiser.com

FAX: 800-524-4982


A

Th e

Component Manufacturing dverti$ dverti $ er

Don’t Forget! You Saw it in the

Adverti$$er

November 2026 #18328 Page #82

2007 120′ Mitek Side Eject Trackless Gantry System Overall length 139′, working length 120′. This system features (15) 6′ 3″ x 14′ slotted steel top tables, (14) ejectors, (2) 24″ diameter gantry heads with safety bars and laser proximity sensors, and 10 hp motors, and (2) park stations. Also includes transfer rollers, (38) powered roller conveyors and (32) idler conveyors. Also includes a 2007 MiTek finish roller press with a 16′ 4″ throat and 24″ diameter rollers and 10hp motors.. 480v, 3 phase power.

$335,995 FOB TN www.woodtechsystems.com

765-751-9990 PHONE: 800-289-5627

Read/Subscribe online at www.componentadvertiser.com

FAX: 800-524-4982


A

Th e

Component Manufacturing dverti$ dverti $ er

Don’t Forget! You Saw it in the

Adverti$$er

November 2026 #18328 Page #83

TRUSS EQUIPMENT

Pricteion! c e R du

Pricteion! c e R du Baumeister Lumber Splicer • Vertical Hydraulic Press with 3"x 12" Platen Size • 2x3 and 2x4 Lumber Material (3" x 10" maximum plate size) • Magnetic Platens to hold plates in the correct position • Working Pressure: 1600 PSI • Dual press cycle activation for safety • 208, 240 or 480 Volt / 3 Phase (10 HP) • Video available upon request • Excludes: Infeed/Outfeed Roller Conveyor • Optional 2x6 Capacity (up to 16" long plate) Splicer is available $29,000 NOW $26,950 FOB PA Wasserman & Associates 800-382-0329 www.wasserman-associates.com

Hydro-Air / MiTek Pedestal Clamp System & Transfer Cart Hydro-Air model 6 and MiTek Mono Press heads with (21) magnetic pedestals and 14′ x 40-ft long steel floor plate. Includes boom sub-assemblies and hydraulic reservoirs for each clamp. Also includes all spare parts and one large transfer cart. 230 volt, 3-phase electrical required. $17,990 FOB NH Wood Tech Systems 765-751-9990 www.woodtechsystems.com

A

Th e

Component Manufacturing dverti$er

Commercial Machinery Fabricators 12' Finish Roller • 12’ Long x 18” Diameter Rollers • Front and Rear Safety Bars • Adjustable Roller Height (1 1/2” and 3 1/2”) $14,900 NOW $12,900 FOB IA Wasserman & Associates 800-382-0329 www.wasserman-associates.com

EMSI Field Repair Press EMSI 10 Ton Field Repair Truss Press System. Complete with: 1/2 HP, 115 Volt, 50/60 Cycle Universal Motor – Operates at voltage as low as 60 volts. 10,000 PSI Portable Power Pack with Two Speed Operation – 200 cu in/min @ 0–200 psi, 20 cu in/min @ 200–10,000 psi and Externally Adjustable Relief Valve (unit weight 55 lbs.). C-Clamp Assembly with 8" Maximum Reach, 4" x 5" Pressing Platen (optional platen available for 4” x 2”). Independent 10 Ton Hydraulic Cylinder. 10’ Hydraulic Hose Assembly with Quick Disconnect Coupling. Handle with 24 Volt Remote Electrical Pendant. Call for Price Eide Machinery Sales, Inc. 612-521-9193 www.eidemachinery.com

Pricteion! c Redu

PHONE: 800-289-5627

End-eject floor machine with floor finish roller press, 40-ft working length, builds 12″ to 24″ deep 4×2 floor trusses. Clamping is ontable air cylinders with toggle controls. Includes idler roll leading to floor finish press. Gantry press head has a 7 HP drive motor. Includes electrical panel and inverter installed in 2024. Needs safety bar repairs. Model RF2300. Made in the Czech Republic. Floor finish press, 12″ diameter rolls, 5 HP motor.

765-751-9990

$51,997 FOB NH

www.woodtechsystems.com

“Serving the Component Industry Since 1996”

Now offering short term Working Capital Loans

Serving the Structural Building Components Industry

Like Money in the Bank. Service you can count on!

2002 Krepl-Stroj End-eject Floor Truss Machine

1977 Joos Stand-alone Hydraulic Press 1977 Joos stand-alone hydraulic press, model HP-150, platen is 10-ft wide x 5-ft deep x 2-ft high. Used by seller to press RV trusses. 240 volt, 3 phase, 80 Amp electrical required. $9,995 NOW $8,499 FOB OR Wood Tech Systems 765-751-9990 www.woodtechsystems.com

Start smarter... Grow faster... Achieve more... Keep More of Your CASH Eliminate Yearly Financial Reporting

Low Fees Fixed Payment Programs No Additional Collateral

cvillella@acceptlease.com | www.acceptlease.com 894 Beaver Grade Road, Suite #304 - Moon Township, PA. 15108

Phone: 412-262-3225 Fax: 412-262-1154

Read/Subscribe online at www.componentadvertiser.com

FAX: 800-524-4982


MAXIMIZE

ACCURACY, SAFETY, & PRODUCTIVITY INTRODUCING THE SPLICEMASTER 12... ...an innovative approach to producing longer truss members with enhanced strength and reliability.

• Unmatched Accuracy • Superior Safety • Maximized Productivity To learn more about the SpliceMaster 12, scan this code!

Visit www.wasserman-associates.com or call 402.761.2421 for more information! 2341 Shepard Road, Milford, NE 68405 PHONE 402.761.2421 | TOLL-FREE 800.382.0329 WWW.WASSERMAN-ASSOCIATES.COM

MANUFACTURED BY

Continued next page


A

Th e

Component Manufacturing dverti$ dverti $ er

Don’t Forget! You Saw it in the

November 2026 #18328 Page #85

Adverti$$er

NEW! $92,400 FOB MT

TruStance Pedestal Jig System The TruStance Pedestal Jig System was developed to solve the problems associated with pedestal jig systems, while retaining and enhancing all the advantages. The system features track mounted pedestals with a track and lockdown design, movable pedestals, and a roller lift assembly. The pedestal tops are 30″ above the floor, creating a comfortable working height. The ability to configure the system in a very small footprint makes it ideal for any size truss plant. It is designed to use with a ‘C-clamp’ type press. With the ability to install the interchangeable crossmembers and angle iron stops on both track mounted and movable pedestals, the system can be configured to meet the needs of even the most complicated truss designs. Movable pedestals can be moved and locked down efficiently; the 4″ thick steel base provides the weight needed to keep them in position. Bottom chord pedestals are installed on the steel track mounted to the floor. Pedestals are easy to move and rigidly lock into place with threaded rod locks. The optional air activated roller lift assembly raises the truss above the jig to be easily ejected. Its versatile design allows it to be configured for any set-up. TruStance recommends a (16) pedestal system for roof trusses to 60-ft in span. 120 volt, 1 phase, 20 Amp electrical required. 50 PSI air required.

www.woodtechsystems.com

765-751-9990 PHONE: 800-289-5627

Read/Subscribe online at www.componentadvertiser.com

FAX: 800-524-4982


A

Th e

Component Manufacturing dverti$ dverti $ er

Don’t Forget! You Saw it in the

November 2026 #18328 Page #87

Adverti$$er

TRUSS EQUIPMENT

Pricteion! c Redu

New Replacement 14' x 24" Roll for Finish Roller • 14' Long x 24" Diameter Roll • .0969" Wall Thickness • 3 7/16" Shaft (keyed at each end) • Taper Lock Bushings to Secure the Shaft (no welding & easy to replace) $15,900 FOB PA Wasserman & Associates 800-382-0329 www.wasserman-associates.com

A

The

Component Manufacturing dverti$er

Serving the Structurval Building Components Industry

C-clamp system with strut table, 48-ft maximum span, 14-ft maximum height trusses. Includes 48-ft of stand-alone strut frames, (3) complete boom sub-assemblies with hydraulic fluid reservoirs, (1) boom sub-assembly for parts, (1) ’07 MiTek TK8 clamp with 8″ throat, (1) ’12 MiTek TK6 clamp with 6″ throat, (2) ’23 Eagle TP-300 clamps, and one Eagle clamp for parts. Includes any available spare motors, strut / strut extenders and hardware. Decommissioned January 2025. The MiTek presses are 110 volt, 1-phase. The Eagle presses are 220 volt, 1-phase. $37,997 NOW $24,994 FOB TN Wood Tech Systems 765-751-9990 www.woodtechsystems.com

Pricteion! c Redu New Baumeister DuraPress 14' Finish Roller

NEW!

• 24” Diameter x 14’ Long Rollers (custom lengths available) • Removable Shaft Replacement in Rolls • Simplified Roll Height Adjustment

• • • •

10 HP Motor with Soft Start VFD 230-480 Volt / 3 Phase Front & Rear Emergency Shut Off Bar Integrated E-Stop System with Interlock

$94,000 NOW $84,950 FOB PA 800-382-0329 | www.wasserman-associates.com

NEW! $122,500 FOB TX

NEW IDLE & POWERED 14' TRUSS CONVEYOR (AZ)

Pacific Automation Auto-8 Press & Table • Reconditioned in May 2025 • 50 Ton Hydraulic Press with 24" x 96" Platen • 8' x 40' Table with J-Slot & Plastic Top • Roof Truss Jig Hardware • 480 Volt / 3 Phase - 15 HP Motor • Video available upon request

800-382-0329 | www.wasserman-associates.com PHONE: 800-289-5627

• 14' Long x 4" or 5" (Inside Diameter) Schedule 40 Pipe • Tube Steel Stands (7" Height Adjustment - Height to be Specified) • 4 Bolt Flange Bearings • Idle and Motorized Rollers • 1/4 HP Motors (240/480 Volt-3 Phase) with Controls • 1" and 1 1/4" Cold Rolled 24" Shafts Baffled • 6 to 8 Week Delivery

800-382-0329 | www.wasserman-associates.com

Read/Subscribe online at www.componentadvertiser.com

FAX: 800-524-4982


A

Th e

Component Manufacturing dverti$ dverti $ er

Don’t Forget! You Saw it in the

Adverti$$er

November 2026 #18328 Page #89

The Strategic Advantage of Payment Deferrals for Equipment Purchases Carl Villella, CLFP President, Acceptance Leasing & Financing Service

A

s the fourth quarter unfolds, component manufacturers and industrial operators face a critical strategic window. Balancing year-end tax planning with ongoing liquidity requirements is a delicate undertaking. For businesses looking to expand production capacity or replace aging machinery right now, timing is everything. Implementing a six-month payment deferral structure for equipment acquired in Q4 delivers a powerful combination of immediate tax optimization and preserved working capital.

Capturing Year-End Tax Advantages Without Cash Drain A primary driver of Q4 capital expenditure is tax strategy. Under current federal tax provisions, including Section 179 and bonus depreciation, businesses can deduct the full purchase price of eligible equipment in the tax year it is placed in service. Crucially, IRS eligibility is determined by the in-service date — meaning the equipment must be delivered, installed, and operational by December 31 — rather than when the first payment is made. By pairing a fourth-quarter equipment acquisition with a six-month payment deferral, a company achieves a unique financial synergy. The business secures the entire tax deduction for the current fiscal year, significantly lowering its year-end tax liability, while keeping cash reserves fully intact inside the organization.

Bridging the Productivity and Revenue Gap Heavy commercial component manufacturing equipment rarely generates profit on day one. Delivery, mechanical integration into existing production lines, calibration, and operator training take time. Furthermore, the fourth quarter often brings scheduled operational disruptions, including holiday shutdowns, annual inventory counts, and winter weather slowdowns. Continued next page

PHONE: 800-289-5627

Read/Subscribe online at www.componentadvertiser.com

FAX: 800-524-4982


A

Th e

Component Manufacturing dverti$ dverti $ er

Don’t Forget! You Saw it in the

Adverti$$er

November 2026 #18328 Page #90

A six-month payment deferral serves as a vital bridge across this onboarding phase. Because monthly debt service does not kick in until spring, the equipment has ample runway to become fully operational and generate revenue. The machinery effectively pays for its own financing through improved output and efficiency long before the organization writes its first check. This eliminates the cash-flow squeeze commonly felt when integrating high-value capital assets.

Protecting Working Capital Through Seasonal Transitions For many commercial enterprises, the winter months following the fourth quarter represent a seasonal dip in cash flow. Construction activity tempers, component shipments adjust, and customer receivables can experience temporary winter delays. Draining liquid capital in December to satisfy immediate equipment installments leaves a balance sheet vulnerable to unexpected winter operational costs. A six-month deferral safeguards cash reserves through this cycle. Working capital remains available to fund raw material purchases, cover payroll, and handle fluctuating utility expenses without stress.

Maximizing Return on Investment Every capital expenditure must be measured by its return on investment. Delaying payments for six months fundamentally improves the math of capital acquisition. By eliminating immediate cash outlays during the fourth quarter and postponing debt service, the net present value of the investment increases. Fourth-quarter equipment purchases should be a catalyst for growth, not a drain on liquidity. Leveraging a six-month payment deferral lets component businesses maximize year-end tax benefits, navigate seasonal shifts, and protect cash reserves while positioning for strong profitable output in the coming year. Whether you finance or lease your next purchase, Acceptance Leasing and Financing can help. We were established in 1992, which puts us in our 34th year of business. We pride ourselves on our Certified Leasing and Financing Professional designation. We are a member of SBCA and a frequent attendee of the BCMC tradeshows. We can provide financing for any new and, regardless of age, used equipment. We invite you to call us at 412 262-3225 to discuss your next big project. We make financing or leasing easy with no financial statements required up to $350,000 if qualified!

PHONE: 800-289-5627

Read/Subscribe online at www.componentadvertiser.com

FAX: 800-524-4982


Speed Dolly

You(D

Fastest

See it on: YouTube.com/user/TriadMachines

Lead Times in The Industry! The Speed Dolly is our fastest and easiest-touse tool dolly - EVER. No lifting by the operator! Push Button-activated air cylinders engage the tool, detect the wall panel thickness and fire the sequence of nails & spacing that you choose. • Handles 2x4 through 2x8 wall panels • Down clamp to hold plate and stud in place during nailing • Down clamp also senses wall panel thickness • Down clamp pointer provides easy & precise nail placement into the studs • Easy “Set it and Forget it” nail spacing configuration • You choose the number of nails in each size of stud

The Speed Dolly can be retrofit to your existing Triad Framing Tables* * 2018 or newer - Diamond Quad, Generation 3, or PreStage Tables - call for details!

• Wall lengths up to 80' • Wall height range from 6' 9" to 12' 3" • Several Tool Dolly, Sheathing Bridge & Router Bridge options

Triad Machines

800-568-7423 ext. 126 www.TriadMachines.com


A

Th e

Component Manufacturing dverti$ dverti $ er

Don’t Forget! You Saw it in the

Adverti$$er

November 2026 #18328 Page #92

800-382-0329

2006 Pacific Automation Roof Gantry 14RT with Wizard Jigging

Pricteion! c Redu

$280,000 NOW $240,000 FOB AB • • • • • • • •

14' x 24" Diameter Gantry Roller (Model 14RT) 7 1/2 HP Motor (208 Volt / 3 Phase) 14' x 72' Steel Slotted Top Table with Side Eject Skatewheel Ejectors (Raised Track) (2) 5'-6" Park Sections Wizard (GEN 1 and GEN 2) Automated Jigging (36 Rails) with Computer/Cabinet Excludes: Exiting Truss Conveyor/Receivers and Finish Roller Add $40,000 for Used Pacific Automation Finish Roller Prices are in US Dollars

www.wasserman-associates.com PHONE: 800-289-5627

Read/Subscribe online at www.componentadvertiser.com

FAX: 800-524-4982


A

Th e

Component Manufacturing dverti$ dverti $ er

Don’t Forget! You Saw it in the

November 2026 #18328 Page #93

Adverti$$er

TRUSS EQUIPMENT

Used Pacific Floor Gantry Press System (1) 40’ Floor Gantry | Built In End Ejectors & Conveyors | (2) QTY park stations | (1) QTY elevated for end eject Call For Pricing Eide Machinery Sales, Inc. 612-521-9193 www.eidemachinery.com

Used Pacific AutoPress 16 RT (1) AutoPress 16RT high speed Hydraulic Gantry with 14' X 30" Press Platen | (11) 1” Steel J-Slot Steel/Plastic Top Table sets 8’ wide X 16' | (28) WizardPDS® ChannelS® spaced 24” o/c. | (11) Pneumatic Rack & Pinion End Eject Lifters for end ejection of truss. | (1) Zone control air system for truss ejectors. | 88’ Overhead power supply to Gantry. | Recessed Raised 85# Floor Track. | Wired for 480 Volt X 3 Phase Operation. Call For Pricing Eide Machinery Sales, Inc. 612-521-9193 www.eidemachinery.com

Used - Pacific AutoPress 14 LT AutoPress 14LT high speed Hydraulic Gantry with 14' X 24" Press Platen| 2017 (7) WizardPDS® Ready 1” Steel Slotted Top Table sets 8’ wide X 14' | 2017 (28) WizardPDS® assemblies spaced 24” o/c, complete.| 2017 (7) Pneumatic Rack & Pinion End Eject Lifters for end ejection of truss, positioned between table sets.| (1) Zone control air system for truss ejectors. | 56’ Overhead power supply to Gantry. | 85# RR Floor Track | Gantry Park stations. | Wired for 480 Volt X 3 Phase Operation Call For Pricing Eide Machinery Sales, Inc. 612-521-9193 www.eidemachinery.com

Used - Pacific Automation 60 foot Peak Up Stacker Set of (7) lift arms with indexing heads. | Adjustable pop-up platform / single target for triggering stacking cycle. | Powered truss conveyor as shown. | Control panel with auto and manual stacking mode. | Machine wired for 480 Volt / 3 phase operation Call For Pricing Eide Machinery Sales, Inc. 612-521-9193 www.eidemachinery.com

Used - Pacific AR16 Finish Press Complete the plate embedment process in roof and/or floor trusses with the Pacific Automation Auto Roll 16 Finish Press System. | (1) Pacific Automation Auto Roll Finish Press Call For Pricing Eide Machinery Sales, Inc. 612-521-9193 www.eidemachinery.com

Used Tee-Lok Roof Press (1) TOF Tee-Lok Roof Gantry | (8) 72” Slotted steel top tables | 62’ & 85# RR track with anchor plates | Side Eject | Machine wired for 480 Volt / 3 phase operation Call For Pricing Eide Machinery Sales, Inc. 612-521-9193 www.eidemachinery.com

M ACdverti$er

Th e

omponent

anufacturing

Tee-Lok 14' x 120' Roller Gantry System • 2 Each - Tee-Lok 14' x 18" Diameter Gantry Rollers with Ride Platform • Gantry Floor Rail with Table Support • 15 Each - Tee-Lok 8' x 14' Drilled & Tapped Steel Top Tables (stored outside) • Roof Truss Jig Hardware • Skatewheel Ejectors (between tables) • Skatewheel Receivers (between truss rollers) • Tee-Lok 14' x 24" Diameter Finish Roller (stored outside) • Excludes Inside & Outside Truss Rollers • Available Early May • Video available upon request

$98,880 NOW $82,500 FOB NC

800-382-0329 | www.wasserman-associates.com TRUSS EQUIPMENT

Used Tee-Lok Roof Press With WizardPDS (1) TOF Tee-Lok Roof Gantry | (7) 72” Slotted steel top tables | 55' of table with 45’ of WizardPDS® Gen 1 Tables | 62’ & 85# RR track with anchor plates | Side Eject | Machine wired for 480 Volt / 3 phase operation - Transformers available for voltage changes. Call For Pricing Eide Machinery Sales, Inc. 612-521-9193 www.eidemachinery.com

Used Tee-Lok Finish Press (1) Tee-Lok Finish Press | Standard roller size: 24” | Controls: Forward / Reverse / E-Stop Button / Safety Shutdown Bars | Shipping weight: 13,000 lb. | Roller length: 14'| Machine wired for 480 Volt / 3 phase operation. Call For Pricing Eide Machinery Sales, Inc. 612-521-9193 www.eidemachinery.com

Serving the Structural Building Components Industry

PHONE: 800-289-5627

Read/Subscribe online at www.componentadvertiser.com

FAX: 800-524-4982


The Industry-Leading Manufacturer of Wall Panel and Floor Cassette Systems. CALL US TODAY AT 1-866-726-7587 WWW.PANPLUS.COM

LASER PROJECTION READY FRAMING STATION Efficiently built walls with a consistent approach is exactly what you get with a Panels Plus Laser Projection Ready Framing Station. Our Laser Projection Ready Framing Station can be stand alone or integrated into a larger system, custom sizes and configurations available. Designed to frame wall panels from lumber that is 2 x 3 all the way up to 2 x 10. The Laser Projection Ready Framing Station offers better visibility for laser projection taking the guess work out of the process, saving you time and money! This system can also be used in conjunction with plate marking saws. Features: • Laser ready table • Indexing nailing carriages • Pop up conveyors • Ergonomic design • Table clamping controls on both ends • 4ft to 12ft-4in wall height and 16ft length Options: • Powered conveyors • Custom lengths available


A

Th e

Component Manufacturing dverti$ dverti $ er

Don’t Forget! You Saw it in the

November 2026 #18328 Page #95

Adverti$$er

2003 Klaisler Roller Gantry System

Pricteion! c Redu

• Klaisler Model GR14• 24 Gantry Roller • Recessed Floor • Mounted Rail • (5) 6' x 14' WEG-IT • Tables with Ejectors • 460 Volt / 3 Phase • Excludes:Inside • Exiting Conveyor, • Finish Roller & Outside • Conveyor • Price in US Dollars

$65,000 NOW $43,900 FOB Newfoundland 800-382-0329 | www.wasserman-associates.com

$139,900 FOB SD

2003 Pacific Automation 14' x 85' AutoPress with Wizard Jigging

• 2003 Pacific Automation AutoPress 14LT (track on floor) • 50 Ton Hydraulic Press with 24" Wide x 1 1/2" Thick Steel Platen • 15 HP Motor (480 Volt / 3 Phase) • 14' x 85' Table (Plastic Top over Steel) with Side Eject Skatewheel Ejectors • (2) Park Sections • Wizard (GEN 2) Automated Jigging (32 Rails) • Spare Set of Bogie Wheels • Excludes: Exiting Truss Conveyor/Receivers and Finish Roller • Video available upon request

800-382-0329 | www.wasserman-associates.com PHONE: 800-289-5627

NEW!

NEW!

New Baumeister PowerPress Truss Table • 24” Diameter x 14’ Long Rollers (custom lengths available) • Removable Shaft Replacement in Rolls • Simplified Roll Height Adjustment

• • • •

10 HP Motor with Soft Start VFD 230-480 Volt / 3 Phase Front & Rear Emergency Shut Off Bar Integrated E-Stop System with Interlock

Call for pricing FOB PA 800-382-0329 | www.wasserman-associates.com

Read/Subscribe online at www.componentadvertiser.com

FAX: 800-524-4982


A

Th e

Component Manufacturing dverti$ dverti $ er

Don’t Forget! You Saw it in the

Adverti$$er

November 2026 #18328 Page #97

2000 118′ Mitek Side Eject Trackless Gantry Line Overall length 140′, working length 118′. This system features (15) 6′ x 14′ slotted steel top tables, (15) ejectors, (2) 24″ diameter gantry heads with 10 hp motors, and (2) park stations. Does not include conveyor or finish roller press. 480v, 3 phase power.

$282,995 FOB TN

www.woodtechsystems.com

765-751-9990 PHONE: 800-289-5627

Read/Subscribe online at www.componentadvertiser.com

FAX: 800-524-4982


A

Th e

Component Manufacturing dverti$ dverti $ er

Don’t Forget! You Saw it in the

Adverti$$er

November 2026 #18328 Page #98

Third Quarter Market Performance By the Lesko Financial Services Team

T

he US economy entered the fourth quarter of the year poised for additional growth but with an air of uncertainty and the remnants of pessimism about jobs, wages, and energy prices. Both global and domestic headwinds remain in place to intensify tensions as political divisions take center stage leading up to the mid-term elections. It’s a non-presidential year that would traditionally not attract outsize attention or exert undue pressure on economic outcomes. But 2026 has so far shown itself to be anything but routine. There are a number of factors in play.

Middle East What leaders and the public hoped would be a quick resolution of the war with Iran has dragged on through a cease-fire into what opponents have dubbed a stalemate. A slow and steady policy of economic pressure and isolation has tightened the grip on Iran’s leaders and slowly eased the flow of oil through the normal shipping channels but not yet enough to reassure investors and bring oil prices down. By early October, average fuel prices remained in the four-five dollar range while diesel hovered near the seven dollar a gallon mark. Energy prices at near historic highs have a ripple effect on consumer and wholesale prices, pushing them higher. This has resulted in a chain reaction among consumers who feel inflationary effects every day. And although wages have ticked up, increases have not been enough to offset worries over what lies ahead. The bottom line is that even when economic growth indicators have been positive, a sense of uncertainty and gloominess has settled into consumer’s collective psyche and could affect buying behavior and political decisions at a critical time for both.

