NEW ALBANY WALKING CLASSIC
GENERAL NOTES The graphical illustration of traffic control devices in this document is not a design or plan from a professional engineer nor does it supersede the Ohio Manual of Uniform Traffic Control Devices, current edition. The Paul Peterson Co. and employees assume no liability in connection with the traffic control suggestions or information herein made. It cannot be assumed that every acceptable traffic control procedure is contained herein as this document is for reference purposes only. This document may not be reproduced and is intended only for internal use by the Paul Peterson Co.
THESE DRAWINGS NOT TO SCALE APPROVED BY: ______________________________ DATE: ______________
AS OF 08/02/2014
PRINT: ______________________________________TITLE: ______________
1
R
M
62 US
DETO UR
NY
CL
ER SO
UT
HB
OU
BABBITT RD
ND
ILL ZM KIT
REYNO
LE RD
OS
RD
RG-NE LDSBU
62 US
DUBLIN-GRANVIL
ED
W ALBA
DETOUR
HAMILTON RD
DETOUR
R
TO U
DE
DETOUR
R
RO
AD
LO
CA
RA
MORSE RD
ROAD CLOSED
CL
OS
LT
FF
IC
ED
LOCAL TRAFFIC ONLY
ON
LY
MORSE RD
DETOUR
DE
DETOUR
TO U
DETOUR
DETOUR
U TO DE
L IL
KITZMILLER RD CLOSED SOUTH OF DUBLIN GRANVILLE RD FOLLOW DETOUR
S
DETOUR
DETOUR
H IT
DET OUR
ILLE RD
-GRANV
DUBLIN
DUBLIN GRANVILLE RD CLOSED WEST OF KITZMILLER RD FOLLOW DETOUR
SM
U TO
DE
R
DETOUR
- DETOUR ROUTE - CLOSED SECTIONS - OPEN SECTIONS
Notes: Friday Set Up
REFER TO PAGE ONE FOR GENERAL NOTES
NEW ALBANY WALKING CLASSIC
08-15-2014
Contractor
Traffic Control Contractor
CITY OF NEW ALBANY Work Description
ROAD CLOSURES
N
Date
Project Name
Paul Peterson Co
-Close Reynoldsburg-New Albany Rd between US 62 and Village Hall Rd E -Close Dublin-Granville Rd between US 62 and Kitzmiller Rd -Close South Bound Kitzmiller Rd South of Dublin-Granville Rd
W
S
2
KE
SW
ICK
DR
RO CLO AD SED RO CLO AD SED
O
O
DS
BL VD
RO CLO AD SED
R CLO OAD SED
DE N
W
US
AL
O
G
PA TH
RD
Notes: Friday Set Up
REFER TO PAGE ONE FOR GENERAL NOTES
N
Date
Project Name
NEW ALBANY WALKING CLASSIC
08-15-2014
Contractor
Traffic Control Contractor
CITY OF NEW ALBANY
62
Paul Peterson Co
-Close rear exit of the development East of Ogden Woods Blvd to the first alley
W
E
Work Description
ROAD CLOSURES
S
3
D
LL R
HA AGE
VILL
R CL OAD OS ED R CL OAD OS ED
RK
ST
US
62
R CL OAD OS ED
ET
R CL OAD OS ED
MA
REFER TO PAGE ONE FOR GENERAL NOTES Date
Project Name
NEW ALBANY WALKING CLASSIC
08-15-2014
Contractor
Traffic Control Contractor
CITY OF NEW ALBANY
Notes: Sunday 4:00 am -Inner Closure of Market St. -Stage Friday, will be placed by others.
