DEVELOPMENT INFORMATION PACK
prepared for builders and development partners
1.
Executive Summary
6
2.
Project Overview
8
3.
Location
11
CONTENTS
4.
Market Update
14
5.
Section Sales
15
a rare opportunity to secure a position in one of Queenstown’s most prestigious residential settings.
6.
Comparable End Product Sales
16
7.
Market Demand
17
8.
Masterplan and Availability
18
9.
Bulk Packages
20
10.
Architectural Concepts
21
11.
Vision, Controls & Approvals
28
12.
Development Plans & Drawings
30
13.
Programme & Titles
34
14.
Key Sale & Purchase Terms
36
15.
Sales and Marketing Support
37
16.
Delivery Team
38
17.
Next Steps & Contacts
39
1
the opportunity EXECUTIVE SUMMARY
A PREMIUM BUILDING PARTNERSHIP ON QUEENSTOWN HILL a rare opportunity to secure a position in one of Queenstown’s most prestigious residential settings. Karamata Peak presents an opportunity for builders and development partners to participate in the delivery of an exceptional residential neighbourhood on Queenstown Hill. Elevated above Lake Whakatipu and the town centre, the development combines a highly sought-after location, panoramic alpine outlooks and proximity to Queenstown’s lifestyle amenities. For builders, Karamata Peak offers the opportunity to secure premium residential land and create architecturally considered homes for a market drawn to Queenstown’s distinctive combination of natural beauty, recreation and lifestyle. With freehold sections, established design guidelines and a coordinated infrastructure programme, the development provides a framework for delivering homes that respond to both the landscape and the expectations of the premium market.
Premium Location: An elevated Queenstown Hill address, approximately 1.8km from Queenstown CBD, with views across Lake Whakatipu and the surrounding mountain ranges. Development Options: Residential sections of varying sizes, alongside potential opportunities for larger-scale or multi-lot development, subject to applicable planning and design controls. Strong Buyer Appeal: An opportunity to deliver bespoke homes for purchasers seeking quality, outlook, privacy and convenient access to Queenstown’s amenities. Clear Framework: A masterplan, Build Design Guide and associated covenants establish a consistent architectural and landscape vision for the neighbourhood. Defined Delivery Pathway: The subdivision’s infrastructure and site preparation programme is underway, with titles anticipated in mid2028, providing a forward window for builder planning and feasibility assessment. Lot 1000 and Section 2 are due for title at an earlier anticipated date of May 2027.
6
A partnership opportunity This Development Information Pack has been prepared to help builders and development partners evaluate the opportunity at Karamata Peak with clarity and confidence. It brings together market evidence, comparable sales, buyer insights, available sections, development concepts, design requirements, infrastructure information and key commercial considerations. Whether considering an individual section, a multi-lot acquisition or a broader building partnership, the objective is to provide the information needed to assess feasibility, understand the delivery pathway and identify the right opportunity. Karamata Peak is an opportunity to build beyond the ordinary, creating distinctive homes in a location defined by its outlook, setting and enduring appeal.
7
PROJECT OVERVIEW
2
Masterplan
as at 3 november 2026
Item
Position
Project
96 residential lots (300–1,015 m²), plus Lot 1000 (2,085 m²) and Section 2, a 4,448 m² net comprehensive development lot. Medium Density Residential Zone.
Sales
37 lots sold across 24 contracts, $44.45m excl GST ($51.1m incl GST). A further 3 lots are under contract or in negotiation.
Consent and land
Resource consent issued July 2026. Land purchase from Queenstown Lakes District Council settled in late September.
Site works
Tree clearance underway (Sept–Nov). Engineering approval expected 1 December. Civil work start December 2026; contractor is Base Contracting.
Titles
Stage 1 (Lot 1000 and Section 2) due May 2027. Stage 2 (all remaining lots) due mid 2028.
Pricing
Schedule rates of approximately $1,540–$2,830/m² excl GST. Block purchases are negotiated on their own terms.
CURRENT AT: 14.09.2026 | SUBJECT TO CHANGE.
site overview
ELEVATED LIVING
8
9
The design philosophy for Karamata Peak is to create a timeless, design-led residential environment where architecture and landscape work in harmony. Buildings are to be recessive, elegant, and crafted from natural, enduring materials that settle into the landform and local vernacular.
Landscape treatments will emphasise native vegetation, ecological resilience, and seasonal character, providing a coherent identity across the development while allowing individual owners creative freedom within a clear framework. The overarching intent is to deliver a community that is distinctly Queenstown in character, respectful of its alpine setting, and exemplary in its quality of design.
10
3
The best of the best
LOCATION Accessed via Vancouver Drive on Queenstown Hill, Karamata Peak combines an elevated residential setting with convenient access to Queenstown’s vibrant town centre, renowned dining and hospitality, retail amenities, and year-round recreational opportunities. It is a location that appeals to buyers seeking a connection to the outdoors, a sense of place and the lifestyle that makes Queenstown internationally recognised.
QUEENSTOWN CBD
11
ben lomond & skyline
LOCATIONS OF INTEREST From lakeside dining and boutique retail to international travel. golf and world-class ski fields, Queenstown's amenities are within easy reach. The location offers a balance between the energy of the town and the privacy and perspective of an elevated residential address.
queenstown hill coronet peak
queenstown cbd
frankton & 5 mile shops queenstown gardens
the remarkables
queenstown golf club
queenstown airport
Queenstown CBD
Queenstown Airport
CORONET PEAK SKI AREA
1.8km | Approx. 6-minute drive
6.3km | Approx. 14-minute drive
17km | Approx. 26-minute drive
ARROWTOWN
FRANKTON & FIVE MILE SHOPS, SCHOOL AND COMMERICAL PRECINCT
THE REMARKABLES SKI AREA
21km | Approx. 25-minute drive
22.5km | Approx. 40-minute drive
6.6km | Approx. 15-minute drive
12
Lot 28
views for all sections
VIEWSHED STUDY A detailed Viewshed Analysis Study has been commissioned for the project, providing prospective purchasers with an indication of the visual outlook and amenity available from each lot across the development. The study uses a detailed digital landform model based on the proposed subdivision design and earthworks to illustrate anticipated view corridors and surrounding lot relationships.
LotLot 46 28 5.8 metres above finished ground level
The report includes panoramic views generated from both ground-floor and first-floor viewing heights for every lot, helping purchasers understand the potential outlook towards Queenstown’s iconic alpine landscape from future building platforms. While indicative in nature, the study is a valuable tool for comparing lots and gaining a clearer understanding of the visual amenity offered throughout Karamata Peak.
» TO VIEW THE FULL VIEWSHED STUDY, CLICK HERE FOR THE KARAMATA PEAK DATA ROOM.
Lot 46 5.8 metres above Section 2 finished ground level 1.8 metres above finished ground level
Reference : PA25834 IS02
Lo landscape
architecture
urban
section 2 5.8 metres above finished ground level
1.8 metres above finished ground level
13
4
queenstown outperforms
MARKET UPDATE
Queenstown is New Zealand’s strongest-performing residential market over any meaningful holding period. The investment case is underpinned by three key drivers: population growth running at more than double the national rate, a tourism economy attracting record levels of investment, and a finite land supply constrained by the district’s lakes, mountains, and urban growth boundaries.
Market section from our draft (growth, population, tourism Otago & Southland Market Report 2026/27. Refreshed RE month. Tim
Since 1993, the average Queenstown dwelling price has increased from $187,934 to $1,960,319, representing compound annual growth of 7.6%. Over the same period, the average bare section value has risen from $76,726 to $1,219,575, equating to compound annual growth of 9.03%. In other words, the land component has outperformed the improvements built upon it, underpinning the long-term investment case for securing a land position in Queenstown. The District’s population has grown from 14,800 in 1996 to 53,800 in 2025 and is projected to reach 58,700 by 2027. Economic fundamentals remain equally strong, with district GDP reaching $4.77 billion and expanding by 2.0% in the year to September 2025, despite the national economy contracting by 0.5%. Construction spending exceeds $6.4 billion and makes up 11.7% of District GDP. Visitor spending reached $2.83 billion in 2025 and tourism supports 36.4% of district employment. Airport passenger movements are setting new records, and Queenstown hotels now lead every other New Zealand tourism centre on revenue per available room, average daily rate and occupancy. Roughly a billion dollars of identified infrastructure is being delivered into a district of 53,800 people — the $300m Skyline and Bob’s Peak redevelopment directly across the valley, $65m of airfield works and a staged terminal expansion at the airport, the $400m Queenstown cable car, a $150m-plus Remarkables ski area expansion and the $280m Ayrburn screen hub. None of it adds competing medium density residential land inside the Urban Growth Boundary.
