Skip to main content

Karamata Builders Pack

Page 1

DEVELOPMENT INFORMATION PACK

prepared for builders and development partners


1.

Executive Summary

6

2.

Project Overview

8

3.

Location

11

CONTENTS

4.

Market Update

14

5.

Section Sales

15

a rare opportunity to secure a position in one of Queenstown’s most prestigious residential settings.

6.

Comparable End Product Sales

16

7.

Market Demand

17

8.

Masterplan and Availability

18

9.

Bulk Packages

20

10.

Architectural Concepts

21

11.

Vision, Controls & Approvals

28

12.

Development Plans & Drawings

30

13.

Programme & Titles

34

14.

Key Sale & Purchase Terms

36

15.

Sales and Marketing Support

37

16.

Delivery Team

38

17.

Next Steps & Contacts

39


1

the opportunity EXECUTIVE SUMMARY

A PREMIUM BUILDING PARTNERSHIP ON QUEENSTOWN HILL a rare opportunity to secure a position in one of Queenstown’s most prestigious residential settings. Karamata Peak presents an opportunity for builders and development partners to participate in the delivery of an exceptional residential neighbourhood on Queenstown Hill. Elevated above Lake Whakatipu and the town centre, the development combines a highly sought-after location, panoramic alpine outlooks and proximity to Queenstown’s lifestyle amenities. For builders, Karamata Peak offers the opportunity to secure premium residential land and create architecturally considered homes for a market drawn to Queenstown’s distinctive combination of natural beauty, recreation and lifestyle. With freehold sections, established design guidelines and a coordinated infrastructure programme, the development provides a framework for delivering homes that respond to both the landscape and the expectations of the premium market.

Premium Location: An elevated Queenstown Hill address, approximately 1.8km from Queenstown CBD, with views across Lake Whakatipu and the surrounding mountain ranges. Development Options: Residential sections of varying sizes, alongside potential opportunities for larger-scale or multi-lot development, subject to applicable planning and design controls. Strong Buyer Appeal: An opportunity to deliver bespoke homes for purchasers seeking quality, outlook, privacy and convenient access to Queenstown’s amenities. Clear Framework: A masterplan, Build Design Guide and associated covenants establish a consistent architectural and landscape vision for the neighbourhood. Defined Delivery Pathway: The subdivision’s infrastructure and site preparation programme is underway, with titles anticipated in mid2028, providing a forward window for builder planning and feasibility assessment. Lot 1000 and Section 2 are due for title at an earlier anticipated date of May 2027.

6


A partnership opportunity This Development Information Pack has been prepared to help builders and development partners evaluate the opportunity at Karamata Peak with clarity and confidence. It brings together market evidence, comparable sales, buyer insights, available sections, development concepts, design requirements, infrastructure information and key commercial considerations. Whether considering an individual section, a multi-lot acquisition or a broader building partnership, the objective is to provide the information needed to assess feasibility, understand the delivery pathway and identify the right opportunity. Karamata Peak is an opportunity to build beyond the ordinary, creating distinctive homes in a location defined by its outlook, setting and enduring appeal.

7


PROJECT OVERVIEW

2

Masterplan

as at 3 november 2026

Item

Position

Project

96 residential lots (300–1,015 m²), plus Lot 1000 (2,085 m²) and Section 2, a 4,448 m² net comprehensive development lot. Medium Density Residential Zone.

Sales

37 lots sold across 24 contracts, $44.45m excl GST ($51.1m incl GST). A further 3 lots are under contract or in negotiation.

Consent and land

Resource consent issued July 2026. Land purchase from Queenstown Lakes District Council settled in late September.

Site works

Tree clearance underway (Sept–Nov). Engineering approval expected 1 December. Civil work start December 2026; contractor is Base Contracting.

Titles

Stage 1 (Lot 1000 and Section 2) due May 2027. Stage 2 (all remaining lots) due mid 2028.

Pricing

Schedule rates of approximately $1,540–$2,830/m² excl GST. Block purchases are negotiated on their own terms.

CURRENT AT: 14.09.2026 | SUBJECT TO CHANGE.

site overview

ELEVATED LIVING

8


9


The design philosophy for Karamata Peak is to create a timeless, design-led residential environment where architecture and landscape work in harmony. Buildings are to be recessive, elegant, and crafted from natural, enduring materials that settle into the landform and local vernacular.

Landscape treatments will emphasise native vegetation, ecological resilience, and seasonal character, providing a coherent identity across the development while allowing individual owners creative freedom within a clear framework. The overarching intent is to deliver a community that is distinctly Queenstown in character, respectful of its alpine setting, and exemplary in its quality of design.

10


3

The best of the best

LOCATION Accessed via Vancouver Drive on Queenstown Hill, Karamata Peak combines an elevated residential setting with convenient access to Queenstown’s vibrant town centre, renowned dining and hospitality, retail amenities, and year-round recreational opportunities. It is a location that appeals to buyers seeking a connection to the outdoors, a sense of place and the lifestyle that makes Queenstown internationally recognised.

QUEENSTOWN CBD

11


ben lomond & skyline

LOCATIONS OF INTEREST From lakeside dining and boutique retail to international travel. golf and world-class ski fields, Queenstown's amenities are within easy reach. The location offers a balance between the energy of the town and the privacy and perspective of an elevated residential address.

queenstown hill coronet peak

queenstown cbd

frankton & 5 mile shops queenstown gardens

the remarkables

queenstown golf club

queenstown airport

Queenstown CBD

Queenstown Airport

CORONET PEAK SKI AREA

1.8km | Approx. 6-minute drive

6.3km | Approx. 14-minute drive

17km | Approx. 26-minute drive

ARROWTOWN

FRANKTON & FIVE MILE SHOPS, SCHOOL AND COMMERICAL PRECINCT

THE REMARKABLES SKI AREA

21km | Approx. 25-minute drive

22.5km | Approx. 40-minute drive

6.6km | Approx. 15-minute drive

12


Lot 28

views for all sections

VIEWSHED STUDY A detailed Viewshed Analysis Study has been commissioned for the project, providing prospective purchasers with an indication of the visual outlook and amenity available from each lot across the development. The study uses a detailed digital landform model based on the proposed subdivision design and earthworks to illustrate anticipated view corridors and surrounding lot relationships.

LotLot 46 28 5.8 metres above finished ground level

The report includes panoramic views generated from both ground-floor and first-floor viewing heights for every lot, helping purchasers understand the potential outlook towards Queenstown’s iconic alpine landscape from future building platforms. While indicative in nature, the study is a valuable tool for comparing lots and gaining a clearer understanding of the visual amenity offered throughout Karamata Peak.

» TO VIEW THE FULL VIEWSHED STUDY, CLICK HERE FOR THE KARAMATA PEAK DATA ROOM.

Lot 46 5.8 metres above Section 2 finished ground level 1.8 metres above finished ground level

Reference : PA25834 IS02

Lo landscape

architecture

urban

section 2 5.8 metres above finished ground level

1.8 metres above finished ground level

13


4

queenstown outperforms

MARKET UPDATE

Queenstown is New Zealand’s strongest-performing residential market over any meaningful holding period. The investment case is underpinned by three key drivers: population growth running at more than double the national rate, a tourism economy attracting record levels of investment, and a finite land supply constrained by the district’s lakes, mountains, and urban growth boundaries.

Market section from our draft (growth, population, tourism Otago & Southland Market Report 2026/27. Refreshed RE month. Tim

Since 1993, the average Queenstown dwelling price has increased from $187,934 to $1,960,319, representing compound annual growth of 7.6%. Over the same period, the average bare section value has risen from $76,726 to $1,219,575, equating to compound annual growth of 9.03%. In other words, the land component has outperformed the improvements built upon it, underpinning the long-term investment case for securing a land position in Queenstown. The District’s population has grown from 14,800 in 1996 to 53,800 in 2025 and is projected to reach 58,700 by 2027. Economic fundamentals remain equally strong, with district GDP reaching $4.77 billion and expanding by 2.0% in the year to September 2025, despite the national economy contracting by 0.5%. Construction spending exceeds $6.4 billion and makes up 11.7% of District GDP. Visitor spending reached $2.83 billion in 2025 and tourism supports 36.4% of district employment. Airport passenger movements are setting new records, and Queenstown hotels now lead every other New Zealand tourism centre on revenue per available room, average daily rate and occupancy. Roughly a billion dollars of identified infrastructure is being delivered into a district of 53,800 people — the $300m Skyline and Bob’s Peak redevelopment directly across the valley, $65m of airfield works and a staged terminal expansion at the airport, the $400m Queenstown cable car, a $150m-plus Remarkables ski area expansion and the $280m Ayrburn screen hub. None of it adds competing medium density residential land inside the Urban Growth Boundary.