Inflation Prices had been edging up over the summer but inflation accelerated in September, rising 0.06% and bringing the annualized inflation reading to 3.7. Once again, energy costs due to the Iran war were largely responsible. But price pressures moved beyond just energy to include tariffs, the construction of artificial intelligence data centers, and strong consumer demand in categories like travel, economists said. Wall Street had been betting the Federal Reserve would hold interest rates steady, but the spike in prices makes a second possible interest rate hike by the Fed more likely when they meet at the end of the month.

Jobs The labor market has been the source of more mixed signals. A surprisingly robust report in August was followed by disappointing numbers in September along with downward revisions in the previous two months. Companies still seem to be struggling to break free from its “no hire, no fire” rut, but it did show some signs of life. With evidence of widespread layoffs still virtually nonexistent, the unemployment rate fell 4.2% while wage growth cooled to 3.1% year over year by the end of the summer. Continued next page

PHONE: 800-289-5627

Read/Subscribe online at www.componentadvertiser.com

FAX: 800-524-4982


A

Th e

Component Manufacturing dverti$ dverti $ er

Don’t Forget! You Saw it in the

Adverti$$er

November 2026 #18328 Page #99

Federal Reserve New leadership at the helm of the Federal Reserve calmed some of the political tensions that had plagued the Powell tenure. Chair Kevin Warsh and the Federal Open Market Committee held rates steady at Warsh’s first meeting, extending the rate pause through the middle of the year. But disagreement among committee members struck a notably hawkish tone. And faced with sticky inflation, the group unanimously voted a 25-basis point increase in September. The Fed has two more meetings left this year: late October and the second week of December and has tentatively telegraphed two additional rate hikes before 2026 ends.

Growth Projected Despite mixed messages and volatility, the bull market passed the four-year mark. The biggest tech companies have been keeping the stock market humming despite spiraling oil prices and higher interest rates. Big tech has held firm, lifting the Nasdaq composite by 2.5%. The tech-heavy benchmark closed a record high on September 22. The S&P 500 rose 2% in the face of relentless bond selloff. Even though higher yields translate into higher borrowing costs across the economy, investors are betting tech companies will keep borrowing and investing at a breakneck clip to chase skyrocketing demand for AI tools. After GDP growth in the second quarter, the Atlanta Fed’s GDPNow is estimating real gross domestic product (GDP) growth in the third quarter to be about 3.7%.

AI Buildout Artificial intelligence is transitioning from a conceptual future state into a tangible infrastructure phase, as companies build out the critical support systems needed to fully realize its potential. This shift signals a massive wave of upcoming investment into both tech companies and related ecosystems. However, these developments are currently clouded by market speculation, regulatory fears, and political maneuvering, all fueled by the current political climate. One unfortunate result of this blurring between economics and politics is investor confusion. While uncertainty will undoubtedly continue to affect the markets, the entire Lesko Financial team remains committed to helping you navigate the challenges ahead. Recent experience reminds us that volatility – and even uncharted waters – can present unique opportunities when we allow our strategies to be tested and refined. In environments like this, it is critical to stay invested, remain patient, and adhere to a plan tailored to your unique financial position, risk tolerance, and investment timeline. Please do not hesitate to contact us with any questions or to schedule a portfolio review. We wish you a healthy and prosperous autumn ahead, and we thank you for your ongoing confidence and trust.

PHONE: 800-289-5627

Read/Subscribe online at www.componentadvertiser.com

FAX: 800-524-4982


A

Th e

Component Manufacturing dverti$ dverti $ er

Don’t Forget! You Saw it in the

November 2026 #18328 Page #101

Adverti$$er

Pricteion! c Redu

1987 Alpine RAM Roof Gantry Line with 1995 2nd Head

1987 Alpine tracked roof truss gantry with 1995 second gantry press head: 14′ x 151-ft working length system includes (1) 1987 14-ft x 18-inch diameter gantry head with 5 HP motor, (1) 1995 Alpine model 700 RAM Roll-AMaster gantry head, 14-ft x 18-inch diameter roll and 5 HP motor, (21) 14-ft x 67-inch wide tables with slotted steel tops and skatewheel ejectors, (21) receiving arms, (313) feet of crane rail, all available aisle pads & hardware, and electrical bus bar supply. 208 volt, 3 phase, 21.5 Amps electrical required for each press head. Center conveyor and finish press shown in some of the photos are not included.

$211,993 NOW $179,993 FOB NY www.woodtechsystems.com

765-751-9990 PHONE: 800-289-5627

Read/Subscribe online at www.componentadvertiser.com

FAX: 800-524-4982


HUNDEGGER lnnovationen fur den Holzbau

HUNDEGGER

_,...,_,

Hundegger leads the way in automation innovation for the truss component industry. Our advanced CAMBIUM software offers cutting-edge automation and digitalization solutions, revolutionizing operations, boosting productivity, and driving sustainable growth for manufacturers like you.

We go beyond standard mechanization; we champion true

Automation. The Hundegger TD-II isn't just a saw-it's a

REVOLUTIONIZE YOUR TRUSS MANUFACTURING WITH THE HUNDEGGER TD-II

transformative, comprehensive solution designed to streamline your production process. From retrieving lumber to optimizing, nesting, stacking, destacking, sorting, buffering, and precise delivery, our system ensures peak efficiency and productivity, tailored specifically to truss component manufacturing.

Harness the power of data with Hundegger's advanced CAMBIUM TACTICAL software. It meticulously tracks and optimizes your production, ensuring more automated operations and significant productivity gains. We provide state-of-the-art automation and control solutions that set the industry standard. Our focus on industrial automation and robotics positions Hundegger as the leader in enhancing performance and efficiency in truss component manufacturing and beyond. Hundegger products are essential for future-proofing your business. Elevate your productivity and secure your competitive edge with our advanced technologies and automation solutions, meticulously designed to meet the unique demands of component manufacturers today and tomorrow.

Don't get left behind. Invest in the future with true automation from Hundegger and see your business thrive.

om .

.


A

Th e

Component Manufacturing dverti$ dverti $ er

Don’t Forget! You Saw it in the

Adverti$$er

November 2026 #18328 Page #103

We create transformative website and app experiences

Circa 2006 Refurbished (’26) Pacific Automation 16-ft Roof Finish Roller Press Information Here

$52,495 FOB AZ 765-751-9990

www.woodtechsystems.com

Since 2006, we've been helping businesses of all kinds build their online presence. We make websites and software for the construction industry to empower companies to reach a wider customer base and engage their audiences. Companies all around the world work with us to make websites and apps that people actually want to use. Reach out to Wolf X Machina if you're a business and you want a website that actually drives results.

WOLF X MACHINA www.wolfxmachina.com info@wolfxmachina.com

2008 Pacific Automation Roof Gantry 12RT with Wizard Jigging

Click Here

for Information

$156,500 FOB AB 800-382-0329 | www.wasserman-associates.com PHONE: 800-289-5627

Read/Subscribe online at www.componentadvertiser.com

FAX: 800-524-4982


Wasserman & Associates Wall Panel Line Accessories

t w en Ne ipm u Eq

nt ew me N ip u Eq

Wall Panel Lift * 8’- 12’ Wall Height * 1,000 LB Capacity * Easy Adjustment * Hoist and Crane Sold Separate

$1,950.00

Handle Bar Router * 8’ - 12’ Wall Height * 2 Person Operation * 3 ¼ hp Production Router * 120 Volt /1 Phase/15 Amp

$3,000.00

Lay-Up Tables * 10’ x 10’ Working Area * Lift & Extend Rollers * Squaring Lip * Nail Tray $13,900.00

Skate Rollers * 15’ Standard Length * Adjustable Height * Sturdy Stands * Custom Lengths Available

$3,500.00

EST. 1991


A

Th e

Component Manufacturing dverti$ dverti $ er

Don’t Forget! You Saw it in the

Adverti$$er

November 2026 #18328 Page #105

800-382-0329 Reconditioned Mitek RoofGlider Roller Gantry System $199,500 FOB AZ

• • • • • • •

Reconditioned Mitek RoofGlider 14' x 24" Diameter Gantry Roller (Trackless) Ride Platform & Joystick Control 10 Each - Reconditioned 76" Slotted Top Tables with New Skatwheel Ejectors New Roof Truss Jig Hardware 2 Each - New Park Sections Excludes: Powered Transfer Roller, Powered Exiting Conveyor & Outside Conveyor/Stacker (available at additonal cost) Add $47,500 for Reconditioned 14' x 24" Diameter Finish Roller

www.wasserman-associates.com PHONE: 800-289-5627

Read/Subscribe online at www.componentadvertiser.com

FAX: 800-524-4982


A

Th e

Component Manufacturing dverti$ dverti $ er

Don’t Forget! You Saw it in the

Adverti$$er

November 2026 #18328 Page #106

Consider Your Options Before Accepting That Offer Thomas McAnally TheJobLine.com Hiring-Zone.com The Advertiser Automated Builder

Y

ou’ve accepted an offer for a new job. Congratulations! But before you made that decision, how many opportunities did you actually consider? Was it the best opportunity available to you, or simply the first one that met your immediate needs?

These are questions worth asking because changing jobs is one of the most consequential decisions you’ll make in your professional life. Yet many people spend more time comparing vehicles before buying one than they spend evaluating their next employer.

Time Isn’t Always on Your Side If you’re unemployed, the pressure to get back to work is real. Bills don’t stop arriving just because your paycheck does. When an offer comes along that meets your immediate financial needs, accepting it is understandable. But is it the right opportunity? Does the company have a solid reputation? Is management stable? Will the position provide opportunities to grow, or will you find yourself searching again in another year? Are you accepting the offer because it’s a good career move or because it’s the only offer you have? I’m certainly not suggesting that an unemployed candidate should turn down a good offer while waiting for something better that may never materialize. The point is to develop multiple opportunities early in your search, before you’re faced with making a decision. Having two or three legitimate possibilities under consideration can change your perspective. Instead of asking whether you can afford to turn down an offer, you can evaluate which opportunity offers the best combination of immediate income and long-term career potential.

Employed Candidates Often Waste Their Advantage If you’re currently employed, you have something unemployed candidates may not: time. You can explore opportunities without the immediate pressure of needing a paycheck. You can be selective about compensation, management, company culture, advancement, and location. Unfortunately, many employed candidates limit their searches to watching job boards and occasionally responding to a recruiter’s call. There’s nothing wrong with either approach, but both

Continued next page

PHONE: 800-289-5627

Read/Subscribe online at www.componentadvertiser.com

FAX: 800-524-4982


A

Th e

Component Manufacturing dverti$ dverti $ er

Don’t Forget! You Saw it in the

Adverti$$er

November 2026 #18328 Page #107

have limitations. Job boards only show the positions that employers have decided to advertise. A recruiter may bring you an excellent opportunity, but exploring additional options can help you determine whether it’s the best fit for your career goals. How can you know whether it’s the best available option without considering alternatives? Consider a senior truss designer who has spent 10 years with the same employer. He’s comfortable, reasonably compensated, and not actively looking. Another company approaches him with a substantial raise. It sounds attractive, and he accepts. But what if another employer would have offered similar compensation, a stronger management team, better technology, and a path into design management? He never knew that opportunity existed because he stopped looking after receiving the first attractive offer. The problem wasn’t necessarily accepting the offer. It was making the decision without knowing what else might have been available.

Great Opportunities May Not Be Advertised Our industry is relatively small, and relationships matter. Component manufacturers don’t always advertise every position they’re willing to fill. Some are considering expansion. Others anticipate retirements, management changes, or increased production requirements. Occasionally, an employer isn’t actively recruiting but would make room for someone with exceptional experience. These opportunities can be difficult to discover through traditional job searches. That’s where working with an experienced, well-connected industry recruiter can provide a significant advantage. I’m not talking about someone who simply matches your résumé to an advertised opening. I’m talking about a recruiter who understands your experience, knows the industry, and has developed relationships with employers over many years. Rather than starting with a particular job to fill, the process should begin with understanding what you want to accomplish. Are you looking for better compensation, advancement, a different work environment, or greater stability? Would you relocate for the right opportunity? Are you interested in management, or would you prefer to remain focused on design, engineering, or production? Once those questions are answered, then a recruiter with established industry relationships can explore opportunities beyond the positions currently advertised. That doesn’t guarantee multiple offers, but it gives you a better chance of discovering possibilities you might otherwise never know existed.

Consider More Than Just Compensation Compensation matters, but it shouldn’t be the only consideration. A position paying $10,000 more annually may not be the better choice if the company has high turnover, unrealistic expectations, or limited opportunities for advancement.

Continued next page

PHONE: 800-289-5627

Read/Subscribe online at www.componentadvertiser.com

FAX: 800-524-4982


A

Th e

Component Manufacturing dverti$ dverti $ er

Don’t Forget! You Saw it in the

Adverti$$er

November 2026 #18328 Page #108

Likewise, a position offering slightly less compensation might provide stronger leadership, better training, improved technology, or a realistic path toward management. When evaluating opportunities, consider the complete picture: •

Compensation: Base salary, bonuses, benefits, retirement contributions, and realistic earning potential.

•

Company stability: Financial strength, market position, growth plans, and management turnover.

•

Career development: Opportunities to learn, advance, and assume additional responsibilities.

•

Working environment: Management philosophy, employee retention, expectations, and company culture.

•

Long-term fit: How the position would support your professional and personal goals over the next several years.

These considerations become much easier to evaluate when you can compare multiple opportunities. And remember, an interview is a two-way process. Employers are evaluating whether you’re right for their organization, but you should be equally interested in determining whether their organization is a good fit for you.

An Attractive Offer May Not Be Your Best Opportunity Over my years in recruiting, I’ve seen candidates make excellent career decisions, and I’ve seen others accept positions they later regretted. Sometimes the difference wasn’t compensation, qualifications, or even the employer. It was how thoroughly the candidate evaluated the available options before making a commitment. You can’t eliminate every risk associated with changing jobs. Companies change, managers leave, markets fluctuate, and even the most promising opportunity can develop unexpected challenges. But you should always strive to make an informed decision. Whether you’re unemployed and need to move quickly or comfortably employed and considering your next career move, don’t limit yourself to the first acceptable offer or the one opportunity somebody happens to bring you. Be ready to explore the market, understand your options, and evaluate what matters most to you. The goal isn’t simply to find another job. It’s to make the best career decision by knowing what opportunities are available and understanding how they compare. At JobLine, our goal is to help you explore as many opportunities as your qualifications and career goals allow. In a tight job market or during a seasonal slowdown, those opportunities may be limited. But whether there are two possibilities or ten, our objective remains the same: to help you understand your options and make the best career decision possible. PHONE: 800-289-5627

Read/Subscribe online at www.componentadvertiser.com

FAX: 800-524-4982


Valuable

WEBSITE Resources Visit msrlumber.org to find: • Design Values Comparison Tool Compare MSR lumber reference design values with visually graded dimensional lumber by species.

• History of the MSR Lumber Industry Spanning eight decades, the industry’s robust history has been captured for the first time in one place.

• Sources for MSR Lumber

Filter by species, grade and dimension to locate products from MSRLPC members.

• Educational Resources

Find helpful information for current and potential MSR lumber users.

“Lumber buyers don’t often have access to truss design software to easily determine the allowable substitutions that may inform their purchasing decisions in a meaningful way. This tool helps with that and provides valuable information about species substitution, which is becoming more common in today’s market. It’s a one-stop shop.” —George Hamilton, MSRLPC Board & Website Committee Member

LEARN MORE AT:

msrlumber.org


A

Th e

Component Manufacturing dverti$ dverti $ er

Don’t Forget! You Saw it in the

Adverti$$er

November 2026 #18328 Page #110

$188,500 NOW $139,900 FOB SC Pricteion! c Redu

Teelok 115-ft Side-eject Roof Gantry Line Teelok Roof Gantry -115-ft working length, side-eject system with (18) Tee-Slot tables 6×14′ each, (2) Tee-Lok 14’x18″ dia. roller gantries, (2) 6×8-ft slotted steel parking stations that can be used to build heel conditions, (2) end masts, festoon electrical supply cable and any available jigging hardware. Tables are slotted steel with skate wheel ejectors. Four of the tables are missing ejectors. The center conveyor system and transfer roll shown in some of the photos are not included. 230 / 460 volt 3 phase electrical required.

765-751-9990

www.woodtechsystems.com

2022 MiTek RailRider Pro Trackless Floor Truss Gantry Trackless end-eject, double-pass floor truss system builds floor trusses from 9-1/2” to 36” in depth. Features a 3/4” steel tabletop with under-table pneumatic lumber clamps, and remote-controlled pop-ups, flippers, rollers, and ejectors. Gantry head features a 10 HP motor, a 7’ roller, and travel speeds up to 125 feet per minute. Includes push-button pendant with remote-control operation. 480v, 3 phase power.

$139,995 FOB TN 765-751-9990 PHONE: 800-289-5627

www.woodtechsystems.com Read/Subscribe online at www.componentadvertiser.com

FAX: 800-524-4982


A

Th e

Component Manufacturing dverti$ dverti $ er

Don’t Forget! You Saw it in the

Adverti$$er

November 2026 #18328 Page #111

TRUSS EQUIPMENT

2005 MiTek Hydraulic Splicer Model 88560-501 Splices 2″ x 4″ chords with a maximum plate size of 3″ x 12″. Dual hand controls with foot-pedal activation allows for safer operation, 3- second cycle time, 5 HP, hydraulic system with 20 gallon reservoir. Small footprint 54″ L x 38″ W x 36″ H (working height). 230v, 3 phase power. $17,497 FOB OH Wood Tech Systems 765-751-9990 www.woodtechsystems.com

Commercial Machinery Fabricators 14' Finish Roller #1 • 14' x 24" Diameter Rollers • Safety Bars on Both Sides • 10 HP / 230 Volt / 3 Phase • Video available upon request $27,500 NOW $26,000 FOB NE Wasserman & Associates 800-382-0329 www.wasserman-associates.com

JobLine.com, inc.

800-289-JOBS

We’re here when you need help! visit: www.thejobline.com email: twm@thejobline.com

STRICTLY CONFIDENTIAL!

Stacker $79,997 FOB NY 2023 NWH Vertical Roof Truss Stacker, stacks roof trusses from 20-ft to 60-ft spans. Includes (6) pedestals at 12-ft on center, (4) receiving arms, (6) receiver stands, (1) continuous drive shaft, (1) 3 HP Sumimoto drive, (1) electrical control panel, and (1) 50-ft adjustable target rail. Also includes a set of (6) additional custom receiving arms. Roller conveyors not included. 208 volt, 3 phase, 15 Amp electrical required.

The

Time To Hire?

2023 NWH Vertical Roof Truss

PE & E 40' Floor Truss Machine • Table Mounted 24" Diameter Gantry Roller with Safety Bars • 6' x 50' Table with Fire Hose Clamping • Floor Truss Length to 40', Depth to 24" • ____ Volt - 3 Phase • Need some rewelding/fastening of table clamping system $26,900 FOB NM Wasserman & Associates 800-382-0329 www.wasserman-associates.com

765-751-9990

www.woodtechsystems.com

M ACdverti$er

Th e

omponent

anufacturing

Serving the Structural Building Components Industry

2007 Eagle 64′ x 14′ Roof Truss C-Clamp System Two 2007 model PE 55 Eagle C Clamp 25 ton press heads. System includes overhead I beams, approximately 80′ of floor track, 16 pedestals, 8 idle conveyor rolls, 3 air lift rollers to eject trusses, and 80′ of exterior roller conveyor. (FRP not included) $29,995 FOB MI Wood Tech Systems 765-751-9990 www.woodtechsystems.com PHONE: 800-289-5627

2003 Pacific Automation 14' x 85' AutoPress with Wizard Jigging

Like Money in the Bank. Service you can count on!

• 2003 Pacific Automation AutoPress 14LT (track on floor) • 50 Ton Hydraulic Press with 24” Wide x 1 1/2” Thick Steel Platen • 15 HP Motor (480 Volt / 3 Phase) • 14’ x 85’ Table (Plastic Top over Steel) with Side Eject Skatewheel Ejectors

• (2) Park Sections • Wizard (GEN 2) Automated Jigging (32 Rails) • Spare Set of Bogie Wheels • Excludes: Exiting Truss Conveyor/ Receivers and Finish Roller • Video available upon request

$139,900 FOB SD 800-382-0329 | www.wasserman-associates.com

Read/Subscribe online at www.componentadvertiser.com

FAX: 800-524-4982


A

Th e

Component Manufacturing dverti$ dverti $ er

Don’t Forget! You Saw it in the

Adverti$$er

November 2026 #18328 Page #112

800-382-0329 Roof Truss, Floor Truss & Wall Panel Plant

Complete Facility and Equipment For Sale! • 300' x 80' Building & Adjacent Land (for sale or lease) • Used CMF 14' x 60' Roller Gantry System • Powered Transfer Roller & Powered Exiting Conveyor • Reconditioned Klaisler Finish Roller • Outside Non-Powered Conveyor • 2025 3 Head SL Laser Truss Projection System • 2025 ASI Automated Truss Saw • 2022 Spida Automated Apollo Saw • Used CMF Trackless Floor Truss Machine

• 2022 Complete Wall Panel Line (Component Table, Framing Table with Panel Bridge, Conveyor) • 2022 Craneveyor Crane System with Electric Hoist & Wall Panel Lift • 2022 Spida Ink Jet Plate Marker • 2024 Lakeside 40' Gooseneck Roll-Off Trailer • Material Carts & Wall/Truss Dollies • Located in Edmond, OK (north side of Oklahoma City)

www.wasserman-associates.com PHONE: 800-289-5627

Read/Subscribe online at www.componentadvertiser.com

FAX: 800-524-4982


A

Th e

Component Manufacturing dverti$ dverti $ er

Don’t Forget! You Saw it in the

November 2026 #18328 Page #113

Adverti$$er

New TruStance Portable Plate Press

NEW! Reconditioned Tee-Lok 35' Kickleg Floor Truss Machine Click Here for more information

$42,500 FOB AZ 800-382-0329 | www.wasserman-associates.com TRUSS EQUIPMENT

Pricteion! c Redu

Clark Floor Truss Jig The Clark floor truss jig allows for on-table building of floor trusses for hydraulic press tables. The jig has pneumatic clamping and allows you to build floor trusses from 10″ to 24″ in depth up to 40 ft. long. $5,990 FOB OH Wood Tech Systems 765-751-9990 www.woodtechsystems.com

PHONE: 800-289-5627

2023 2-Head 30 mW LAP Laser System Condition: As-Is, Where-Is Set of (2) 30 mW green Cad-Pro LAP Lasers. Includes mounting brackets, distribution box, projector cables, remote control, and all available system hardware and instructions. 30 mW lasers are better suited to Canadian facilities, but could work in a US location with some additional steps due to regulations. $39,890 NOW $29,890 FOB BC Wood Tech Systems 765-751-9990 www.woodtechsystems.com

This is the first, self-contained, truly portable repair unit used to press metal truss plates into dimensional lumber at virtually any location. Wood component (roof and floor truss) manufacturers, as well as builders, frequently require a tool to repair metal plate connected, wood truss components. The complete unit is mounted to a wagon built from square tubular steel. Extremely compact at only 28” wide and about 32” long the wagon features four wheels on soft-rubber solid tires, and a steering axle on the front with a handle that makes the unit easily maneuverable. The wagon contains the hydraulic power unit and an area for a portable gas generator. A rack in the back securely stores the C clamp, a standard 25′ hydraulic hose, and an electric power-supply cable. The clamp is manufactured from T1 steel, cut into a C-shape with a steel tube welded to the front that securely holds the hydraulic cylinder. Pressing is easily performed with a 4×4 magnetized steel platen that holds and presses the truss connecter plates. The C-clamp that weighs less than 30 pounds, features a throat that opens to 4-1/2” inches to accept either 4 x 2 or 2 x 4 lumber. It has a push on and release off switch to cycle the unit. A 10,000-psi electric-overhydraulic power unit pumps hydraulic fluid through a 10,000-psi hose to activate a 10-ton hydraulic cylinder with a 3.9 inch stroke. The unit can be powered by 120v electric power or an optional 120v, 2200-amp (output), gasoline powered Honda generator, which can also act as a portable power supply out in the field for other singlephase equipment. • Pressing Capability: 4.5” throat opening presses 2×4 through 4×2, includes a standard 25-foot, HD 10,000 PSI hose, with a 10 TON, 4”x4” magnetized pressing platen. • Electric/Hydraulic: SPX Hydraulic Technologies – Rockford, IL USA 10,000 PSI / 700 BAR. 10 ton pressing capability • Power Source: The unit is powered by a standard 120v/15 amp electric power or an optional 120v, gasoline powered Honda generator with 2200-watt output capability, which can also act as a portable power supply for other single-phase equipment. • Warranty: One year from date of purchase on manufactured unit, OEM warranties on hydraulic and optional gas motor

$11,800 FOB MT 765-751-9990

Read/Subscribe online at www.componentadvertiser.com

www.woodtechsystems.com FAX: 800-524-4982


Wasserman & Associates Framing Table With Panel Bridge

Wasserman & Associates

One Ta

ble Sys

One Ta

ble Sys

tem $9

8,880

*Inclu des the Un Installation ited Sta S tes & C uppo anada Web: www.wasserman-associates.com

Wasserman & Associates

2341 Shepard Rd Milford NE 68405 Phone: 800-382-0329

tem $9

-Laser Poin -Bridge Auto Retu -Bridge Tilt at Sheathing Sea -Programmable Fastener Patte -Pop-Up Skatewheel Convey -6’-11” to 12’-5” Wall Heig -Fixed Squaring Sto -No Floor Ra

-Laser Pointer -Bridge Auto Return -Bridge Tilt at Sheathing Seams -Programmable Fastener Patterns -Pop-Up Skatewheel Conveyors -6’-11” to 12’-5” Wall Heights -Fixed Squaring Stops -No Floor Rails

8,880

*Inclu des Ins t h e United tallation Sup Wasserman & Associates p States & Can ort in 2341 Shepard Rd ada Milford NE 68405 Phone: 800-382-0329 Web: www.wasserman-associates.com


A

Th e

Component Manufacturing dverti$ dverti $ er

Don’t Forget! You Saw it in the

Adverti$$er

November 2026 #18328 Page #115

PANEL EQUIPMENT

Alpine PF90 AutoMark Linear Wall Panel Station Processes 16-ft long max. material via a 16-ft long infeed and 16-ft long outfeed conveyor, material pusher, PC and enclosure. The PF90 has the potential to mark each component with critical information that speeds the layout and assembly process. System automatically pushes the lumber from the load position to each cut position and signals the saw to make the cut. Primary saw has had new drive belts, ram valves, touchscreen monitor and print heads installed. Includes second PF-90, located inside of the modified 40-ft high-cube container, can be used for parts. $25,997 FOB AZ Wood Tech Systems 765-751-9990 www.woodtechsystems.com

PHONE: 800-289-5627

New Component Table with Skatewheel Conveyors Lift & Extend Skatewheel Conveyors. 10' x 10' Work Area with Squaring Lip. Gun Holster & Nail Tray. $13,900 FOB NE Wasserman & Associates 800-382-0329 www.wasserman-associates.com

$42,750 FOB FL

• • • •

New Wall Panel Lift 8' to 12' Wall Heights 1,000 Lb Capacity Weight: 120 Lbs Excludes: Electric Hoist & Freestanding Bridge Crane $1,950 FOB NE Wasserman & Associates 800-382-0329 www.wasserman-associates.com

2024 Panels Plus Squaring Station – B This station (model PP55015) is designed to hold a framed wall panel square while sheathing is applied and manually tacked in place. Standard table has a capacity for clamping walls from 16′ L to 12’4″ wall height and materials from 2×4 through 2×12. Telescoping function is operated by foot-pedal or push-button controls. This Squaring Station was never installed.