N
W
E
Paul Peterson Co
Work Description
ROAD CLOSURES
S
4
ROAD D SE CLO ROAD D SE CLO
8:30 AM
D
LL R
ROAD CLOSED
HA AGE
VILL
R CL OAD OS ED
RK
ET
R CL OAD OS ED
MA
R CL OAD OS ED
ROA CLO D SED
ST
US
62
GATE
R CL OAD OS ED
REFER TO PAGE ONE FOR GENERAL NOTES Date
Project Name
NEW ALBANY WALKING CLASSIC
08-15-2014
Contractor
Traffic Control Contractor
CITY OF NEW ALBANY
Notes: Sunday 7:00 am -Outer Closure of Market St -Place 2 Type 1 on Village Hall Rd and Parking lot at 8:30 AM
N
W
E
Paul Peterson Co
Work Description
ROAD CLOSURES
S
5
IS YANT
OGDEN WOODS BLVD
DR
WALKERS
TRAFFIC
REFER TO PAGE ONE FOR GENERAL NOTES Date
Project Name
NEW ALBANY WALKING CLASSIC
08-15-2014
Contractor
Traffic Control Contractor
CITY OF NEW ALBANY
Notes: Sunday 7:00 am -Run cones down the center line of Ogden Wood EB for 200 feet
N
W
E
Paul Peterson Co
Work Description
ROAD CLOSURES
S
6
PAGE 8
AN HM UG
BA O WA NE Y
N RA G
PAGE 9
T
ONE WAY
AD RO SED O CL AFFIC ONLY
ED LOS
L TR
DC
LOCA
ROA
BRANDON R
D
RO CLO AD SED
E ON AY W
ONE WAY ROAD CLOSED
ONE WAY ONE WAY
E ON Y WA
D
KR
R PA
ONE WAY
ONE WAY
PAGE 11
E ON Y WA
ONE WAY
N TO
E ON Y WA
MB
LA
LOCAL TRAFFIC ONLY
PAGE 12
ON WA EONE Y Y A W
PAGE 10
Notes: Sunday 8:00 AM -Run Cones down the center line of Lambton Park Rd, Brandon Rd, and Baughman Grant -Lambton is one way to Brandon Rd -Brandon Rd is one way to Baughman Grant -Baughman Grant is one way to Fenway Rd -One Way on Barrels -Cones at 40 ft spacing and 8 ft spacing at cross streets
REFER TO PAGE ONE FOR GENERAL NOTES
N Date
Project Name
NEW ALBANY WALKING CLASSIC
08-15-2014
Contractor
Traffic Control Contractor
CITY OF NEW ALBANY
W
E
Paul Peterson Co
Work Description
ROAD CLOSURES
S
7
D
R AY W N
FE
AD RO ED S CLO AD RO ED S CLO
H SQUARE
N GOODRIC
BA
UG
HM
AN
GR
AN
T
O WA NE Y
TR
AF
FI
C
W AL
KE
RS
Notes: Sunday 8:00 AM
REFER TO PAGE ONE FOR GENERAL NOTES
NEW ALBANY WALKING CLASSIC
08-15-2014
Contractor
Traffic Control Contractor
CITY OF NEW ALBANY Work Description
ROAD CLOSURES
N
Date
Project Name
Paul Peterson Co
-Move runners to Bike Path -Run cones down the center of Baughman Grant -Close Baughman Grant SB traffic at Fenway Rd
W
E
S
8
WA L
KE
RS
TR
AF
FIC LAM
BTO
RD
US
62
NP ARK
Notes: Sunday 8:00 AM
REFER TO PAGE ONE FOR GENERAL NOTES
NEW ALBANY WALKING CLASSIC
08-15-2014
Contractor
Traffic Control Contractor
CITY OF NEW ALBANY
N
Date
Project Name
Paul Peterson Co
-Move runners to the north side of the intersection. -Police will direct US 62 traffic
W
E
Work Description
ROAD CLOSURES
S
9
SB OLD RYN URG NE W ANY
ALB RD
FIC
AF
TR D
NR
DO RAN
RS
KE
L WA
B
Notes: Sunday 8:00 AM
REFER TO PAGE ONE FOR GENERAL NOTES
NEW ALBANY WALKING CLASSIC
08-15-2014
Contractor
Traffic Control Contractor
CITY OF NEW ALBANY
N
Date
Project Name
-RUN BARRELS DOWN THE CENTER LINE OF BRANDON RD
W
E
Paul Peterson Co
Work Description
ROAD CLOSURES
S
10
W AL
KE
RS
TR
AF
FI
C
O WA NE Y
ND
F
AD
RD
PO
LA
MB
O
TO N
HE
K
RD
Notes: Sunday 8:00 AM
REFER TO PAGE ONE FOR GENERAL NOTES
N
Date
Project Name
NEW ALBANY WALKING CLASSIC
08-15-2014
Contractor
Traffic Control Contractor
CITY OF NEW ALBANY
PA R
Paul Peterson Co