14


KARAMATA’S OWN SALES HISTORY

5

SECTION SALES SOLD SOLD

SOLD

SOLD

SOLD

SOLD

SOLD

Lot(s)

Area m2

Price excl GST

m, airport,17,Skyline). Colliers 30, 31 1,655 $3,075,000 EINZ figures to the latest 18–24 3,855 $7,710,000

$/m2 excl GST $1,858

SOLD

SOLD

Unconditional

SOLD SOLD

SOLD

Aug 2026

SOLD

SOLD

$2,000

Mar 2026

$1,993

Jan 2026

SOLD

SOLD

SOLD

SOLD

25

650

$1,295,652

SOLD

SOLD

SOLD

SOLD

SOLD

SOLD

SOLD SOLD

29

605

$1,478,261

$2,443

Jul 2026

40

645

$1,295,652

$2,009

Jan 2026

56

545

$921,739

$1,691

May 2026

65

630

$1,408,696

$2,236

Apr 2026

68

865

$1,556,522

$1,799

Jun 2026

69

605

$1,469,565

$2,429

Jun 2026

70

600

$1,469,565

$2,449

Jun 2026

72

565

$1,328,938

$2,352

Feb 2026

78

1,010

$1,521,739

$1,507

Jan 2026

Historically, sections close to town and those located on the hill have traded at broadly similar underlying values. There has long been a direct trade-off between views and proximity, with the market generally pricing the two as substitutes rather than distinct products. At present, a significant gap exists between these competing value propositions, and our expectation is that this disparity will narrow as Karamata Peak titles are issued and the development is absorbed by the market.

79

775

$1,556,522

$2,008

Mar 2026

The fringe evidence we hold:

80–85

3,400

$7,395,000

$2,175

Jul 2026

Property

Area m2

Price

$/m2

87

680

$1,217,391

$1,790

Jul 2026

4 Park Street (Happiness House)

693

$4,080,000

$5,887

88

405

$739,130

$1,825

Jul 2026

9 Hobart Street

1,436

$7,200,000

$5,014

89

355

$660,870

$1,862

Jun 2026

5 Hobart Street

986

$4,900,000

$4,970

4 & 8 Malaghan Street

3,051

$14,440,000

$4,733

26 Hallenstein Street

936

$4,200,000

$4,487

SOLD SOLD

SOLD

SOLD SOLD

SOLD

SOLD SOLD

SOLD

SOLD

CURRENT AT: 14.09.2026 | SUBJECT TO CHANGE.

Town centre and fringe development land

ELEVATED LIVING

90

415

$652,174

$1,571

Jun 2026

91

425

$652,174

$1,534

May 2026

5 York Street

765

$3,125,000

$4,085

92

375

$652,174

$1,739

May 2026

4–6 Hallenstein Street

963

$3,910,000

$4,060

93

325

$608,696

$1,873

Jun 2026

Thompson Street (3 sites)

2,056

$8,100,000

$3,940

94

300

$608,696

$2,029

May 2026

32 Fryer Street

809

$3,000,000

$3,708

43 Robins Road

822

$2,975,000

$3,619

95

305

$608,696

$1,996

Jun 2026

21 Sawmill Road

508

$1,775,000

$3,494

1000

2,085

$4,565,000

c.$2,070 net

May 2026

47 Robins Road

1,264

$3,800,000

$3,006

9–13 Hallenstein St & 1 York St

3,277

$7,800,000 + GST $2,380

37 lots

$44,447,852

SOLD

The fringe market is currently achieving between $2,380/m² and $5,887/m², with a median rate of approximately $4,000/m². By comparison, Karamata Peak’s achieved sales rates have ranged from $1,858/m² to $2,175/m², with the current retail pricing schedule topping out at $2,785/m². On that basis, hill land is effectively trading at around half the value of comparable fringe locations. We view this as a timing gap rather than a value gap. Karamata Peak will not receive titles until May 2027 and mid 2028, meaning all sales to date reflect pre-title pricing. In contrast, fringe sites are generally transacting with existing titles and immediate development capability. As Stage 1 titles are issued and the first homes are completed, we expect this discount to progressively compress. For builders and developers purchasing today, the opportunity lies not only in the underlying land value, but also in capturing that pricing convergence over time.

15


QUEENSTOWN HILL

6

COMPARABLE END PRODUCT SALES

Development

Sale price

Floor area

Gross $/m2

Note

8 Suburb Street

$3,195,000

170 m2

$18,794

Asking rate

159E Frankton Road

$3,600,000

192 m2

$18,750

Sold, high spec

5/55 Kent Street

$5,000,000

289 m2

$17,301

Sold, unit title

7 Salmond Place

$1.79m – $1.959m

112 m2

$15,983 – $18,140

Four sold off plans, no garage

7 Turner Street

$1.78m – $1.95m

110 m2

$16,181 – $17,727

Seven sold, no garage

Salmond Place and Turner Street are the two most useful rows on the above table. Compact, mid specification, no garage, sold off plans, and both clearing $16,000 per m². That is exactly the product a builder at Karamata Peak would deliver, and it is better evidence than the high-end one-off sales above them.

new multi-unit product across Queenstown For the wider market, the top of the band is Queenstown Hill Villas at $17,558 per m², then Alpine Quarters between $16,508 and $17,157, Rosefern at 26 Hallenstein Street at $16,446 for the three-bedroom and $15,063 for the four-bedroom, and 25 Robins Road at $16,358. Below those, Peninsula Rise sits at $14,151 to $14,339, the Sawmill Road two-bedroom at $13,841, Sterling Lane at $13,016, and the Tiers, Five Mile Villas and Kawarau Villas all around $13,000. Bullenrise at Arthurs Point is the floor at $7,929 and $8,269.

the two current listings 5 Hobart Street is Colliers — Candice and Vera. A 986 m² site, medium density with an 8 metre height limit, and inside the proposed Urban Intensification Variation rezoning to high density. Six freehold four-bedroom duplexes at $2,449,000 each plus GST, which analyses to about $20,500 per m² including GST. Two went under contract within thirty hours of launching in late September. High spec — cedar hot tubs, underfloor heating, schist and cedar cladding. Construction starts early next year. The Reach at 53–65 Frankton Road, with Ben Terry at Sotheby’s. This is the most directly relevant live comparable we have. Wildridge Projects, 38 architecturally designed freehold townhouses across eight blocks on a 4,695 m² site - 21 four-bedroom and 17 three-bedroom, 154 to 192 m² excluding decks, three levels, designed by AWA Architects. Three are dual-key. Priced from $2,295,000 plus GST, with a 365-day visitor accommodation consent. Around half signed up in the first three weeks and the agent reports local and Australian investors in the mix. Construction starts shortly, completing late 2027. Visitor accommodation consent is the single biggest determinant of rate.

16


7

STRONG ENQUIRY LEVELS

MARKET DEMAND

WEBSITE REGISTRATIONS A total of 680 registrations of interest have been recorded through karamatapeak.co.nz since the website launched in December 2025. Demand has been split almost evenly between Australia (46%) and New Zealand (44%), with the balance originating from offshore markets including Hong Kong, Singapore, and the United States. This broad geographic spread demonstrates the depth of interest in the project and reinforces Queenstown’s ongoing appeal to both local and international purchasers.

AUSTRALIAN DEMAND Australian demand is tangible and measurable, rather than anecdotal. Australian citizens and permanent residents can purchase New Zealand residential land without requiring Overseas Investment Act consent, allowing them to transact on the same basis as local buyers. This demand is already evident at Karamata Peak, where several lots have been sold to Australian purchasers, including one family group that secured five sections. Looking ahead, recent changes to Australian property tax settings are expected to further influence buyer behaviour. From July 2027, Australia removed negative gearing for established investment properties acquired after May 2026 and reduced the capital gains tax concessions previously available to investors. As a result, holding residential investment property in Australia has become materially less attractive, increasing the relative appeal of alternative markets. The Colliers Otago 2026 Market Report identifies these policy changes as a factor likely to encourage greater Australian investment across the Tasman, particularly into premium lifestyle and residential markets such as Queenstown.

YPOGRAPHY YPOGRAPHY YPOGRAPH RAPHY HY + GR GRAPHIC GRAPHI GRAP GRAPH APHIC HIC IC ELEMENTS ELEMENT ELEME LEMENTS MENTS TS

TYPOGRAPHY TYPOGRAPH TYPOGRAPHY RAPHY HY + GR GRAPHIC GRAPHI GRAP GRAPH APHIC HIC IC ELEMENTS ELEMENT ELEME LEMENTS MENTS TS 17


SITE PACKAGES AND OPPORTUNITIES

8

MASTERPLAN AND AVAILABILITY

Karamata Peak offers a range of site packages designed to help builders and developers identify an acquisition opportunity aligned with their project scale, capital position and delivery strategy.

PACKAGE A SOLD SOLD SOLD

PACKAGE B

SOLD SOLD

SOLD

SOLD SOLD SOLD SOLD SOLD

SOLD

SOLD

SOLD SOLD

SOLD

SOLD

SOLD

SOLD

SOLD

SOLD

SOLD

SOLD

SOLD

SOLD SOLD

SOLD SOLD

SOLD

SOLD SOLD

SOLD

SOLD SOLD

SOLD

SOLD

SOLD

PACKAGE C

CURRENT AT: 14.09.2026 | SUBJECT TO CHANGE.

18


19


FOCUS PACKAGES

9 BULK PACKAGES The packages below bring together land area, purchase price and indicative land cost per home, providing a straightforward basis for comparing land cost per home and assessing the potential economics of each opportunity.