14
KARAMATA’S OWN SALES HISTORY
5
SECTION SALES SOLD SOLD
SOLD
SOLD
SOLD
SOLD
SOLD
Lot(s)
Area m2
Price excl GST
m, airport,17,Skyline). Colliers 30, 31 1,655 $3,075,000 EINZ figures to the latest 18–24 3,855 $7,710,000
$/m2 excl GST $1,858
SOLD
SOLD
Unconditional
SOLD SOLD
SOLD
Aug 2026
SOLD
SOLD
$2,000
Mar 2026
$1,993
Jan 2026
SOLD
SOLD
SOLD
SOLD
25
650
$1,295,652
SOLD
SOLD
SOLD
SOLD
SOLD
SOLD
SOLD SOLD
29
605
$1,478,261
$2,443
Jul 2026
40
645
$1,295,652
$2,009
Jan 2026
56
545
$921,739
$1,691
May 2026
65
630
$1,408,696
$2,236
Apr 2026
68
865
$1,556,522
$1,799
Jun 2026
69
605
$1,469,565
$2,429
Jun 2026
70
600
$1,469,565
$2,449
Jun 2026
72
565
$1,328,938
$2,352
Feb 2026
78
1,010
$1,521,739
$1,507
Jan 2026
Historically, sections close to town and those located on the hill have traded at broadly similar underlying values. There has long been a direct trade-off between views and proximity, with the market generally pricing the two as substitutes rather than distinct products. At present, a significant gap exists between these competing value propositions, and our expectation is that this disparity will narrow as Karamata Peak titles are issued and the development is absorbed by the market.
79
775
$1,556,522
$2,008
Mar 2026
The fringe evidence we hold:
80–85
3,400
$7,395,000
$2,175
Jul 2026
Property
Area m2
Price
$/m2
87
680
$1,217,391
$1,790
Jul 2026
4 Park Street (Happiness House)
693
$4,080,000
$5,887
88
405
$739,130
$1,825
Jul 2026
9 Hobart Street
1,436
$7,200,000
$5,014
89
355
$660,870
$1,862
Jun 2026
5 Hobart Street
986
$4,900,000
$4,970
4 & 8 Malaghan Street
3,051
$14,440,000
$4,733
26 Hallenstein Street
936
$4,200,000
$4,487
SOLD SOLD
SOLD
SOLD SOLD
SOLD
SOLD SOLD
SOLD
SOLD
CURRENT AT: 14.09.2026 | SUBJECT TO CHANGE.
Town centre and fringe development land
ELEVATED LIVING
90
415
$652,174
$1,571
Jun 2026
91
425
$652,174
$1,534
May 2026
5 York Street
765
$3,125,000
$4,085
92
375
$652,174
$1,739
May 2026
4–6 Hallenstein Street
963
$3,910,000
$4,060
93
325
$608,696
$1,873
Jun 2026
Thompson Street (3 sites)
2,056
$8,100,000
$3,940
94
300
$608,696
$2,029
May 2026
32 Fryer Street
809
$3,000,000
$3,708
43 Robins Road
822
$2,975,000
$3,619
95
305
$608,696
$1,996
Jun 2026
21 Sawmill Road
508
$1,775,000
$3,494
1000
2,085
$4,565,000
c.$2,070 net
May 2026
47 Robins Road
1,264
$3,800,000
$3,006
9–13 Hallenstein St & 1 York St
3,277
$7,800,000 + GST $2,380
37 lots
$44,447,852
SOLD
The fringe market is currently achieving between $2,380/m² and $5,887/m², with a median rate of approximately $4,000/m². By comparison, Karamata Peak’s achieved sales rates have ranged from $1,858/m² to $2,175/m², with the current retail pricing schedule topping out at $2,785/m². On that basis, hill land is effectively trading at around half the value of comparable fringe locations. We view this as a timing gap rather than a value gap. Karamata Peak will not receive titles until May 2027 and mid 2028, meaning all sales to date reflect pre-title pricing. In contrast, fringe sites are generally transacting with existing titles and immediate development capability. As Stage 1 titles are issued and the first homes are completed, we expect this discount to progressively compress. For builders and developers purchasing today, the opportunity lies not only in the underlying land value, but also in capturing that pricing convergence over time.
15
QUEENSTOWN HILL
6
COMPARABLE END PRODUCT SALES
Development
Sale price
Floor area
Gross $/m2
Note
8 Suburb Street
$3,195,000
170 m2
$18,794
Asking rate
159E Frankton Road
$3,600,000
192 m2
$18,750
Sold, high spec
5/55 Kent Street
$5,000,000
289 m2
$17,301
Sold, unit title
7 Salmond Place
$1.79m – $1.959m
112 m2
$15,983 – $18,140
Four sold off plans, no garage
7 Turner Street
$1.78m – $1.95m
110 m2
$16,181 – $17,727
Seven sold, no garage
Salmond Place and Turner Street are the two most useful rows on the above table. Compact, mid specification, no garage, sold off plans, and both clearing $16,000 per m². That is exactly the product a builder at Karamata Peak would deliver, and it is better evidence than the high-end one-off sales above them.
new multi-unit product across Queenstown For the wider market, the top of the band is Queenstown Hill Villas at $17,558 per m², then Alpine Quarters between $16,508 and $17,157, Rosefern at 26 Hallenstein Street at $16,446 for the three-bedroom and $15,063 for the four-bedroom, and 25 Robins Road at $16,358. Below those, Peninsula Rise sits at $14,151 to $14,339, the Sawmill Road two-bedroom at $13,841, Sterling Lane at $13,016, and the Tiers, Five Mile Villas and Kawarau Villas all around $13,000. Bullenrise at Arthurs Point is the floor at $7,929 and $8,269.
the two current listings 5 Hobart Street is Colliers — Candice and Vera. A 986 m² site, medium density with an 8 metre height limit, and inside the proposed Urban Intensification Variation rezoning to high density. Six freehold four-bedroom duplexes at $2,449,000 each plus GST, which analyses to about $20,500 per m² including GST. Two went under contract within thirty hours of launching in late September. High spec — cedar hot tubs, underfloor heating, schist and cedar cladding. Construction starts early next year. The Reach at 53–65 Frankton Road, with Ben Terry at Sotheby’s. This is the most directly relevant live comparable we have. Wildridge Projects, 38 architecturally designed freehold townhouses across eight blocks on a 4,695 m² site - 21 four-bedroom and 17 three-bedroom, 154 to 192 m² excluding decks, three levels, designed by AWA Architects. Three are dual-key. Priced from $2,295,000 plus GST, with a 365-day visitor accommodation consent. Around half signed up in the first three weeks and the agent reports local and Australian investors in the mix. Construction starts shortly, completing late 2027. Visitor accommodation consent is the single biggest determinant of rate.
16
7
STRONG ENQUIRY LEVELS
MARKET DEMAND
WEBSITE REGISTRATIONS A total of 680 registrations of interest have been recorded through karamatapeak.co.nz since the website launched in December 2025. Demand has been split almost evenly between Australia (46%) and New Zealand (44%), with the balance originating from offshore markets including Hong Kong, Singapore, and the United States. This broad geographic spread demonstrates the depth of interest in the project and reinforces Queenstown’s ongoing appeal to both local and international purchasers.
AUSTRALIAN DEMAND Australian demand is tangible and measurable, rather than anecdotal. Australian citizens and permanent residents can purchase New Zealand residential land without requiring Overseas Investment Act consent, allowing them to transact on the same basis as local buyers. This demand is already evident at Karamata Peak, where several lots have been sold to Australian purchasers, including one family group that secured five sections. Looking ahead, recent changes to Australian property tax settings are expected to further influence buyer behaviour. From July 2027, Australia removed negative gearing for established investment properties acquired after May 2026 and reduced the capital gains tax concessions previously available to investors. As a result, holding residential investment property in Australia has become materially less attractive, increasing the relative appeal of alternative markets. The Colliers Otago 2026 Market Report identifies these policy changes as a factor likely to encourage greater Australian investment across the Tasman, particularly into premium lifestyle and residential markets such as Queenstown.
YPOGRAPHY YPOGRAPHY YPOGRAPH RAPHY HY + GR GRAPHIC GRAPHI GRAP GRAPH APHIC HIC IC ELEMENTS ELEMENT ELEME LEMENTS MENTS TS
TYPOGRAPHY TYPOGRAPH TYPOGRAPHY RAPHY HY + GR GRAPHIC GRAPHI GRAP GRAPH APHIC HIC IC ELEMENTS ELEMENT ELEME LEMENTS MENTS TS 17
SITE PACKAGES AND OPPORTUNITIES
8
MASTERPLAN AND AVAILABILITY
Karamata Peak offers a range of site packages designed to help builders and developers identify an acquisition opportunity aligned with their project scale, capital position and delivery strategy.
PACKAGE A SOLD SOLD SOLD
PACKAGE B
SOLD SOLD
SOLD
SOLD SOLD SOLD SOLD SOLD
SOLD
SOLD
SOLD SOLD
SOLD
SOLD
SOLD
SOLD
SOLD
SOLD
SOLD
SOLD
SOLD
SOLD SOLD
SOLD SOLD
SOLD
SOLD SOLD
SOLD
SOLD SOLD
SOLD
SOLD
SOLD
PACKAGE C
CURRENT AT: 14.09.2026 | SUBJECT TO CHANGE.
18
19
FOCUS PACKAGES
9 BULK PACKAGES The packages below bring together land area, purchase price and indicative land cost per home, providing a straightforward basis for comparing land cost per home and assessing the potential economics of each opportunity.
PACKAGE A
PACKAGE B
PACKAGE C
Four contiguous lots forming an eight-home duplex scheme. Two homes per lot as of right, so no density consent is required. North 5.5 metre and south 8 metre height control.