-RUN BARRELS DOWN CENTER LINE OF ROAD -CREATE A RIGHT IN AND RIGHT OUT AT HEAD OF POND RD
W
E
Work Description
ROAD CLOSURES
S
11
F AF TR IC
AL W RS
KE
ON
D AN BR RD
E ON AY W
RK
N
RD
PA
O BT
TR
AF
AM
FIC
L
WA L
KE
IC AF F TR
WA L
KE RS
RS
Notes: Sunday 8:00 AM
REFER TO PAGE ONE FOR GENERAL NOTES
NEW ALBANY WALKING CLASSIC
08-15-2014
Contractor
Traffic Control Contractor
CITY OF NEW ALBANY Work Description
ROAD CLOSURES
N
Date
Project Name
Paul Peterson Co
-Police will direct traffic in intersection -One way NB on Lambton Park Rd -One Way WB on Brandon Rd
W
E
S
12
SEE PAGE 3
S ER LK WA
POST OFFICE
AG
LL
VI
62
E LL
HA
US
RD
Notes: Sunday 8:30 AM
REFER TO PAGE ONE FOR GENERAL NOTES
NEW ALBANY WALKING CLASSIC
08-15-2014
Contractor
Traffic Control Contractor
CITY OF NEW ALBANY
N
Date
Project Name
Paul Peterson Co
-Close US 62 just North and South of Village Hall Rd -Cone off South entrance to Post Office
W
E
Work Description
ROAD CLOSURES
S
13
ROAD CLOSED AHEAD
REYNOLDSBUR G
NEW ALBANY R D
ANTMON ROUND
Notes: Sunday 8:30 AM
REFER TO PAGE ONE FOR GENERAL NOTES
NEW ALBANY WALKING CLASSIC
08-15-2014
Contractor
Traffic Control Contractor
CITY OF NEW ALBANY
N
Date
Project Name
-Place road closed ahead sign
W
E
Paul Peterson Co
Work Description
ROAD CLOSURES
S
14
E HAL
L RD
WALKER S
ROAD CLOSED
Notes: Sunday 8:30 AM
REFER TO PAGE ONE FOR GENERAL NOTES
N
Date
Project Name
NEW ALBANY WALKING CLASSIC
08-15-2014
Contractor
Traffic Control Contractor
CITY OF NEW ALBANY
REYNOLDSBURG NEW ALBANY RD
VILLAG
-Close RNA just south of Village Hall Rd
W
E
Paul Peterson Co
Work Description
ROAD CLOSURES
S
15
CLOSE TURN LANE MAIN ST
CLOSE TURN LANE
ON
BI
HIGH ST
ED
LY
TO EN T OP POS ICE F OF LO
AFFI
CL
IC FF
L TR
AD
A TR
DU
LOCA
RO
L CA
62 ROA
OS
ROAD CLOSED
US
C ON
D CLO
N-
GR
LY
SED
AN
VI
LL
GE
PA
E
RD ROAD CLOSED R CLO OAD SED
EE
5
S
W AL
KE
RS
Notes: Sunday 8:30 AM
REFER TO PAGE ONE FOR GENERAL NOTES
NEW ALBANY WALKING CLASSIC
08-15-2014
Contractor
Traffic Control Contractor
CITY OF NEW ALBANY Work Description
ROAD CLOSURES
N
Date
Project Name
Paul Peterson Co
-Close High St South of Main St -Close Dublin-Granville Rd East of US 62 -Close left turn lane of US 62 SB at Dublin-Granville Rd -Close left turn lane of Main St WB at High St
W
E
S
16
DETOUR ROAD CLOSED
DUBLIN-GRANVILLE RD RUNNERS
ROAD CLOSED
N
LER RD KITZMIL Date
NEW ALBANY WALKING CLASSIC
08-15-2014
Contractor
Traffic Control Contractor
CITY OF NEW ALBANY
CONT. CO NES TO NE W A L B A NY FARM S RD
RUNNERS
Notes: Sunday 8:45
REFER TO PAGE ONE FOR GENERAL NOTES Project Name
Paul Peterson Co
-Close Dublin-Granville Rd West of Kitzmiller Rd -Close South Bound Kitzmiller Rd South of Dublin-Granville Rd
W
E
Work Description
ROAD CLOSURES
S
17
RD CO DU NT. CO BL IN- NES GR AN TO VIL LE
NE
W
AL
BA
NY
FA R
KIT
ZM IL
LER
RD
MS
Notes: Sunday 8:45 AM
REFER TO PAGE ONE FOR GENERAL NOTES
NEW ALBANY WALKING CLASSIC
08-15-2014
Contractor
Traffic Control Contractor
CITY OF NEW ALBANY
N
Date
Project Name
Paul Peterson Co
-Keep South Bound Kitzmiller Rd Closed -Move runners to New Albany Farms
W
E
Work Description
ROAD CLOSURES
S
18