PACKAGE A

PACKAGE B

PACKAGE C

Four contiguous lots forming an eight-home duplex scheme. Two homes per lot as of right, so no density consent is required. North 5.5 metre and south 8 metre height control.

Six lots overlooking the park reserve, 8 m rolling height. With tree clearance finishing in November, these will open right up.

The quickest way to get on site at Karamata Peak. On its own title and ready in about 12 months, a year ahead of the Stage 2 lots.

Lots

Land Area

Lots

Land Area

Lots

Land Area

28 + 41 - 43

2,050M2

46 - 49

2,430M2

SECTION 2

4,448M2 NET

Homes

Land Cost excl. GST

Homes

Land Cost excl. GST

Homes

Land Cost excl. GST

8

$5.5 M

14

$5.6 M

19

$8.90 M

Basis

Land Cost per Home

Basis

Land Cost per Home

Basis

$684,000

250M per home $400,000

SOLARI DUPLEX HOME CONCEPTS PROVIDED

SOLARI TERRACE HOME CONCEPTS PROVIDED

DUPLEX

2

Land Cost per Home

250M per home $468,000 2

NALA STUDIO MIXED HOME CONCEPTS PROVIDED

Yields are indicative and subject to the covenant floor-area limits at clause 4.1(g), design approval, and resource consent where more than three homes are proposed on one site.

20


LOT EXAMPLES

10 ARCHITECTURAL CONCEPTS

To help demonstrate the development potential of the selected site packages, three indicative architectural schemes have been prepared, tailored to suit the individual sites and their characteristics. Developed in collaboration with Solari Architects and Nala Studio Architects, the concepts explore potential home configurations, building forms and architectural responses to the Queenstown Hill setting. Each scheme has been considered in relation to its respective site, providing builders and developers with a visual starting point for understanding potential yield, built form and the opportunity to create quality residential homes. Package A:

Duplex Home Scheme - Lots: 28 + 41 - 43 Architect: Solari Architects

TERRACE HOMES

A HEAD START ON BRINGING YOUR VISION TO LIFE.

The concept scheme for Package A contains lots 28 + 41 - 43 in a 8 Duplex home scheme, Two at 210 m² on Lot 28, two at 206 m² on Lot 43 and four at 248 m² across Lots 41 and 42. Total 1,824 m². Package B:

Terrace Home Scheme - Lots 46 - 49 Architect: Solari Architects

The concept scheme for Package B contains lots 46 – 49 in a 14-unit terrace home scheme, designed within three blocks. Four units of 190, 175, 175 and 190 m²; five of 190, 175, 175, 175 and 190 m²; and five of 190, 180, 180, 180 and 190 m². Total 2,555 m², all three levels, with 11 to 12 m² of outdoor living each. Mixed Scheme Bulk & Location - Section 2 Architect: Nala Studio Architects

The concept scheme for Package C contains the whole of Section 2. Nala Studio have provided a high-level bulk and location plan which offers mixed-style housing including freestanding larger homes, duplex and smaller block terrace homes. The total building area proposed is 1,936m2. A starting point, not a fixed outcome.

The architectural schemes are indicative concepts intended to illustrate potential development outcomes. They are provided as a reference for feasibility and design exploration, rather than prescribed building solutions. Builders may wish to develop, adapt or reimagine the concepts to suit their preferred construction methodology, market positioning and commercial objectives, subject to the relevant planning requirements, design controls and approvals.

DUPLEX HOMES

Package C:

21


PACKAGE A

DUPLEX HOMES Lots: 28 + 41 - 43 Architect: Solari Architects The concept scheme for Package A contains lots 28 + 41 - 43 in a 8 Duplex home scheme, Two at 210 m² on Lot 28, two at 206 m² on Lot 43 and four at 248 m² across Lots 41 and 42. Total 1,824 m².

SITE PLAN OVERVIEW: Lot 26 Lot 27

Accessway (Road 3)

1

M-42

Lot 201

Consider realigning boundaries (shown dashed) to better suit site coverage

Lot 28

Units 15-16

Lot 43

Units 17-18 Lot 202

Lot 44 Easem

ent

Easem

ent

Consider realigning boundaries (shown dashed) to better suit site coverage

Units 19-20

Lot 41

Lot 42 Level 2, 191 Cuba Street, Te Aro, Wellington t: +64 (0)4 974 4562 e: hello@solariarchitects.com

Lot 40

Units 21-22

Accessway (Road 3)

Site Plan - Lots 28, 41 to 43 A3 scale: 1 : 300

» TO VIEW THE FULL SOLARI PLANS, CLICK HERE FOR THE KARAMATA PEAK DATA ROOM.

Scale 1:300 @ A3 0

3

6

15m

NOTE: This drawing is copyright and is the property of Solari Architects Limited and must not be used without written authorisation.

Drawing Number

M-02

Disclaimer: All renders are indicative artist impressions only and have been prepared for illustrative purposes. They may not accurately reflect the final site location, orientation, topography, outlook or surrounding environment. Final building designs and positioning will be subject to detailed design development, site conditions and relevant approvals.

22


DUPLEX HOMES

HIGH-LEVEL FEASIBILITY The following worked example illustrates a potential feasibility outcome for the duplex scheme, based on a set of stated assumptions and indicative inputs. It is intended as a starting framework for builders to assess, adjust and test against their own construction costs, sales expectations and commercial requirements. It is indicative only and should not be relied upon as a formal valuation or appraisal. Assumptions: build at $6,000 per m² excluding GST for an efficient multi-unit group build, sell at $16,000 per m² including GST, site works $100,000 a unit, development contributions $30,000 a unit as a placeholder until Council confirms, professional fees at 6% and contingency at 5% of build, selling and marketing at 2.5%, finance at 8% on 60% of hard costs over 18 months from title. Line item

Basis & Assumptions

Amount excl GST

Gross realisation

1824

$16,000

$29,184,000

1.15

$25,377,391

Gross realisation excl GST Land

2050

$2,670

$5,473,913

Construction

1824

$6,000

$10,944,000

Site works and earthworks

8

$100,000

$800,000

Development contributions

8

$30,000

$240,000

Professional fees

6%

$656,640

Contingency

5%

$547,200

Selling and marketing

2.50%

$634,435

Finance

8%

$17,457,913

$1,256,970

Total development cost

$20,553,158

surplus

$4,824,234

profit

23%

land Cost per unit

28/41/42/43 8

Section value incl gst

excl gst

28

$1,490,000

41

$1,590,000

42

$1,690,000

43

$1,525,000

$1,295,652 $1,382,609 $1,469,565 $1,326,087 $5,473,913 $2,670

$6,295,000 per m²

$3,071

684,239 That is 23.0% on cost and 19.4% on gross realisation. The duplex scheme sits entirely inside the permitted activity envelope - two homes per lot as of right, no land use consent, straight to building consent.

23


PACKAGE B

TERRACE HOMES Lots 46 - 49 Architect: Solari Architects The concept scheme for Package B contains lots 46 – 49 in a 14-unit terrace home scheme, designed within three blocks. Four units of 190, 175, 175 and 190 m²; five of 190, 175, 175, 175 and 190 m²; and five of 190, 180, 180, 180 and 190 m². Total 2,555 m², all three levels, with 11 to 12 m² of outdoor living each.

SITE PLAN OVERVIEW: Eas

eme

nt

Units 01 - 04

Lot 45

Units 05-09

Lot 46

Accessway (Road 3)

Lot 47

Lot 48 Units 10-14

t en

m

se

Ea

Lot 96 Lot 203

Lot 49

Level 2, 191 Cuba Street, Te Aro, Wellington t: +64 (0)4 974 4562 e: hello@solariarchitects.com

Lot 50

Site Plan - Lots 46 to 49 A3 scale: 1 : 300

» TO VIEW THE FULL SOLARI PLANS, CLICK HERE FOR THE KARAMATA PEAK DATA ROOM. Scale 1:300 @ A3 0

3

6

15m

NOTE: This drawing is copyright and is the property of Solari Architects Limited and must not be used without written authorisation.

Drawing Number

M-01

Disclaimer: All renders are indicative artist impressions only and have been prepared for illustrative purposes. They may not accurately reflect the final site location, orientation, topography, outlook or surrounding environment. Final building designs and positioning will be subject to detailed design development, site conditions and relevant approvals.

24


TERRACE HOMES

HIGH-LEVEL FEASIBILITY The following worked example illustrates a potential feasibility outcome for the terrace scheme, based on a set of stated assumptions and indicative inputs. It is intended as a starting framework for builders to assess, adjust and test against their own construction costs, sales expectations and commercial requirements. It is indicative only and should not be relied upon as a formal valuation or appraisal. Assumptions: build at $6,000 per m² excluding GST for an efficient multi-unit group build, sell at $16,000 per m² including GST, site works $100,000 a unit, development contributions $30,000 a unit as a placeholder until Council confirms, professional fees at 6% and contingency at 5% of build, selling and marketing at 2.5%, finance at 8% on 60% of hard costs over 18 months from title. Line item

Basis & Assumptions

Amount excl GST

Gross realisation

2555

$16,000

$40,880,000

1.15

$35,547,826

Gross realisation excl GST Land

2430

$2,308

$5,608,696

Construction

2555

$6,000

$15,330,000

Site works and earthworks

14

$100,000

$1,400,000

Development contributions

14

$30,000

$420,000

Professional fees

6%

$919,800

Contingency

5%

$766,500

Selling and marketing

2.50%

$888,696

Finance

8%

$22,758,696

$1,638,626

Total development cost

$26,972,317

surplus

$8,575,509

profit

32%

land Cost per unit

46/47/48/49

Section value incl gst

excl gst

46

$1,800,000

47

$1,700,000

48

$1,600,000

49

$1,350,000

$1,565,217 $1,478,261 $1,391,304 $1,173,913 $5,608,696 $2,308

$6,450,000 per m²

$2,654

14

400,621 This is a 32% margin on cost. Note: The architect has maximised development potential at 14 units which equates to a ratio of 1 unit per 182.5m² land area which is outside the current 1 unit per 250m² zoning.