Six lots overlooking the park reserve, 8 m rolling height. With tree clearance finishing in November, these will open right up.
The quickest way to get on site at Karamata Peak. On its own title and ready in about 12 months, a year ahead of the Stage 2 lots.
Lots
Land Area
Lots
Land Area
Lots
Land Area
28 + 41 - 43
2,050M2
46 - 49
2,430M2
SECTION 2
4,448M2 NET
Homes
Land Cost excl. GST
Homes
Land Cost excl. GST
Homes
Land Cost excl. GST
8
$5.5 M
14
$5.6 M
19
$8.90 M
Basis
Land Cost per Home
Basis
Land Cost per Home
Basis
$684,000
250M per home $400,000
SOLARI DUPLEX HOME CONCEPTS PROVIDED
SOLARI TERRACE HOME CONCEPTS PROVIDED
DUPLEX
2
Land Cost per Home
250M per home $468,000 2
NALA STUDIO MIXED HOME CONCEPTS PROVIDED
Yields are indicative and subject to the covenant floor-area limits at clause 4.1(g), design approval, and resource consent where more than three homes are proposed on one site.
20
LOT EXAMPLES
10 ARCHITECTURAL CONCEPTS
To help demonstrate the development potential of the selected site packages, three indicative architectural schemes have been prepared, tailored to suit the individual sites and their characteristics. Developed in collaboration with Solari Architects and Nala Studio Architects, the concepts explore potential home configurations, building forms and architectural responses to the Queenstown Hill setting. Each scheme has been considered in relation to its respective site, providing builders and developers with a visual starting point for understanding potential yield, built form and the opportunity to create quality residential homes. Package A:
Duplex Home Scheme - Lots: 28 + 41 - 43 Architect: Solari Architects
TERRACE HOMES
A HEAD START ON BRINGING YOUR VISION TO LIFE.
The concept scheme for Package A contains lots 28 + 41 - 43 in a 8 Duplex home scheme, Two at 210 m² on Lot 28, two at 206 m² on Lot 43 and four at 248 m² across Lots 41 and 42. Total 1,824 m². Package B:
Terrace Home Scheme - Lots 46 - 49 Architect: Solari Architects
The concept scheme for Package B contains lots 46 – 49 in a 14-unit terrace home scheme, designed within three blocks. Four units of 190, 175, 175 and 190 m²; five of 190, 175, 175, 175 and 190 m²; and five of 190, 180, 180, 180 and 190 m². Total 2,555 m², all three levels, with 11 to 12 m² of outdoor living each. Mixed Scheme Bulk & Location - Section 2 Architect: Nala Studio Architects
The concept scheme for Package C contains the whole of Section 2. Nala Studio have provided a high-level bulk and location plan which offers mixed-style housing including freestanding larger homes, duplex and smaller block terrace homes. The total building area proposed is 1,936m2. A starting point, not a fixed outcome.
The architectural schemes are indicative concepts intended to illustrate potential development outcomes. They are provided as a reference for feasibility and design exploration, rather than prescribed building solutions. Builders may wish to develop, adapt or reimagine the concepts to suit their preferred construction methodology, market positioning and commercial objectives, subject to the relevant planning requirements, design controls and approvals.
DUPLEX HOMES
Package C:
21
PACKAGE A
DUPLEX HOMES Lots: 28 + 41 - 43 Architect: Solari Architects The concept scheme for Package A contains lots 28 + 41 - 43 in a 8 Duplex home scheme, Two at 210 m² on Lot 28, two at 206 m² on Lot 43 and four at 248 m² across Lots 41 and 42. Total 1,824 m².
SITE PLAN OVERVIEW: Lot 26 Lot 27
Accessway (Road 3)
1
M-42
Lot 201
Consider realigning boundaries (shown dashed) to better suit site coverage
Lot 28
Units 15-16
Lot 43
Units 17-18 Lot 202
Lot 44 Easem
ent
Easem
ent
Consider realigning boundaries (shown dashed) to better suit site coverage
Units 19-20
Lot 41
Lot 42 Level 2, 191 Cuba Street, Te Aro, Wellington t: +64 (0)4 974 4562 e: hello@solariarchitects.com
Lot 40
Units 21-22
Accessway (Road 3)
Site Plan - Lots 28, 41 to 43 A3 scale: 1 : 300
» TO VIEW THE FULL SOLARI PLANS, CLICK HERE FOR THE KARAMATA PEAK DATA ROOM.
Scale 1:300 @ A3 0
3
6
15m
NOTE: This drawing is copyright and is the property of Solari Architects Limited and must not be used without written authorisation.
Drawing Number
M-02
Disclaimer: All renders are indicative artist impressions only and have been prepared for illustrative purposes. They may not accurately reflect the final site location, orientation, topography, outlook or surrounding environment. Final building designs and positioning will be subject to detailed design development, site conditions and relevant approvals.
22
DUPLEX HOMES
HIGH-LEVEL FEASIBILITY The following worked example illustrates a potential feasibility outcome for the duplex scheme, based on a set of stated assumptions and indicative inputs. It is intended as a starting framework for builders to assess, adjust and test against their own construction costs, sales expectations and commercial requirements. It is indicative only and should not be relied upon as a formal valuation or appraisal. Assumptions: build at $6,000 per m² excluding GST for an efficient multi-unit group build, sell at $16,000 per m² including GST, site works $100,000 a unit, development contributions $30,000 a unit as a placeholder until Council confirms, professional fees at 6% and contingency at 5% of build, selling and marketing at 2.5%, finance at 8% on 60% of hard costs over 18 months from title. Line item
Basis & Assumptions
Amount excl GST
Gross realisation
1824
$16,000
$29,184,000
1.15
$25,377,391
Gross realisation excl GST Land
2050
$2,670
$5,473,913
Construction
1824
$6,000
$10,944,000
Site works and earthworks
8
$100,000
$800,000
Development contributions
8
$30,000
$240,000
Professional fees
6%
$656,640
Contingency
5%
$547,200
Selling and marketing
2.50%
$634,435
Finance
8%
$17,457,913
$1,256,970
Total development cost
$20,553,158
surplus
$4,824,234
profit
23%
land Cost per unit
28/41/42/43 8
Section value incl gst
excl gst
28
$1,490,000
41
$1,590,000
42
$1,690,000
43
$1,525,000
$1,295,652 $1,382,609 $1,469,565 $1,326,087 $5,473,913 $2,670
$6,295,000 per m²
$3,071
684,239 That is 23.0% on cost and 19.4% on gross realisation. The duplex scheme sits entirely inside the permitted activity envelope - two homes per lot as of right, no land use consent, straight to building consent.
23
PACKAGE B
TERRACE HOMES Lots 46 - 49 Architect: Solari Architects The concept scheme for Package B contains lots 46 – 49 in a 14-unit terrace home scheme, designed within three blocks. Four units of 190, 175, 175 and 190 m²; five of 190, 175, 175, 175 and 190 m²; and five of 190, 180, 180, 180 and 190 m². Total 2,555 m², all three levels, with 11 to 12 m² of outdoor living each.
SITE PLAN OVERVIEW: Eas
eme
nt
Units 01 - 04
Lot 45
Units 05-09
Lot 46
Accessway (Road 3)
Lot 47
Lot 48 Units 10-14
t en
m
se
Ea
Lot 96 Lot 203
Lot 49
Level 2, 191 Cuba Street, Te Aro, Wellington t: +64 (0)4 974 4562 e: hello@solariarchitects.com
Lot 50
Site Plan - Lots 46 to 49 A3 scale: 1 : 300
» TO VIEW THE FULL SOLARI PLANS, CLICK HERE FOR THE KARAMATA PEAK DATA ROOM. Scale 1:300 @ A3 0
3
6
15m
NOTE: This drawing is copyright and is the property of Solari Architects Limited and must not be used without written authorisation.
Drawing Number
M-01
Disclaimer: All renders are indicative artist impressions only and have been prepared for illustrative purposes. They may not accurately reflect the final site location, orientation, topography, outlook or surrounding environment. Final building designs and positioning will be subject to detailed design development, site conditions and relevant approvals.
24
TERRACE HOMES
HIGH-LEVEL FEASIBILITY The following worked example illustrates a potential feasibility outcome for the terrace scheme, based on a set of stated assumptions and indicative inputs. It is intended as a starting framework for builders to assess, adjust and test against their own construction costs, sales expectations and commercial requirements. It is indicative only and should not be relied upon as a formal valuation or appraisal. Assumptions: build at $6,000 per m² excluding GST for an efficient multi-unit group build, sell at $16,000 per m² including GST, site works $100,000 a unit, development contributions $30,000 a unit as a placeholder until Council confirms, professional fees at 6% and contingency at 5% of build, selling and marketing at 2.5%, finance at 8% on 60% of hard costs over 18 months from title. Line item
Basis & Assumptions
Amount excl GST
Gross realisation
2555
$16,000
$40,880,000
1.15
$35,547,826
Gross realisation excl GST Land
2430
$2,308
$5,608,696
Construction
2555
$6,000
$15,330,000
Site works and earthworks
14
$100,000
$1,400,000
Development contributions
14
$30,000
$420,000
Professional fees
6%
$919,800
Contingency
5%
$766,500
Selling and marketing
2.50%
$888,696
Finance
8%
$22,758,696
$1,638,626
Total development cost
$26,972,317
surplus
$8,575,509
profit
32%
land Cost per unit
46/47/48/49
Section value incl gst
excl gst
46
$1,800,000
47
$1,700,000
48
$1,600,000
49
$1,350,000
$1,565,217 $1,478,261 $1,391,304 $1,173,913 $5,608,696 $2,308
$6,450,000 per m²
$2,654
14
400,621 This is a 32% margin on cost. Note: The architect has maximised development potential at 14 units which equates to a ratio of 1 unit per 182.5m² land area which is outside the current 1 unit per 250m² zoning.