765-751-9990

Read/Subscribe online at www.componentadvertiser.com

www.woodtechsystems.com FAX: 800-524-4982


EVEN WITH ALL ITS ADVANCES, THE SAME OLD ADAGE RINGS TRUE. NOTHING DRIVES QUITE LIKE A V.8. Inspired by ten years of intensive field experience and the ample and detailed feedback of numerous customers, we’re pleased to introduce the most advanced, most enhanced and high-performance Terminailer yet - Terminailer V.8. Drawing on invaluable time in the trenches closely evaluating Terminailer’s performance under varying conditions, our engineers have incorporated critical learning and insight to enhance simplicity, performance and operator control. Just part of what V.8 offers includes: •

Vastly enhanced operator control for even greater productivity

•

A redesigned nail-feed supplying EverWin PN90-PAL industrial nail guns

•

Simplified pneumatics featuring direct air-supply to all six nail guns

•

Even more sub-component profiles for wall design flexibility

•

Rugged durability with pharmaceutical grade assembly

Developed by people who know well the mechanics, safety considerations and business aspects of wall panel production, Terminailer V.8 combines more enhancements & operator-friendly features than ever to take your productivity to the next level and beyond. Contact us to learn even more and to put the V.8 performance in motion at your facility.

765-751-9990 www.woodtechsystems.com

Wood Tech Systems is a registered tradename of Wood Truss Systems, Inc.


A

Th e

Component Manufacturing dverti$ dverti $ er

Don’t Forget! You Saw it in the

November 2026 #18328 Page #117

Adverti$$er

New ProStack

Wall Panel Stacker

NEW!

NEW 12' X 16' FRAMING TABLE

• Pop-up Skatewheel Conveyor • Powered Height Adjustment (6'-11" to 12'-5" wall heights) • Fixed Squaring Stops • Excludes Tool Dollies • 110 Volt / 20 Amps • Add $6,600 for Stud Locators at 16" & 24" O.C. • Add $3,500 for 1 Pair of 15' Skatewheel Conveyor with Stands

• Add $13,900 for Sub-Component Layup Tables with Pop-up Skatewheel Conveyors • EQUIPMENT FINANCING available from SLS Financial Services

$39,500 FOB NE

800-382-0329 | www.wasserman-associates.com

Refurbished Triad Diamond Quad 24-ft Framing Station Triad model DQ (Diamond Quad) framing station, designed to frame dimensional wood wall panels from 7′-4″ to 12′-4″ in height, to 24-ft long. Framing station includes dual motor wall height adjustment, pop-up skate wheel conveyors, and stud locators at 16″ and 24″ o/c spacing. 100 PSI air required. 120 volt, 1 phase electrical required. 765-751-9990

$34,991 FOB AZ

PHONE: 800-289-5627

www.woodtechsystems.com

Call for Pricing FOB ND Reduced labor, increased safety, the benefits just keep stacking up. Stacking wall panels at the end of your production line can be a real labor-intensive and safety-challenging task. But it doesn’t have to be now, thanks to ProStack. This innovative wall panel stacker literally stacks from the bottom up, reducing awkward overhead lifting & placement, and the risk of head injury. Plus, ProStack frees up at least one worker to return more productively to your core task—building wall panels. Enhanced worker safety and productivity is what ProStack is all about. Developed for commercial wall panel production facilities this is the remarkable ProStack, fully automated wall panel stacker. The ProStackrelieves your build team from creating a stack of wall panels and keeps them building walls instead. Stacks 2×4 through 2×8 walls up to 20′ in length and up to 12′ in height (taller by special order). The ProStack will automatically center or left or right justify each layer including multiple wall segments on the same layer. For ease of loading in your yard or on the build site, fork pockets are created in two ways: The operator can attach blocking up to 5″ tall to the last wall of the stack prior to entering the stacker, or two shorter walls can be spread apart prior to the second to last row of the stacker. Designed without any overhead frame or apparatus, so no crane inspections are required. The ProStack is “event driven”, so there is no need to read a file. Setup and installation is easy too, without the need for complex training or disruption to workflow. So free up your team to do what they do best, and you need to do most, and let ProStack stack your wall panels instead. ProStack can even operate with your existing powered conveyors or select our optional matching conveyors (see the video shown below). 208 volt, 3 phase, 43 Amp base model electrical required. No air required. Footprint is 26′-5″L x 19′-3″W. For additional information Click Here

765-751-9990

Read/Subscribe online at www.componentadvertiser.com

www.woodtechsystems.com FAX: 800-524-4982


A

Th e

Component Manufacturing dverti$ dverti $ er

Don’t Forget! You Saw it in the

Adverti$$er

November 2026 #18328 Page #118

Design Connections

Sales vs. Design: Are You Draining Your Talent Pool? Geordie Secord, Senior Recruiter TheJobLine.com – Canada

A

veteran designer recently laid out a hard truth about the component world that most general managers prefer to ignore. They pointed out that sales reps routinely make significantly more money in shorter periods of time, often with far less technical understanding of the product they just sold. And when a complex job goes sideways in the field, sales slides through unscathed, while the design department gets raked over the coals or quietly fired. This isn’t just an isolated complaint; it is a structural reality in component manufacturing. We have built an operational culture where sales teams are highly incentivized for bringing in top-line revenue, while the design department is treated as a fixed-cost overhead expense. The friction ignites when an eager sales rep promises a builder a poorly conceived roof system or an overly aggressive delivery date. When the architectural intent clashes with the manufacturing reality, the burden of fixing the mess falls entirely on the designer. If the job succeeds, sales gets the commission and the glory. If the job fails, design gets the blame and the back-charges.

The Internal Brain Drain This massive spread in compensation and respect creates a dangerous unintended consequence: the internal brain drain. Highly capable, ambitious senior designers eventually look across the floor and realize that their earning potential is strictly capped. They recognize that wrestling with complex load paths and fielding angry phone calls from the job site is not worth a capped hourly wage when the person who created the problem is taking home a massive commission. This frustration is multiplied exponentially when you ask those same senior designers to step into a Design Manager role. Why would they take on the added departmental liability, reduced effective hourly pay, and middle-management headaches when the sales team is making significantly more money? To be fair, technical sales is certainly not stress-free — reps carry the heavy burden of quota pressures and frontline client demands. But compared to the operational friction of design management, the financial upside of sales is heavily skewed. They see that the only viable path to significantly increase their income and escape the constant technical liability is to cross the aisle and become a sales rep. Worse yet, they often make this transition by accepting a lucrative sales role at a competing plant, taking their technical expertise and builder relationships directly to your competition. Continued next page

PHONE: 800-289-5627

Read/Subscribe online at www.componentadvertiser.com

FAX: 800-524-4982


A

Th e

Component Manufacturing dverti$ dverti $ er

Don’t Forget! You Saw it in the

Adverti$$er

November 2026 #18328 Page #119

There is absolutely nothing wrong with a professional leveraging their technical background to pivot into sales for better compensation. In fact, former designers often make exceptional technical sales reps. However, from a general manager’s perspective, this is a dangerous trade. Finding, training, and retaining elite senior design talent is arguably the hardest staffing challenge in the industry today. Every time you allow a broken compensation model to push a top-tier designer into sales, you solve a revenue problem by gutting your technical engine.

Realigning the Value If we want to attract good people to the design profession generally — not just fill open manager seats — ownership must stop viewing the design room merely as a necessary expense. Yes, sales brings in the revenue, but your senior designers are the ones who protect your profit margins. They are the final line of defense catching difficult or poor architectural plans, optimizing lumber usage, and preventing costly on-site framing delays before the first board is cut. Bridging this divide between sales and design requires taking a hard look at how you incentivize your teams: •

Shared Liability: If a job fails due to over-promised sales commitments, the financial penalty cannot fall solely on the design room. Accountability must be shared.

•

Closing the Pay Gap: If your sales compensation vastly outpaces what your top technical experts can earn, you will inevitably lose your best designers. Consider department-wide bonuses based on error reduction and overall profitability.

•

Redefining Respect: Elite designers need to know they are viewed as critical operational partners, not just the people who clean up the messes left by aggressive quoting.

The Industry Health Check Truss manufacturing requires a delicate balance between aggressive sales and flawless technical execution. When you allow a massive compensation and accountability gap to form between these two departments, you actively encourage your best technical minds to abandon the design pool. Sustaining long-term operational health requires recognizing that the designers protecting your margins are just as valuable as the reps bringing in the volume, and they must be compensated and respected accordingly. Is your company draining its own talent pool? Are you concerned about the future? Please share your thoughts with me at secord@thejobline.com or 800-289-5627 x2 — I’d love to hear from you.

PHONE: 800-289-5627

Read/Subscribe online at www.componentadvertiser.com

FAX: 800-524-4982


Cutting, Framing and Truss Solutions - We Do It All! We provide high quality precision machinery suitable for cutting and assembly of walls, roof trusses and floor trusses. All your needs are covered.

+

OVER 70 PRODUCTS

EXPERTISE & KNOWLEDGE

SERVICE & SUPPORT

If you’re wanting to increase productivity in your factory, then get in touch with us today. E sales@spida.com

T +1 866 647 7771

spida.com


A

Th e

Component Manufacturing dverti$ dverti $ er

Don’t Forget! You Saw it in the

November 2026 #18328 Page #121

Adverti$$er

2026 ProStack Automated Wall Panel Stacker Call for pricing FOB: ND

2026 ProStack Automated Wall Panel Stacker with Overhang Option - Stacks 2x4 through 2x8 walls up to 20' in length and up to 12' in wall height. The ProStack will automatically center, left-justify, or right-justify each layer including multiple wall segments on the same layer. Fork pockets are easily created for ease of loading in your yard or on the build site. There is no overhead frame or apparatus, so no hardhats or crane inspections are required. The ProStack is "event driven," so there is no need to read a file or update software. This ProStack with the Overhang option allows stacking wall panels with sheathing overhangs up to 18". It can be paired with the optional tilt in-feed and/ or powered out-feed conveyors. Please call us today for full details, terms, and pricing. 208 volt, 3 phase, 49 Amp electrical required. Footprint is 26'-5"L x 19'-3"W.

765-751-9990

www.woodtechsystems.com

SINGLE BEAM

SHEATHING STATION The Single Beam Sheathing Station offers flexibility in fastener spacing both in the field, on seams, and while stitching the top and bottom plates. This Sheathing Station fastens sheathing to wood wall panels to ensure quality panels every time. BENEFITS • Ergonomic working height • Flexibility with fastener spacing • Fastens consistently and accurately • Reduces the risk of “shiners”

WWW.PANPLUS.COM

1-866-726-7587

PHONE: 800-289-5627

Read/Subscribe online at www.componentadvertiser.com

FAX: 800-524-4982


Faster plates

More Trusses

The Plate Picker™ uses

Click Here to see the Plate Picker™ in action!

a nesting algorithm to tightly pack and sequence plates in the exact order needed for assembly.

Or visit our website at www.trussmachineworks.com Magazine system covers 95-99% of plate sizes needed

Robotic placement insures no wasted space in bins

Sorting schemes include truss type, per truss, dense pack, and more

Modular design sized for your plant

Integrates with skate-wheel receiver or conveyor to table

P: 269-815-8844

|

E: sales@machineworks.llc

|

A: 7260 1st Street • Eau Claire, MI 49111


Don’t Forget!

November 2026 #18328 Page #123

Wasserman &AAssociates You Saw it in the

dverti$ $er

Wall Panel Line Accessories

t w en Ne ipm u Eq

A

t Cewomponent en Manufacturing N dverti dverti$ $ er pm i u Eq

Th e

Wall Panel Lift * 8’- 12’ Wall Height * 1,000 LB Capacity * Easy Adjustment * Hoist and Crane Sold Separate

$1,950.00

Handle Bar Router * 8’ - 12’ Wall Height * 2 Person Operation * 3 ¼ hp Production Router * 120 Volt /1 Phase/15 Amp

$3,000.00

Lay-Up Tables * 10’ x 10’ Working Area * Lift & Extend Rollers * Squaring Lip * Nail Tray $13,900.00

Skate Rollers * 15’ Standard Length * Adjustable Height * Sturdy Stands * Custom Lengths Available PHONE: 800-289-5627

$3,500.00

EST. 1991

Read/Subscribe online at www.componentadvertiser.com

FAX: 800-524-4982


THE BENEFITS JUST KEEP EASILY, SAFELY, NEATLY STACKING UP. Stacking wall panels at the end of your production line can be a real labor-intensive and safety-challenging task. But it doesn’t have to be now, thanks to ProStack. This innovative wall panel stacker literally stacks from the bottom up, reducing awkward overhead lifting & placement, and the risk of head injury. Plus, ProStack frees up at least one worker to return more productively to your core task—building wall panels. Enhanced worker safety and productivity is what ProStack is all about.

Setup and installation is easy too, without the need for complex training or disruption to workflow. So, free up your team to do what they do best, and you need to do most, and let ProStack stack your wall panels instead. Contact us to learn more today. For a ProStack demonstration video, scan the QR code below.

ProStack

By: DAK Automation

765-751-9990 www.woodtechsystems.com

Wood Tech Systems is a registered trade name of Wood Truss Systems, Inc.


A

Th e

Component Manufacturing dverti$ dverti $ er

Don’t Forget! You Saw it in the

Adverti$$er

November 2026 #18328 Page #125

NEW!

Building Component Manufacturing Industry

Job Board CLICK HERE for more information

Turn Key Platform Post and Manage Multiple Jobs and Multiple Candidates New Application Notices and Internal Candidate Messaging Keeps your search confidential Manage on Your Phone or Computer

For Additional Information

twm@Hiring-Zone.com Visit our website: www.Hiring-Zone.com

New Panels Plus Wall Panel Framing Equipment

Consider Panels Plus wall panel assembly equipment for manufacturers of wood or steel wall panels, floor-panels, and related framing components. Panels Plus is an employee owned, ISO certified, manufacturing company that builds state-of-the-art equipment featuring durable construction, with fit and finish second to none in the structural building component industry. The referenced base framing table allows you to assemble from 7-12 foot wall heights, at industry standard 16 foot lengths, at a working height of 29 to 32 inches. This framer design includes controls at each end of table, squaring stops and pneumatic clamping for consistent wall panel quality. Frames 2x4 or 2 x 6 walls, with color-coded, steel stud locators at 16 and 24 inches O.C. spacing. Includes pop-up skate wheels for easy transfer of completed wall frame. Framing table can be configured to receive wall framing light bars, other options include custom buildable wall heights, lengths and auto-indexing of optional 2 or 3 tool carriages. Additionally from Panels Plus are sheathing tables with features that include foot pedal control at squaring end of table, with squaring stops, roller conveyors at both sides, single pendant controls for bridge, tool spacing at 6 inch centers with 3 inch bridge shift for offset nailing. Tool bridges can accommodate from 2 x 4 to 2 x 8 walls, with seam tilt being standard equipment Panels Plus Tool Bridges are available with single beam or dual beam design for two different tool mounts on one bridge. Squaring stations, sub-component tables, conveyors and panel lifts are also available to complete the configuration of the wall panel assembly line. Price includes factory installation and training. 50 CFM at 120 psi air. 120 or 230 volt, 1 phase electrical.

765-751-9990

ProStack Wall Panel Tilt In-Feed Conveyor Solving the problem of missed fasteners on exterior sheathing remains one of the primary reasons for call back charges and exceptions noted during jobsite building inspections. Clearly finding and resolving missed fasteners or “shiners” becomes mission critical before a sheathed wall panel leaves the production line. Our shop-proven, tilting conveyor makes the process safe, fast, and labor efficient. The ProStack tilt in-feed safely lifts wall segments to 45º in 5 seconds for inspection and on to 75º for easy to reach repairs. This tilt system is also excellent for installing blocking , windows, and other details in your wall panel segments. More information click here. 72,665 FOB ND

NEW!

765-751-9990 PHONE: 800-289-5627

www.woodtechsystems.com

www.woodtechsystems.com

NEW! $37,525 FOB ND

ProStack Wall Panel In-Feed Conveyor ProStack powered in-feed conveyor was engineered to deliver wall panel segments at a matched speed and height into the ProStack automated wall panel stacker. Built for smooth operation and assembled with laser cut, powder-coated finish steel. Base model conveys wall panel segments up to 12’ in height and up to 16’ in length for wall segments up to 1,600 lbs. Extended length systems come in standard 20′ and 24’ length capacity. All models come with adjustable working heights and variable conveyor speeds. Powered in-feed conveyor section, synchronized chain drive under top and bottom plate for open access, 5-HP, 208v, 3Ph power. Adjustable working height from 28” to 34”. 16′ length capacity.

765-751-9990

Read/Subscribe online at www.componentadvertiser.com

www.woodtechsystems.com FAX: 800-524-4982


A

Th e

Component Manufacturing dverti$ dverti $ er

AN ITW COMPANY

By Bill Krick, P.E., Alpine Chief Engineer and Abdur Khan, Alpine Engineer

Don’t Forget! You Saw it in the

Adverti$$er

November 2026 #18328 Page #126

Code Change Ahead: Key Structural Changes in Florida’s New Building Code

t’s that time again. The 2026 Florida Building Code 9th Edition will take effect on December 31, 2026, bringing with it updates that could affect how structural components are designed, analyzed, and documented throughout the state. For engineers, truss designers, and component manufacturers, understanding these changes is essential to ensure compliance to avoid costly project disruptions while preparing design workflows for the code cycle.

I

Released late June of 2026, the final PDF of the code publication adopts several updates to standards that will impact the structural building and truss industry, including: •

National Design Specification for Wood Construction ANSI/AWC NDS 2024

•

Building Component Safety Information (BCSI) 2018, Updated March 2020

•

Minimum Design Loads and Associated Criteria for Buildings and Other Structures ASCE/SEI 7-2022

•

National Design Standard for Metal Plate Connected Wood Truss Construction ANSI/TPI 1-2022

NDS 2024 includes notable updates to shear design for bending members, changes to the connections between multi-ply members, and new fire design provisions. The state of Florida’s adoption of ASCE/SEI 7-2022 in the previous code cycle positioned the state to address significant wind load changes in the standard. As a result, the code already accounts for the revisions to components and cladding wind pressures for shallower pitched roofs, as well as the simplification of zones for the external pressure coefficient. ASCE/SEI 7-2022 also introduces a new Chapter 32, which establishes tornado wind load requirements for Risk Category III and IV structures to enhance resilience. This article focuses on the changes introduced in ANSI/TPI 1-2022. While the updated standard includes numerous revisions, several are expected to have a more direct impact on truss design and engineering workflows during the transition from previous editions. To better understand the revisions, this article examines the four key areas: plating, web reinforcement, multi-ply girders, and person load requirements. Together, these topics represent some of the most consequential revisions designers and engineers should understand as they prepare to adopt the new standard. Figure 1 illustrates the projected impact of these changes on truss design. Continued next page

PHONE: 800-289-5627

Read/Subscribe online at www.componentadvertiser.com

FAX: 800-524-4982


A

Th e

Component Manufacturing dverti$ dverti $ er

Don’t Forget! You Saw it in the

Adverti$$er

November 2026 #18328 Page #127

Figure 1. Highlighting the four key topics along with the types of changes impacting component designs with the ANSI/TPI 1-2022 design criteria.

Plating Joint Modeling and Structural Behavior. TPI 1-2022 allows most truss plate joints to be treated as rigid but requires flexibility to be considered for floor trusses with narrow-face plating. These revisions improve the alignment between analytical predictions and actual in-service performance, resulting in more reliable and consistent truss designs. Effective Depth of Chord Member. While NDS focuses on wood member stresses, TPI expands the design framework by incorporating plate/joint checks that account for tension perpendicular to grain. Rolling Shear. TPI addresses shear stress perpendicular to grain by creating a horizontal shear volume factor, CV. This will mostly affect top chord bearings. Steel Thickness Reduction. The plate thickness is being reduced by 0.0003 inches. Out-ofplane plate capacity of truss plate – 65 pounds/inch per pair. Under TPI 1-2022, when metal plates are installed on both faces of a joint and meet minimum tooth and size requirements, they can be assumed to resist 65 pounds per inch along the plate’s length for loads acting perpendicular to the plate. This update removes ambiguity and provides a consistent, standardized method for evaluating out-of-plane loading conditions such as wind, bracing, and construction loads.

Web Reinforcement Web Member Reinforcement to Increase Buckling Capacity. TPI 1-2022 expands and clarifies the design of web member reinforcement for buckling, providing more guidance than TPI 1-2014. The updated standard now applies to both webs (or studs) with and without lateral loads and includes changes in how reinforcement is considered in structural analysis. A key update is the introduction of three new reinforcement types; I-Reinforcement, U-Reinforcement, and Double Scab (DBL) Reinforcement (see Figure 2). These new reinforcements provide designers with more options to efficiently address buckling. In addition, TPI 1-2022 standardizes fastening requirements, including minimum nail size and spacing, improving consistency and reliability in the field (see Figure 3).

Continued next page

PHONE: 800-289-5627

Read/Subscribe online at www.componentadvertiser.com

FAX: 800-524-4982


A

Th e

Component Manufacturing dverti$ dverti $ er

Don’t Forget! You Saw it in the

Adverti$$er

November 2026 #18328 Page #128

Figure 2 (above). Highlighting a key update from TPI 1-2022 Web Reinforcements (Source Figure 7.3-1). Figure 3 (right). Highlighting another key update from TPI 1-2022 Load Not Continuous Across All Plies. (Source Figure 7.5.2.4 ANSI/TPI 1-2022 Commentary.) Percentage of facemounted load carried by each ply (Page 65).

Multi-Ply Girders TPI 1-2022 introduces clearer and more structured guidance for multi-ply truss behavior, particularly for side-loaded girder trusses. Section 7.5.2.4 refines limits on the number of plies and load distribution across them. For member design, TPI 1-2022 moves away from equal load distribution and requires higher load assignment to individual plies to better capture real behavior (see Figure 3). However, for fastener (ply-to-ply connection) design, the traditional 1/n load distribution assumption remains as a practical and conservative approach. Additionally, new Section 7.5.3.7 introduces an allowable bending stress increase for multi-ply trusses, recognizing improved performance due to load sharing. This increase varies by chord type and number of plies, providing a more realistic and efficient design approach for multi-ply systems. Continued next page

PHONE: 800-289-5627

Read/Subscribe online at www.componentadvertiser.com

FAX: 800-524-4982


A

Th e

Component Manufacturing dverti$ dverti $ er

Don’t Forget! You Saw it in the

Adverti$$er

November 2026 #18328 Page #129

Reducing 3-ply girders to 2-ply serves as an allowable cost benefit consideration. Obviously, this will increase lumber and plate quantities, but compared to the 3-ply design, this could be beneficial.