25


PACKAGE C

MIXED HOMES Section 2

Architect: Nala Studio Architects The concept scheme for Package C contains the whole of Section 2. Nala Studio have provided a high level bulk and location plan which offers a mixed style housing including freestanding larger home, duplex and smaller block terrace homes. The total building area proposed is 1,936m2 - 19 units, being 2 of 220 m2, 13 of 149 m2 and 4 of 213 m2. Building coverage of 1,936 m2 is 43.5% of the 4,448 m2 site, against a 45% permitted standard.

+497,000

+497,000

+494,000

+494,000

+491,000

+491,000

A2 -

The scheme is 19 units where permitted density gives 17, so it sits subject to a density consent.

SECTION A2 1:200

B5 -

SECTION B5 1:200

» TO VIEW THE FULL NALA STUDIO PLANS, CLICK HERE FOR THE KARAMATA PEAK DATA ROOM.

+499,304

+499,304

+496,304

+496,304

SITE PLAN OVERVIEW: +493,304

51

+493,304

0.0

C15 -

SECTION C15 1:200

C18 -

SECTION C18 1:200

505.0 C18 SK108

505.0

L 20.00m D 89° 53' 16"

HV 4,500

4,500

4,500

4,500

A1 B6

B7

4B8

BULK & LOCATION ONLY — NOT FOR CONSTRUCTION LIMITATIONS AND DISCLAIMER:

B9 B10 B11 B12 B13 SO 503041

C14

C15

D19 SECTION 2

REGULATORY RESTRICTIONS: THESE DRAWINGS ARE HIGH-LEVEL BULK AND LOCATION CONCEPTS ONLY. THEY ARE NOT FOR RESOURCE CONSENT AND NOT FOR BUILDING CONSENT SO 503041 APPLICATIONS.

L 13 D 103 .47m ° 1' 1 9"

B16 B17

.0

495

C18

KA

NOTES: DO NOT SCALE FOR CONSTRUCTION VERIFY ALL DIMENSIONS ON SITE BEFORE COMMENCING WORK.

DATA SOURCE & ACCURACY: SITE INFORMATION, DIMENSIONS, AND FEATURES HAVE BEEN COMPILED USING PUBLIC COUNCIL RECORDS AND COUNCIL GEOMAPS. THIS DATA HAS NOT BEEN INDEPENDENTLY VERIFIED BY THE ARCHITECT.

ALL WORK TO COMPLY WITH CURRENT NZ BUILDING CODE & STANDARDS AND MANUFACTURERS SPECIFICATION.

Sheet:

BOUNDARY & CONTOUR VERIFICATION: ALL LEGAL BOUNDARIES, EASEMENTS, AND FINAL DESIGN CONTOURS ARE INDICATIVE ONLY AND SUBJECT TO CONFIRMATION BY A LICENSED CADASTRAL SURVEYOR.

DRAWINGS TO BE READ IN CONJUNCTION WITH SPECIFICATION.

Scale @ A3:

DIMENSIONS & LEVELS: THE FINAL SIZE, EXACT LOCATION, AND FINISHED LEVELS OF ALL PROPOSED STRUCTURES ARE SUBJECT TO CHANGE AND MUST BE CONFIRMED ONCE THE FINAL SITE CONTOURS AND LEGAL BOUNDARIES HAVE BEEN FORMALLY VERIFIED. DO NOT SCALE FROM THESE DRAWINGS.

COPY RIGHTS TO NALA STUDIO ARCHITECTS LIMITED.

SK108

49

L 8.73m D 93° 47' 51"

0.0

490.0 L 10.09m D 93° 51' 33"

L 29.73m D 93° 49' 9"

L 36.53m D 87° 47' 58"

LOT 1 DP 532794

LOT DP 53 2 2794

LOT DP 532 3 794

485.0

© COPYRIGHT RE

48

L 51.20m D 94° 37' 46"

5.

C18 SK108

L 12.88m D 93° 50' 26"

B5 SK108

L 4.77 D 9° 39 m ' 4"

LO DP 4 T 3 8897 0

"

8

3,500

.0

SECTION 2

500.0

B5

L1 D 102 1.81m ° 57' 39

A2 SK10

5.0

B4

95

LOT 2 DP 48897 0

LOT 1 DP 488970

48

500.0

B3

C15 SK108

A2

L 36.01m D 179° 56' 31"

.45m L 10 23' 41" 164° 5m L 3.2 1' 23" D 4° 2 D 16

495.0

L 12 D 103 .48m ° 1' 5 1"

LOT 3 DP 545 557

500.0

L 205.17m D 92° 26' 19"

V

C15 SK108

A2 SK10

8

B5 SK108

REFERENCE IMAGES - MATERIALS AND FINISHES

0

LOT 88 DP 23944

LOT 89

480.0DP 23944

LOT 90 DP 23944

480.0 1 -

TOTAL BUILDING AREA:

SITE PLAN 1:500

1,936m

2

26


MIXED HOMES

HIGH-LEVEL FEASIBILITY The following worked example illustrates a potential feasibility outcome for the mixed home scheme, based on a set of stated assumptions and indicative inputs. It is intended as a starting framework for builders to assess, adjust and test against their own construction costs, sales expectations and commercial requirements. It is indicative only and should not be relied upon as a formal valuation or appraisal. Assumptions: build at $6,000 per m² excluding GST for an efficient multi-unit group build, sell at $16,000 per m² including GST, site works $100,000 a unit, development contributions $30,000 a unit as a placeholder until Council confirms, professional fees at 6% and contingency at 5% of build, selling and marketing at 2.5%, finance at 8% on 60% of hard costs over 18 months from title. Line item

Basis & Assumptions

Amount excl GST

Gross realisation

3229

$16,000

$51,664,000

1.15

$44,925,217

Gross realisation excl GST Land

4448

$2,000

$8,896,000

Construction

3229

$6,000

$19,374,000

Site works and earthworks

19

$100,000

$1,900,000

Development contributions

19

$30,000

$570,000

Professional fees

6%

$1,162,440

Contingency

5%

$968,700

Selling and marketing

2.50%

$1,123,130

Finance

8%

$30,740,000

$2,213,280

Total development cost

$36,207,550

surplus

$8,717,667

profit

24%

land Cost per unit

Sec 2

Section value

excl gst

Sec 2

$8,900,000 $2,001

per m²

19

468,211

That is 24% on cost and 19.4% on gross realisation. Section 2 is on its own title and ready in about May 2027, ahead of the Stage 2 packages.

27


DESIGN GUIDES AND TECHNICAL INFORMATION

11 VISION, CONTROLS, APPROVALS

VISION & OBJECTIVES

The vision for this development is to create a high-end residential community that exemplifies urban living within an alpine landscape. The design outcome will balance individual architectural expression with a coherent, high-quality public realm that enhances local amenity and contributes positively to the wider Queenstown setting. KEY OBJECTIVES ARE TO • Maintain key views to Lake Whakatipu and surrounding mountains. • Provide a landscape-led environment that strengthens ecological and community resilience and contributes to the transition between urban and natural landforms. • Encourage architectural and landscape design that is refined, adaptable, and contemporary, while complementary to the wider sense of place. • Ensure a strong relationship with adjacent open spaces, recreational accessways, and ecological restoration areas.

DESIGN PHILOSOPHY The design philosophy for Karamata Peak is to create a timeless, design-led residential environment where architecture and landscape work in harmony. Buildings are to be recessive, elegant, and crafted from natural, enduring materials that settle into the landform and local vernacular. Landscape treatments will emphasise native vegetation, ecological resilience, and seasonal character, providing a coherent identity across the development while allowing individual owners creative freedom within a clear framework. The overarching intent is to deliver a community that is distinctly Queenstown in character, respectful of its alpine setting, and exemplary in its quality of design.

» TO VIEW THE DESIGN GUIDELINES, CLICK HERE FOR THE KARAMATA PEAK DATA ROOM. 28


−

Aurora Distribution Line

The PDP planning map below illustrates the site and overlays:

PLANNING OVERVIEW The site is contained within the Medium Density Residential Zone (MDRZ). The MDRZ is now deemed operative, and as such, the Operative District Plan provisions (including subdivision) are now ignored. Aside from being contained in the MDRZ, the site is also affected by the following: • PDP Wahi Tapuna Overlay (reference 20 – Queenstown Hill) • Aurora Distribution Line The PDP planning map adjacent illustrates the site and overlays:

rom E.G.L.