25
PACKAGE C
MIXED HOMES Section 2
Architect: Nala Studio Architects The concept scheme for Package C contains the whole of Section 2. Nala Studio have provided a high level bulk and location plan which offers a mixed style housing including freestanding larger home, duplex and smaller block terrace homes. The total building area proposed is 1,936m2 - 19 units, being 2 of 220 m2, 13 of 149 m2 and 4 of 213 m2. Building coverage of 1,936 m2 is 43.5% of the 4,448 m2 site, against a 45% permitted standard.
+497,000
+497,000
+494,000
+494,000
+491,000
+491,000
A2 -
The scheme is 19 units where permitted density gives 17, so it sits subject to a density consent.
SECTION A2 1:200
B5 -
SECTION B5 1:200
» TO VIEW THE FULL NALA STUDIO PLANS, CLICK HERE FOR THE KARAMATA PEAK DATA ROOM.
+499,304
+499,304
+496,304
+496,304
SITE PLAN OVERVIEW: +493,304
51
+493,304
0.0
C15 -
SECTION C15 1:200
C18 -
SECTION C18 1:200
505.0 C18 SK108
505.0
L 20.00m D 89° 53' 16"
HV 4,500
4,500
4,500
4,500
A1 B6
B7
4B8
BULK & LOCATION ONLY — NOT FOR CONSTRUCTION LIMITATIONS AND DISCLAIMER:
B9 B10 B11 B12 B13 SO 503041
C14
C15
D19 SECTION 2
REGULATORY RESTRICTIONS: THESE DRAWINGS ARE HIGH-LEVEL BULK AND LOCATION CONCEPTS ONLY. THEY ARE NOT FOR RESOURCE CONSENT AND NOT FOR BUILDING CONSENT SO 503041 APPLICATIONS.
L 13 D 103 .47m ° 1' 1 9"
B16 B17
.0
495
C18
KA
NOTES: DO NOT SCALE FOR CONSTRUCTION VERIFY ALL DIMENSIONS ON SITE BEFORE COMMENCING WORK.
DATA SOURCE & ACCURACY: SITE INFORMATION, DIMENSIONS, AND FEATURES HAVE BEEN COMPILED USING PUBLIC COUNCIL RECORDS AND COUNCIL GEOMAPS. THIS DATA HAS NOT BEEN INDEPENDENTLY VERIFIED BY THE ARCHITECT.
ALL WORK TO COMPLY WITH CURRENT NZ BUILDING CODE & STANDARDS AND MANUFACTURERS SPECIFICATION.
Sheet:
BOUNDARY & CONTOUR VERIFICATION: ALL LEGAL BOUNDARIES, EASEMENTS, AND FINAL DESIGN CONTOURS ARE INDICATIVE ONLY AND SUBJECT TO CONFIRMATION BY A LICENSED CADASTRAL SURVEYOR.
DRAWINGS TO BE READ IN CONJUNCTION WITH SPECIFICATION.
Scale @ A3:
DIMENSIONS & LEVELS: THE FINAL SIZE, EXACT LOCATION, AND FINISHED LEVELS OF ALL PROPOSED STRUCTURES ARE SUBJECT TO CHANGE AND MUST BE CONFIRMED ONCE THE FINAL SITE CONTOURS AND LEGAL BOUNDARIES HAVE BEEN FORMALLY VERIFIED. DO NOT SCALE FROM THESE DRAWINGS.
COPY RIGHTS TO NALA STUDIO ARCHITECTS LIMITED.
SK108
49
L 8.73m D 93° 47' 51"
0.0
490.0 L 10.09m D 93° 51' 33"
L 29.73m D 93° 49' 9"
L 36.53m D 87° 47' 58"
LOT 1 DP 532794
LOT DP 53 2 2794
LOT DP 532 3 794
485.0
© COPYRIGHT RE
48
L 51.20m D 94° 37' 46"
5.
C18 SK108
L 12.88m D 93° 50' 26"
B5 SK108
L 4.77 D 9° 39 m ' 4"
LO DP 4 T 3 8897 0
"
8
3,500
.0
SECTION 2
500.0
B5
L1 D 102 1.81m ° 57' 39
A2 SK10
5.0
B4
95
LOT 2 DP 48897 0
LOT 1 DP 488970
48
500.0
B3
C15 SK108
A2
L 36.01m D 179° 56' 31"
.45m L 10 23' 41" 164° 5m L 3.2 1' 23" D 4° 2 D 16
495.0
L 12 D 103 .48m ° 1' 5 1"
LOT 3 DP 545 557
500.0
L 205.17m D 92° 26' 19"
V
C15 SK108
A2 SK10
8
B5 SK108
REFERENCE IMAGES - MATERIALS AND FINISHES
0
LOT 88 DP 23944
LOT 89
480.0DP 23944
LOT 90 DP 23944
480.0 1 -
TOTAL BUILDING AREA:
SITE PLAN 1:500
1,936m
2
26
MIXED HOMES
HIGH-LEVEL FEASIBILITY The following worked example illustrates a potential feasibility outcome for the mixed home scheme, based on a set of stated assumptions and indicative inputs. It is intended as a starting framework for builders to assess, adjust and test against their own construction costs, sales expectations and commercial requirements. It is indicative only and should not be relied upon as a formal valuation or appraisal. Assumptions: build at $6,000 per m² excluding GST for an efficient multi-unit group build, sell at $16,000 per m² including GST, site works $100,000 a unit, development contributions $30,000 a unit as a placeholder until Council confirms, professional fees at 6% and contingency at 5% of build, selling and marketing at 2.5%, finance at 8% on 60% of hard costs over 18 months from title. Line item
Basis & Assumptions
Amount excl GST
Gross realisation
3229
$16,000
$51,664,000
1.15
$44,925,217
Gross realisation excl GST Land
4448
$2,000
$8,896,000
Construction
3229
$6,000
$19,374,000
Site works and earthworks
19
$100,000
$1,900,000
Development contributions
19
$30,000
$570,000
Professional fees
6%
$1,162,440
Contingency
5%
$968,700
Selling and marketing
2.50%
$1,123,130
Finance
8%
$30,740,000
$2,213,280
Total development cost
$36,207,550
surplus
$8,717,667
profit
24%
land Cost per unit
Sec 2
Section value
excl gst
Sec 2
$8,900,000 $2,001
per m²
19
468,211
That is 24% on cost and 19.4% on gross realisation. Section 2 is on its own title and ready in about May 2027, ahead of the Stage 2 packages.
27
DESIGN GUIDES AND TECHNICAL INFORMATION
11 VISION, CONTROLS, APPROVALS
VISION & OBJECTIVES
The vision for this development is to create a high-end residential community that exemplifies urban living within an alpine landscape. The design outcome will balance individual architectural expression with a coherent, high-quality public realm that enhances local amenity and contributes positively to the wider Queenstown setting. KEY OBJECTIVES ARE TO • Maintain key views to Lake Whakatipu and surrounding mountains. • Provide a landscape-led environment that strengthens ecological and community resilience and contributes to the transition between urban and natural landforms. • Encourage architectural and landscape design that is refined, adaptable, and contemporary, while complementary to the wider sense of place. • Ensure a strong relationship with adjacent open spaces, recreational accessways, and ecological restoration areas.
DESIGN PHILOSOPHY The design philosophy for Karamata Peak is to create a timeless, design-led residential environment where architecture and landscape work in harmony. Buildings are to be recessive, elegant, and crafted from natural, enduring materials that settle into the landform and local vernacular. Landscape treatments will emphasise native vegetation, ecological resilience, and seasonal character, providing a coherent identity across the development while allowing individual owners creative freedom within a clear framework. The overarching intent is to deliver a community that is distinctly Queenstown in character, respectful of its alpine setting, and exemplary in its quality of design.
» TO VIEW THE DESIGN GUIDELINES, CLICK HERE FOR THE KARAMATA PEAK DATA ROOM. 28
−
Aurora Distribution Line
The PDP planning map below illustrates the site and overlays:
PLANNING OVERVIEW The site is contained within the Medium Density Residential Zone (MDRZ). The MDRZ is now deemed operative, and as such, the Operative District Plan provisions (including subdivision) are now ignored. Aside from being contained in the MDRZ, the site is also affected by the following: • PDP Wahi Tapuna Overlay (reference 20 – Queenstown Hill) • Aurora Distribution Line The PDP planning map adjacent illustrates the site and overlays:
rom E.G.L.