Person Loading Section 6.2.2.5 now requires a 300 pound (lbs) person load applied to trusses with these conditions: a. Trusses spanning 18’ or more b. Load applied to chords with no structural wood sheathing c. 300 lbs mid panel point load d. 300 lbs point load to be run concurrently with all dead loads e. Load case can be run with a duration factor of 1.6 or less. This raised many questions that required clarification from TPI. Here are some of the questions posed by Alpine and the truss industry: a. Is this load post construction? b. What is meant by spanning? c. What about panels that are not accessible? d. Is this point load supported by one truss? e. What consideration should be taken for sloping chords? f.

Where do purlins fall regarding structural wood sheathing?

The TPI Technical Advisory Committee (TAC) issued a technical interpretation on February 6, 2026. Here are some of the clarifications TPI provided: a. If the trusses are spaced 30” or less, the 300 lbs point load would be supported by 2 trusses. b. If the panel can accommodate a 42”x24” rectangular space, then the person load needs to be applied. c. If the slope on the bottom chord is less than 2/12, the person load is required. d. Spanning is defined as being between bearings, not the overall truss span. e. If purlins are spaced greater than 24” on-center or there is no structural wood sheathing, the person load is required The 2026 Florida Building Code represents another step in an ongoing effort to improve structural performance, safety, and consistency across projects. Although many of the changes discussed are technical in nature, their impact on design, engineering, and compliance can be significant. With each code cycle, preparation and education remain key to successful adoption. For questions or additional information, please contact the Alpine Engineering team. PHONE: 800-289-5627

Read/Subscribe online at www.componentadvertiser.com

FAX: 800-524-4982


EVEN WITH ALL ITS ADVANCES, THE SAME OLD ADAGE RINGS TRUE. NOTHING DRIVES QUITE LIKE A V.8. Inspired by ten years of intensive field experience and the ample and detailed feedback of numerous customers, we’re pleased to introduce the most advanced, most enhanced and high-performance Terminailer yet - Terminailer V.8. Drawing on invaluable time in the trenches closely evaluating Terminailer’s performance under varying conditions, our engineers have incorporated critical learning and insight to enhance simplicity, performance and operator control. Just part of what V.8 offers includes: •

Vastly enhanced operator control for even greater productivity

•

A redesigned nail-feed supplying EverWin PN90-PAL industrial nail guns

•

Simplified pneumatics featuring direct air-supply to all six nail guns

•

Even more sub-component profiles for wall design flexibility

•

Rugged durability with pharmaceutical grade assembly

Developed by people who know well the mechanics, safety considerations and business aspects of wall panel production, Terminailer V.8 combines more enhancements & operator-friendly features than ever to take your productivity to the next level and beyond. Contact us to learn even more and to put the V.8 performance in motion at your facility.

765-751-9990 www.woodtechsystems.com

Wood Tech Systems is a registered tradename of Wood Truss Systems, Inc.


A

Th e

Component Manufacturing dverti$ dverti $ er

Don’t Forget! You Saw it in the

Adverti$$er

November 2026 #18328 Page #131

PANEL EQUIPMENT

Equipment Wanted! Custom Wall Panel Framing Stations Custom wall panel framing stations build 8′ to 12′ high walls up to 20′ long, using push button controls for powered movement in and out. Builds 2×4 or 2×6 walls. Stations come with tool dollies. Nail guns are fed with loose nails in a hopper system. Moves completed walls using pop-up rollers. 208v, 3 phase power. Minimum of 125 PSI at 1030 CFM air required. $7,995 FOB CA Wood Tech Systems 765-751-9990 www.woodtechsystems.com

Used - IBS Squaring Sheathing Table 16' x 12' Squaring – Sheathing Wall Panel Table | Square walls from 4' x 12' high and 16' long. Call For Pricing Eide Machinery Sales, Inc. 612-521-9193 www.eidemachinery.com

Trucks & Trailers

• Automated Component & Linear Saws (2010 & Newer) • Monet DeSauw or TimberMill Manual Component Saws • Floor Web Saws • Spida (Apollo) Saws with Truss Automation • Bunk Cutters

Modular Equipment

Truss Equipment

A

The

Saws

Component Manufacturing dverti$er

Serving the Structural Building Components Industry

• Roller Gantry & Hydraulic Press Systems • Finish Rollers • Truss Stackers • Floor Truss Machines • Lumber Splicers • Jack Tables • C-Clamp Presses

• Stretch Roll-Off Trailers • Gooseneck Roll-Off Trailers • Pacific Automation or MiTek Mobile Home Press

Contact Wasserman & Associates for a Fair Market Value Assessment of your Used Equipment Operational, Needs Work, and Parts Only equipment will be considered!

800-382-0329 | www.wasserman-associates.com

Panels Plus Wide Plate Framing Station Designed for use with a laser projection or plate-marking (ink-jet) processing system. The framing table securely holds plates, subcomponents, and studs in place for precise fastening, ensuring high-quality panels with every use. This station features a framing table equipped with a squaring edge, projection plates, pop-up rollers, foot-switch, push-button controls, a stationary side, and a manually telescoping side. 120 PSI at 50 CFM air. 120 or 230 volt, 1 phase electrical.

$53,995 FOB TN 765-751-9990 PHONE: 800-289-5627

www.woodtechsystems.com

2020 Spida Wall Panel Equipment Click Here for Information

$112,500 FOB AZ

800-382-0329 | www.wasserman-associates.com

Read/Subscribe online at www.componentadvertiser.com

FAX: 800-524-4982


A

Th e

Component Manufacturing dverti$ dverti $ er

Don’t Forget! You Saw it in the

Adverti$$er

November 2026 #18328 Page #133

NEW!

New Panels Plus Combination Table

Price: $Call for pricing FOB: MN 765-751-9990

www.woodtechsystems.com

Design That Drives Production A truss plant isn’t just about square footage. It’s about efficiency, safety, and flow. CT Darnell Construction’s design-build approach delivers: • Facilities tailored to your operation and equipment • Smarter layouts for safer load-ins and faster turns • Integrated storage and optimized SKU management With nearly 40 years of LBM experience and more than 4,500 completed projects, we build turnkey truss facilities designed to perform from day one.

CT-Darnell.com | 800-353-0892

2007 Panels Plus Steel Wall Panel Sheathing Station $74,970 NOW $68,997 FOB MN 765-751-9990 PHONE: 800-289-5627

www.woodtechsystems.com

Visit CT-Darnell.com to see our latest truss project in action. © WTD Holdings, Inc., 2026. All rights reserved.

Read/Subscribe online at www.componentadvertiser.com

FAX: 800-524-4982


REAL WORLD PRODUCTION:

ny a m s t i retrofiad tables! tr olderAdd’l Features:

Shown with the optional PlateFire on the bridge’s backside.

Specifications subject to change without notice

The Trident Bridge from TRIAD was engineered from builders’ wish lists: The bridge incorporates a nimble 3 high-capacity tool carriage that provides flexibility without compromising speed and efficiency. At the same time it significantly reduces builder’s tool costs over traditional sheathing bridges. The Trident Bridge is easily positioned using the operator’s choice of either a joystick or manual rotary actuator. The carriage is lined up with a laser and it nails across each stud while utilizing all three tools in rapidfire succession. The bridge detects any openings and does not fire the tools as the tool carriage traverses them. TRIAD'S Trident Bridge is more efficient than single tool bar bridges with its unique bidirectional nailing, and always-at-the-ready carriage system.

TRIAD *EXCLUSIVES:

• Handles Vertical OR Horizontal Sheathing* • Handles staggered sheathing*

• Touchscreen allows you to set any field and seam line spacing • Three tools fire across the stud and are triggered in an alternating pattern • Variable speed drive to control speed of firing • Auto sensors the opening and does not fire the tools. • Easy change out of the tools from nails to staples • Fits Diamond Quad, GEN II and Generation III Tables

Triad makes a full line of bridges that can be customized to your particular needs.

Fastest lead times in the industry plus over 60 years experience 133


A

Th e

Component Manufacturing dverti$ dverti $ er

Don’t Forget! You Saw it in the

Adverti$$er

TRUCKS & TRAILERS

Pricteion! c Redu

Used - 2014, R157 48” Roll -Off Precision Trailer Tandem Axles | Air Ride Suspension : Air Operated Load Control, Air Operated Pin Locks | Mesh Between Rollers | Beaver Tail | Strap Locks and Winches | LED Lighting | 11.4 Ton Self Contained Power | (1) Heachache Rack $17,500 NOW $10,500 Eide Machinery Sales, Inc. 612-521-9193 www.eidemachinery.com/equipment/ trailers

November 2026 #18328 Page #135

The

Pricteion! educ

R

JobLine.com

Truss Design Skills Evaluation $145.00

2004 Commercial 40' Roll-Off Trailer • GVWR: 40,000 Lbs • Dual Axle, Dual Wheel • Hydraulic Tilt (New battery and hydraulic pump in 2025) • 12,000 Lb Heavy Duty Winch • Lighty used over the last 2 years $23,900 NOW $21,900 FOB UT Wasserman & Associates 800-382-0329 www.wasserman-associates.com

Measures 9 areas of Skills and Experience Compare Results to National Averages Identify Strengths and Areas For Improvement

Available On-Line Test your design team to have a better understanding of your department strengths and areas for improvement.

Pricteion! c Redu Used - 2014, R156 48” Roll -Off Precision Trailer Tandem Axles | Air Ride Suspension : Air Operated Load Control, Air Operated Pin Locks | Mesh Between Rollers | Beaver Tail | Strap Locks and Winches | LED Lighting | 11.4 Ton Self Contained Power | (1) Heachache Rack $17,500 NOW $10,500 Eide Machinery Sales, Inc. 612-521-9193 www.eidemachinery.com/equipment/ trailers

For Additional Information email: twm@thejobline.com 2003 JDH Trussmaster 36' Roll-Off Trailer • Hydraulic Lift • Sliding Axle • Roller Locks • Winches & Straps • Air Brakes & Auto Slacks • Headache Rack $8,500 NOW $6,500 FOB WI Wasserman & Associates 800-382-0329 www.wasserman-associates.com

Pricteion! c Redu

2014 Precision 48′ Roll Off Trailer (R156) 2014 Precision 48′ roll off trailer features tandem axle, fifth wheel connection, locking rollers, ABS brakes, and hydraulic lift neck. Estimated 50% tire tread remaining. $17,990 FOB WI Wood Tech Systems 765-751-9990 www.woodtechsystems.com PHONE: 800-289-5627

Use your team's results to measure against potential new hires!

Pricteion! c Redu

2000 Haulin 36' Truss/Panel Roll-Off Trailer • Bed Length: 36' • GVWR: 26,000 Lbs • Battery Operated Hydraulic Tilt • Electric Brakes • Locking Rollers • Trailer Inspection is current • One location needs steel plate/weld repair (reference photo) $19,900 NOW $10,900 FOB PA Wasserman & Associates 800-382-0329 www.wasserman-associates.com

A

The

Component Manufacturing dverti$er

Serving the Structural Building Components Industry

Would you spend as little as

$136 Per Month! For this Space? See our rates and contact us for more info

Read/Subscribe online at www.componentadvertiser.com

FAX: 800-524-4982


A

Th e

Component Manufacturing dverti$ dverti $ er

By William Gould, PE, Director, R&D, Testing & Regulatory Compliance, Structural Engineering Technology Group

Don’t Forget! You Saw it in the

Adverti$$er

November 2026 #18328 Page #136

Florida’s New Saltwater Coastline Corrosion Rules: What Component Manufacturers Need to Know

T

he 2026 Florida Building Code adds prescriptive corrosion-protection requirements for fasteners, connectors, and metal plates near saltwater coastlines. Here is what changed, which options fit the requirements, and what to do next.

At a Glance Effective December 31, 2026, new Section 1711 of the Florida Building Code–Building and Section R332 of the Florida Building Code–Residential apply to specified fasteners, connectors, and metal plates in buildings within 3,000 feet of a saltwater coastline. The required material or coating depends on distance from the saltwater coastline and the structural component’s exposure.

What Changed? The Florida Building Code now uses a location-andexposure approach rather than a single corrosion rule for every coastal application. Projects within 3,000 feet of a saltwater coastline must be checked against Table 1711.1 or Table R332.1. The most demanding conditions occur within 300 feet, particularly for exterior or partially sheltered components exposed to salt-laden air.

Coastal buildings can contain exterior, partially sheltered, and vented connection locations. Image source: FEMA Coastal Construction Manual.

What Action is Required? •

Identify whether the project is within 3,000 feet of the saltwater coastline. If the coastline boundary is unclear, confirm the local jurisdiction’s interpretation.

•

Classify each connection location: exterior exposed or partially sheltered, unconditioned interior with ventilation, or unconditioned interior without ventilation.

Continued next page

PHONE: 800-289-5627

Read/Subscribe online at www.componentadvertiser.com

FAX: 800-524-4982


A

Th e

Component Manufacturing dverti$ dverti $ er

Don’t Forget! You Saw it in the

Adverti$$er

November 2026 #18328 Page #137

•

Specify fasteners, connectors, and metal plates that match the required protection level for that location and exposure.

•

Confirm that the selected product, finish, and required fasteners are shown in the project documents, truss design documents, submittals, purchase information, and installation instructions.

•

Do not assume standard galvanized hardware is acceptable for every saltwater coastal condition.

•

Verify Florida product approvals are in place for fasteners, connectors, and metal plates.

Affected Products and Compliance The table below is a practical selection summary for commonly specified fasteners, connectors, and metal plates. It is not a substitute for Table 1711.1 or Table R332.1, and the complete connection must comply, including fasteners.

Key Considerations for Stakeholders Component manufacturers: Saltwater coastal location is now a material-selection input. Material lists, connector, metal plate, and fastener inventories, product selections, estimating, and job setup may need to distinguish G90, G185/TZ, and stainless steel options.

Continued next page

PHONE: 800-289-5627

Read/Subscribe online at www.componentadvertiser.com

FAX: 800-524-4982


A

Th e

Component Manufacturing dverti$ dverti $ er

Don’t Forget! You Saw it in the

Adverti$$er

November 2026 #18328 Page #138

Designers and truss technicians: Construction documents should identify exposure and required corrosion protection. Connectors, metal plates, and fasteners should be selected as a coordinated system rather than independently. Builders and installers: Ordering the right connector is only part of compliance. Substituted fasteners, mixed metals, field storage, and installation damage can undermine the specified corrosion protection. Dealers and customers: Product cost and lead time may change when enhanced galvanized or stainless steel materials are required. Confirm requirements early enough to avoid redesign, substitutions, or jobsite delays. Building officials: Code evaluation reports and Florida product approvals will state that products used within 3,000 feet must comply with Section 1711 or R332. The listed product must be supplied in the appropriate material or coating required for the actual exposure. Florida product approvals: Where a product is subject to Florida’s statewide product-approval program, confirm the applicable Florida product approval and supporting evaluation report. Verify the approved product designation, material or coating, required fasteners, design limitations, and conditions of use for the specific application.

A Simple Project Workflow 1. Locate — Determine whether the building is 0–300 feet, 300–3,000 feet, or more than 3,000 feet from the saltwater coastline. 2. Classify — Identify the exposure around each connection, not just the building as a whole. 3. Specify — Select the required stainless steel, enhanced galvanized, or standard galvanized products and matching fasteners. 4. Communicate — Carry the selection through design notes, truss design documents, submittals, material lists, purchase orders, and installation instructions. 5. Verify — Before installation, check product markings, coating designation, fasteners, and any code evaluation report conditions.

Common Misinterpretation “Within 3,000 feet” does not automatically mean every connector, metal plate, and fastener must be stainless steel. The 2026 Florida Building Code differentiates by distance, exposure, and component type. The opposite is equally important: standard G90 hardware is not automatically acceptable throughout the 3,000-foot zone. Continued next page

PHONE: 800-289-5627

Read/Subscribe online at www.componentadvertiser.com

FAX: 800-524-4982


A

Th e

Component Manufacturing dverti$ dverti $ er

Don’t Forget! You Saw it in the

Adverti$$er

November 2026 #18328 Page #139

Corroded structural connectors. Image source: FEMA Coastal Construction Manual.

Technical Reference: Protection Levels For stakeholders who need the underlying specifications, the Florida Building Code recognizes the following protection approaches in the applicable conditions: •

Fasteners: stainless steel or prescribed galvanized/performance-based options, including ASTM A153, ASTM A641 Class 3S, and specified ASTM B117 or ASTM G85 Annex A5 performance criteria.

•

Standard galvanized connectors and metal plates: ASTM A653 G90, qualifying ASTM A123 hot-dip galvanizing, or protection permitted by ANSI/TPI 1.

•

Enhanced galvanized connectors and metal plates: ASTM A653 G185, qualifying ASTM A123 hot-dip galvanizing, or protection permitted by ANSI/TPI 1.

•

Stainless-steel connectors: ASTM A240 Type 316 where the table requires stainless steel connectors and metal plates.

The Bottom Line Florida’s new building code provisions make corrosion protection a defined design and procurement decision for saltwater coastal work. The practical response is straightforward: identify the project location, classify the exposure, select a compliant connector, metal plate, and fastener package, and carry that selection through installation. Making the decision early is the best way to protect the connection and keep the project moving.

References and Verification •

2026 Florida Building Code–Building, Section 1711 and Table 1711.1.

•

2026 Florida Building Code–Residential, Section R332 and Table R332.1.

•

ANSI/TPI 1-2022, Section 6.5.

PHONE: 800-289-5627

Read/Subscribe online at www.componentadvertiser.com

FAX: 800-524-4982


The ERP Your Business Can Build On Connect every part of your operation with an ERP built to help building materials businesses work smarter and grow stronger.

LEARN MORE


A

Th e

Component Manufacturing dverti$ dverti $ er

Don’t Forget! You Saw it in the

Adverti$$er

November 2026 #18328 Page #141

TRUCKS & TRAILERS

Pricteion! c Redu

2022 Peterbilt 579 S/A Day Cab Truck #1 Paccar MX-13 / 12.9L / 405 HP Engine 249,300 Miles / 5,566 Engine Hours Auto Transmission Engine Brake 12,000 Lb Front Axle / 22,700 Lb Rear Axle / 34,700 Lb GVWR Air Trac Air Ride Suspension 148 Inch Wheelbase Dual Fuel Tanks Tires are Very Good $35,000 FOB PA Wasserman & Associates 800-382-0329 www.wasserman-associates.com

2021 Big John Extendable Pole Truss Trailer Extendable pole trailer Used for 60' span roof trusses, peak down Retracted length - 35'. O.A. Extended length - 45' O.A. Adjustable 2' Increments Outer tube frame - 8" square tube Inner tube frame - 6" square tube Axles - (2) 25,000 LB Capacity Each Axle width -102" Anti-lock brake system Parking brakes on both axles Wheels - 10 stud outboard drums Tires - 11 R 22.5 radials Rims - 22.5 steel unimount (8) alum wheels Suspension - Watson air ride with dump valve Landing gear - 2 speed Bumper - standard Lights - DOT Specs, LED Package (2) truss stands (4) winches with straps $29,900 NOW $11,500 FOB SC Wasserman & Associates 800-382-0329 www.wasserman-associates.com

1991 40′ Wabash Roll Off Truss Trailer 1991 40′ Wabash truss trailer features a sliding single axle, a fifth wheel connection, and locking rollers. The trailer has a current DOT certification and an estimated 80% brake life remaining and 75% tire tread remaining. $11,900 FOB OH Wood Tech Systems 765-751-9990 www.woodtechsystems.com

Pricteion! c Redu 2000 Iron Steer 25' Gooseneck Roll-Off Trailer • Tandem Dexter 10,000 Lb Axles with Dual Wheels • Electric Brakes • Electric over Hydraulic Bed Tilt • 25' Roller Bed Length with Roller Locks $17,500 NOW $15,500 FOB IN Wasserman & Associates 800-382-0329 www.wasserman-associates.com PHONE: 800-289-5627

2005 48-60′ Precision Roll-Off Trailer 48–60ft Stretch features include ABS, locking rollers, sliding tandem axle, hydraulic lift neck, 48,000 lbs. GVWR. 80% brakes remaining, 80% tire tread. Current DOT. $24,995 FOB OH Wood Tech Systems 765-751-9990 www.woodtechsystems.com

Read/Subscribe online at www.componentadvertiser.com

FAX: 800-524-4982


Be in the

KNOW Consider the Benefits of MSRLPC Membership

All who produce, supply, and use machine stress rated lumber are invited to join the MSR Lumber Producers Council. Membership supports the annual MSR Workshop, which brings together members of the entire lumber supply chain and offers a unique opportunity for participants to network and gain a broader perspective on the MSR market and opportunities for growth.

“

As a component manufacturer, understanding what you’re buying and how it’s produced is critical. If you are bidding and designing jobs months in advance and don’t have a pulse on the MSR supply in North America, you can find yourself in a pickle. Material availability is not optional—it’s foundational to profitability.” —Porter Clark, Hiwassee Builders Supply Inc.

LEARN MORE & JOIN AT:

msrlumber.org/about


A

Th e

Component Manufacturing dverti$ dverti $ er

Don’t Forget! You Saw it in the

November 2026 #18328 Page #143

Adverti$$er

FLATBED WITH FORKLIFT MOUNT STANDARD - EXTENDABLE & HD TRUCK BED

40', 45' Standard Sizes - 20' & 24' HD Truck Bed Sizes 40'-53', 45'-60' Extendable Sizes 2 YEAR WARRANTY

PLAN YOUR 2027 ~ BUILD WITH US TODAY FORKLIFT MOUNT FITS MAJOR BRANDS - FULL GALVANIZED OPTION AVAILABLE

NEW HD TRUCK BED

NEW EXTENDABLE FLATBED

2019 International Durastar Flatbed Truck • 28’ Long x 96” Wide Flatbed (sandblasted & painted in 2025) • Belt Tilt with 3 Rollers • 6.7L Cummins Engine • Automatic Transmission • Air Brakes & Air Ride Suspension • GVW: 33,000 Lbs • 113,133 Miles • DOT is Current

$72,500 FOB IN

800-382-0329 | www.wasserman-associates.com

STANDARD WITH AIR-RIDE SUSPENSION, SLIDING WINCH & STRAP LOCK SYSTEM, CENTER TIE-DOWN BAR, APITONG DECKING

BUILT TO MOVE MORE ~ ENGINEERED TO DO MORE FOR OVER 25 YEARS

1-800-237-5161

sales@precisionequipmfg.com

Work Smarter

Sub Component Nailer Speed Up Your Production of wall panels, windows, doors, and other sub components

Block Sizes: 2x4 & 2x6 framing lumber, any length Nail Cycle Time: 1 nail 1 sec; 2 nail 2 sec; 3 nail 3 sec Machine Set Up Time: 1 sec from any prior set up Air Supply: 125 psi at 30 CFM, nothing less Electrical Supply: 120 VAC Frame: 1/4” steel plates mounted to heavy duty roll top tables and 2x2 skids mounted no install Transfer System: Pneumatic transfer for finished sub component assembly Covers: 3/16” thick aluminum Shipping Weight: 1000 lbs including crate Dimensions: Height 48”, Width 48”, Depth 10” MADE IN AMERICA BY AMERICANS See it in Action!

530-295-8068 PHONE: 800-289-5627

sales@thehaincompany.com

Read/Subscribe online at www.componentadvertiser.com

FAX: 800-524-4982


Industry Best Practice:

SBCA’s Jobsite Packages

With the new BCSI-2025, all B Series Documents have been updated

≤45° typical

Apply diagonal bracing or structural sheathing *Note: Maximum spacing for top chord temporary lateral restraint.