» TO VIEW THE FULL RC PLANNING REPORT, CLICK HERE FOR THE KARAMATA PEAK DATA ROOM. It is noted that the PDP Urban Growth Boundary is located a. onModel three boundaries of the site (red dashed line).

8m

HEIGHT STUDY

LE G E N D

The site also adjoins Designation 572 (Aurora Electricity Substation) and Designation 79 8m rolling height from E.G.L. (Council Water Reservoir). Medium Density Residential Zone - Purpose

5.5m 8m

8m

The MDRZ has the purpose of providing land for residential development at greater 8m density than the Lower Density Suburban Residential Zone. In conjunction with the High Density Residential Zone and Lower Density Suburban Residential Zone, this zone will play a key role in minimising urban sprawl and increasing housing Northsupply. boundary 5.5m South boundary 8m

5.5m

8m 8m

height

Set RL maximum height

RL: Xmasl

Set RL maximum height and 8m rolling height RL: Xmasl

height ight

8m

8m

» TO VIEW THE FULL BUILDING HEIGHT STUDY AND LAND COVENANT, CLICK HERE FOR THE KARAMATA PEAK DATA ROOM.

Client / project Name : Commonage Queenstown LP Drawing Date : 18 September 2026 Drawing Name : Model Scale @a3 : landscape

architecture

urban

29


DEVELOPMENT PLANS & DRAWINGS

12

In this section you will find the subdivision scheme plan and proposed schedule of easements, the vested lots landscaping plan and the earthworks drawings (design contours and cut/fill depth contours).

SUBDIVISION SCHEME PLAN

PROPOSED SCHEDULE OF EASEMENTS

» TO VIEW THE FULL SCHEME PLAN, CLICK HERE FOR THE KARAMATA PEAK DATA ROOM.

PURPOSE

SHOWN

BURDENED LAND

BENEFITTED LAND / GRANTEE

RIGHT OF WAY

A

LOT 1001

LOTS 86-95 (OR LOT 1002) SECTION 2 SO 503041 PART LOT 1 DP 21763 AURORA ENERGY LTD LOTS 86-95 (OR LOT 1002) & 1001 PART LOT 1 DP 21763

SECTION 2 SO 503041 & LOT 302

B

RIGHT OF WAY

LOT 2 DP 496901 QUEENSTOWN LAKES DISTRICT COUNCIL (RECREATION RESERVE)

AURORA ENERGY LTD

RIGHT OF WAY

E

PART LOT 1 DP 21763

RIGHT OF WAY

G

LOT 301

LOTS 86-95 (OR LOT 1002) & 1001 SECTION 2 SO 503041 AURORA ENERGY LTD

LOT 2 DP 351844

SEE SHEET 111

4

3

5

6 7

2

74

LOT 1003 COMPRISES LOTS 80-85 (REFER TO NOTES)

D3 ROA

16

10

17

30

18

31

19

72

32

66

33

21

34 AD

67

71 70

1000

36

3

201

25

26

38

300 83

82 ROAD

1001

24

35

68

81

80

79

14

37

69

77

39

40

27

28 41

42

45 ROAD

43

84

QUEENSTOWN LAKES DISTRICT COUNCIL

LOT 201

46

SECTION 2 SO 317364 DEPARTMENT OF CONSERVATION (RECREATION RESERVE)

47 48

3

49 202 44

96

50

203

301

85 86 87 302

D3

SECTION 1 SO 24383 AURORA ENERGY LTD

61 60

51

52

ROA

1

94 93 92 91 90 89 88

95

(ACCESS 1) G

59 58

57

56

55

54

53

A

1 7 T 55 LO545 2 57 T 5 DP LO545 DP

VA

NC

OU

VE

SECTION 2 SO 503041

LOT 2 DP 488970 LOT DP 4 3 8897 0 LOT 3 DP 532 794 LO DP 53T 2 2794 LOT 1 D 532794 P

LOT 84 DP 23944

LOT 1 DP 488970

ACCESS 2

LOT DP 54553 57

LOT 83 DP 23944

J

AURORA ENERGY LTD

J

13

22 23

ROAD 4

78

RIGHT OF WAY (VEHICULAR AND PEDESTRIAN ACCESS)

LOT 200

SECTION 1 SO 23185 QUEENSTOWN LAKES DISTRICT COUNCIL

11

3

12

20

RO

76

SECTION 1 SO 503041

AD

64

75

LOT 94 DP 24186

RO

65 73

H

9

15 29

63

RIGHT OF WAY (VEHICULAR AND PEDESTRIAN ACCESS)

200

8

1

62

H

LOTS 51 & 53-55 QUEENSTOWN LAKES DISTRICT COUNCIL

RD

RIV

E

SEE SHEET 113

B

E

LOT 89 DP 23944

LOT 90 DP 23944

PART LOT 1 DP 21763

LOT 13 DP 27397 HENSMAN, GRANT HYLTON HENSMAN, PHILLIP JOHN

R O DS

STER

PLAC

IN

CHE

E

W

MAN

PL

AC

E

SEE SHEET 112

LOT 88 DP 23944

LOT 1002 COMPRISES LOTS 86-95. (REFER TO NOTES)

CLIENT

COMMONAGE QUEENSTOWN LP

DRAWING TITLE

QUEENSTOWN HILL DEVELOPMENT

DATUM INFORMATION COORDINATE SYSTEM

NZGD2000

MOUNT NICHOLAS CIRCUIT

REV DRAWN

DATE

NOTE

SURVEYED

PAT

27.02.25

PROJECT

9

27.05.26

Lots 26-44, 57-61,96,202 updated

DESIGNED

AT / SM

2025

DRAWING NO

001

DRAWN

AT

13.04.25

SHEET

110

CD

P241358

30


VESTED LOTS LANDSCAPING PLAN

» TO VIEW THE FULL LANDSCAPE PLAN, CLICK HERE FOR THE KARAMATA PEAK DATA ROOM.

31


GEOTECH AND EARTHWORKS DRAWINGS » TO VIEW THE FULL GEOTECH PLAN, CLICK HERE FOR THE KARAMATA PEAK DATA ROOM.

Across 69,258 m2 of earthworks there is 21,247 m2 of cut to fill in soil and 56,222 m2 in rock, with a maximum cut of 9.2 metres and fill of 8.3.

DESIGN CONTOURS LOT 2 DP 496901 QUEENSTOWN LAKES DISTRICT COUNCIL (RECREATION RESERVE)

4 5

3

SECTION 2 SO 317364 DEPARTMENT OF CONSERVATION (RECREATION RESERVE)

6 7

2

D3

8

ROA

1

16

10 17

200 18

29

11 19

30

12

20 31

21

62

13

32

22

63

33

RO

AD

RO

AD

66

72

45

201 25

46

36

3

67

26 37

47 27 48

28

71

43

38

68

70

75

3

24 35

65 73

14 23

34

64 74

SECTION 1 SO 23185 QUEENSTOWN LAKES DISTRICT COUNCIL

9 15

49

39

69

40

ROAD 4

76

202

41

44

42

96

50

84 77 78

82

81

80

79

85

ROAD

1

93

91

90

89

88

SECTION 1 SO 24383 AURORA ENERGY LTD

87

61

60

59

ACCESS 01

58

57

56

55

54

53

ACCESS 2 SECTION 2 SO 503041

RD

RIV

LOT 1 D 532794 P

VE

LO DP 53T 2 2794

OU

PART LOT 1 DP 21763

0

NC

LOT DP 53273 94

LO DP 4 T 3 8897

VA

LOT 2 DP 488970

LOT 1 DP 488970

LOT DP 54553 57

1 7 T 55 LO545 2 7 T 55 DP LO545 DP

94

95

1001

LOT 84 DP 23944

51

86 92

LOT 83 DP 23944

ROAD 3 52

1000

DP 24186

203

83

LOT 88 DP 23944

LOT 89 DP 23944

E

LOT 13 DP 27397 HENSMAN, GRANT HYLTON HENSMAN, PHILLIP JOHN

LOT 90 DP 23944

EARTHWORKS QUANTITIES: AREA OF EARTHWORKS = 69,258m² STRIP TOPSOIL TO STOCKPILE FOR RESPREAD = 5,359m³ STRIP TOPSOIL AND OTHER ORGANIC MATERIAL TO WASTE OFFSITE = 15,522m³ CUT TO FILL (SOIL) = 21,247m³ (cut) CUT TO FILL (ROCK) = 56,222m³ (cut) TOTAL CUT TO WASTE = 8,925m³ RESPREAD TOPSOIL TO LOTS AND BERMS FROM STOCKPILE = 5,359m³ NOTES 1. CONTOUR INTERVAL: 5m MAJOR / 1m MINOR 2. SURPLUS FILL WILL BE DEPENDANT ON COMPACTION FACTORS AND ROCK RECOVERY RATES 3. SURPLUS FILL WILL BE REUSED ON SITE WITHIN THE LOTS RATHER THAN CARTING TO WASTE OFFSITE 4. SPLIT BETWEEN SOIL AND ROCK MATERIAL VOLUMES WILL BE DEPENEDANT ON DEPTH OF ROCK AT THE VARIOUS CUT AREAS

CLIENT

DRAWING TITLE

COMMONAGE QUEENSTOWN LP

QUEENSTOWN HILL DEVELOPMENT DESIGN CONTOURS

DATUM INFORMATION

PROJECT

REV DRAWN

DATE

NOTE

SURVEYED

NZGD2000

3

GCL

22.10.25

RE-ISSUED FOR CONSENT

DESIGNED

SAM

27.05.25

MOUNT NICHOLAS CIRCUIT

4

GCL

27.11.25

CONTOURS UPDATED

DRAWN

SAM

28.05.25

COORDINATE SYSTEM

5

GCL

5.02.26

TURNING HEAD CONTOURS UPDATED REVIEWED

AT

25.06.25

ORIGIN OF COORDINATES

6

LB

29.05.26

LOT BOUNDARIES UPDATED

SP

25.06.25

ORIGIN OF LEVELS

STATUS

DATUM

NZVD2016

FOR CONSENT

APPROVED

© Paterson Pitts Limited Partnership

P241358

DRAWING NO

004

SHEET

202

REVISION

6

SCALE (A3)

1:1500

32


CUT / FILL DEPTH CONTOURS LOT 2 DP 496901 QUEENSTOWN LAKES DISTRICT COUNCIL (RECREATION RESERVE) 0.0

-1.0

1.0

1.0 1.0

-1.0

6

1.