» TO VIEW THE FULL RC PLANNING REPORT, CLICK HERE FOR THE KARAMATA PEAK DATA ROOM. It is noted that the PDP Urban Growth Boundary is located a. onModel three boundaries of the site (red dashed line).
8m
HEIGHT STUDY
LE G E N D
The site also adjoins Designation 572 (Aurora Electricity Substation) and Designation 79 8m rolling height from E.G.L. (Council Water Reservoir). Medium Density Residential Zone - Purpose
5.5m 8m
8m
The MDRZ has the purpose of providing land for residential development at greater 8m density than the Lower Density Suburban Residential Zone. In conjunction with the High Density Residential Zone and Lower Density Suburban Residential Zone, this zone will play a key role in minimising urban sprawl and increasing housing Northsupply. boundary 5.5m South boundary 8m
5.5m
8m 8m
height
Set RL maximum height
RL: Xmasl
Set RL maximum height and 8m rolling height RL: Xmasl
height ight
8m
8m
» TO VIEW THE FULL BUILDING HEIGHT STUDY AND LAND COVENANT, CLICK HERE FOR THE KARAMATA PEAK DATA ROOM.
Client / project Name : Commonage Queenstown LP Drawing Date : 18 September 2026 Drawing Name : Model Scale @a3 : landscape
architecture
urban
29
DEVELOPMENT PLANS & DRAWINGS
12
In this section you will find the subdivision scheme plan and proposed schedule of easements, the vested lots landscaping plan and the earthworks drawings (design contours and cut/fill depth contours).
SUBDIVISION SCHEME PLAN
PROPOSED SCHEDULE OF EASEMENTS
» TO VIEW THE FULL SCHEME PLAN, CLICK HERE FOR THE KARAMATA PEAK DATA ROOM.
PURPOSE
SHOWN
BURDENED LAND
BENEFITTED LAND / GRANTEE
RIGHT OF WAY
A
LOT 1001
LOTS 86-95 (OR LOT 1002) SECTION 2 SO 503041 PART LOT 1 DP 21763 AURORA ENERGY LTD LOTS 86-95 (OR LOT 1002) & 1001 PART LOT 1 DP 21763
SECTION 2 SO 503041 & LOT 302
B
RIGHT OF WAY
LOT 2 DP 496901 QUEENSTOWN LAKES DISTRICT COUNCIL (RECREATION RESERVE)
AURORA ENERGY LTD
RIGHT OF WAY
E
PART LOT 1 DP 21763
RIGHT OF WAY
G
LOT 301
LOTS 86-95 (OR LOT 1002) & 1001 SECTION 2 SO 503041 AURORA ENERGY LTD
LOT 2 DP 351844
SEE SHEET 111
4
3
5
6 7
2
74
LOT 1003 COMPRISES LOTS 80-85 (REFER TO NOTES)
D3 ROA
16
10
17
30
18
31
19
72
32
66
33
21
34 AD
67
71 70
1000
36
3
201
25
26
38
300 83
82 ROAD
1001
24
35
68
81
80
79
14
37
69
77
39
40
27
28 41
42
45 ROAD
43
84
QUEENSTOWN LAKES DISTRICT COUNCIL
LOT 201
46
SECTION 2 SO 317364 DEPARTMENT OF CONSERVATION (RECREATION RESERVE)
47 48
3
49 202 44
96
50
203
301
85 86 87 302
D3
SECTION 1 SO 24383 AURORA ENERGY LTD
61 60
51
52
ROA
1
94 93 92 91 90 89 88
95
(ACCESS 1) G
59 58
57
56
55
54
53
A
1 7 T 55 LO545 2 57 T 5 DP LO545 DP
VA
NC
OU
VE
SECTION 2 SO 503041
LOT 2 DP 488970 LOT DP 4 3 8897 0 LOT 3 DP 532 794 LO DP 53T 2 2794 LOT 1 D 532794 P
LOT 84 DP 23944
LOT 1 DP 488970
ACCESS 2
LOT DP 54553 57
LOT 83 DP 23944
J
AURORA ENERGY LTD
J
13
22 23
ROAD 4
78
RIGHT OF WAY (VEHICULAR AND PEDESTRIAN ACCESS)
LOT 200
SECTION 1 SO 23185 QUEENSTOWN LAKES DISTRICT COUNCIL
11
3
12
20
RO
76
SECTION 1 SO 503041
AD
64
75
LOT 94 DP 24186
RO
65 73
H
9
15 29
63
RIGHT OF WAY (VEHICULAR AND PEDESTRIAN ACCESS)
200
8
1
62
H
LOTS 51 & 53-55 QUEENSTOWN LAKES DISTRICT COUNCIL
RD
RIV
E
SEE SHEET 113
B
E
LOT 89 DP 23944
LOT 90 DP 23944
PART LOT 1 DP 21763
LOT 13 DP 27397 HENSMAN, GRANT HYLTON HENSMAN, PHILLIP JOHN
R O DS
STER
PLAC
IN
CHE
E
W
MAN
PL
AC
E
SEE SHEET 112
LOT 88 DP 23944
LOT 1002 COMPRISES LOTS 86-95. (REFER TO NOTES)
CLIENT
COMMONAGE QUEENSTOWN LP
DRAWING TITLE
QUEENSTOWN HILL DEVELOPMENT
DATUM INFORMATION COORDINATE SYSTEM
NZGD2000
MOUNT NICHOLAS CIRCUIT
REV DRAWN
DATE
NOTE
SURVEYED
PAT
27.02.25
PROJECT
9
27.05.26
Lots 26-44, 57-61,96,202 updated
DESIGNED
AT / SM
2025
DRAWING NO
001
DRAWN
AT
13.04.25
SHEET
110
CD
P241358
30
VESTED LOTS LANDSCAPING PLAN
» TO VIEW THE FULL LANDSCAPE PLAN, CLICK HERE FOR THE KARAMATA PEAK DATA ROOM.
31
GEOTECH AND EARTHWORKS DRAWINGS » TO VIEW THE FULL GEOTECH PLAN, CLICK HERE FOR THE KARAMATA PEAK DATA ROOM.
Across 69,258 m2 of earthworks there is 21,247 m2 of cut to fill in soil and 56,222 m2 in rock, with a maximum cut of 9.2 metres and fill of 8.3.
DESIGN CONTOURS LOT 2 DP 496901 QUEENSTOWN LAKES DISTRICT COUNCIL (RECREATION RESERVE)
4 5
3
SECTION 2 SO 317364 DEPARTMENT OF CONSERVATION (RECREATION RESERVE)
6 7
2
D3
8
ROA
1
16
10 17
200 18
29
11 19
30
12
20 31
21
62
13
32
22
63
33
RO
AD
RO
AD
66
72
45
201 25
46
36
3
67
26 37
47 27 48
28
71
43
38
68
70
75
3
24 35
65 73
14 23
34
64 74
SECTION 1 SO 23185 QUEENSTOWN LAKES DISTRICT COUNCIL
9 15
49
39
69
40
ROAD 4
76
202
41
44
42
96
50
84 77 78
82
81
80
79
85
ROAD
1
93
91
90
89
88
SECTION 1 SO 24383 AURORA ENERGY LTD
87
61
60
59
ACCESS 01
58
57
56
55
54
53
ACCESS 2 SECTION 2 SO 503041
RD
RIV
LOT 1 D 532794 P
VE
LO DP 53T 2 2794
OU
PART LOT 1 DP 21763
0
NC
LOT DP 53273 94
LO DP 4 T 3 8897
VA
LOT 2 DP 488970
LOT 1 DP 488970
LOT DP 54553 57
1 7 T 55 LO545 2 7 T 55 DP LO545 DP
94
95
1001
LOT 84 DP 23944
51
86 92
LOT 83 DP 23944
ROAD 3 52
1000
DP 24186
203
83
LOT 88 DP 23944
LOT 89 DP 23944
E
LOT 13 DP 27397 HENSMAN, GRANT HYLTON HENSMAN, PHILLIP JOHN
LOT 90 DP 23944
EARTHWORKS QUANTITIES: AREA OF EARTHWORKS = 69,258m² STRIP TOPSOIL TO STOCKPILE FOR RESPREAD = 5,359m³ STRIP TOPSOIL AND OTHER ORGANIC MATERIAL TO WASTE OFFSITE = 15,522m³ CUT TO FILL (SOIL) = 21,247m³ (cut) CUT TO FILL (ROCK) = 56,222m³ (cut) TOTAL CUT TO WASTE = 8,925m³ RESPREAD TOPSOIL TO LOTS AND BERMS FROM STOCKPILE = 5,359m³ NOTES 1. CONTOUR INTERVAL: 5m MAJOR / 1m MINOR 2. SURPLUS FILL WILL BE DEPENDANT ON COMPACTION FACTORS AND ROCK RECOVERY RATES 3. SURPLUS FILL WILL BE REUSED ON SITE WITHIN THE LOTS RATHER THAN CARTING TO WASTE OFFSITE 4. SPLIT BETWEEN SOIL AND ROCK MATERIAL VOLUMES WILL BE DEPENEDANT ON DEPTH OF ROCK AT THE VARIOUS CUT AREAS
CLIENT
DRAWING TITLE
COMMONAGE QUEENSTOWN LP
QUEENSTOWN HILL DEVELOPMENT DESIGN CONTOURS
DATUM INFORMATION
PROJECT
REV DRAWN
DATE
NOTE
SURVEYED
NZGD2000
3
GCL
22.10.25
RE-ISSUED FOR CONSENT
DESIGNED
SAM
27.05.25
MOUNT NICHOLAS CIRCUIT
4
GCL
27.11.25
CONTOURS UPDATED
DRAWN
SAM
28.05.25
COORDINATE SYSTEM
5
GCL
5.02.26
TURNING HEAD CONTOURS UPDATED REVIEWED
AT
25.06.25
ORIGIN OF COORDINATES
6
LB
29.05.26
LOT BOUNDARIES UPDATED
SP
25.06.25
ORIGIN OF LEVELS
STATUS
DATUM
NZVD2016
FOR CONSENT
APPROVED
© Paterson Pitts Limited Partnership
P241358
DRAWING NO
004
SHEET
202
REVISION
6
SCALE (A3)
1:1500
32
CUT / FILL DEPTH CONTOURS LOT 2 DP 496901 QUEENSTOWN LAKES DISTRICT COUNCIL (RECREATION RESERVE) 0.0
-1.0
1.0
1.0 1.0
-1.0
6
1.