Trus

s Cle up toar Spans 30'

• Floor Truss Jobsite Package

Up to

Less

45’

60’**

up to

80’

Top Chord Temporary Lateral Restraint

Max. 4’ spacing

Figure B2-37

TRUSSES OVER 60 FEET IN LENGTH

RIGGING ANGLE AS REQUIRED FOR THE SPREADER BAR

Attach to truss per lifting plan design

Spreader Bar Spreader Bar Attach to truss per lifting plan design

Stiffback

Tagline

Figure B2-38

sbcacomponents.com/jobsite-packages

60’

Max. 45˚

Includes the Component Warning Notice Sheet for installers. Also available as part of SBCA’s Electronic Jobsite Package subscription!

than

60' up to 80'

• Long Span Jobsite Package • Wall Panel Jobsite Package

3, er 1 pt .4. ha 3 C n e tio Se ec S

• Jobsite Package

3, er 1 pt .4. ha 3 C n e tio Se ec S

3, er 1 pt .4. ha 3 C n e tio Se ec S

There are four different Jobsite Packages available:

4' oc max.*

Spreader Bar 2/3to 3/4Truss Length Truss Length (Over 60')

Tagline

Spreader Bar 2/3to 3/4Truss Length Truss Length (Over 60')


A

Th e

Component Manufacturing dverti$ dverti $ er

Don’t Forget! You Saw it in the

Adverti$$er

November 2026 #18328 Page #145

TRUCKS & TRAILERS

2005 Precision Equipment 42'-60' Stretch Roll-Off Trailer • Hydraulic Lift • Sliding Tandems • Headache Rack • Roller Locks • Tires & Brakes: 80% Remaining • DOT is Current • Video available upon request $23,500 FOB OH Wasserman & Associates 800-382-0329 www.wasserman-associates.com

BUILT TO MOVE MORE ~ ENGINEERED TO DO MORE FOR OVER 25 YEARS 2014 Precision 48′ Roll Off Trailer (R157) 2014 Precision 48′ roll off trailer features tandem axle, fifth wheel connection, locking rollers, ABS brakes, and hydraulic lift neck. Estimated 50% tire tread remaining. $17,990 FOB WI Wood Tech Systems 765-751-9990 www.woodtechsystems.com

GOOSENECK TRUSS TRAILERS 26', 32', 36', & 40' ALSO AVAILABLE WITH SPLIT ROLLERS

HEAVY DUTY TRUCK ROLLER BEDS 26', 28', 30' & 32' available Can be mounted on ALL MAJOR TRUCK BRANDS!

EXTENDABLE TRUSS TRAILERS

Pricteion! c Redu

2021 Maxx-D 40' Roll-Off Trailer • 40’ Bed Length x 102” Wide with Custom Rollers • Hydraulic Bed Tilt • Dual 12,000 Lb Dexter Axles • Heavy Duty Suspension • Electric over Hydraulic Disk Brakes • Tires & Brakes are Good $$29,500 FOB IN Wasserman & Associates 800-382-0329 www.wasserman-associates.com

1990 Wabash 48' - 77' Roll off trailer • Certified for highway • New 5th wheel • New Undercarriage • New rear bumper • New wiring • 70% rubber remaining Asking $19,500 NOW $10,500 M.P.B. Builders 920-748-2601 www.mpbbuilders.com

Pricteion! c Redu

38'-53',42'-60',50'-70'' & 53'-80' SIZES AVAILABLE (Shown with optional Headache Rack)

STANDARD TRUSS TRAILERS 40', 48' & 53’ SIZES AVAILABLE 46' NON-HYDRAULIC & 48' HYDRAULIC TRUSS/ WALL PANEL STEP DECK TRAILERS (Shown with optional Headache Rack)

NEW FLATBED FORKLIFT MOUNT

HD Truck Bed, Standard & Extendable

Pricteion! c e R du

2002 JDH Trussmaster 36'-51' Stretch Roll-Off Trailer • Hydraulic Lift • Sliding Tandems • Spring Suspension • Roller Locks & Roller Brakes • Headache Rack • Tires are 50% or Better $19,000 NOW $13,900 FOB CO Wasserman & Associates 800-382-0329 www.wasserman-associates.com PHONE: 800-289-5627

2021 Big John Extendable Truss Pole Trailer 2021 Big John peak down extendable pole trailer. Transports up to 60′ peak down trusses with a retracted length of 35 ft. O.A., and an extended length of 45 ft. O.A. Adjustable in up to 2 ft. increments. Outer tube frame is 8″ sq. tub and inner frame is 6″ sq. tub. Features 2 axles with anti-lock brake system and parking brakes on both axles. Trailer features air ride suspension with dump valve and 2 speed landing gear. $23,890 NOW $11,490 FOB NC Wood Tech Systems 765-751-9990 www.woodtechsystems.com

• Split roller option on Goosenecks • 6 Paint colors Standard • Exclusive patented strap locks • Wireless remote • Rollers - Powder-coated & • Sliding Winch System Galvanized Standard • Custom engineered & designed

2 YEAR WARRANTY PLAN YOUR 2027 ~ BUILD WITH US TODAY Shawn Kuck - Sales Manager NA

Read/Subscribe online at www.componentadvertiser.com

701-941-2017 or 1-800-237-5161

sales@precisionequipmfg.com FAX: 800-524-4982


A

Th e

Component Manufacturing dverti$ dverti $ er

Don’t Forget! You Saw it in the

Adverti$$er

November 2026 #18328 Page #146

From Chaos to Cut Lists: How Truss Manufacturers are Using AI to Optimize Plant Operations By Simpson Strong-Tie Staff

N

eed to improve your truss plant production? AI may be the answer for you.

Using information and knowledge you already have, you can work with AI to streamline your production workflow with a few basic prompts. One of the best things about using AI is that no prior training is required. It’s not a new tool you need to learn, and you can begin using it immediately. This article is a blueprint for how truss manufacturers can use generative AI as a “thought partner” to unlock hidden capacity in your facility.

1. Let AI Organize Large Amounts of Raw Data Truss plants generate mountains of unorganized data every day: job logs, shift reports, cut list PDFs, lumber inventory sheets, and notes from floor managers. Manually cleaning and formatting this data into useful spreadsheets can take hours you don’t have. One of the most immediate wins with AI is letting it make sense out of operational chaos. Generative AI tools (like ChatGPT, Microsoft Copilot, Claude, or Google Gemini) excel at swallowing raw data and spitting out structured analysis. You do not need to clean the data first; simply upload it or drag and drop it into the AI chat box. A Note About Security and Data Privacy Different AI tools have different privacy rules, depending on what kind of account you have. Most free AI tools use your conversations to “train” the model and make it smarter; this means that your input helps tell it how to better respond to someone else in the future. AI subscriptions have varying levels of data privacy. •

Free AI = assume your data may be used to improve the service.

•

Paid personal AI = better features but check the privacy settings. There might also be privacy settings you can change. Don’t assume the settings are set the way you want.

•

Business/Enterprise AI = typically designed so your organization’s data is not used to train public models and is protected by business agreements.

Continued next page

PHONE: 800-289-5627

Read/Subscribe online at www.componentadvertiser.com

FAX: 800-524-4982


A

Th e

Component Manufacturing dverti$ dverti $ er

Don’t Forget! You Saw it in the

Adverti$$er

November 2026 #18328 Page #147

Make sure you’re logged in before you start a chat if you have a paid subscription. If you don’t log in, you’re on the free tier which means no privacy. Review the privacy policy for your specific subscription. Finally, make sure you don’t put passwords or credentials into an AI prompt or a chat conversation. Follow any company-wide AI policies, if your company has them. If there is no company-wide policy, use the accountant, lawyer, or HR rule — if it’s something you would only share with those departments, don’t share it with AI. AI in Action Try this prompt in your AI tool: “I run a component manufacturing plant. Act as my research and operations analyst. I am going to provide you with a series of raw daily shift reports and job logs from my truss plant. Do not perform any analysis until I tell you I am done uploading. Once I give the word, I want you to organize the information into key themes, look for patterns regarding our daily bottlenecks, and give me a bulleted executive summary of recommended actions based on the evidence.” The output you receive is just a starting point; responses become more refined and detailed as you add context and follow-up prompts. Remember that AI is not replacing you as a decisionmaker but instead functions more as a partner you can share ideas with and get input on. It helps you ask better questions and clarify your thought process, detect information you may be missing, and lay out your options in an orderly manner. Because you make the final decision, you remain in control and can redirect the conversation at any point. Overcoming Technical Roadblocks Because of technical constraints, you may encounter some stumbling blocks when giving AI information to review. Keep the following in mind if your AI tool is having trouble consuming the data. •

The File Extension Trick: Component design software often outputs data files with specialized extensions that AI tools won’t accept. Open the file in Notepad first. If it is readable text, simply rename the file extension to .txt. If it looks like gibberish, rename the extension to .zip; it is sometimes a compressed folder containing files or data the AI can read.

•

Video & Meetings: Want to analyze a long production meeting or a walk-through video of a bottleneck? Use auto-transcription tools (like Microsoft Teams) to download the text transcript and paste that directly into the AI tool instead.

•

File Size Limitations: Some files may be too large to upload; 30–100 MB is the typical limit on file sizes. But there are ways around this: o Use a direct connection to Cloud File Storage (One Drive, Google Drive, etc.). o For videos, upload transcripts instead of full files. o Copy and paste text or screenshots. Continued next page

PHONE: 800-289-5627

Read/Subscribe online at www.componentadvertiser.com

FAX: 800-524-4982


A

Th e

Component Manufacturing dverti$ dverti $ er

Don’t Forget! You Saw it in the

Adverti$$er

November 2026 #18328 Page #148

2. Break Big Factory Problems into “Bite-Sized” Solutions When a plant manager wants to tackle a major operational question, like changing how material is batched or routed, the sheer number of moving parts can be overwhelming. AI is exceptionally skilled at mapping out complex systems so you can execute them one piece at a time. Consider a typical truss plant question: Should you optimize a linear saw to cut one truss at a time, or batch multiple trusses together? When we ran this scenario through AI, the system didn’t just give a generic answer; it mapped out the five distinct sub-problems the manager needed to account for before making a change: •

01. Lumber Savings (How much material is saved?)

•

02. Re-Sort Time (Who sorts mixed pieces at the outfeed?)

•

03. Saw-to-Table Timing (Do larger runs cause table delays?)

•

04.Outfeed Staging Space (Are more carts or space required?)

•

05. Job Mix (How often do repeat trusses occur?)

By letting AI map the landscape, a production manager can choose to solve just Problem 01 first, ignoring the others until the data is verified. To delve deeper into the issue, issue additional prompts that build on the starting prompt, as shown in the graphic.

Continued next page

PHONE: 800-289-5627

Read/Subscribe online at www.componentadvertiser.com

FAX: 800-524-4982


A

Th e

Component Manufacturing dverti$ dverti $ er

Don’t Forget! You Saw it in the

Adverti$$er

November 2026 #18328 Page #149

3. Build a Custom Lumber Optimizer (without writing any code) We uploaded a standard Cut List PDF; this is a file format universal to almost every truss facility and we asked the AI to build a cost-minimizing lumber cutting optimizer. Through a sequence of plain-English prompts, the AI acted as a sophisticated software engineer: 1. It extracted the exact lumber dimensions and quantities directly from the PDF. 2. It pulled localized online lumber pricing to shift the algorithm from a basic “waste-reduction” model to a “cost-first” optimization model. 3. When checked, the AI initially used odd lumber lengths (like 17 ft and 19 ft). When we provided the additional prompt: “Only use standard purchasable lengths,” it immediately corrected its constraints to standard 2-foot increments. Use this as a lesson and always check your results. Ultimately, the AI generated a highly advanced global optimizer using column generation — a mathematical approach that speeds analysis without the need to evaluate millions of piece combinations. Across four sample jobs tested, optimizing for the “Full Job” rather than cutting one truss at a time yielded clear material savings. Best of all, the AI wrote a downloadable Python program so that a plant manager could run future PDF cut lists through the tool automatically, without the plant manager or any human writing a single line of code. Optimization Window

Job Cost Total Material Savings

1 Truss at a Time (Baseline)

$865.84

Baseline

2 Trusses at a Time

$862.83

$3.01

3 Trusses at a Time

$855.02

$10.82

Full Job Optimization (All 11 Trusses)

$844.01

$21.83

Note: While material savings were proven, the AI accurately flagged that the manager must weigh these dollar savings against increased handling and sorting times at the outfeed table.

4. Predict Capacity Using Data and Complexity Factors Most truss plants schedule their weekly capacity based purely on total Board Footage (BF). Yet every manager knows that two jobs with identical board footage can take wildly different amounts of time to build if one is a simple common truss and the other is a complex girder or scissor truss. When asked how to build a truer “complexity factor” to overlay onto board footage, the AI laid out a comprehensive data collection framework. It isolated the specific variables that dictate true assembly speed: Continued next page

PHONE: 800-289-5627

Read/Subscribe online at www.componentadvertiser.com

FAX: 800-524-4982


A

Th e

Component Manufacturing dverti$ dverti $ er

Don’t Forget! You Saw it in the

Adverti$$er

•

Piece Count & Joint Count per truss

•

Connector Plate Count

•

Number of Multi-Ply Trusses

•

Lumber Diversity (varying widths/species in a single build)

•

Truss Type & Span

November 2026 #18328 Page #150

Furthermore, the AI accurately predicted the exact statistical sample sizes required to make the data reliable. It noted that while a plant can start analyzing trends with 5,000 to 10,000 trusses, an excellent, bulletproof capacity model requires a historical pool of 100,000+ trusses. The lesson for manufacturers? The data collection can start today, even if the final analysis doesn’t happen until next year. Knowing exactly what data to capture is massive progress.

5. Build Real Tools: The 2-Hour Live Floor Dashboard You can also build live tools in a short amount of time. Take the example of the plant manager who wanted to foster a friendly rivalry between his production lines. He wanted a simple dashboard displayed on a TV screen on the shop floor showing Shift Goal vs. Actual Pace. Using a step-by-step plain English conversation, the AI built a working tool in roughly two hours: [User Request: “Show shift goal vs actual on a screen”]

↓

[AI Drafts a Clean HTML Dashboard Layout]

↓

[User Request: “Connect it to our software’s shift-statistics API”]

↓

[AI Writes Data-Pull Script & Recommends Windows Credential Manager for Security]

↓

[User Request: “Show East Line vs West Line side-by-side for competition”]

↓

[AI Adds Live Progress Bars, Elapsed Time Pace Markers, and Shift Comparisons]

Continued next page

PHONE: 800-289-5627

Read/Subscribe online at www.componentadvertiser.com

FAX: 800-524-4982


A

Th e

Component Manufacturing dverti$ dverti $ er

Don’t Forget! You Saw it in the

Adverti$$er

November 2026 #18328 Page #151

The resulting script executes in 5 seconds and auto-refreshes every 5 minutes via Windows Task Scheduler. No programmers were hired, and no IT budget was spent. It required only a clear description of the goal and someone with basic Windows PC skills to execute the AI’s step-by-step setup instructions. Your AI Implementation Roadmap You do not need to be a software engineer to bring artificial intelligence into your component plant. Treat the technology like a brilliant, eager co-worker who has no agenda, but occasionally makes mistakes. To get started next week, follow this five-step roadmap: 1. Pick One Small Problem: Choose a specific, routine production choice you make every week (e.g., a batching question, a staging puzzle, or a minor scheduling bottleneck). 2. Describe It in Plain Language: Open an AI tool and explain your plant setup, your crew constraints, and the specific decision you are facing. No industry jargon or special promptwriting formatting is required. 3. Continue the Conversation: Do not accept the first answer as a final prescription. Treat it as a back-and-forth. Ask the AI to compare alternative perspectives, lay out the hidden trade-offs, or design a mini-experiment to test the theory. 4. Validate Against Your Experience: AI can “hallucinate” — it can give a beautifully written, highly confident answer that is operationally completely wrong. Your lifelong manufacturing judgment is the ultimate filter. Question in greater depth anything that doesn’t feel right, and explicitly ask the AI: “What are your sources for that conclusion?” 5. AI is its Own User Manual: If you don’t know how to upload or format a file, let AI teach you. It will give you the exact steps required. For example, “I have an .xyz file generated by [Application Name] and need to extract data from it. I can’t upload the file because the format isn’t supported. What are my options for converting, exporting, extracting, or packaging the data into a format that can be uploaded and analyzed?” The barrier between a plant manager having an innovative operational idea and building a real, data-driven tool to solve it has officially vanished. The plants that start talking to AI today are the ones that will dominate the capacity demands of tomorrow.

Copyright © 2026 Simpson Strong-Tie Company Inc. All Rights Reserved

PHONE: 800-289-5627

Read/Subscribe online at www.componentadvertiser.com

FAX: 800-524-4982


THE BENEFITS JUST KEEP EASILY, SAFELY, NEATLY STACKING UP. Stacking wall panels at the end of your production line can be a real labor-intensive and safety-challenging task. But it doesn’t have to be now, thanks to ProStack. This innovative wall panel stacker literally stacks from the bottom up, reducing awkward overhead lifting & placement, and the risk of head injury. Plus, ProStack frees up at least one worker to return more productively to your core task—building wall panels. Enhanced worker safety and productivity is what ProStack is all about.

Setup and installation is easy too, without the need for complex training or disruption to workflow. So, free up your team to do what they do best, and you need to do most, and let ProStack stack your wall panels instead. Contact us to learn more today. For a ProStack demonstration video, scan the QR code below.

ProStack

By: DAK Automation

765-751-9990 www.woodtechsystems.com

Wood Tech Systems is a registered trade name of Wood Truss Systems, Inc.


A

Th e

Component Manufacturing dverti$ dverti $ er

Don’t Forget! You Saw it in the

Adverti$$er

November 2026 #18328 Page #153

MISC.

Pricteion! c Redu

New Heavy Duty Lift Cart

NEW! 2006 Rogers 15 HP Compressor 2006 Rogers 15 HP rotary screw compressor model RMC-KIV-15-100, reconditioned in 2021. 125 PSI, 8,100 hours. 460 volt, 3 phase electrical required. $16,997 NOW $13,995 FOB OR Wood Tech Systems 765-751-9990 www.woodtechsystems.com

Champion Valve Plus Compressor Champion Valve Plus – Reciprocating twostage compressor, model 7.5–V80E, with Eaton controls, 7.5 HP motor, 80 gal vertical tank, rated for 22 cfm @ 175 PSI. 208/230/ 460 volt, 3 phase electrical required. $2,495 FOB AZ Wood Tech Systems 765-751-9990 www.woodtechsystems.com

A

Th e

• 60" x 72" Base • 10" Fixed & Swivel Casters • 2 Vertical Standards and Cart Blocking for Fork Lift Loading • EZ-Set Pneumatic Height Setting

• Auto Indexing (as material is removed) • 6,000 Lb Capacity • White Powder Coat Finish (Optional Custom Colors) • Made in the USA with USA Steel

Component Manufacturing $11,425 FOB SD dverti$er 800-382-0329 | www.wasserman-associates.com S B C I

Serving the tructural uilding omponents ndustry

2004 MiTek CPC-16 Sub Component Nailer 2004 MiTek CPC-16 sub component nailing machine nails 2×4 or 2×6 sub components up to 11′ long. Includes push button controls and outfeed stacker. Nails corners, L’s, U’s, stud-block-stud, double and triple studs, trimmers, and double trimmers. 230v, 3 phase power. 50 CFM at 120 PSI air required. $10,995 FOB CA Wood Tech Systems 765-751-9990 www.woodtechsystems.com

JobLine.com, inc.

The

800-289-JOBS

NEW! Building Component Manufacturing Industry

Job Board Turn Key Platform Post and Manage Multiple Jobs and Multiple Candidates New Application Notices and Internal Candidate Messaging Keeps your search confidential Manage on Your Phone or Computer

For Additional Information

Time To Hire? We’re here when you need help! visit: www.thejobline.com email: twm@thejobline.com

STRICTLY CONFIDENTIAL!

PHONE: 800-289-5627

twm@Hiring-Zone.com Visit our website: www.Hiring-Zone.com

New Sub-Component Nailer • • • • • • • •

Assembles Trimmers, Jacks, L’s, Channels & Headers 2x4 and 2x6 Capacity Remote Fire & 3-Way Clamping Staggered or Straight Line Nail Pattern Squaring Stop Foot Pedal Control Reserve Air Tank 5’ Infeed & Outfeed Roller Conveyor

$29,800 FOB NE 800-382-0329 | www.wasserman-associates.com

Read/Subscribe online at www.componentadvertiser.com

FAX: 800-524-4982


A

Th e

Component Manufacturing dverti$ dverti $ er

Don’t Forget! You Saw it in the

November 2026 #18328 Page #154

Adverti$$er

$249,997 FOB WY

2020 (Reconditioned) Clark Column Laminator (OEM Reconditioned in 2020) Features the capacity of producing 3-ply to 5-ply columns up to 40 feet in length from 2”x 6”, 2”x 8”, or 2”x 10” boards. The hydraulic pressing clamps secure the entire length of the post on all four sides during the assembly and computerized nailing process to ensure that the plies are kept tightly together producing a straight & true laminated column. Options included hydraulic ejection and handling systems, planing of finished columns for smooth, uniform surface, industrial nailers, and in-line hydraulic plate press for material splicing. www.woodtechsystems.com

765-751-9990 PHONE: 800-289-5627

Read/Subscribe online at www.componentadvertiser.com

FAX: 800-524-4982


A

Th e

Component Manufacturing dverti$ dverti $ er

Don’t Forget! You Saw it in the

Adverti$$er

November 2026 #18328 Page #155

NEW!

$51,500 FOB QC New ASI Ink Jet Plate Marker • Automated Wall Panel Parts Cutting & Marking as directed by Wall Panel Design Software Output • 20' Roller Conveyor with Servo Motor Controlled Length Stop/Plate Pusher • 10' Infeed Roller Conveyor • 24" Lenovo Touch Screen Computer (Windows 11 Pro OS) • ASI Basic L Plate Cutting/Marking Operating Software • 4 Head Ink Jet Plate Marker (marks 2 plates on edge)

• 110 Volt / 1 Phase • Includes Onsite Installation & Training • Excludes Saw & Dust Collector • Add $2,250 for Dewalt Sliding Miter Saw with Saw Support Table • Other Saw Options Include: Existing Saws, ASI Radial Arm Saw, Lauderdale Hamilton Up Cut Saw & Vista Angle Boss Saws • Video available upon request

Pricteion! c Redu

800-382-0329 | www.wasserman-associates.com

NEW!

BAM Stair Wedge Saw Builders Automation Machinery (BAM) model 2220, stair wedge saw station automatically produces wood wedges used to lock stair treads and risers into slots cut into the stair stringers…

Price based on configuration FOB FL

765-751-9990 PHONE: 800-289-5627

www.woodtechsystems.com

2023 MiTek Component Delivery System (CDS) Quantity of two, priced per each. Automated conveyor system for moving cut boards from a linear saw towards assembly tables. Cut boards move from the linear saw to a staging conveyor with the ability to divert boards for use later. Board capacities from 2×3″ minimum to 2×12″ maximum, to 20-ft maximum length. Shortest lengths governed by the linear saw. Each CDS includes operator bridge platform, HMI control stands with touchscreen tablet, one 5-ft transfer conveyor, one 22-ft push conveyor, one 30-ft staging conveyor assembly, one 10-ft staging conveyor, one power and control module, one 24″ wide bridge, pushbutton emergency stop and any available spare parts

$178,995 NOW $139,990 FOB GA

765-751-9990

Read/Subscribe online at www.componentadvertiser.com

www.woodtechsystems.com FAX: 800-524-4982


ACTUALLY, WE CAN SAY QUITE A LOT WITH LASER ACCURACY. To see meaningful labor savings, quality improvement and production gains, SL Lasers with their easy-to-see green light are nothing short of illuminating. They enhance worker accuracy and productivity, regardless of experience or primary language. They can reduce tedious setup time by up to 70%. No complex training or costly service agreements are required. And SL Lasers integrate seamlessly with any component design software and are quickly installed over existing equipment. We’ve been trailblazers in wood component laser projection since its very beginning, and we’re still delivering more rapid ROI for roof truss, wall and floor panel producers every day. Contact our enlightening team at Wood Tech Systems to see how SL Laser can deliver for you.

Newly enhanced projection speed improves optics, while advanced cooling of the diode ensures greater reliability of the heads.

SL Laser heads are simple to mount and easily installed over your existing assembly equipment with minimal disruption to operation.

Lasers improve the accuracy and productivity of any labor force, regardless of experience or primary language.

765-751-9990 www.woodtechsystems.com Wood Tech Systems is a registered trade name of Wood Truss Systems, Inc.


A

Th e

Component Manufacturing dverti$ dverti $ er

Don’t Forget! You Saw it in the

November 2026 #18328 Page #157

Adverti$$er

MISC.

Pricteion! c Redu

Equipment Wanted! FC Curtis CA Series Compresso FC Curtis model E-15 two-stage, piston drive, air compressor with dryer and 80 Gal. horizontal storage tank, 175 PSI, and 5 HP drive motor. Sold for $4,200 new. 480 volt, 3 phase electrical required. $2,495 FOB AZ Wood Tech Systems 765-751-9990 www.woodtechsystems.com

EMSI Teeter Cart Width – 46” / Length – 73” / Load Capacity – 2850 pounds / Pneumatic tires – 14.5 inch / Maximum utility in truss plants, panel plants, and lumber yards / Quick Assembly by bolting parts together / All hardware is supplied / Upright 2 x 4’s not supplied / Medium duty tires rated at 1500 lbs each are included. Call for Price Eide Machinery Sales, Inc. 612-521-9193 www.eidemachinery.com

NAPA 25 HP Compressor with Dryer (BU-1) 2005 NAPA 25 HP rotary screw compressor model 8025B, with Rogers CLS46 dryer. Compressor reconditioned in 2021. 125 PSIG, 8,292 hours. 460 volt, 3 phase, 29 Amp electrical required. $11,997 NOW $9,997 FOB OR Wood Tech Systems 765-751-9990 www.woodtechsystems.com

Saws

Trucks & Trailers

• Automated Component & Linear Saws (2010 & Newer) • Monet DeSauw or TimberMill Manual Component Saws • Floor Web Saws • Spida (Apollo) Saws with Truss Automation • Bunk Cutters

Modular Equipment

• Stretch Roll-Off Trailers • Gooseneck Roll-Off Trailers • Pacific Automation or MiTek Mobile Home Press

Truss Equipment

Contact Wasserman & Associates for a Fair Market Value Assessment of your Used Equipment

• Roller Gantry & Hydraulic Press Systems • Finish Rollers • Truss Stackers • Floor Truss Machines • Lumber Splicers • Jack Tables • C-Clamp Presses

Operational, Needs Work, and Parts Only equipment will be considered!

