4 minute read
Public Notices
Bids and Settlements
Public Notice
FINAL SETTLEMENT
Project Title: Painted Prairie Subdivision
Filing No. 3, Landscaping and Irrigation
Improvements-Phase 2A & 2B
Project Owners: Painted Prairie Public Improvement Authority
Project Location: City of Aurora, Adams County
The Painted Prairie Public Improvement Authority plans to accept the above titled project as substantially complete and for Final Settlement to Hall Contracting, LLC. after August 17, 2023. In accordance with the Contract Documents, the Painted Prairie Public Improvement Authority may withhold a portion of the remaining payment to be made to Hall Contracting, LLC., as necessary, to protect the Painted Prairie Public Improvement Authority from loss on account of claims filed and failure of Hall Contracting, LLC. to make payments properly to subcontractors or suppliers. Project suppliers and subcontractors of Hall Contracting, LLC. are hereby notified that unresolved outstanding claims must be certified and forwarded to:
Contact Person: Barney Fix, P.E.
Address: 5970 Greenwood Plaza Blvd. Greenwood Village, CO 80111 as soon as possible, but no later than August 10, 2023.
Legal Notice No. CCX1099
First Publication: July 20, 2023
Last Publication: August 3, 2023
Publisher: Commerce City Sentinel
Express
Non-Consecutive Publications
Public Notice
Request For Proposals
CONSTRUCTION MANAGER/GENERAL CONTRACTOR (CMGC) SERVICES FOR SACWSD 2023 COUNTER DRIVE LIFT STATION IMPROVEMENTS
Date: July 20, 2023
The South Adams County Water and Sanitation District, acting by and through its South Adams County Water and Sanitation District Activity Enterprise (Owner), is requesting sealed proposals for Construction Manager/General Contractor (CMGC) services for the District’s 2023 Counter Drive Lift Station Improvements. Muller Engineering Company (Muller/ Engineer) is providing design services to support this CMGC procurement. Preliminary design has been completed, and Muller will continue to advance this design and submit packages for SACWSD review at intermediate and final design levels and provide design services during construction.
The project consists of increasing emergency response time at the District’s Counter Drive Lift Station site by creating additional wet well containment capacity.
Anticipated work includes construction of a water-tight secant pile wall (or equivalent) containment structure drilled to bedrock adjacent to the lift station’s existing wet well, cast-in-place floor and roof slabs, connecting overflow pipe between the existing wet well and new containment structure by HDD or other means, sump pump system to evacuate the containment structure when used, and miscellaneous site restoration, landscaping and surface improvements commensurate with the adjacent properties and neighborhood. The site is in a high-groundwater residential area, in close proximity to the adjacent residences to the north and south, and lies immediately east of a concrete-lined section of the Fulton Ditch. The District currently owns the property to the south of the Lift Station parcel, and will grant an easement and/or relocate the lot line to facilitate construction and create the permanent area necessary for the containment structure.
As part of the pre-construction phase services, the selected Contractor will prepare a project risk analysis, and will collaborate with the Owner and Engineer to develop concepts, establish construction methods, and advance the conceptual design included in the Request for Proposals (RFP) to acceptably mitigate the project’s risks associated with groundwater control and the protection of nearby structures and residences. The selected Contractor will coordinate with subcontractors, suppliers, and any needed outside consultants in collaboration with the Owner and Engineer to finalize the design, establish a detailed project schedule, and develop a Guaranteed Maximum Price (GMP) for recommendation to the District’s Board of Directors. Of critical importance to the success of the project will be the Contractor’s role in the management and mitigation of construction, cost, and schedule risks throughout the duration of the project. If the GMP is approved by the District’s Board, a GMP Amendment will be executed for the construction phase of the project and establish the Contractor in the role of General Contractor for the completion and final acceptance of the project by the District. Final completion is targeted for early August of 2024, based on anticipated timing of the CDPHE Site Application approval in mid-February.
Interested Contractors may obtain an of ficial RFP package by contacting Glenn Hamilton, Project Manager with Muller, via email at ghamilton@mullereng.com. If email transmission issues are suspected, Glenn can be contacted at (303) 2680400. Additionally, interested Contrac tors are required to attend a mandatory pre-proposal meeting at the project site as set forth in the RFP. Proposals must be submitted by email to Dawn Fredette at dfredette@sacwsd.org in conformance with the RFP no later than 12:00 p.m. local Colorado time on Friday, August 18, 2023. If email transmission issues are suspected with the transmission to Ms. Fredette, she can be contacted at (720) 206-0509.
The District intends to award the contract to the firm which submits the proposal that, in the District’s estimation, represents the best value to the District. The District reserves the right to reject any or all proposals, including without limitation, nonconforming, nonresponsive, unbalanced, or conditional proposals. If it appears Owner can perform the Work or secure material for less than the lowest proposal, it may proceed to do so. Owner reserves the right to act in its best interest and may terminate, modify or suspend the process, modify the terms and conditions of this proposal and selection process, and/or waive informalities of any submission.
By: Vicki Ennis, Secretary South Adams County Water and Sanitation District
Legal Notice No. CCX1102
First Publication: July 20, 2023
Last Publication: July 20, 2023
Publisher: Commerce City Sentinel Express
Public Notice
NOTICE OF FINAL SETTLEMENT
Notice is hereby given that on or after July 30, 2023 at 8:00 AM local time, final settlement shall be made by the City of Commerce City, Colorado with:
Hallmark Inc.
5085 Harlan St. Denver Co, 80212
Hereinafter called the “Contractor”, for and on account of the Contract: “E.72nd. Ave. and Quebec Parkway Underpass Improvements”, Project Number PRG2022-003, hereinafter called the “Project,” for the City of Commerce City, Colorado.
1. Any person or entity who has an unpaid
Notice to Creditors
NOTICE TO CREDITORS
Estate of Jin Woo Lee, Deceased Case Number: 2023 PR 30344
All persons having claims against the above-named estate are required to present them to the Personal Representative or to the District Court of Adams County, Colorado on or before November 20, 2023, or the claims may be forever barred.
Youn Mo Gu
Personal Representative
5621 Niagara St
Commerce City CO 80022
Legal Notice No. CCX1101
First Publication: July 20, 2023
Last Publication: August 3, 2023
Publisher: Commerce City Sentinel Express ###