0
70.0
-3.0
0.0
-1.0
3.0
0.0 3.0
-1.0 1.0
.0 -3
0 3.
MAX DEPTH OF FILL: 6.1m 0.
0
3.0
-1.0
1.0
0.0
0.0
58
57
56
55
6.0
3.0
-1
.0
4.0 3.0
0.0 ACCESS 01 1.0
53
54 0.0
G
-1.0
0.0
0.0
-4.0
-1.0
.0
4.0
-1.0 0 -2 .
0
-2
1.0 0.0
1.0
0 0.
5.0
5.0
-
3.0
0.0
-1.0 0.0
0.0
RIV
LO DP 53T 2 2794
RD
LOT 1 D 532794 P
VE
LOT DP 53273 94
LO DP 4 T 3 8897 0
LOT 2 DP 488970
NC
LOT 88 DP 23944
3.0
0.0
0.0
0.0
0. -4.0
4.0
3.0
3.0
-1.0
0.0
0
0.0
-1.0
0
-1.0
LOT 1 DP 488970
1.
2.0 1.0
5.0
0.0
6.0
LOT 89 DP 23944
E
0.0 1.0
LOT DP 54553 57
-1.0
51 52
2.0
1.0
0
-
3.
-2.0
0.0
1.
0.0
4.0
59
.0
-1.0
ACCESS 2
SECTION 2 SO 503041
OU
60
-1
2.0
0.0
2.0
VA
0 0.0.0
1.0
1.0 0.0
0.0
61
0
2.0
1.0
0 2.
0.0
0.0
2.0
0.0 0.0
4.0
-1.0 0.0
3.0 2.0
SECTION 1 SO 24383 AURORA ENERGY LTD
87
88
1.0
1 7 T 55 LO545 2 7 T 55 DP LO545 DP
MAX DEPTH OF CUT: 7.6m
86
1.0
4.0
0.0
89
-2.0
-2.0
1.0 2.0
0.0
90
0.0
0.0
0.0
0
2.
F
1.0
0.0
-1.0
3.0
0
0.0
91
0.0
0.0
0.
0.0
-1.0 0.0
0. 0.0
203
3.0
0.0
92
93
94
95
1001
ROAD-3.03
-3.0
-2.0
0.0
1.0
50
.0
0
0.0
-2.0
0.0
-4.0
1.0
-7.0
-3.0
-3.0 0
1.
-1
1.0
0.
3.0
.0
-1.0
-1.0
96 2.0
-5.0
0.0
0.0
44
49 5.0 0.0
.0
-2
1.0
42 .0
-7.0
-5.0 -4.0 -2
-3.0
0.0
-3.0
-1
0.0
0
-5.0
0.0
2.0
3.0
-4.0 .0
202
-3.0
-4.0 -6
0
-3.0
0.0
-1.0
-2.0
-1.0
1
2.
-1.0 -1.0
41 -6.0
.0
-3.0
-4.0
D ROA 1.0
-2.0
4.0
-1.0
-
-1.0
-4.0
-5.0
0.0
-1.0
-3.0 -6.0
-3.0 -2.0
-1.0
0.0
-5.0 -4.0
-1.0
0.0 -3.0
0.0
85
48 -3.0
-1
1.0
-3.0
0.0
1000
LOT 84 DP 23944
0.0
0.0
0
0.
0.0
0.0
4.0
-5.0
E
-2.0
80
79
0.0
5.0
.0
0.0
0.0
81
-3.0
83
82
4.0
5.0
-5
84
78
28 43 MAX DEPTH OF FILL: 5.2m 40
0.0
0.0
77
-2.0
1.0
-7.0
-1.0
1.0
2.0
3.0
47 -1.0
-3.0
39
0.0
0.0
2.0
-1.0
0.0 3.0
-7.0
RO0.0AD 4
-4.0
-1.0
0.0
2.0
-3.0
0 0. 76
1.0
-1.0
0.
0.0
.0
3.0
69
-2.0
-1.0 0.0
0.0
0.0
1.0
46 -1
3.0
27
45
201 -2.0
38
-8.0
-4.0 -3.0 -2.0
3.0 0.0
-2.0
37
0.0
-1.0
3
1.0
0.0
0.0 -2.0
-6.0 -5.0
-3.0 -2.0
1.0
0.0
-2.0
-4.0
1.0
0.0 2.0
0.0
RO
26
-7.0
70
0.0
0.0
68
14 0.0
25
-1.0
75
0.0
0.0
.0
0.0
0.0
-4
.0
-1.0
-4 -3.0.0
0.0
71
-3
-1.0
0.0
.0
67 0.0
0.0
0
AD
24 MAX DEPTH OF CUT: 9.2m -5.0
-9.0
-8
0
0
0.
36
3
0.0
4.0
0.
0 -1.0
0
4.
AD
0.0
13
2.0
1.
23
RO 0.0
0.
-1.0
0.0
0
72
0.0
0.0
0
1.
1
0.0
2.0
33
66
0
- 1.0
22
35
0.0
0.
D
34
0 0.
0.0
12
2.0
0.0
-1.0
21
65
2.0
0
2.
11
2.0
-
-3.0
6.
0.0
0 2.
20
3.0 5.0
6.0
73 .0
0 1.
LOT 83 DP 23944
200 -1.0
-4.0
8.0 1.0
-5.0
64 0.0
0
-1.0 0.0
DP 24186
-4.0
32 63
SECTION 1 SO 23185 QUEENSTOWN LAKES DISTRICT COUNCIL
0.0
1.0
6.0
0
3.
0.0
0
2.
0.0
-5.0
19
31
4.
62
-
3.0
30
MAX DEPTH OF FILL: 8.3m
C
.0
.0
18
-4
-3
0.0 0
10
-1.0 -2.0
4.0
7.0
17
2.0
5.0
16
-1.0
.0
-4.0
9 0.0
5.
0
2.
.0
0.0
0.0
-2.0
-1
0
0
1.0
29
74
2.
1.
-1
0.0 0.0
0
-3.0
-1.0
.0
0.0
0.0
0.0
8
B -
0.0 -1.0
ROA
0.0
1.0
1
0
15
-5.0
-1.0
-
0.0
0.
D3
0
0.
1.0
0.
A
SECTION 2 SO 317364 DEPARTMENT OF CONSERVATION (RECREATION RESERVE)
AREA 1 CUT 72.0m² FILL 0.6m² 0 0.
2
-2
0.0
0.0
0
0
0.
0.0
0.0
5
0.
3
0.0
0
0.
0.0
0.0
0.0
.0
-1
-1.0
4
PART LOT 1 DP 21763 LOT 13 DP 27397 HENSMAN, GRANT HYLTON HENSMAN, PHILLIP JOHN
LOT 90 DP 23944
NOTE DEPTH CONTOUR INTERVAL: 1m
CLIENT
COMMONAGE QUEENSTOWN LP
DRAWING TITLE
QUEENSTOWN HILL DEVELOPMENT
DATUM INFORMATION
PROJECT
REV DRAWN
DATE
NOTE
SURVEYED
NZGD2000
3
GCL
22.10.25
RE-ISSUED FOR CONSENT
DESIGNED
SAM
27.05.25
MOUNT NICHOLAS CIRCUIT
4
GCL
28.11.25
SWALE LOCATIONS AMENDED
DRAWN
SAM
28.05.25
COORDINATE SYSTEM
CUT / FILL DEPTH CONTOURS
DATUM
5
AGM
5.02.26
TURNING HEADS UPDATED
REVIEWED
AT
25.06.25
(EXISTING TO DESIGN SURFACES)
ORIGIN OF COORDINATES
6
LB
29.05.26
LOT BOUNDARIES UPDATED
APPROVED
SP
25.06.25
ORIGIN OF LEVELS
STATUS
NZVD2016
FOR CONSENT
© Paterson Pitts Limited Partnership
P241358
DRAWING NO
004
SHEET
203
REVISION
6
SCALE (A3)
1:1500
33
13
PROGRAMME AND TITLES
A programme has been prepared by the appointed subdivision Project Managers and Quantity Surveyors, Ascent Group. Stage 1 titles are set to be delivered in May 2027 with Stage 2 titles following in mid 2028.