800-382-0329 | www.wasserman-associates.com NEW GALVANIZED STEEL STRAPPING 1 1/4" wide x .035 thick. $95 per coil. $1,900 per skid (21 coils). FOB PA. Wasserman & Associates 800-382-0329 www.wasserman-associates.com

BAM Pre-Hung Door Machine Titan Series Builders Automation Machinery (BAM) Titan series pre-hung door machine. Designed to produce between 150 and 250 doors per day. Multi-function door machine capable of doors 1'-6″ to 4′-0″ in width, and both 6′-8″ or 8′-0″ door heights. Processes both 1 3/8″ and 1 3/4″ thick door slabs. Machines the door, hinge jamb and strike jamb all at the same time. Capable hinge sizes include 3 1/2″ x 3 1/2″, 4″ x 4″, 4 1/2″ x 4 1/2″ with 5/8″ radius. Cycle time with flush hinge routing is 45 seconds. 10′ long x 7′-6″ wide footprint. Shipping weight 4,000 lbs. More information Click Here Price based on configuration

NEW!

Used PCS 5 Chain Live Deck • PCS Hercules Heavy Utilization 5 Chain Live Deck • Auto Feeder or Foot Pedal Control • 3 HP / 3 Phase Motor $7,500 FOB WI Wasserman & Associates 800-382-0329 www.wasserman-associates.com

A

The

Component Manufacturing dverti$er

Serving the Structural Building Components Industry

2019 LAP Laser, 2-head System Two-head LAP Laser system, model CADPro, 10 mW green lasers. 0.5mm beam width, laser class 3R. Includes PRO SOFT TP 5.1 software, all available mounting brackets, distribution box, projector cables, remote control, hardware and manuals. Can work in a US location with some additional regulatory steps. OEM installation & support available for an additional fee of approx. $5,000. 110v, 1 phase electrical required. $21,995 Wood Tech Systems 765-751-9990 www.woodtechsystems.com

765-751-9990 PHONE: 800-289-5627

Read/Subscribe online at www.componentadvertiser.com

www.woodtechsystems.com FAX: 800-524-4982


The truss industry relies on 3rd party quality assurance services to provide random visits to review the plants Quality Assurance program along with their operations. If your plant needs to comply with the IRC, IBC and to those who depend on solid, experienced QA expertise, we ask you to consider selecting Timber Products Inspection, Inc. (TP) as your choice for 3rd party inspections. Proudly serving the forest products industry for over 50 years, TP brings the expertise you need to ensure your business is successful. As a responsible partner, TP delivers to clients, employees, and the industries we serve the confidence to drive value through the effective use of our diverse professional team. TP would like to welcome the following authorized agents to our inspection team, each of whom have many years of experience in the truss industry! •

Al Coffman

•

Jean Hart

•

Curt Holler

•

Chuck Ray

•

Glenn Traylor

•

Elliot Wilson

If you have questions about how you can make this selection, please contact your authorized agent above or Glenn Traylor at 919-280-5905 or trusguy@gmail.com


A

Th e

Component Manufacturing dverti$ dverti $ er

Don’t Forget! You Saw it in the

November 2026 #18328 Page #159

Adverti$$er

MISC.

New Handle Bar Router • Metabo HPT M12XE Variable Speed Router • Steel Handle Bar Frame with Makita Switches • 3 1/4 HP / 120 Volt / 1 Phase / 15 Amp • Includes 2 Router Bits $3,000 FOB NE. Wasserman & Associates 800-382-0329 www.wasserman-associates.com

Custom Slotted Steel Low-profile Tables, Qty: (13) Quantity of thirteen (13) custom-built, slotted steel tables, each 6′-8″ wide x 14′0″ deep x 1′-4″ tall. Table top building surface is 6″ x 1/2″ thick bar stock over 3″ channel, and 3/4″ diameter threaded rod adjustable feet. Slots are 3/4″ wide. No truss hardware included. Can be purchased in various quantities. $1,875 ea. FOB Ontario Wood Tech Systems 765-751-9990 www.woodtechsystems.com

SL-Laser Model ProDirector 7 Projection System Improved model ProDirector 7, green-color laser projection system from SL-Laser. Projects roof truss, floor truss and wall panel design images accurately onto building surface for faster setup and fabrication times. New employees are productive more quickly, with less training required. Each laser head provides 21′ projection length (at 15-foot ceiling heights). New model PD7 projector heads are smaller in size than previous models, have diodes that are easier than ever to swap out and maintain, and project an even clearer line onto the building surface.FOB NC Wood Tech Systems 765-751-9990 www.woodtechsystems.com

2005 NAPA 15 HP Compressor 2005 NAPA rotary screw compressor, 15 HP, reconditioned in 2021, 25,887 hours, model H80158. 460 volt, 3 phase, 20 Amp electrical required. $8,991 NOW $4,991 FOB OR Wood Tech Systems 765-751-9990 www.woodtechsystems.com

Electrical Supply: Motor: Highly Accurate: Stop Rail: Stops: Stop Blocks: Internal Components: Dimensions:

Used - Quincy 25 Horsepower Screw Compressor Taken from service $3500 Eide Machinery Sales, Inc. 612-521-9193 www.eidemachinery.com

PHONE: 800-289-5627

6 Chain Live Deck 6 Chain Live Deck 20’ Long x 17’ Wide Foot Pedal Control 240 Volt / 3 Phase $9,900 FOB ND Wasserman & Associates 800-382-0329 www.wasserman-associates.com

110 VAC 1/4 HP, 110 VAC, Linear Actuator +/- .010 Inches 2 x 4 x 1/4 Aluminum Extrusion Jig Bored Steel Machine Billet Aluminum Hardened, Ground and Polished Steel and Billet Aluminum Length: 5 feet (60”) to 60 feet (720”) Height: 12 inches Depth: 12 inches

If you are looking for the fastest, mist consistent way to measure and cut your product, then the Hain Measuring System (MEA) is your answer. The MEA changes from one length t any length instantly, up to 60’, without changing the operator’s position on the line. It is also highly accurate (+- .010) and quickly moves from one length to the next in seconds. The MEA is designed for quick and easy setup and is simple to use. Even a first time user will be productive with little or no training required. It can adapt to any saw and can be mounted to any surface so that you can integrate the MEA with your existing setup. The MEA is versatile allowing “left” or “right” handed operation and measurement in “feet and inches” or “inches” depending on your preference. The MEA is also available in a “Skid Mounted” version.

theHAINCOMPANY 6125 Enterprise Drive, Unit 92 | Diamond Springs, CA 95619 530.295.8068 | sales@thehaincompany.com

Read/Subscribe online at www.componentadvertiser.com

FAX: 800-524-4982


A

Th e

Component Manufacturing dverti$ dverti $ er

Don’t Forget! You Saw it in the

Adverti$$er

November 2026 #18328 Page #160

SBCA Heads to Charlotte for December Open Quarterly Meeting By Christine Wagner SBCA Director of Marketing & Communications

T

he Structural Building Components Association (SBCA) and National Framers Council (NFC) will bring component manufacturers, framers, suppliers, and other industry professionals together in Charlotte, North Carolina, December 8–10, 2026, for their final Open Quarterly Meeting (OQM) of the year. Held at the Sheraton Charlotte Hotel, the three-day event will offer opportunities to explore new technologies, discuss business strategies, connect with peers, and participate in initiatives shaping the structural building components industry. Open Quarterly Meetings have long been an important part of SBCA’s commitment to bringing the industry together. Unlike larger conferences and trade shows, OQMs provide an environment where attendees can engage directly with one another, share experiences, and contribute to conversations that influence the association’s direction. These meetings are open to anyone interested in the industry, whether they are longtime members, first-time attendees, or professionals looking to become more involved. For BJ Louws, President of Louws Truss, SBCA Board Member, and longtime OQM attendee, the meetings offer an opportunity to step away from the demands of running a business and consider what’s happening throughout the industry. “It’s a quarterly pulse check on what’s happening across the country,” says BJ. The December meeting will feature a diverse agenda addressing several topics relevant to businesses throughout the industry, including artificial intelligence (AI), marketing, economic conditions, workforce development, and emerging technologies.

Firsthand Look at Manufacturing Innovation The meeting begins Tuesday, December 8, with an optional tour of Rafters and Walls LLC. Attendees will visit the company’s manufacturing facility for a firsthand look at its operations and see JAX, The Wood Retriever, in action. The tour will highlight how technology is being incorporated into production processes and provide an opportunity to hear directly from the company about its approach to operational improvements.

Continued next page

PHONE: 800-289-5627

Read/Subscribe online at www.componentadvertiser.com

FAX: 800-524-4982


A

Th e

Component Manufacturing dverti$ dverti $ er

Don’t Forget! You Saw it in the

Adverti$$er

November 2026 #18328 Page #161

Tuesday afternoon’s official OQM Kick-Off will include an introduction and moderated Q&A with SBCA’s new Executive Director, Steve Skodak, CAE, CFRE. Having joined the association in September, Steve will have an opportunity to connect with members, share his perspective, and engage in conversations about the organization’s priorities and opportunities. Additional sessions will include a panel on the Housing Innovation Alliance and updates on SCOUT and Betty AI. It will also explore professional development within the industry, with Abby Yoder of Stark Truss sharing her experience transitioning from truss design into sales, demonstrating how technical knowledge can support customer relationships, problem-solving, and career advancement.

Practical Education for Today’s Businesses Wednesday’s educational programming will focus on helping component manufacturers and other industry businesses identify opportunities to strengthen their operations and prepare for the future. A session titled “Marketing Your Business: More Than a Logo” will examine how companies communicate their value to customers, employees, and communities. The discussion will extend beyond traditional branding to consider how everyday interactions, company culture, and employee engagement influence a business’s reputation and market presence. AI will also take center stage through two complementary sessions. “Putting AI to Work” will introduce practical applications for businesses throughout the industry, moving beyond familiar uses such as drafting emails and summarizing documents to explore how AI can support workflows, business processes, and decision-making. A follow-up interactive workshop will give attendees an opportunity to apply those concepts. Through guided activities and real-world examples, participants will explore building and adapting AI tools to organize information, streamline processes, and support collaboration within their organizations. With economic conditions continuing to influence the construction industry, attendees will also hear from Chris Beard with an economic forecast examining trends affecting housing, construction activity, and the broader business environment. The session will provide perspective on factors that may influence business planning and opportunities in the months ahead.

Continued next page

PHONE: 800-289-5627

Read/Subscribe online at www.componentadvertiser.com

FAX: 800-524-4982


A

Th e

Component Manufacturing dverti$ dverti $ er

Don’t Forget! You Saw it in the

Adverti$$er

November 2026 #18328 Page #162

Building Relationships and Shaping the Industry Beyond the educational sessions, the Charlotte OQM will provide opportunities for component manufacturers, framers, suppliers, and other industry professionals to participate in committee meetings, collaborate on association initiatives, and strengthen relationships with peers. Committee meetings offer an important avenue for members to contribute their expertise and help guide SBCA’s work across areas such as education, membership, marketing, advocacy, and industry advancement. Networking activities, team-building opportunities, and a group dinner will provide additional time for attendees to exchange ideas and learn from one another. The meeting will conclude Thursday morning with the SBCA Board Meeting and a strategic plan update, providing insight into the association’s priorities and ongoing efforts to support its members and the broader industry. Bringing together professionals from different segments of the industry creates opportunities to better understand shared challenges, exchange perspectives, and identify ways to work together. From manufacturing and supply to installation and construction, these conversations help strengthen connections throughout the industry. For Luke Wiesen, Division General Manager of PBS – Comtech – US LBM, OQMs provide an opportunity to gain a broader perspective on the industry and return to day-to-day operations with new ideas. “It’s when you go to BCMC and Open Quarterly Meetings that you allow yourself to think about the big picture and dream bigger. It provides a space to think about all the great things that we, as an industry of component manufacturers, are doing across the country. It’s exciting for me to come back to my operation after these events with new ideas and a broader understanding of the industry before getting back to the daily grind,” says Luke. As businesses throughout the structural building components industry navigate evolving technologies, changing market conditions, and new opportunities for growth, industry collaboration remains essential. The December OQM offers an opportunity to gain practical knowledge, build valuable relationships, and take an active role in conversations about the industry’s future. Registration is open for the December 8–10 OQM in Charlotte. Attendees are encouraged to make plans early, as SBCA’s hotel group block at the Sheraton Charlotte Hotel closes November 23. For additional information, the complete agenda, and registration, visit www.sbcacomponents.com/events/sbca-and-nfcopen-quarterly-meeting---charlotte-nc.

PHONE: 800-289-5627

Read/Subscribe online at www.componentadvertiser.com

FAX: 800-524-4982


Milwaukee, WI | October 11-15, 2027

2027 SBCA Open Quarterly Meetings (OQMs) February 2-4, 2027 LAS VEGAS, NV (in conjunction with IBS 2027)

72

SCAN HERE FOR MORE DETAILS & UPCOMING EVENTS sbcacomponents.com

April 27-29, 2027 DALLAS, TX

July 27-29, 2027 CHICAGO, IL


A

Th e

Component Manufacturing dverti$ dverti $ er

Don’t Forget! You Saw it in the

Adverti$$er

Calendar of Events

November 2026 #18328 Page #164

NOVEMBER 2026

November 2–4

Multifamily Executive (MFE) Conference

Newport Beach, CA

November 3–5

NAFCD + NBMDA 2026 Annual Convention

Dallas, TX

November 4–6

DBIA 2026 Design-Build Conference and Expo

Cleveland, OH

November 4–6

North Am Wholesale Lumber Assoc (NAWLA) Traders Market

Anaheim, CA

November 4–5

Wood Solutions Conference: Calgary 2026

Calgary, AB

November 5

American Lumber Standard Committee (ALSC) Annual Meeting

Scottsdale, AZ

November 9–11

LBM Advantage Fall Planning Conference

Boston, MA

November 12

Mid Atlantic SBCA Chapter Meeting

East Earl, PA

November 15–17 STAFDA’s 50th Annual Convention and Trade Show

Anaheim, CA

November 16–18 AHF Live Summit

Chicago, IL

November 17–18 Wood Solutions Conference: Moncton 2026

Moncton, NB

November 19

Offsite Construction Summit

Washington, D.C.

DECEMBER 2026 December 1–3

University of Texas Bldg Professional Inst (BPI) of Texas—Central

Austin, TX

December 2–4

The Buildings Show

Toronto, ON

December 8

BLD Connection 2026 Mid-America Connection Conference

Olathe, KS

December 8–9

Western Bldg Material Assoc (WBMA) Annual Conference

Seattle, WA

December 8–10

Structural Bldg Components Assoc (SBCA) Open Quarterly Meeting

Charlotte, NC

December 9–10

LBM EXPO

Uncasville, CT

December 9

Offsite Construction Summit

Houston, TX

December 10

BLD Connection 2026 Nebraska Connection Conference

Omaha, NE

JANUARY 2027 January 19–20

BLD Connection 2027 BizCon North

Brooklyn Park, MN

January 19–20

West Coast LBMA Annual Convention

San Diego, CA

FEBRUARY 2027 February 1–2

BLD Connection 2027 BizCon South

Altoona, IA

February 2–4

Natl Assoc of Home Bldrs (NAHB) International Builders Show (IBS)

Las Vegas, NV

February 2–4

SBCA Open Quarterly Meeting

Las Vegas, NV

February 8–10

Natl Frame Bldg Assoc (NFBA) Annual Conference & Expo

Columbus, OH

PHONE: 800-289-5627

Read/Subscribe online at www.componentadvertiser.com

FAX: 800-524-4982


A

Th e

Component Manufacturing dverti$ dverti $ er

Don’t Forget! You Saw it in the

Adverti$$er

Calendar of Events

November 2026 #18328 Page #165

February 10–11

WoodWorks at BUILDEX

Vancouver, BC

February 10–13

American Institute of Architects (AIA) Leadership Summit

Washington, D.C.

February 16–18

University of Texas Bldg Professional Institute (BPI) of Texas—Houston

Sugar Land, TX

February 23

BLD Connection 2027 Wisconsin Connection Conference

Wisconsin Dells, WI

February 25–27

Orgill Spring Dealer Market

Orlando, FL

MARCH 2027 March 1–5

EduCODE 2027

Las Vegas, NV

March 1–3

North Am Wholesale Lumber Assoc (NAWLA) T-100

Amelia Island, FL

March 3–4

6th Annual Modular, Prefab and Construction Tech Senate

Toronto, Canada

March 3–4

Bldg Mat Suppliers Assoc (BMSA) Learning Exchange & LBM Expo

Hickory, NC

March 5–7

Do it Best & True Value Spring Market

Orlando, FL

March 14–16

Ace Hardware Spring Convention

Atlanta, GA

March 22–24

Lumbermens Merchandising Corp (LMC) Annual

Louisville, KY

Is your event on this list? Email us the details to share.

PHONE: 800-289-5627

Read/Subscribe online at www.componentadvertiser.com

FAX: 800-524-4982


A A

Th e

Component Manufacturing Cdverti OMPONENT OMPONENT MANUFACTURING ANUFACTURING dverti$ $ er dverti$er

Don’t Forget! Don’t You SawForget! it in the Adverti$ $er Y YOU OU S SAW AW IT IT IN IN THE THE

Safety First! Safety Meeting Topics Safety Meeting Topics From State Fund CA. From State Fund CA.

Accident Investigation Safe Lifting Techniques

Accidents are unplanned and unexpected events that cause injury, property damage, and/or financial loss in the workplace. Incidents or injuries account aboutbut one in every five job-related injuries “nearBack misses” don’t result for in loss, have the potential to do so. in California workplaces. Disabling back injuries are no laughing matter for workers who lose time from work or from personal activities. The Ideally, safety programs focus onlost preventing and incidents, sad truth is that most of the pain and time canaccidents been prevented if you but one occurs, accident investigation readytoand train are ifaware of howhave thean back functions and howprocedure to lift safely protect your how to use it. Investigate ALL accidents and injuries; your employees back. the severity determines the extent of the investigation. Handled properly, The back is a network of fragile ligaments, discs, and muscles accident investigation helps you look at problems, solve them, improve which can easily be thrown out of order. The back’s complex design your safety programs, and prevent future accidents. breaks down when it’s forced to perform activities it was not designed to do. Lifting with the back twisted or bent just begs for a pulled muscle or ruptured disc. One sure way to risk injuring the back is to lift heavy Accident investigation should prevent or bulky loads improperly or unassisted. Never be afraid to ask for help recurrence. Adhering strictly to fact finding with loads that you know you cannot lift safely. in a neutral, non-confrontational manner Lift with good sense and a little extrathe helptrue fromattitudes, a co-worker or mechanical identifies behaviors, aid when necessary. and other factors that led to the problem. Analyzing and asking a neutral “why”a light If youfacts decide you are capable of lifting question helps fi nd the root cause load, make sure you lift correctly. of the accident. For example, if employee error • Move in so that your feet are close to the caused the accident, dig further to determine base of the object to be lifted. why the employee made the error. • Face the object squarely. Bend your knees and squat over the item to be lifted. In Accident investigation should not belifting this position, the back gets added used to blame, punish or exonerate workers strength and power from the legs and and managers; arms. true facts will not emerge in this environment. If you investigate an • Move up close to the item, because accident just to complete paperwork and the backbone must act as a supporting satisfy insurance requirements, you will erode confidence in the system column, and it takes the least strain close and you won’t achieve your goal of prevention and loss reduction. in. • Tilt the item on edge with its long axis A supervisor inso the affected areaofisthe theweight best person to conduct an straight up that the center investigation because they are most familiar with is as high as possible above the ground. the tools, equipment, and people involved. Experts in equipment, outside agencies, and other • Still squatting, the feet should be set technical resources may also be needed. with legs pointed right at the load, with the back straightened, the worker may the load by with both arms and placing equipment Startthen yourgrasp investigation securing the scene, slowlyifstand up with it, taking pushingphotos. up withInterview victims and out of service necessary, and leg muscles. yourecords can’t lift witnesses.the Collect evidenceIfand andslowly, document your observations. you can’t lift safely. Find the contributing factors to determine the accident’s root cause.

November 2026 th, 2012 January 13th July 13 , 2012 #18328 #05126 #05150 Page #166 P AGE #33 #27 PAGE

Adverti$er Técnicas para Investigación de levantar accidentes objetos pesados Los accidentes son eventos no planificados e inesperados que causan

lesiones, daños a la propiedad y/o pérdidas económicas en el lugar de trabajo. incidentes o “casiconstituyen accidentes”una no de causan pero Las Los lesiones de la espalda cada pérdidas, cinco lesiones tienen el potencial hacerlo. relacionadas con elde trabajo en California. Las lesiones a la espalda que resultan en incapacidad no son chiste para los trabajadores que pierden horas de trabajo o de actividades personales. La triste verdad es que la Idealmente, programas de seguridad dirigidos a prevenir mayoría del dolorlos y el tiempo perdido puedenestán evitarse si se sabe cómo accidentes e incidentes, pero si uno ocurre, tenga listo un procedimiento funciona la espalda y cómo levantar de forma segura los objetos pesados de de accidentes y capacite a sus empleados en su parainvestigación protegerse la espalda. implementación. Investigue TODOS los accidentes y lesiones; la La espalda es unaelred frágil de discos ySimúsculos que gravedad determina alcance de ligamentos, la investigación. se conduce pueden lastimarse con facilidad. El diseño complejo de la espalda deja de correctamente, la investigación del accidente le ayuda a identificar funcionar correctamente cuando se le fuerza a ejecutar actividades para problemas, solucionarlos, mejorar sus programas de seguridad y prevenir las cuales no ha sido diseñada. Levantar objetos pesados con la espalda futuros accidentes. doblada es una forma fácil de estirarse un músculo o romperse un disco de la columna vertebral. Una manera sin falla de lastimarse la espalda es levantar un objeto pesadoLa o voluminoso o sin ayuda. investigaciónincorrectamente del accidente debe prevenir Nunca tenga temor de pedir ayuda levantar objetos queestricta usted sabe que éste separa repita. La adherencia al que no es capaz de levantar en de forma solo. Levante los hallazgo los segura hechospor de sí una manera neutra objetos pesados aplicando el buen juicio y con la ayudaca de las un compañero y sin enfrentamiento identifi actitudes, de trabajo o ayuda mecánica cuando sea necesario. los comportamientos y otros factores reales queSicondujeron al que problema. El de análisis de una los usted decide es capaz levantar hechos y hacer las preguntas en unde“por qué” carga ligera, asegúrese de levantarla la forma neutro ayuda a encontrar la raíz del accidente. correcta. Por ejemplo, si el accidente fue causado por • errorColóquese de manera quemás tenga los para pies de un empleado, averigüe a fondo cercanos a la base delelobjeto a levantar. determinar por qué empleado cometió el error. • Sitúese directamente de cara al objeto. Doble las rodillas y haga cuclillas sobre el objeto a levantar. investigación del accidente no potencia debe usarse En estaLaposición, la espalda recibe la de para culpar,que castigar o exonerar a trabajadores y izar adicional le brindan las piernas y los brazos. gerentes; en ese ambiente no saldrá a la luz la • verdad. Colóquese cerca objeto,simplemente porque la Si investiga un del accidente columna vertebral eldebe funcionar como con una para completar papeleo y cumplir columna de apoyo, y estando cerca del objeto recibe los requerimientos del seguro, erosionará la menos esfuerzo. confianza en el sistema y no alcanzará su objetivo de prevención y reducción de pérdidas. • Gire el objeto hasta tener el eje longitudinal vertical para que el centro de gravedad esté lo más alto posible sobre el suelo. La mejor persona para conducir la investigación es un supervisor • Aún de cuclillas, los pies las herramientas, piernas deben en el área afectada, porque es el más familiarizado cony las estar apuntando a la carga, con la espalda recta, el los equipos y las personas afectadas. También puede que se necesiten trabajador debe sujetar la carga con ambos expertos en equipos, agencias externas y otros recursos técnicos.brazos y pararse lentamente, haciendo la fuerza con los músculos de las piernas. Si no se levanta lentamente, no se está levantando de manera segura. Comience su investigación resguardando la escena, retirando de servicio equipos y, si fuera necesario, tomando fotos. Entreviste a las Una buena manera de diferenciar entre el víctimas y a los testigos. Reúna pruebas y registros y documente método correcto y los incorrectos de levantarsus es observaciones. Encuentre factores contribuyentes paracon determinar la practicar la forma correctalosvarias veces. Observará que el método causa que dio origen al accidente. Documente las acciones correctivas, correcto es más fácil levantar la carga, con el menor esfuerzo y menos las personas para completar laspesados mismasincorrectamente y la fecha límitepuede para torpeza. Con asignadas el tiempo, el levantar objetos terminarlas. ocasionar lesiones y dolor. La espalda se puede lastimar en un instante

Document recommended corrective the people to A goodthe way to learn the right from theactions, wrong way to lift isassigned to practice complete them, and a due date forwill completion. lifting correctly a few times. You notice that the correct way to lift is the easiest way to lift the load, with the least strain and awkwardness. To lift the wrong way will, over time, cause injury and pain. The back y tomar mucho tiempo para sanar. can be damaged quickly but can take a long time to heal.