0

70.0

-3.0

0.0

-1.0

3.0

0.0 3.0

-1.0 1.0

.0 -3

0 3.

MAX DEPTH OF FILL: 6.1m 0.

0

3.0

-1.0

1.0

0.0

0.0

58

57

56

55

6.0

3.0

-1

.0

4.0 3.0

0.0 ACCESS 01 1.0

53

54 0.0

G

-1.0

0.0

0.0

-4.0

-1.0

.0

4.0

-1.0 0 -2 .

0

-2

1.0 0.0

1.0

0 0.

5.0

5.0

-

3.0

0.0

-1.0 0.0

0.0

RIV

LO DP 53T 2 2794

RD

LOT 1 D 532794 P

VE

LOT DP 53273 94

LO DP 4 T 3 8897 0

LOT 2 DP 488970

NC

LOT 88 DP 23944

3.0

0.0

0.0

0.0

0. -4.0

4.0

3.0

3.0

-1.0

0.0

0

0.0

-1.0

0

-1.0

LOT 1 DP 488970

1.

2.0 1.0

5.0

0.0

6.0

LOT 89 DP 23944

E

0.0 1.0

LOT DP 54553 57

-1.0

51 52

2.0

1.0

0

-

3.

-2.0

0.0

1.

0.0

4.0

59

.0

-1.0

ACCESS 2

SECTION 2 SO 503041

OU

60

-1

2.0

0.0

2.0

VA

0 0.0.0

1.0

1.0 0.0

0.0

61

0

2.0

1.0

0 2.

0.0

0.0

2.0

0.0 0.0

4.0

-1.0 0.0

3.0 2.0

SECTION 1 SO 24383 AURORA ENERGY LTD

87

88

1.0

1 7 T 55 LO545 2 7 T 55 DP LO545 DP

MAX DEPTH OF CUT: 7.6m

86

1.0

4.0

0.0

89

-2.0

-2.0

1.0 2.0

0.0

90

0.0

0.0

0.0

0

2.

F

1.0

0.0

-1.0

3.0

0

0.0

91

0.0

0.0

0.

0.0

-1.0 0.0

0. 0.0

203

3.0

0.0

92

93

94

95

1001

ROAD-3.03

-3.0

-2.0

0.0

1.0

50

.0

0

0.0

-2.0

0.0

-4.0

1.0

-7.0

-3.0

-3.0 0

1.

-1

1.0

0.

3.0

.0

-1.0

-1.0

96 2.0

-5.0

0.0

0.0

44

49 5.0 0.0

.0

-2

1.0

42 .0

-7.0

-5.0 -4.0 -2

-3.0

0.0

-3.0

-1

0.0

0

-5.0

0.0

2.0

3.0

-4.0 .0

202

-3.0

-4.0 -6

0

-3.0

0.0

-1.0

-2.0

-1.0

1

2.

-1.0 -1.0

41 -6.0

.0

-3.0

-4.0

D ROA 1.0

-2.0

4.0

-1.0

-

-1.0

-4.0

-5.0

0.0

-1.0

-3.0 -6.0

-3.0 -2.0

-1.0

0.0

-5.0 -4.0

-1.0

0.0 -3.0

0.0

85

48 -3.0

-1

1.0

-3.0

0.0

1000

LOT 84 DP 23944

0.0

0.0

0

0.

0.0

0.0

4.0

-5.0

E

-2.0

80

79

0.0

5.0

.0

0.0

0.0

81

-3.0

83

82

4.0

5.0

-5

84

78

28 43 MAX DEPTH OF FILL: 5.2m 40

0.0

0.0

77

-2.0

1.0

-7.0

-1.0

1.0

2.0

3.0

47 -1.0

-3.0

39

0.0

0.0

2.0

-1.0

0.0 3.0

-7.0

RO0.0AD 4

-4.0

-1.0

0.0

2.0

-3.0

0 0. 76

1.0

-1.0

0.

0.0

.0

3.0

69

-2.0

-1.0 0.0

0.0

0.0

1.0

46 -1

3.0

27

45

201 -2.0

38

-8.0

-4.0 -3.0 -2.0

3.0 0.0

-2.0

37

0.0

-1.0

3

1.0

0.0

0.0 -2.0

-6.0 -5.0

-3.0 -2.0

1.0

0.0

-2.0

-4.0

1.0

0.0 2.0

0.0

RO

26

-7.0

70

0.0

0.0

68

14 0.0

25

-1.0

75

0.0

0.0

.0

0.0

0.0

-4

.0

-1.0

-4 -3.0.0

0.0

71

-3

-1.0

0.0

.0

67 0.0

0.0

0

AD

24 MAX DEPTH OF CUT: 9.2m -5.0

-9.0

-8

0

0

0.

36

3

0.0

4.0

0.

0 -1.0

0

4.

AD

0.0

13

2.0

1.

23

RO 0.0

0.

-1.0

0.0

0

72

0.0

0.0

0

1.

1

0.0

2.0

33

66

0

- 1.0

22

35

0.0

0.

D

34

0 0.

0.0

12

2.0

0.0

-1.0

21

65

2.0

0

2.

11

2.0

-

-3.0

6.

0.0

0 2.

20

3.0 5.0

6.0

73 .0

0 1.

LOT 83 DP 23944

200 -1.0

-4.0

8.0 1.0

-5.0

64 0.0

0

-1.0 0.0

DP 24186

-4.0

32 63

SECTION 1 SO 23185 QUEENSTOWN LAKES DISTRICT COUNCIL

0.0

1.0

6.0

0

3.

0.0

0

2.

0.0

-5.0

19

31

4.

62

-

3.0

30

MAX DEPTH OF FILL: 8.3m

C

.0

.0

18

-4

-3

0.0 0

10

-1.0 -2.0

4.0

7.0

17

2.0

5.0

16

-1.0

.0

-4.0

9 0.0

5.

0

2.

.0

0.0

0.0

-2.0

-1

0

0

1.0

29

74

2.

1.

-1

0.0 0.0

0

-3.0

-1.0

.0

0.0

0.0

0.0

8

B -

0.0 -1.0

ROA

0.0

1.0

1

0

15

-5.0

-1.0

-

0.0

0.

D3

0

0.

1.0

0.

A

SECTION 2 SO 317364 DEPARTMENT OF CONSERVATION (RECREATION RESERVE)

AREA 1 CUT 72.0m² FILL 0.6m² 0 0.

2

-2

0.0

0.0

0

0

0.

0.0

0.0

5

0.

3

0.0

0

0.

0.0

0.0

0.0

.0

-1

-1.0

4

PART LOT 1 DP 21763 LOT 13 DP 27397 HENSMAN, GRANT HYLTON HENSMAN, PHILLIP JOHN

LOT 90 DP 23944

NOTE DEPTH CONTOUR INTERVAL: 1m

CLIENT

COMMONAGE QUEENSTOWN LP

DRAWING TITLE

QUEENSTOWN HILL DEVELOPMENT

DATUM INFORMATION

PROJECT

REV DRAWN

DATE

NOTE

SURVEYED

NZGD2000

3

GCL

22.10.25

RE-ISSUED FOR CONSENT

DESIGNED

SAM

27.05.25

MOUNT NICHOLAS CIRCUIT

4

GCL

28.11.25

SWALE LOCATIONS AMENDED

DRAWN

SAM

28.05.25

COORDINATE SYSTEM

CUT / FILL DEPTH CONTOURS

DATUM

5

AGM

5.02.26

TURNING HEADS UPDATED

REVIEWED

AT

25.06.25

(EXISTING TO DESIGN SURFACES)

ORIGIN OF COORDINATES

6

LB

29.05.26

LOT BOUNDARIES UPDATED

APPROVED

SP

25.06.25

ORIGIN OF LEVELS

STATUS

NZVD2016

FOR CONSENT

© Paterson Pitts Limited Partnership

P241358

DRAWING NO

004

SHEET

203

REVISION

6

SCALE (A3)

1:1500

33


13

PROGRAMME AND TITLES

A programme has been prepared by the appointed subdivision Project Managers and Quantity Surveyors, Ascent Group. Stage 1 titles are set to be delivered in May 2027 with Stage 2 titles following in mid 2028.