260902 - Karamata Peaks Draft Development Programme (Rev 2)
Page 1 of 2
ID
Task Name
Dur
Start
Finish
0
260902 - Karamata Peaks Draft Development Programme REV 2
502d
12/08/26
04/09/28
1
Karamata Peaks Draft construction programme
1d
12/08/26
12/08/26
2
EA Lodgement
1d
12/08/26
12/08/26
3
EA Processing
4.0mo
12/08/26
01/12/26
4
EA
0d
01/12/26
01/12/26
6
Initial works
119d
12/08/26
15/02/27
7
Tender Submission
0d
12/08/26
12/08/26
8
Tree Clearance
40d
21/09/26
13/11/26
9
Early EMP Controls
20d
28/09/26
23/10/26
10
Environmental works
82d
05/10/26
15/02/27
11
Contract start
0d
02/11/26
02/11/26
12
Setup site access
2d
16/11/26
17/11/26
13
Construct temp access road in
5d
18/11/26
24/11/26
14
Construct EMP controls for initial phases of work(assuming drop out pits a…
5d
25/11/26
01/12/26
15
Remove stumps and slash and Mulch and remove from site(timeframe TBC)
40d
02/12/26
15/02/27
16
Install remaining EMP works (ongoing as project progresses)
0d
19/11/26
19/11/26
17
Building surveys
20d
05/10/26
30/10/26
107d
01/12/26
21/05/27
18
Stage 1 works
19
Strip topsoil to enable UC wall and MSE wall to begin
10d
01/12/26
14/12/26
20
Construct UC Wall
36d
15/12/26
22/02/27
21
Construct MSE Wall access 2
25d
15/12/26
04/02/27
22
Construct SW,FS and water connections On Vancouver drive
25d
15/12/26
04/02/27
23
Complete Earthworks Cut/FIll
5d
05/02/27
12/02/27
24
Construct services down Access 2
35d
15/02/27
06/04/27
25
Roading access 1 and part of road 1
32d
07/04/27
21/05/27
26
224c Inspection
1d
28/05/27
28/05/27
27
Completion works
15d
24/05/27
14/06/27
28
Passed 224c Inspection
1d
15/06/27
15/06/27
29
Practical Completion
0d
16/06/27
16/06/27
30
223 - Processing
60d
24/05/27
17/08/27
31
224c - Processing
60d
24/05/27
17/08/27
32
Titles
Anticipated May 2027
35
Stage 2 Works
413d
15/12/26
04/09/28
36
Earthworks
220d
15/12/26
15/11/27
Aug 26 Sep 26 Oct 26 Nov 26 Dec 26 Jan 27 Feb 27 Mar 27 Apr 27 May 27 Jun 27 Jul 27 Aug 27 Sep 27 Oct 27 Nov 27 Dec 27 Jan 28 Feb 28 Mar 28 Apr 28 May 28 Jun 28 Jul 28 Aug Sep 28
34
14
Construct EMP controls for initial phases of work(assuming drop out pits a…
5d
25/11/26
01/12/26
15
Remove stumps and slash and Mulch and remove from site(timeframe TBC)
40d
02/12/26
15/02/27
16
Install remaining EMP works (ongoing as project progresses)
0d
19/11/26
19/11/26
17
Building surveys
20d
05/10/26
30/10/26
107d
01/12/26
21/05/27
18
Stage 1 works
19
Strip topsoil to enable UC wall and MSE wall to begin
10d
01/12/26
14/12/26
20
Construct UC Wall
36d
15/12/26
22/02/27
21
Construct MSE Wall access 2
25d
15/12/26
04/02/27
22
Construct SW,FS and water connections On Vancouver drive
25d
15/12/26
04/02/27
23
Complete Earthworks Cut/FIll
5d
05/02/27
12/02/27
24
Construct services down Access 2
35d
15/02/27
06/04/27
25
Roading access 1 and part of road 1
32d
07/04/27
21/05/27
26
224c Inspection
1d
28/05/27
28/05/27
27
Completion works
15d
24/05/27
14/06/27
28
Passed 224c Inspection
1d
15/06/27
15/06/27
29
Practical Completion
0d
16/06/27
16/06/27
260902 - Karamata Peaks Draft Development Programme (Rev 2) 30 223 - Processing 60d 24/05/27 260902 - Karamata Peaks Draft Development Programme (Rev 2) 24/05/27
17/08/27
31
224c - Processing
60d
32
Titles
Anticipated May 2027
ID ID
Task Name Task Name
Dur Dur
0 41 35 1 42 36 2 43 37 3 44 38 4 45 39 6 ID 46 40 7 41 47 8 42 48 9 43 49 10 44 50 11 45 51 12 46 52 13 47 53 14 48 54 15 49 55 16 50 56 17 51 57 18 52 58 19 53 59 20 54 60 21 55 61 22 56 23 57 24 58 25 59 26
260902 - Karamata Peaks Draft Development Programme REV 2 Cut to fill earthworks remainder of site Stage 2 Works Karamata Peaks Draft construction programme Construct swales around extent of project Earthworks EA Lodgement Drainage Road 1 earthworks. Anchors and shotcrete EA Processing Construct all services up road 1 Waste/Soil strip to stockpile EA Constuct gravity linessite Road intersection south of Resivoir and Aurora … Rock blasting across inc1/3 trenches Initial works Task Name Relocation of existingSouth waterof main Cut to fill earthworks roadand 1 power lines Tender Submission Cut to fill earthworks remainder of site Construct gravity lines in remainder of site Tree Clearance Construct swales of site project all retic around servicesextent around Early EMP Controls Drainage Roading Environmental works Construct servicesAP65, up road 1 Roading - all Subgrade, AP40, Kerbing surfacing Contract start Constuct lines Road 1/3 intersection south of Resivoir and Aurora … Footpath gravity construction Setup site access Relocation of by existing main and power lines Landscaping otherswater - Timeframe and scope TBC Construct temp access road in Construct gravity lines in remainder of site 224c Inspection Construct EMP controls for initial phases of work(assuming drop out pits a… Construct allworks retic services around site Completion Remove stumps and slash and Mulch and remove from site(timeframe TBC) Roading Passed 224c Inspection Install remaining EMP works (ongoing as project progresses) Roading Subgrade, AP65, AP40, Kerbing surfacing Practical -Completion Building surveys Footpath construction 223 - Processing Stage 1 works Landscaping by others - Timeframe and scope TBC 224c - Processing Strip topsoil to enable UC wall and MSE wall to begin 224c LINZ/Inspection Settlement Construct UC Wall Completion works Titles Construct MSE Wall access 2 Passed 224c Inspection Settlement Construct SW,FS and water connections On Vancouver drive Practical Completion Complete Earthworks Cut/FIll 223 - Processing Construct services down Access 2 224c - Processing Roading access 1 and part of road 1 Titles 224c Inspection
502d 12/08/26 04/09/28 100d 14/04/27 03/09/27 413d 15/12/26 04/09/28 1d 12/08/26 12/08/26 50d 06/09/27 15/11/27 220d 15/12/26 15/11/27 1d 12/08/26 12/08/26 210d 08/03/27 20/01/28 45d 15/12/26 05/03/27 4.0mo 12/08/26 01/12/26 20d 08/03/27 06/04/27 25d 15/12/26 04/02/27 0d 01/12/26 01/12/26 50d 07/04/27 17/06/27 150d 05/02/27 10/09/27 119d 12/08/26 15/02/27 Dur Start Finish 25d 07/04/27 12/05/27 45d 05/02/27 13/04/27 0d 12/08/26 12/08/26 100d 14/04/27 03/09/27 80d 18/06/27 08/10/27 40d 21/09/26 13/11/26 50d 06/09/27 15/11/27 60d 11/10/27 20/01/28 20d 28/09/26 23/10/26 210d 08/03/27 20/01/28 158d 21/01/28 04/09/28 82d 05/10/26 15/02/27 20d 08/03/27 06/04/27 68d 21/01/28 01/05/28 0d 02/11/26 02/11/26 50d 07/04/27 17/06/27 30d 20/03/28 03/05/28 2d 16/11/26 17/11/26 25d 07/04/27 12/05/27 30d 23/03/28 08/05/28 5d 18/11/26 24/11/26 80d 18/06/27 08/10/27 1d 15/05/28 15/05/28 5d 25/11/26 01/12/26 60d 11/10/27 20/01/28 15d 09/05/28 29/05/28 40d 02/12/26 15/02/27 158d 21/01/28 04/09/28 1d 30/05/28 30/05/28 0d 19/11/26 19/11/26 68d 21/01/28 01/05/28 0d 31/05/28 31/05/28 20d 05/10/26 30/10/26 30d 20/03/28 03/05/28 60d 09/05/28 31/07/28 107d 01/12/26 21/05/27 30d 23/03/28 08/05/28 60d 09/05/28 31/07/28 10d 01/12/26 14/12/26 1d 15/05/28 15/05/28 25d 01/08/28 04/09/28 36d 15/12/26 22/02/27 15d 09/05/28 29/05/28 20d 01/08/28 28/08/28 25d 15/12/26 04/02/27 1d 30/05/28 30/05/28 5d 29/08/28 04/09/28 25d 15/12/26 04/02/27 0d 31/05/28 31/05/28 5d 05/02/27 12/02/27 60d 09/05/28 31/07/28 35d 15/02/27 06/04/27 60d 09/05/28 31/07/28 32d 07/04/27 21/05/27 Anticipated June/July 2028 1d 28/05/27 28/05/27
Start Start
17/08/27
Finish Finish
260902 - Karamata Peaks Draft Development Programme (Rev 2)
27
Completion works
15d
24/05/27
14/06/27
28
Passed 224c Inspection
1d
15/06/27
15/06/27
29
Practical Completion
0d
16/06/27
16/06/27
30