The The above above evaluations evaluations and/or and/or recommendations recommendations are are for for general general guidance guidance only only and and should should not not be be relied relied upon upon for for legal legal compliance compliance purposes. purposes. They They are are based based solely solely on on the the information information provided provided to to us us and and relate relate only only to to those those conditions conditions specifi specifically cally discussed. discussed. We We do do not not make make any any warranty, warranty, expressed expressed or or implied, implied, that that your your workplace workplace is is safe safe or or healthful healthful or or that that it it complies complies with with all all laws, laws, regulations regulations or or standards. standards.

PHONE: 800-289-5627 PHONE: 800-289-5627 PHONE: 800-289-5627

R EAD AT WWW online at RRead/Subscribe EAD/S /SUBSCRIBE UBSCRIBE ONLINE ONLINE AT www.componentadvertiser.com WWW..COMPONENTADVERTISER COMPONENTADVERTISER..COM COM

FAX: 800-524-4982 FAX: 800-524-4982 FAX: 800-524-4982


The

JobLine

.com

Since 1992

Careers in the Truss, Wall Panel

and Engineered Wood Components Industry

Job Opportunities Available Candidates Services & Products Personalized Service Truss Designer Testing

800-289-5627 www.thejobline.com


A

Th e

Component Manufacturing dverti$ dverti $ er

Industry News

November 2026 #18328 Page #168

How Old Are America’s Construction Workers? Posted October 26, 2026 on NAHB Now | The News Blog of the National Association of Home Builders Reprinted with permission. The construction workforce has made strides in attracting and retaining younger generations of skilled workers, but there is still work to do. According to recent NAHB analysis of the 2024 American Community Survey data, the median age of a construction worker is 42 years old, which is one year older than the typical worker in the labor force. Which states have the oldest and youngest construction workers? •

Rhode Island has the oldest median age construction worker at 47 years old, followed by Connecticut, New Hampshire, New Jersey and Illinois (44 years old).

•

The central part of the United States has most of the youngest median average aged construction workers, including Utah and Idaho at 39 years old.

Which states have the oldest construction workers when compared to other careers in their states? •

Once again, Rhode Island’s older construction workforce is seven years higher than the overall median age worker in the state.

•

Vermont’s median age construction worker is four years older than its overall median age worker.

How is each generation contributing to the construction labor force? •

Gen Z’s influence in construction is growing rapidly, increasing from 6.4% of the workforce in 2019 to 16.8% in 2024.

•

Millennials’ share in the workforce also grew from 35.7% to 37.5% while Gen X (-4.1%) and Baby Boomers (-7.8%) both decreased.

•

Compared to all industries, construction has a smaller share of younger workers, with just 10.7% of the workforce under age 25. All other industries have 13.7% of their workforce under 25.

What are the oldest and youngest median ages of construction trades workers’ occupations? •

Construction and building inspectors, plasterers and stucco masons share the highest median ages at 46

•

Highway maintenance workers are close behind with a median age of 45

On the other end, pipe layers’ median age is 34 while solar photovoltaic installers are the youngest group in the construction trades with a median age of 27 For more analysis, read this Eye on Housing post from NAHB Principal Economist Na Zhao.

PHONE: 800-289-5627

Read/Subscribe online at www.componentadvertiser.com

FAX: 800-524-4982


A

Th e

Component Manufacturing dverti$ dverti $ er

Industry News

November 2026 #18328 Page #169

Housing Headwinds Intensify Heading Into 2027 Posted October 1, 2026 on NAHB Now | The News Blog of the National Association of Home Builders Reprinted with permission. In his bi-weekly newsletter, Eye On the Economy, NAHB Chief Economist Dr. Robert Dietz examined several notable headwinds for housing, and offered his insights on what those data points will mean for the industry in 2027. The following is a summary of the key indicators Dietz called attention to: •

Tightening Market Conditions — Long-term rates accelerated after the Federal Reserve raised interest rates in September, as the bond market is flashing danger signals for the economy. The 30-year fixed mortgage rate averaged 7.03% as of Sept. 24, reaching its highest level since January 2025. This rate environment is worsening affordability for buyers and raising capital costs for builders.

•

Declining Builder Sentiment — The NAHB/Wells Fargo Housing Market Index fell three points to 32, its lowest level since September 2025. Builders continue to report myriad headwinds including higher mortgage rates, tight lending conditions, rising land, labor and construction costs, higher gas and diesel prices, and persistent labor shortages.

•

Diverging Housing Production — Overall housing starts decreased 2.6% in August to a 1.28 million seasonally adjusted annual rate. Single-family starts rebounded 7.6% (up 5.2% from a year ago) while Multifamily starts fell 21.7% (down 14.6% from a year ago). Permits also softened, with overall permits down 2.7%. 2026 will be the second year in a row with a decline for single-family home building, and signs indicate further declines in 2027.

•

Incentivizing New-Home Sales — Sales of newly built single-family homes increased 6.4% in August to a 684,000 annual rate but were still 2% below the pace from one year ago. The median new-home sales price dropped 5% from a year ago to $393,700, reflecting builder incentives and a shift toward lower price points.

•

Expanding Opportunities for Remodeling — Remodeling is taking on a larger role within residential construction, but cost and labor pressures are intensifying. NAHB’s new Remodeling Input Price Index increased 6.6% year over year, up from 3.9% in the previous quarter, reinforcing the broader cost pressures facing the sector. Remodeler employment totaled 454,100 in the second quarter, accounting for nearly half of all residential construction employment.

2027 Outlook Overall, housing remains caught between limited supply and binding affordability constraints. Demand exists but is increasingly sidelined due to higher costs and interest rates. The recent surge for long-term interest rates adds a warning signal for 2027 and the overall economy, as 2026 growth has been heavily dependent on one sector (AI), which is crowding out lending for the rest of the economy, including housing.

PHONE: 800-289-5627

Read/Subscribe online at www.componentadvertiser.com

FAX: 800-524-4982


A

Th e

Component Manufacturing dverti$ dverti $ er

Industry News

November 2026 #18328 Page #170

Affordability Challenges Push New Home Sales Lower Posted October 27, 2026 on NAHB Now | The News Blog of the National Association of Home Builders Reprinted with permission. High mortgage rates and economic uncertainty continued to keep potential home buyers on the sidelines and constrain new home sales in September. Sales of newly built single-family homes decreased 0.6% in September to a seasonally adjusted annual rate of 676,000, following a downwardly revised August estimate, according to newly released data from the U.S. Department of Housing and Urban Development and the U.S. Census Bureau. The pace of new home sales was 5.3% lower than a year earlier. “Affordability remains a significant hurdle for prospective home buyers,” said Bill Owens, chairman of the National Association of Home Builders (NAHB) and a home builder and remodeler from Worthington, Ohio. “Builders continue to offer incentives and adjust pricing to attract buyers, but elevated mortgage rates and high home prices are limiting the number of households that can afford to purchase a home.” “The decline in new home sales is consistent with softer builder sentiment and highlights the continued sensitivity of housing demand to financing costs,” said Danushka Nanayakkara-Skillington, NAHB assistant vice president for forecasting and analysis. “Sustained improvements in mortgage rates and housing affordability would help maintain demand.” A new home sale occurs when a sales contract is signed, or a deposit is accepted. The home can be in any stage of construction: not yet started, under construction or completed. In addition to adjusting for seasonal effects, the September reading of 676,000 units is the number of homes that would sell if this pace continued for the next 12 months. New single-family home inventory in September fell to 476,000 units, down 1% from August, and down 2.3% compared to a year ago. This represents an elevated 8.4 months’ supply at the current building pace. Completed, ready-to-occupy inventory consisted of 111,000 homes in September. The median new home sales price in September increased 3.9% from August to $400,400 but was down 3.9% from a year ago. Regionally, on a year-to-date basis, new home sales were down 0.5% in the Midwest, 1.3% in the South and 9.2% in the West. New home sales were up 2.3% in the Northeast.

PHONE: 800-289-5627

Read/Subscribe online at www.componentadvertiser.com

FAX: 800-524-4982


A

Th e

Component Manufacturing dverti$ dverti $ er

Industry News

November 2026 #18328 Page #171

Builder Sentiment Falls on Rising Rates Posted October 19, 2026 on NAHB Now | The News Blog of the National Association of Home Builders Reprinted with permission. Rising mortgage rates, energy and material costs, and worsening labor and lot conditions have pushed builder sentiment to a 14-year low. Builder confidence in the market for newly built single-family homes fell three points to 29 in October, according to the National Association of Home Builders (NAHB)/Wells Fargo Housing Market Index (HMI) released today. The reading was the lowest since June 2012. “Mortgage rates have climbed well above 7% in recent weeks, and higher gas prices and inflation have further weakened buyer traffic across much of the country,” said NAHB Chairman Bill Owens, a home builder and remodeler from Worthington, Ohio. “Though builders are also contending with higher costs for construction loans, building materials and diesel, the Trump administration’s efforts to advance regulatory reform are helping to ease some of the cost pressures they face. Nationwide, more than one-third of builders reported immigration enforcement activity in their market areas during the past month, causing construction delays and discouraging legal workers from reporting to work.” “Housing remains squeezed by supply-side constraints and significant affordability challenges,” said NAHB Chief Economist Robert Dietz. “Demand persists, but higher mortgage rates, elevated construction costs and weaker consumer confidence are keeping more buyers on the sidelines. As a result, buyer traffic has fallen to its lowest level since April 2012, excluding the pandemic’s onset in April 2020.” The latest HMI survey found that 43% of builders cut prices in October, the highest share during the 2020-2026 period. The average price cut remained at 6% for the seventh consecutive month. Meanwhile, 65% of builders reported using sales incentives in October, the 19th straight month at least 60% of builders have done so. All three of the major HMI indices posted losses in October. The index measuring current sales conditions fell two points to 33, the index gauging future sales expectations dropped five points to 32 and the index charting prospective buyer traffic fell five points to 18. Looking at the three-month moving averages for regional HMI scores, the Northeast dropped one point to 38, the Midwest fell three points to 40, the South fell one point to 30 and the West posted a two-point decline to 26. The Midwest is a relatively bright spot for single-family home building, with permits up 2.9% HMI tables can be found at nahb.org/hmi. More information on housing statistics is also available at Housing Economics PLUS.

PHONE: 800-289-5627

Read/Subscribe online at www.componentadvertiser.com

FAX: 800-524-4982


A

Th e

Component Manufacturing dverti$ dverti $ er

Industry News

November 2026 #18328 Page #172

Single-Family Starts Down as Affordability Challenges Persist Posted October 20, 2026 on NAHB Now | The News Blog of the National Association of Home Builders Reprinted with permission. Overall housing starts decreased 5.2% in September to a seasonally adjusted annual rate of 1.22 million units, according to a report from the U.S. Department of Housing and Urban Development and the U.S. Census Bureau. The September reading of 1.22 million starts is the number of housing units builders would begin if development kept this pace for the next 12 months. Within this overall number, single-family starts decreased 4.6% to an 859,000 seasonally adjusted annual rate and are up 2.6% compared to September 2025. The multifamily sector, which includes apartment buildings and condos, decreased 6.7% to an annualized 362,000 pace and are down 24.9% compared to September 2025. “Housing starts declined in September as high mortgage rates, persistent affordability challenges and rising construction costs held back home building,” said Bill Owens, chairman of the National Association of Home Builders (NAHB) and a home builder and remodeler from Worthington, Ohio. “High land, labor and construction costs are eroding builder confidence. A sustained increase in home building is key to long-term affordability, but nearterm construction depends on mortgage rates, financing conditions and efforts to ease regulatory barriers.” “Declining housing starts reflect the high borrowing costs and affordability challenges builders face, consistent with our recent builder surveys,” said Danushka Nanayakkara-Skillington, NAHB’s assistant vice president for forecasting and analysis. “September’s single-family starts data align with our forecast of lower production in 2026, with further declines expected in 2027 as rates stay elevated and material costs rise.” On a regional and year-to-date basis, combined single-family and multifamily starts were 8.3% higher in the Northeast, 2% lower in the Midwest, 0.3% lower in the South and 6.3% lower in the West. Overall permits decreased 0.2% to a 1.40-million-unit annualized rate in September. Single-family permits decreased 4% to an 845,000-unit rate and are down 4.8% compared to September 2025. Multifamily permits increased 6.1% to an annualized 555,000 pace and are down 0.2% compared to September 2025. Looking at regional permit data on a year-to-date basis, permits were 10.6% higher in the Northeast, 2.2% higher in the Midwest and 3.2% lower in the South. The West saw no change.

PHONE: 800-289-5627

Read/Subscribe online at www.componentadvertiser.com

FAX: 800-524-4982


A

Th e

Component Manufacturing dverti$ dverti $ er

Industry News

November 2026 #18328 Page #173

Your Guide to the SSW to SSWH Transition October 28, 2026—Simpson Strong-Tie is pleased to introduce the new Strong-Wall® high-strength steel shearwall (SSWH™), now available and replacing our Steel Strong-Wall (SSW) product line. SSWH offers higher load capacities, greater design flexibility and improved access for anchorage installation. To help our customers plan for this transition, we are sharing the following SSW availability milestones and important project considerations. SSW Availability Timeline Through January 31, 2027: We will continue filling SSW orders. Some models may have extended lead times as production transitions to SSWH. February 1 – May 31, 2027: SSW walls, anchor bolts and templates will be available only while remaining inventory lasts. Once inventory is depleted, these products will no longer be manufactured. May 31, 2027: The SSW phase-out will be complete, with SSWH serving as the replacement product line. IMPORTANT: Please plan for updated dimensions and anchorage SSWH wall dimensions and anchorage differ from those for SSW. Existing SSW anchor bolts and templates are not compatible with the SSWH, so the transition should not be treated as a direct field substitution. Please coordinate with your project’s design professional to review and update plans and installation details before ordering materials or placing concrete. We’re Here to Help Customers with current or upcoming projects specifying SSW should contact their Simpson Strong-Tie sales representative with model numbers, quantities and anticipated delivery dates. Our sales and engineering teams can assist with: •

Reviewing SSW product availability

•

Identifying appropriate SSWH alternatives

•

Providing technical documentation and design support

•

Helping facilitate a smooth transition to SSWH

Thank you for your continued trust in Simpson Strong-Tie. We appreciate your business and look forward to supporting you through this transition.

PHONE: 800-289-5627

Read/Subscribe online at www.componentadvertiser.com

FAX: 800-524-4982


A

Th e

Component Manufacturing dverti$ dverti $ er

Industry News

November 2026 #18328 Page #174

BFS Hosts Open House at New Facility in Adams County, CO October 2, 2026—Builders FirstSource celebrated its new 185,000-sq.-ft. facility located on 40 acres within Rocky Mountain Rail Park in Bennett, Colo., at an open house event on Sept. 29, 2026. Builders FirstSource customers, supplier partners, and team members as well as representatives from Adams County took part in facility tours, lunch, and prize drawings. More than 100 full-time BFS team members working at the new site serve homebuilder customers with manufactured components such as roof trusses, floor trusses, and wall panels in addition to lumber and other building materials. “At Builders FirstSource, everything we do is centered on providing extraordinary service to our customers,” said Mike Hiller, BFS chief operating officer-designate. “That is why we continue to invest in facilities that enable us to provide homebuilders in growing areas such as the communities east of Denver and across the Colorado Front Range with the products, services and support they need to build quality homes more efficiently. We are grateful to the teams at Adams County, Union Pacific, and Patriot Rail for their partnership on this project. Together, we’re strengthening the infrastructure and connections that will help us better serve builders in these communities for years to come.” About Builders FirstSource Builders FirstSource (NYSE: BLDR), headquartered in Irving, Texas, is a leading provider of building materials for professional builders in new residential construction and repair and remodeling. We deliver integrated homebuilding solutions by manufacturing, supplying, and installing a full range of structural and related building products. With approximately 575 locations across 43 states, we serve 48 of the top 50 and 91 of the top 100 Core Based Statistical Areas (CBSAs), ensuring broad geographic coverage and enhancing our ability to partner with our customers. Our leading network of strategically located manufacturing facilities produces factory-built roof and floor trusses, wall panels, vinyl windows, custom millwork and trim, manufactured and semi-custom modular homes, as well as engineered wood that we design and cut specifically for each home. We also assemble interior and exterior doors into pre-hung units for easy installation. Additionally, we distribute a wide range of building products, including lumber, sheet goods, windows, doors, millwork, and specialty items. Our services, which vary by market, include professional installation, turnkey framing, and shell construction. Supported by the latest construction innovations and digital solutions, we help drive greater efficiency across homebuilding. Learn more at www.bldr.com.

PHONE: 800-289-5627

Read/Subscribe online at www.componentadvertiser.com

FAX: 800-524-4982


A

Th e

Component Manufacturing dverti$ dverti $ er

Industry News

November 2026 #18328 Page #175

BFS Raises $1.6 Million for Blood Cancer United October 26, 2026, Irving, TX—Builders FirstSource today announced that its 2026 charity event raised approximately $1.6 million for Blood Cancer United. This marks the 20th year of the Builders FirstSource partnership with Blood Cancer United, which has helped raise more than $19 million for critical research, patient support, and advocacy programs dedicated to advancing treatments and cures for blood cancers over those two decades. Held Sept. 30–Oct. 1 in Irving, Texas, the event featured a keynote speech by Pro Football Hall of Fame linebacker Mike Singletary, who shared inspirational anecdotes from his childhood in Houston, Texas, and his career as an NFL player and coach. Attendees also heard the emotional story of four-year-old cancer patient “Mighty Mabel” Manthey, as told by her mother, Sarah. Following Sarah’s moving message, Builders FirstSource CEO Peter Jackson and Chief Operating Offcer-Designate Mike Hiller presented Blood Cancer United with a check for $250,000 on behalf of the Builders FirstSource Foundation, a private charitable foundation introduced earlier this year.

Peter Jackson and Mike Singletary

“At Builders FirstSource, our Purpose is to build a better future for those we serve,” said Jackson. “We are grateful to our supplier partners, customers and team members whose generosity brings that purpose to life through their ongoing support of Blood Cancer United. For 20 years, they have helped advance the fight against blood cancers, and we are proud of the impact we have made together.” “Reaching 20 years of partnership with Builders FirstSource is a milestone worth celebrating,” said Dr. Andy Kolb, President and CEO, Blood Cancer United. “Over the past two decades, their team Mike Hiller, BFS COO; Leah Swanson, Blood Cancer members, customers, and supplier partners have demonstrated what United; and Peter Jackson, BFS CEO is possible when a community comes together around a shared purpose. Their dedication has helped advance lifesaving research and critical patient support programs, creating a legacy of impact that will be felt for generations. We are honored to have Builders FirstSource as a partner in this work.” Builders FirstSource will continue its support of Blood Cancer United throughout the remainder of this year through various fundraising initiatives, including the Light The Night® walks in Dallas and other locations across the country. More information on the Builders FirstSource Foundation is available at bldr.com.

PHONE: 800-289-5627

Read/Subscribe online at www.componentadvertiser.com

FAX: 800-524-4982


A

Th e

Component Manufacturing dverti$ dverti $ er

Industry News

November 2026 #18328 Page #176

Ontario’s First Robotic Roof Truss Manufacturing Line Commissioned in Huron County By Robin MacLennan, Editor, Ontario Construction News, October 26, 2026—Atlas Engineered Products Ltd. has completed commissioning of Canada’s first robotic roof truss manufacturing line at its new 42,000-sq. ft. automation facility in Clinton. Training and testing are underway, including production runs of roof trusses intended for sale, the Nanaimo, B.C.-based company announced Oct. 8. The robotic line is designed to increase production capacity and improve operating efficiency as the company responds to demand for housing construction. “We are extremely grateful for the support of our shareholders, the Government of Canada’s IFIT program, our suppliers and our employees as we complete the installation and commissioning of Canada’s first robotic roof truss manufacturing line at our new 42,000-sq. ft. automation facility,” Hadi Abassi, Atlas president, CEO and founder, said in a statement. “The increased capacity and operating efficiencies provided by this robotic line will help AEP support the industry as Canada works to build more homes.” View a video clip of AEP’s robotic roof truss manufacturing line in the new automation facility here. The company plans to showcase the facility later this month, with shareholders, industry partners, students and community members invited to attend. Atlas Engineered Products acquires and operates businesses in Canada’s truss and engineered products industry. The company says its growth strategy includes acquisitions and the adoption of new technologies to expand operations in a fragmented market of independent manufacturers.

PHONE: 800-289-5627

Read/Subscribe online at www.componentadvertiser.com

FAX: 800-524-4982


A

Th e

Component Manufacturing dverti$ dverti $ er

Industry News

November 2026 #18328 Page #177

Mead Family Cancer Center Opens in Columbus October 26, 2026—The Columbus Community Hospital (CCH) and the Mead family celebrated the ribbon cutting for the Mead Family Cancer Center on Thursday, October 22. Made possible by a gift from Bob Mead, who led Mead Lumber as president and CEO from 1987 to 2006, the center brings comprehensive cancer services together in one location next to the hospital. It opens to patients in November. The center is named for the Mead family, a staple in Columbus for generations. Mead Lumber, founded by Bob Mead’s grandfather, Morton Mead, in 1910, expanded to Columbus in 1934 and still operates a lumber yard and administrative offices in the city. When the gift was announced in May 2025, Bob Mead said, “My family has been touched by cancer. I’m giving to this center because I believe everyone deserves access to compassionate care and cutting-edge treatments within their community.” CCH President and CEO Michael Hansen thanked the Mead family at the ribbon cutting ceremony, “Bob and Gail, over the years, have committed to the hospital in so many ways,” Hansen said. “The biggest thing is people won’t have to travel for a majority of their cancer care.” The 26,500-square-foot center consolidates infusion therapy, radiation oncology, medical oncology, PET/CT imaging and patient navigation in one location. The center has a permanent PET/CT scanner available five days a week. Before, PET/CT was available once a week through a mobile unit. The center also has a Varian TrueBeam linear accelerator, an advanced radiation therapy system known for its precision, speed and ability to limit damage to surrounding healthy tissue. About Mead Lumber Mead Lumber is a 100% Employee Owned Company that has become one of the leaders in the building materials industry, ranking in the top 10 nationally for companies serving Professional Builders. Mead Lumber now has 56 operating locations in Colorado, Kansas, Iowa, Missouri, Montana, Nebraska, Oklahoma, South Dakota, and Wyoming, including several lumber yards and retail hardware stores, six truss and wall panel manufacturing plants and a countertop manufacturing facility. Mead Lumber specializes in providing a complete line of materials to builders and homeowners including lumber, building materials, trusses & wall panels, millwork, kitchen cabinets and countertops, siding, decking, windows, doors and hardware.