260902 - Karamata Peaks Draft Development Programme (Rev 2)

Page 1 of 2

ID

Task Name

Dur

Start

Finish

0

260902 - Karamata Peaks Draft Development Programme REV 2

502d

12/08/26

04/09/28

1

Karamata Peaks Draft construction programme

1d

12/08/26

12/08/26

2

EA Lodgement

1d

12/08/26

12/08/26

3

EA Processing

4.0mo

12/08/26

01/12/26

4

EA

0d

01/12/26

01/12/26

6

Initial works

119d

12/08/26

15/02/27

7

Tender Submission

0d

12/08/26

12/08/26

8

Tree Clearance

40d

21/09/26

13/11/26

9

Early EMP Controls

20d

28/09/26

23/10/26

10

Environmental works

82d

05/10/26

15/02/27

11

Contract start

0d

02/11/26

02/11/26

12

Setup site access

2d

16/11/26

17/11/26

13

Construct temp access road in

5d

18/11/26

24/11/26

14

Construct EMP controls for initial phases of work(assuming drop out pits a…

5d

25/11/26

01/12/26

15

Remove stumps and slash and Mulch and remove from site(timeframe TBC)

40d

02/12/26

15/02/27

16

Install remaining EMP works (ongoing as project progresses)

0d

19/11/26

19/11/26

17

Building surveys

20d

05/10/26

30/10/26

107d

01/12/26

21/05/27

18

Stage 1 works

19

Strip topsoil to enable UC wall and MSE wall to begin

10d

01/12/26

14/12/26

20

Construct UC Wall

36d

15/12/26

22/02/27

21

Construct MSE Wall access 2

25d

15/12/26

04/02/27

22

Construct SW,FS and water connections On Vancouver drive

25d

15/12/26

04/02/27

23

Complete Earthworks Cut/FIll

5d

05/02/27

12/02/27

24

Construct services down Access 2

35d

15/02/27

06/04/27

25

Roading access 1 and part of road 1

32d

07/04/27

21/05/27

26

224c Inspection

1d

28/05/27

28/05/27

27

Completion works

15d

24/05/27

14/06/27

28

Passed 224c Inspection

1d

15/06/27

15/06/27

29

Practical Completion

0d

16/06/27

16/06/27

30

223 - Processing

60d

24/05/27

17/08/27

31

224c - Processing

60d

24/05/27

17/08/27

32

Titles

Anticipated May 2027

35

Stage 2 Works

413d

15/12/26

04/09/28

36

Earthworks

220d

15/12/26

15/11/27

Aug 26 Sep 26 Oct 26 Nov 26 Dec 26 Jan 27 Feb 27 Mar 27 Apr 27 May 27 Jun 27 Jul 27 Aug 27 Sep 27 Oct 27 Nov 27 Dec 27 Jan 28 Feb 28 Mar 28 Apr 28 May 28 Jun 28 Jul 28 Aug Sep 28

34


14

Construct EMP controls for initial phases of work(assuming drop out pits a…

5d

25/11/26

01/12/26

15

Remove stumps and slash and Mulch and remove from site(timeframe TBC)

40d

02/12/26

15/02/27

16

Install remaining EMP works (ongoing as project progresses)

0d

19/11/26

19/11/26

17

Building surveys

20d

05/10/26

30/10/26

107d

01/12/26

21/05/27

18

Stage 1 works

19

Strip topsoil to enable UC wall and MSE wall to begin

10d

01/12/26

14/12/26

20

Construct UC Wall

36d

15/12/26

22/02/27

21

Construct MSE Wall access 2

25d

15/12/26

04/02/27

22

Construct SW,FS and water connections On Vancouver drive

25d

15/12/26

04/02/27

23

Complete Earthworks Cut/FIll

5d

05/02/27

12/02/27

24

Construct services down Access 2

35d

15/02/27

06/04/27

25

Roading access 1 and part of road 1

32d

07/04/27

21/05/27

26

224c Inspection

1d

28/05/27

28/05/27

27

Completion works

15d

24/05/27

14/06/27

28

Passed 224c Inspection

1d

15/06/27

15/06/27

29

Practical Completion

0d

16/06/27

16/06/27

260902 - Karamata Peaks Draft Development Programme (Rev 2) 30 223 - Processing 60d 24/05/27 260902 - Karamata Peaks Draft Development Programme (Rev 2) 24/05/27

17/08/27

31

224c - Processing

60d

32

Titles

Anticipated May 2027

ID ID

Task Name Task Name

Dur Dur

0 41 35 1 42 36 2 43 37 3 44 38 4 45 39 6 ID 46 40 7 41 47 8 42 48 9 43 49 10 44 50 11 45 51 12 46 52 13 47 53 14 48 54 15 49 55 16 50 56 17 51 57 18 52 58 19 53 59 20 54 60 21 55 61 22 56 23 57 24 58 25 59 26

260902 - Karamata Peaks Draft Development Programme REV 2 Cut to fill earthworks remainder of site Stage 2 Works Karamata Peaks Draft construction programme Construct swales around extent of project Earthworks EA Lodgement Drainage Road 1 earthworks. Anchors and shotcrete EA Processing Construct all services up road 1 Waste/Soil strip to stockpile EA Constuct gravity linessite Road intersection south of Resivoir and Aurora … Rock blasting across inc1/3 trenches Initial works Task Name Relocation of existingSouth waterof main Cut to fill earthworks roadand 1 power lines Tender Submission Cut to fill earthworks remainder of site Construct gravity lines in remainder of site Tree Clearance Construct swales of site project all retic around servicesextent around Early EMP Controls Drainage Roading Environmental works Construct servicesAP65, up road 1 Roading - all Subgrade, AP40, Kerbing surfacing Contract start Constuct lines Road 1/3 intersection south of Resivoir and Aurora … Footpath gravity construction Setup site access Relocation of by existing main and power lines Landscaping otherswater - Timeframe and scope TBC Construct temp access road in Construct gravity lines in remainder of site 224c Inspection Construct EMP controls for initial phases of work(assuming drop out pits a… Construct allworks retic services around site Completion Remove stumps and slash and Mulch and remove from site(timeframe TBC) Roading Passed 224c Inspection Install remaining EMP works (ongoing as project progresses) Roading Subgrade, AP65, AP40, Kerbing surfacing Practical -Completion Building surveys Footpath construction 223 - Processing Stage 1 works Landscaping by others - Timeframe and scope TBC 224c - Processing Strip topsoil to enable UC wall and MSE wall to begin 224c LINZ/Inspection Settlement Construct UC Wall Completion works Titles Construct MSE Wall access 2 Passed 224c Inspection Settlement Construct SW,FS and water connections On Vancouver drive Practical Completion Complete Earthworks Cut/FIll 223 - Processing Construct services down Access 2 224c - Processing Roading access 1 and part of road 1 Titles 224c Inspection

502d 12/08/26 04/09/28 100d 14/04/27 03/09/27 413d 15/12/26 04/09/28 1d 12/08/26 12/08/26 50d 06/09/27 15/11/27 220d 15/12/26 15/11/27 1d 12/08/26 12/08/26 210d 08/03/27 20/01/28 45d 15/12/26 05/03/27 4.0mo 12/08/26 01/12/26 20d 08/03/27 06/04/27 25d 15/12/26 04/02/27 0d 01/12/26 01/12/26 50d 07/04/27 17/06/27 150d 05/02/27 10/09/27 119d 12/08/26 15/02/27 Dur Start Finish 25d 07/04/27 12/05/27 45d 05/02/27 13/04/27 0d 12/08/26 12/08/26 100d 14/04/27 03/09/27 80d 18/06/27 08/10/27 40d 21/09/26 13/11/26 50d 06/09/27 15/11/27 60d 11/10/27 20/01/28 20d 28/09/26 23/10/26 210d 08/03/27 20/01/28 158d 21/01/28 04/09/28 82d 05/10/26 15/02/27 20d 08/03/27 06/04/27 68d 21/01/28 01/05/28 0d 02/11/26 02/11/26 50d 07/04/27 17/06/27 30d 20/03/28 03/05/28 2d 16/11/26 17/11/26 25d 07/04/27 12/05/27 30d 23/03/28 08/05/28 5d 18/11/26 24/11/26 80d 18/06/27 08/10/27 1d 15/05/28 15/05/28 5d 25/11/26 01/12/26 60d 11/10/27 20/01/28 15d 09/05/28 29/05/28 40d 02/12/26 15/02/27 158d 21/01/28 04/09/28 1d 30/05/28 30/05/28 0d 19/11/26 19/11/26 68d 21/01/28 01/05/28 0d 31/05/28 31/05/28 20d 05/10/26 30/10/26 30d 20/03/28 03/05/28 60d 09/05/28 31/07/28 107d 01/12/26 21/05/27 30d 23/03/28 08/05/28 60d 09/05/28 31/07/28 10d 01/12/26 14/12/26 1d 15/05/28 15/05/28 25d 01/08/28 04/09/28 36d 15/12/26 22/02/27 15d 09/05/28 29/05/28 20d 01/08/28 28/08/28 25d 15/12/26 04/02/27 1d 30/05/28 30/05/28 5d 29/08/28 04/09/28 25d 15/12/26 04/02/27 0d 31/05/28 31/05/28 5d 05/02/27 12/02/27 60d 09/05/28 31/07/28 35d 15/02/27 06/04/27 60d 09/05/28 31/07/28 32d 07/04/27 21/05/27 Anticipated June/July 2028 1d 28/05/27 28/05/27