PHONE: 800-289-5627

Read/Subscribe online at www.componentadvertiser.com

FAX: 800-524-4982


A

Th e

Component Manufacturing dverti$ dverti $ er

Industry News

November 2026 #18328 Page #178

84 Lumber Spotlights Careers in Truss Manufacturing

EIGHTY FOUR, Pa., October 6, 2026 – A career in construction can begin long before materials reach a job site. During Careers in Construction Month, 84 Lumber is highlighting the people who build roof and floor trusses and the career opportunities available across its 22 truss plant locations spanning 13 states. At 84 Lumber’s Winchester, Virginia, facility, associates learn how a truss plant operates from the production floor through design, dispatch and customer service. The facility also is home to the company’s Production Manager in Training program, which prepares associates for manufacturing leadership while helping them discover where their skills and interests can take them. “We want to promote from within in anything we do, in the stores, in the install program, in manufacturing,” said Ken Kucera, Vice President of Installed Sales and Manufacturing at 84 Lumber. “If you work hard, we’ll support you, we’ll give you training, we’ll give you opportunities.” The training generally takes nine to 12 months. Associates learn production skills such as operating a saw, building trusses and operating a forklift. They also work with customer service, dispatch and design teams, learn about plant leadership and visit job sites to see how the products they make are used. “Once they are exposed to all those different things, there may be a shift in what they want to do,” said Scott Compton, National Production Manager for 84 Components, who mentors 84 Lumber’s manufacturing leaders. “They may come in thinking they want to be in production leadership, or they may want to be a general manager, but once they get a taste of some of those other things, they may find that that’s their passion.” The program was relaunched about two years ago. Compton said more than 30 associates have graduated, including six who have gone on to become plant managers. Others have moved into production management, design and specialized production roles, according to their individual preferences. One example is Cade Templeton, a Shenandoah University graduate who joined the program after playing baseball at the university. After completing the training in about a year, Templeton became a production manager at Winchester. During his second year, he managed both first and second shift production before becoming plant manager at 84 Lumber’s Powhatan, Virginia, location. Compton knows the path firsthand. He joined 84 Lumber 29 years ago as an entry level truss builder in Mount Airy, Maryland. He went on to hold production leadership positions, serve as a general manager and oversee multiple locations. Today, he helps mentor manufacturing leaders and supports plant development, safety, equipment and maintenance across the company. Kucera said that kind of progression is central to 84 Lumber’s approach to careers. “We always say this is a career, it’s not a job,” he said. “You’re going to come into our organization for a specific job, sure. But we want people that ask us, ‘How are you going to support me if I want to stay with your company?’” As builders look to manufacturers to complete more work before components reach the job site, manufacturing careers are also evolving, bringing together hands on skills, design, technology, logistics and leadership. With 22 truss plants across 13 states and continued expansion planned, 84 Lumber is developing career opportunities across the country. “If you’re looking for a career, you should interview the company that’s interviewing you,” Kucera said. “What are you really going to provide for me? And it is this pathway that if you work hard, we’ll support you, we’ll give you training, we’ll give you opportunities.” To learn more about career opportunities at 84 Lumber, visit 84Lumber.com/careers.

PHONE: 800-289-5627

Read/Subscribe online at www.componentadvertiser.com

FAX: 800-524-4982


A

Th e

Component Manufacturing dverti$ dverti $ er

Industry News

November 2026 #18328 Page #179

WoodWorks Mid-Year Report Highlights Market Growth Momentum October 22, 2026—WoodWorks continued its strong performance through Q3 of 2026, influencing 321 projects that advanced to construction while maintaining a consistent pace of project conversions over the past four quarters. Although construction activity continues to vary by project and market, the steady conversion rate reflects WoodWorks’ ongoing ability to help move wood projects from design into construction. The year has been distinguished not only by the number of projects, but also by their scale and impact. Average project size reached 134,000 square feet yearto-date, compared with a historical average of 120,000 square feet, supported by several large multifamily and student housing projects and a higher proportion of mass timber construction. Together, these trends position Wo o d Wo r k s t o d e l i v e r greater market impact while continuing to build long-term demand for wood products. Direct support is just one part of WoodWorks’ impact. Through Q3, the program also provided 46,289 education hours, published 25 technical resources, and supported 15 installation training centers—all of which help expand the use of wood beyond the projects the program touches directly. Check out WoodWorks’ Mid-Year Report to see details through Q2 on how the SLB’s investment in WoodWorks leads to growing demand for lumber. View the Mid-Year Report

PHONE: 800-289-5627

Read/Subscribe online at www.componentadvertiser.com

FAX: 800-524-4982


A

Th e

Component Manufacturing dverti$ dverti $ er

Industry News

November 2026 #18328 Page #180

New Wall Bracing Webinar Series for the 2024 IRC October 22, 2026—Part 1 of APA’s new wall bracing webinar series is now available on demand. 2024 IRC Wall Bracing I: Options, Limitations, and Common Mistakes gives builders, designers, and inspectors a clear roadmap for the design and verification of wall bracing in residential construction. Watch the on-demand webinar to learn how to: •

Define braced wall lines and identify proper offsets

•

Navigate prescriptive limitations and code sections

•

Avoid common mistakes

Watch the recording of 2024 IRC Wall Bracing I: Options, Limitations, and Common Mistakes and take a short quiz to earn AIA or ICC continuing education credits. Register now for the rest of the 2024 IRC wall bracing webinar series: •

Part 2: Wind Design – November 19, 2026 | 10 AM PST / 1 PM EST

•

Part 3: Seismic Design – December 15, 2026 | 10 AM PST / 1 PM EST

•

Part 4: Advanced Wall Bracing – January 20, 2027 | 10 AM PST / 1 PM EST

APA: Experts in Wall Bracing Wall bracing is one of the most misunderstood structural elements of a home – but it doesn’t have to be. APA has worked with code development bodies for decades to make prescriptive bracing easier to apply, and we have a wealth of resources for designers, builders, and inspectors. Read the Guides to IRC Wall Bracing Provisions and use our free Wall Bracing Calculator to generate printable reports intended to support compliance with the 2009–2024 IRC. You can also download technical guides on IRC bracing basics and get answers to FAQs. Explore the APA Wall Bracing Resource Hub ►

PHONE: 800-289-5627

Read/Subscribe online at www.componentadvertiser.com

FAX: 800-524-4982


A

Th e

Component Manufacturing dverti$ dverti $ er

Industry News

November 2026 #18328 Page #181

Construction Fire Safety Coalition Expands Access to CFS Checklist October 7, 2026—The Construction Fire Safety Coalition (CFSC) announced a new web-based version of its fire safety inspection checklist, giving construction crews, safety managers, and fire officials another way to complete the daily jobsite fire inspection required under the 2021 International Fire Code (IFC). The interactive checklist, initially launched as a mobile app, is now also fully integrated into constructionfiresafety.org. Users can walk through the same guided inspection directly in a browser, with no download required, and generate a ready-to-file PDF report at the end of the process. “Our mobile app has always given crews an easy way to run their daily fire inspection right from the field,” said Ray O’Brocki, AWC’s Director of Fire Service Engagement. “The web option gives site teams more flexibility to complete that same inspection when it’s more convenient, from a site trailer laptop, a shared device, or anywhere else the app isn’t the right fit. Whichever way someone gets it done, we want that daily fire check to be as easy and straightforward as possible.” Construction site fires remain one of the most preventable, and costly, risks in construction, which is what led CFSC to design and launch an interactive app to help meet the needs of the fire service and construction crews on the ground. The new web addition builds on the initial app, expanding how users can access the checklist with all the same functionality found in the app. Both the app and the web-based checklist have the same goal: make it as easy as possible for every site to complete its daily fire check and minimize the risk of site fires. The CFSC app remains available for download on the App Store. The web-based checklist is available now at constructionfiresafety.org. About the Construction Fire Safety Coalition CFSC is a collaborative initiative focused on reducing fire risks in construction, alteration, or demolition sites. By uniting developers, builders, regulators, and fire services, we tackle fire safety challenges to improve safety for the public and firefighters. constructionfiresafety.org

PHONE: 800-289-5627

Read/Subscribe online at www.componentadvertiser.com

FAX: 800-524-4982


A

Th e

Component Manufacturing dverti$ dverti $ er

Industry News

November 2026 #18328 Page #182

Statistics Canada: Investment in Building Construction, August 2026 October 21, 2026— The total value of investment in building construction edged up $25.1 million (+0.1%) to $23.5 billion in August. An increase in the non-residential sector (+1.0%) was moderated by a slight decline in the residential sector (-0.3%). Year over year, investment in building construction grew 7.9% in August. On a constant dollar basis (2023=100), the total value of investment in building construction edged down 0.1% from the previous month to $21.2 billion in August, but it was up 4.7% year over year. Institutional and commercial components drive growth in non-residential investment In August, the value of investment in non-residential building construction increased $70.5 million to $7.4 billion. Both the institutional (+1.9%) and commercial (+0.8%) components contributed to the increase, while the industrial component (-0.1%) showed little change. Investment in institutional construction rose $43.5 million to $2.4 billion in August. Gains in Ontario (+$35.9 million) and Quebec (+$15.3 million) were moderated by declines in British Columbia (-$4.6 million) and Alberta (-$3.1 million). Investment in schools and education building construction led to the increase in the institutional component, driven by major projects in the Toronto and Montréal census metropolitan areas. Investment in commercial construction grew $27.9 million to $3.6 billion in August. Ontario (+$18.5 million) and Quebec (+$8.0 million) were the primary contributors to the increase. Meanwhile, investment in industrial construction edged down $0.8 million to $1.5 billion in August. This modest change was largely attributable to Quebec (-$6.6 million), Alberta (-$3.8 million) and Ontario (-$3.0 million). The gain in British Columbia (+$12.5 million) partially offset the overall decline. Investment in residential construction edges down In August, investment in residential building construction edged down $45.4 million to $16.1 billion. The single-family component (-1.3%) led the slight decline, while the multi-unit component increased 0.6%. Investment in single-family home construction was down $98.3 million to $7.6 billion in August. British Columbia (-$46.5 million) and Quebec (-$45.7 million) drove the decrease and were supported by declines across four other provinces and two territories. Meanwhile, investment in multi-unit construction rose $52.9 million to $8.5 billion in August. Gains in Quebec (+$74.7 million) and British Columbia (+$65.2 million) were partially offset by declines in five provinces and one territory, led by Ontario (-$79.4 million). For more information on construction, please visit the Construction statistics portal. For more information on housing, please visit the Housing statistics portal. PHONE: 800-289-5627

Read/Subscribe online at www.componentadvertiser.com

FAX: 800-524-4982


A

Th e

Component Manufacturing dverti$ dverti $ er

Advertiser Directory

November 2026 #18328 Page #183

Your Company can be Listed in

Adverti$er

The

AN ITW COMPANY

Contact Anna Stamm Anna@componentadvertiser.org

800-521-9790

800-289-5627 x3

manufaCturing rti$ rti $ er

623-512-6770 Don’t Forget!

March 2025 #17308 Page #173

Adverti$$er ben@4wardSolutionsGroup.com www.4wardSolutionsGroup.com 4Ward Solutions Group You Saw it in the

info@ct-darnell.com www.ct-darnell.com CT Darnell Construction

800-521-3245

204-782-6272

connect@eaglemetal.com www.eaglemetal.com Eagle Metal

garry.roehr@amtrobotics.com www.amtrobotics.com AMT Robotics

412-262-3225

888-485-8623

cvillella@acceptlease.com www.acceptlease.com Acceptance Leasing & Financing Service, Inc.

info@buymetrics.com www.buymetrics.com BuyMetrics®

oor Truss stimating

800-353-0892

mschwitter@alpineitw.com www.alpineitw.com Alpine

612-521-9193 tom@eidemachinery.com www.eidemachinery.com Eide Machinery Sales, Inc.

Roof Truss Estimating

513-274-3602

Driven by Your Data! advancedcomponentsolutions Quick and easy learning curve

@outlook.com Why Waste Costly Designer Time on Quotes? advancedcomponentsolutions.net 24/7 Access for your In-Office or Remote Estimators

214-929-9386

269-815-4150

kenneth@cadynce.com www.cadynce.com Cadynce

sales@enventek.com www.enventek.com Enventek

TakeAdvanced a Few Minutes to Save Countless Hours! Component Solutions

-289-5627

Request a demonstration today advancedcomponentsolutions@outlook.com advancedcomponentsolutiuons.net Read/Subscribe online at www.componentadvertiser.com

● ● ●

FAX: 800-524-4982

941-713-4395

800-743-9727

PlanSwift Lumber and Building Material Takeoffs Truss and Wall Panel Design Experienced Staff EWP Layouts and much more!

Dave.AllPoints@gmail.com general@clark-ind.com Your Solution for Lack of Technical Staff www.clark-ind.com www.allpointstech.ai Clark Industries, Inc. All Points Technical All Points was launched by Industry Veteran Dave Walstad with over 20 years of Offshore Experience to create the Gold Standard in Technical Support Teams.

Dave.AllPoints@gmail.com

1-941-713-4395

www.AllPoints.Tech

Offices in: Panama City Beach, FL USA HCMC (Saigon), Vietnam Bengaluru, India

PHONE: 800-289-5627

advancedcomponetsolutions@outlook.com

Eliminate your lack of technical resources to grow sales and increase the clock speed of your company. We have the network and experience you can count on. Deploy Technical Teams from All Points!

800-999-1809 buildingsupply@epicor.com www.epicor.com Epicore

Read/Subscribe online at www.componentadvertiser.com

FAX: 800-524-4982


A

Th e

Component Manufacturing dverti$ dverti $ er

719-528-5445

Advertiser Directory 704-997-7292

rfitzgerald@fitzgroup.com www.fitzgroup.com Fitzgerald Group, LLC

sales.us@hundegger.com www.hundegger.com Hundegger Inc.

800-289-5627

980-404-0209

twm@hiring-zone.com www.hiring-zone.com Hiring-Zone

richard@rafterswalls.com www.woodretriever.com JAX, The Wood Retriever

813-754-1665

416-888-4457

info@holtecusa.com www.holtecusa.com HOLTEC USA Corporation

edmond.lim@limteksolutions.com limteksolutions.com LimTek Solutions

November 2026 #18328 Page #184

800-325-8075 customerservice@mii.com www.mitek-us.com MiTek USA

866-726-7587 sales@panplus.com www.panplus.com Panels Plus

423-225-2331 salessupport@paragontruss.com www.paragontruss.com Paragon

Presents

Read Now

Truss Tales Stories and posts on the truss and components industry Let us know if you would like to contribute to this online forum PHONE: 800-289-5627

Read/Subscribe online at www.componentadvertiser.com

FAX: 800-524-4982


A

Th e

Component Manufacturing dverti$ dverti $ er

Advertiser Directory

800-237-5161

770-922-8000

sales@precisionequipmfg.com www.precisionequipmfg.com Precision Equipment Truss Trailer Manufacturing

800-999-5099

www.tpinspection.com Timber Products Inspection

603-748-1051

916-276-7226

web@strongtie.com www.strongtie.com Simpson Strong-Tie

866-647-7771

800-568-7423 ext 133

sales@spida.com www.spida.com The Hain Company Spida Machinery USA

LowellT@merrickmachine.com www.triadmachines.com Triad | Merrick Machine

269-815-8844 Welcome sales@machineworks.llc

sales@thehaincompany.com Welcome to Thewww.trussmachineworks.com Hain www.thehaincompany.com Company's website! Here Truss Machine Works you will find information The Hain Company Home Hain Engineering Services Company Overview Products Companies We Represent

800-289-5627

Hain Racing Products

mail@thejobline.com Request Form www.thejobline.com Contact Us TheJobLine.com Mailing List Used Products

PHONE: 800-289-5627 Leasing & Financing Services

about the Hain Company and its line of innovative products that can help streamline your company. Our products are diversely used throughout the manufacturing industry to speed production and reduce labor costs.

News

800-382-0329 sales@wasserman-associates.com www.wasserman-associates.com Wasserman & Associates

todd@todd-drummond.com www.todd-drummond.com Todd Drummond Consulting, LLC.

530-295-8068

November 2026 #18328 Page #185

907-230-8276 info@vektausa.com www.vektausa.com Vekta USA

gregory.bates@westfraser.com www.strengthinlumber.com West Fraser

info@wolfxmachina.com www.wolfxmachina.com Wolf X Machina

765-751-9990

Products

info@woodtechsystems.com All Measuring Systems Hain Systems Framer www.woodtechsystems.com Sub Component Nailer Wood Tech Systems, Inc. Quick Rafter Cutter Vent Block Drills

Racing Your Hain Company can be Listed in Offset Drive

Adverti$er

TheAluminum Valve Cover Used Products

Contact Anna Stamm Anna@componentadvertiser.org Refurbished QRC Refurbished VBD

800-289-5627 x3

Refurbished MEA Refurbished SCN

Refurbished MMEA

Monet Desauw Read/Subscribe online at www.componentadvertiser.com Component Saws Floor Web Saw

FAX: 800-524-4982


A

Th e

Component Manufacturing dverti$ dverti $ er

Hiring-Zone

November 2026 #18328 Page #186

job opportunities available

For Information on Any of these Job Opportunities Visit: www.Hiring-Zone.com General Manager HZ00040 | Washington, USA

Designer-Wall Panel HZ00027 | Florida, USA

Location: Woodinville, Washington We are seeking a General Manager to lead our Woodinville Truss operation. This role is responsible for the safety, ...

A leading provider of building materials is seeking an experienced Wall Panel Designer to join its expanding design team. This is a full-time in-offic...

Truss Crane Operator HZ00035 | Oregon, USA

Outside Sales Representative/Designer/ Estimator HZ00025 | Alabama, USA

Location: Redmond, OR At PARR, the Truss Crane Operator position is essential to fulfilling the needs of our customers by making sure they are receiv... Designer-Truss HZ00038 | Washington, USA Location: Vancouver, Washington The Truss Designer II is responsible for turning the customers vision into reality by creating designs based on the c... Truss-Crane-Operator HZ00039 | Washington, USA Location: Vancouver, Washington At PARR, the Truss Crane Operator position is essential to fulfilling the needs of our customers by making sure they ... Truss Crane Operator HZ00041 | Washington, USA Location: Woodinville, Washington At PARR, the Truss Crane Operator position is essential to fulfilling the needs of our customers by making sure the... Truss-Builder HZ00034 | Washington, USA Location: Deer Park, Washington The Truss Builder’s main responsibility is using hammer and nail plates to manufacture roof and floor trusses. Truss ...

This position offers an exceptional opportunity to join a well-established building materials supplier launching a new truss manufacturing division. T... Designer-Multifamily HZ00017 | Texas, USA A growing building components manufacturer in Texas is hiring an experienced Truss Designer for an in-office role, with potential flexibility for remote Designer-Truss HZ00032 | Indiana, USA The JobLine is seeking an experienced Senior Truss Designer to join an in-house design team. This role is ideal for a seasoned professional who values... Designer-Truss HZ00004 | Florida, USA A leading provider of building materials is seeking experienced Truss Designers to join its growing design team. This is a full-time position with rem... Estimator HZ00019 | Texas, USA We are seeking a seasoned Lumber Estimator with hands-on expertise in structural framing take-offs for both residential and light commercial proje...

Truss Lumber Picker HZ00036 | Washington, USA

Building Components Manufacturing Industry

Job Board Employer to Candidate

Direct Hiring!

No Recruiting Fees! Post Your Opportunity Candidates Respond

Directly to You! For Additional Information twm@Hiring-Zone.com or Call: 800-289-5627 x1 Visit our website: www.Hiring-Zone.com Available Subcontractors

Designer-Truss and Wall Panel Contractor California, United States

Location: Vancouver, Washington The Truss Lumber Picker is responsible for the accurate and timely pulling of lumber as well as the catching and stac...

ANSI/TPI 1 Quality Assurance Consultant North Carolina, United States

Truss Builder HZ00037 | Washington, USA

Business Operations Consultant Missouri, United States

Location: Vancouver, Washington The Truss Builder’s main responsibility is using hammer and nail plates to manufacture roof and floor trusses. Truss ...

Designer - Multifamily Subcontractor Texas, United States Find more here

The Hiring Zone is operated by TheJobLine.com, Inc. All applications are sent exclusively to the job poster and not to TheJobLine.com. PHONE: 800-289-5627

Read/Subscribe online at www.componentadvertiser.com

FAX: 800-524-4982


INTRODUCING WHAT’S NEW Now it’s time to put innovation to work

BID WITHOUT BOTTLENECKS

DEFEND AGAINST DOWNTIME

Quickly assess project complexity, uncover critical insights, and move from plans to proposals faster.

Keep production moving through preventative maintenance, technical training, and automation services.

MII.COM/ V IS AR A

MII.COM/GUARDI AN


A

Th e

Component Manufacturing dverti$ dverti $ er

Don’t Forget! You Saw it in the

Adverti$$er

November 2026 #18328 Page #188

TheLast Word The Shape of Truss Plates Joe Kannapell, P.E.

he shape of today’s truss plates was greatly influenced by their little-understood production processes. While these processes involve proprietary methods, their underlying technology was conceived decades ago in the tool and die shops and the punch press plants across America, and both businesses were well equipped to supply prospective truss plate manufacturers. Even though fashioning the teeth of a connector plate required some unique craftsmanship, the resulting machine tools didn’t differ significantly from those that stamped other metal parts. However, the configuration of the truss plate design has determined the complexity of the tooling, the tonnage of the punch press, and the level of capital investment required.

T

This is not to say that stamping truss plates was a straightforward process, especially for this industry’s founders. Yet, by necessity and almost by coincidence, each had an advantageous background that aided them in developing the plate designs that would undergird their new businesses. Carol Sanford tapped into the resources available in Akron, Original Sanford (above) OH, the industrial town where he came of age. Cal Jureit benefitted from and Jureit (below) plates what he had learned working in a tool and die shop while waiting to be accepted into the U.S. Navy. Walter Moehlenpah used his mechanical engineering savvy to gain guidance from the many suppliers to the metal stamping industry that were near his St. Louis, MO location. And Edgar Mort of Inter-Lock Steel was already stamping nail-on plates when nearby truss plants made inquiries. But each of these founders produced markedly different designs when they embarked on truss plate development. Not surprisingly, these plate designs were not chosen because they were easy to manufacture. Sanford experimented with multiple design variations and simply took the first one that met the requirements of the Miami, FL building department. It so happened that his Gri-Plate teeth could be formed with minimal force by a single stroke of a rudimentary punch press. Jureit’s long nail-like projections needed to be stiffer, requiring nearly twice the thickness of Sanford’s steel and double the required punching force. In addition, Jureit’s Gang-Nail contained three times as many teeth, resulting in at least a six-fold increase in the punching force. Moehlenpah’s complex tooth shape, chosen primarily to circumvent Jureit’s patent, couldn’t be formed in a single stroke of the press, necessitating a costly progressive forming technique. And Mort, with his more experienced eye, and likely in concert with Jack Ritter from Youngstown (OH) State University, chose a design that would perform consistently at all angles with respect to the wood grain, rendering his Mort’s Inter-Lock Steel Co. plate design even more challenging to stamp than the others. Continued next page

PHONE: 800-289-5627

Read/Subscribe online at www.componentadvertiser.com

FAX: 800-524-4982


A

Th e

Component Manufacturing dverti$ dverti $ er

Don’t Forget! You Saw it in the

November 2026 #18328 Page #189

Adverti$$er

While Moehlenpah succeeded in breaking Jureit’s patent, the resulting plate design, like Mort’s, was difficult to manufacture. Jureit also was stuck with a tenuous design that used twice the thickness of steel and cost twice as much per square inch as Sanford’s Gri-P-late. For more than a decade, however, when truss plates were in high demand, the extra cost and complexity weren’t crucial factors. Even so, Sanford began developing new plate designs in 1960, right after both Gang-Nail and Ronel patented plates that didn’t require supplemental nails, with these changes leading to a design breakthrough that resounds to this day.

One of Moehlenpah’s designs

In 1958, Carol Sanford hired Bill McAlpine as his chief engineer and put him in charge of new plate development. In 1965, McAlpine submitted a patent application for a breakthrough design in which two teeth project from the same slot. In 1966, when he and Charlie Harnden left to form Alpine Engineered Products, they simplified that plate design and contracted with a local stamping plant to produce their first plates. As a direct result, Alpine, the upstart in the industry, quickly began selling a plate with a considerable cost advantage, and that put Gang-Nail’s large following of fabricators at risk. While McAlpine was innovating at Sanford Truss, Jureit was following suit, producing an 18-gauge plate and a much faster punch press to help lower his production costs. In 1966, Moehlenpah responded by introducing a 20-gauge plate, while retaining his much more intricately fashioned 16- and 18-gauge plates. Unfortunately, the teeth of his 20-gauge plate often bent over when pressed in Southern Pine and had lower values than the Alpine plate. For both Gang-Nail and Hydro-Air, these new plates proved to be merely stop-gap measures, because these plates had lower values than Alpine’s and they both continued to entail the higher operating and maintenance costs associated with their oversized punch presses and more complicated tooling. By the early 1970s, when Alpine decided to stamp their own plates, they were able to acquire the Sanford punch presses that had been sitting idle as Carol Sanford was winding down his business, furthering Alpine’s competitive advantage and accelerating their growth in market share. Alpine’s lower manufacturing costs also enabled them to launch five new stamping plants in strategic locations across the country in the 1970s, with a much lower capital cost than their competitors would face. When I visited one of these facilities, I saw modestly priced 50-ton open back inclinable (OBI) punch presses that cost less than half that of Hydro-Air’s 100-ton Minster straight-sided presses. Alpine compounded their advantage by installing engineering offices at their new stamping plants throughout the 1970s, further pressuring their competitors to respond. Moreover, the Alpine plate could be vertically pressed or rolled, unlike most of their competitor’s products, widening their appeal. As a result, nearly all of their competitors responded with similar plates during this period. Truswal acquired the nearly identical Ronel plate by purchasing Ronel, Hydro-Air’s Larry Beineke developed the PT plate, and Gang-Nail’s Carlos Rionda trumpeted the GNA plate. By the 1980s, all of these developments brought an end to the era of significant manufacturing advantages garnered from individual plate designs. PHONE: 800-289-5627

Read/Subscribe online at www.componentadvertiser.com

FAX: 800-524-4982


Turn static files into dynamic content formats.

Create a flipbook
November 2026 Component Manufacturing Advertiser Magazine by Component Manufacturing Advertiser - Issuu