Start Start

17/08/27

Finish Finish

260902 - Karamata Peaks Draft Development Programme (Rev 2)

27

Completion works

15d

24/05/27

14/06/27

28

Passed 224c Inspection

1d

15/06/27

15/06/27

29

Practical Completion

0d

16/06/27

16/06/27

30

223 - Processing

60d

24/05/27

17/08/27

31

224c - Processing

60d

24/05/27

17/08/27

32

Titles

Anticipated May 2027

35

Stage 2 Works

413d

15/12/26

04/09/28

36

Earthworks

220d

15/12/26

15/11/27

Page 1 of 2 Page 2 of 2

Aug 26 Sep 26 Oct 26 Nov 26 Dec 26 Jan 27 Feb 27 Mar 27 Apr 27 May 27 Jun 27 Jul 27 Aug 27 Sep 27 Oct 27 Nov 27 Dec 27 Jan 28 Feb 28 Mar 28 Apr 28 May 28 Jun 28 Jul 28 Aug Sep 28 Aug 26 Sep 26 Oct 26 Nov 26 Dec 26 Jan 27 Feb 27 Mar 27 Apr 27 May 27 Jun 27 Jul 27 Aug 27 Sep 27 Oct 27 Nov 27 Dec 27 Jan 28 Feb 28 Mar 28 Apr 28 May 28 Jun 28 Jul 28 Aug Sep 28

Page 2 of 2

Aug 26 Sep 26 Oct 26 Nov 26 Dec 26 Jan 27 Feb 27 Mar 27 Apr 27 May 27 Jun 27 Jul 27 Aug 27 Sep 27 Oct 27 Nov 27 Dec 27 Jan 28 Feb 28 Mar 28 Apr 28 May 28 Jun 28 Jul 28 Aug Sep 28

35


14

KEY SALE & PURCHASE TERMS

SALE & PURCHASE AGREEMENT TERMS: • 10% deposit: Balance 10 days after issue of Title. • Settlement: Anticipated Stage 1 Titles May 2027 (Sec 2 & Lot 1000), balance mid 2028. • Vendor conditions: Vendor must confirm satisfactory consents and economic feasibility within 12 months, and notify title availability within three years. These conditions protect the vendor, which has early cancellation rights with a deposit refund. • Sunset provisions: Purchaser cancellation rights can extend beyond three years. Survey-plan lodgement is measured from the later of signing or relevant-stage consent, with a further three-year title period following section 223 approval. • Building and use controls: Design approval and review fees apply. • Services and ongoing obligations: Vendor provides services to the boundary; purchaser pays connection and internal servicing costs. • Lot-area changes: Under 5% means no price adjustment; 5% or more triggers proportional repricing. A change exceeding 12.5% allows purchaser cancellation.

» TO VIEW THE SALE AND PURCHASE AGREEMENT, CLICK HERE FOR THE KARAMATA PEAK DATA ROOM.

TYPOGRAPHY TYPOGRAPH TYPOGRAPHY RAPHY HY + GR GRAPHIC GRAPHI GRAP GRAPH APHIC HIC IC ELEMENTS ELEMENT ELEME LEMENTS MENTS TS

36


15

SALES AND MARKETING SUPPORT

Colliers can provide a bespoke sales and marketing campaign for completed homes within Karamata Peak, leveraging our extensive local, national, and international buyer networks. Campaigns can be tailored to suit individual products and target audiences, drawing on a range of channels including digital advertising, database marketing, social media, public relations, signage, print media, and strategic referral networks. With a dedicated residential sales team and a proven track record marketing premium Queenstown property, Colliers can assist developers in maximising exposure, generating qualified enquiry, and achieving the strongest possible sales outcomes. Whether delivering a single completed home or a broader development programme, our team can create a customised strategy designed to connect with the most relevant buyers and efficiently convert interest into sales.

TYPOGRAPHY TYPOGRAPH TYPOGRAPHY RAPHY HY + GR GRAPHIC GRAPHI GRAP GRAPH APHIC HIC IC ELEMENTS ELEMENT ELEME LEMENTS MENTS TS THE BRAND IMAGERY, TYPOGRAPHY AND GRAPHIC DEVICES HAVE BEEN DESIGNED

37


16

DELIVERY TEAM

Behind every great project is a great team. Karamata Peak is backed by industry leaders in their fields.

DEVELOPER

CONTRACTOR

ENGINEERS

LANDSCAPE ARCHITECT

Whaka Projects is the development manager for Karamata Peak, acting for Commonage Queenstown Limited Partnership. Led by Adam Copland and Kirk Pullar, the team takes the project from land acquisition and masterplanning through consenting, civil delivery and sell-down, coordinating the planning, engineering, landscape, surveying and legal teams behind it. Queenstown based, with 15 years across differing property sectors.

Base Contracting is a medium sized civil contracting company. Base are a multi-faceted contracting company undertaking large earthworks, drainage & utility services, subdivisional developments, retaining structures, rock walls, rural property development, ponds & water features, roading, demolition and high alpine re-vegetation projects.

We've been in the game for over 100 years and have seven offices across the South Island. Patersons is your trusted partner for Land Development & Civil in New Zealand. Our intimate local knowledge, backed by the collective experience of our wider group means that you can rely on our team to help you navigate all aspects of your project.

Since 2016, Patch has been changing the traditional model of landscape architecture, by putting environmental and cultural thinking at the forefront.

BASECONTRACTING.CO.NZ

PATERSONS.CO.NZ

PATCHLANDSCAPE.CO.NZ

PLANNERS

PROJECT MANAGERS

LAWYERS

REAL ESTATE AGENT

Located in both Queenstown and Cromwell and servicing the lower South Island, the professionals at SPG are vastly experienced in all resource management and planning aspects of land development.

Ascent Group offers expert project management and quantity surveying in NZ, ensuring full accountability and excellence in complex development projects.

An experienced and enterprising full-service law firm with lawyers located in Auckland, Wellington, Nelson, Blenheim, Christchurch and Queenstown.

SOUTHERNPLANNING.CO.NZ

ASCENTGROUP.CO.NZ

DUNCANCOTTERILL.COM

Colliers is a global real estate services company with an established presence across New Zealand. The Colliers Queenstown team combines indepth local market knowledge with national and international reach, providing specialist expertise in property sales, development opportunities and targeted marketing to connect developers with the right buyers.

COLLIERS.CO.NZ

38


THANK YOU

17 NEXT STEPS & CONTACTS

DATA ROOM

DATA ROOM

NEXT STEPS

FROM OPPORTUNITY TO ACQUISITION Explore the available site packages, assess the development potential and identify the opportunity that best aligns with your strategy.

01 — REGISTER YOUR INTEREST Contact Colliers to discuss package availability, pricing and your acquisition requirements.

02 — ACCESS THE DATA ROOM View all documents in the data room including planning, engineering, infrastructure, title and design documentation, subject to any required confidentiality arrangements.

03 — UNDERTAKE DUE DILIGENCE Review the information, confirm achievable yield and prepare your development feasibility.

04 — SUBMIT AN OFFER Outline your preferred package, purchase price, proposed conditions and settlement requirements.

05 — AGREE TERMS The vendor will review offers and negotiate terms with preferred parties before progressing to a formal sale and purchase agreement.

READY TO EXPLORE THE OPPORTUNITY? Review the packages. Test the numbers. Start the conversation. Contact Colliers to discuss availability and progress your interest in Karamata Peak.

TIM THOMAS TIM.THOMAS@COLLIERS.COM +64 22 5433 210 ALASTAIR WOOD ALASTAIR.WOOD@COLLIERS.COM +64 27 436 2422

karamatapeak.co.nz 39


www.karamatapeak.co.nz WHAKA PROJECTS AND COLLIERS HAVE TAKEN CARE TO ENSURE THE INFORMATION HERE IS ACCURATE AT THE TIME OF PUBLICATION, BUT WE ARE NOT RESPONSIBLE FOR ANY ERRORS OR OMISSIONS. ALL DETAILS PROVIDED SUCH AS SPECIFICATIONS, ILLUSTRATIONS, PERSPECTIVES, AND PLANS ARE INDICATIVE ONLY, MAY CHANGE WITHOUT NOTICE, AND DO NOT FORM PART OF ANY SALES AGREEMENT. BUYERS ACKNOWLEDGE THEY HAVE HAD A FAIR CHANCE TO SEEK LEGAL, TECHNICAL, OR OTHER ADVICE AND HAVE EITHER OBTAINED IT OR CHOSEN NOT TO. THE SPECIFICATIONS PROVIDED ARE FOR GUIDANCE ONLY AND DO NOT CONSTITUTE AN OFFER OR CONTRACT.