223 - Processing
60d
24/05/27
17/08/27
31
224c - Processing
60d
24/05/27
17/08/27
32
Titles
Anticipated May 2027
35
Stage 2 Works
413d
15/12/26
04/09/28
36
Earthworks
220d
15/12/26
15/11/27
Page 1 of 2 Page 2 of 2
Aug 26 Sep 26 Oct 26 Nov 26 Dec 26 Jan 27 Feb 27 Mar 27 Apr 27 May 27 Jun 27 Jul 27 Aug 27 Sep 27 Oct 27 Nov 27 Dec 27 Jan 28 Feb 28 Mar 28 Apr 28 May 28 Jun 28 Jul 28 Aug Sep 28 Aug 26 Sep 26 Oct 26 Nov 26 Dec 26 Jan 27 Feb 27 Mar 27 Apr 27 May 27 Jun 27 Jul 27 Aug 27 Sep 27 Oct 27 Nov 27 Dec 27 Jan 28 Feb 28 Mar 28 Apr 28 May 28 Jun 28 Jul 28 Aug Sep 28
Page 2 of 2
Aug 26 Sep 26 Oct 26 Nov 26 Dec 26 Jan 27 Feb 27 Mar 27 Apr 27 May 27 Jun 27 Jul 27 Aug 27 Sep 27 Oct 27 Nov 27 Dec 27 Jan 28 Feb 28 Mar 28 Apr 28 May 28 Jun 28 Jul 28 Aug Sep 28
35
14
KEY SALE & PURCHASE TERMS
SALE & PURCHASE AGREEMENT TERMS: • 10% deposit: Balance 10 days after issue of Title. • Settlement: Anticipated Stage 1 Titles May 2027 (Sec 2 & Lot 1000), balance mid 2028. • Vendor conditions: Vendor must confirm satisfactory consents and economic feasibility within 12 months, and notify title availability within three years. These conditions protect the vendor, which has early cancellation rights with a deposit refund. • Sunset provisions: Purchaser cancellation rights can extend beyond three years. Survey-plan lodgement is measured from the later of signing or relevant-stage consent, with a further three-year title period following section 223 approval. • Building and use controls: Design approval and review fees apply. • Services and ongoing obligations: Vendor provides services to the boundary; purchaser pays connection and internal servicing costs. • Lot-area changes: Under 5% means no price adjustment; 5% or more triggers proportional repricing. A change exceeding 12.5% allows purchaser cancellation.
» TO VIEW THE SALE AND PURCHASE AGREEMENT, CLICK HERE FOR THE KARAMATA PEAK DATA ROOM.
TYPOGRAPHY TYPOGRAPH TYPOGRAPHY RAPHY HY + GR GRAPHIC GRAPHI GRAP GRAPH APHIC HIC IC ELEMENTS ELEMENT ELEME LEMENTS MENTS TS
36
15
SALES AND MARKETING SUPPORT
Colliers can provide a bespoke sales and marketing campaign for completed homes within Karamata Peak, leveraging our extensive local, national, and international buyer networks. Campaigns can be tailored to suit individual products and target audiences, drawing on a range of channels including digital advertising, database marketing, social media, public relations, signage, print media, and strategic referral networks. With a dedicated residential sales team and a proven track record marketing premium Queenstown property, Colliers can assist developers in maximising exposure, generating qualified enquiry, and achieving the strongest possible sales outcomes. Whether delivering a single completed home or a broader development programme, our team can create a customised strategy designed to connect with the most relevant buyers and efficiently convert interest into sales.
TYPOGRAPHY TYPOGRAPH TYPOGRAPHY RAPHY HY + GR GRAPHIC GRAPHI GRAP GRAPH APHIC HIC IC ELEMENTS ELEMENT ELEME LEMENTS MENTS TS THE BRAND IMAGERY, TYPOGRAPHY AND GRAPHIC DEVICES HAVE BEEN DESIGNED
37
16
DELIVERY TEAM
Behind every great project is a great team. Karamata Peak is backed by industry leaders in their fields.
DEVELOPER
CONTRACTOR
ENGINEERS
LANDSCAPE ARCHITECT
Whaka Projects is the development manager for Karamata Peak, acting for Commonage Queenstown Limited Partnership. Led by Adam Copland and Kirk Pullar, the team takes the project from land acquisition and masterplanning through consenting, civil delivery and sell-down, coordinating the planning, engineering, landscape, surveying and legal teams behind it. Queenstown based, with 15 years across differing property sectors.
Base Contracting is a medium sized civil contracting company. Base are a multi-faceted contracting company undertaking large earthworks, drainage & utility services, subdivisional developments, retaining structures, rock walls, rural property development, ponds & water features, roading, demolition and high alpine re-vegetation projects.
We've been in the game for over 100 years and have seven offices across the South Island. Patersons is your trusted partner for Land Development & Civil in New Zealand. Our intimate local knowledge, backed by the collective experience of our wider group means that you can rely on our team to help you navigate all aspects of your project.
Since 2016, Patch has been changing the traditional model of landscape architecture, by putting environmental and cultural thinking at the forefront.
BASECONTRACTING.CO.NZ
PATERSONS.CO.NZ
PATCHLANDSCAPE.CO.NZ
PLANNERS
PROJECT MANAGERS
LAWYERS
REAL ESTATE AGENT
Located in both Queenstown and Cromwell and servicing the lower South Island, the professionals at SPG are vastly experienced in all resource management and planning aspects of land development.
Ascent Group offers expert project management and quantity surveying in NZ, ensuring full accountability and excellence in complex development projects.
An experienced and enterprising full-service law firm with lawyers located in Auckland, Wellington, Nelson, Blenheim, Christchurch and Queenstown.
SOUTHERNPLANNING.CO.NZ
ASCENTGROUP.CO.NZ
DUNCANCOTTERILL.COM
Colliers is a global real estate services company with an established presence across New Zealand. The Colliers Queenstown team combines indepth local market knowledge with national and international reach, providing specialist expertise in property sales, development opportunities and targeted marketing to connect developers with the right buyers.
COLLIERS.CO.NZ
38
THANK YOU
17 NEXT STEPS & CONTACTS
DATA ROOM
DATA ROOM
NEXT STEPS
FROM OPPORTUNITY TO ACQUISITION Explore the available site packages, assess the development potential and identify the opportunity that best aligns with your strategy.
01 — REGISTER YOUR INTEREST Contact Colliers to discuss package availability, pricing and your acquisition requirements.
02 — ACCESS THE DATA ROOM View all documents in the data room including planning, engineering, infrastructure, title and design documentation, subject to any required confidentiality arrangements.
03 — UNDERTAKE DUE DILIGENCE Review the information, confirm achievable yield and prepare your development feasibility.
04 — SUBMIT AN OFFER Outline your preferred package, purchase price, proposed conditions and settlement requirements.
05 — AGREE TERMS The vendor will review offers and negotiate terms with preferred parties before progressing to a formal sale and purchase agreement.
READY TO EXPLORE THE OPPORTUNITY? Review the packages. Test the numbers. Start the conversation. Contact Colliers to discuss availability and progress your interest in Karamata Peak.
TIM THOMAS TIM.THOMAS@COLLIERS.COM +64 22 5433 210 ALASTAIR WOOD ALASTAIR.WOOD@COLLIERS.COM +64 27 436 2422
karamatapeak.co.nz 39
www.karamatapeak.co.nz WHAKA PROJECTS AND COLLIERS HAVE TAKEN CARE TO ENSURE THE INFORMATION HERE IS ACCURATE AT THE TIME OF PUBLICATION, BUT WE ARE NOT RESPONSIBLE FOR ANY ERRORS OR OMISSIONS. ALL DETAILS PROVIDED SUCH AS SPECIFICATIONS, ILLUSTRATIONS, PERSPECTIVES, AND PLANS ARE INDICATIVE ONLY, MAY CHANGE WITHOUT NOTICE, AND DO NOT FORM PART OF ANY SALES AGREEMENT. BUYERS ACKNOWLEDGE THEY HAVE HAD A FAIR CHANCE TO SEEK LEGAL, TECHNICAL, OR OTHER ADVICE AND HAVE EITHER OBTAINED IT OR CHOSEN NOT TO. THE SPECIFICATIONS PROVIDED ARE FOR GUIDANCE ONLY AND DO NOT CONSTITUTE AN OFFER OR CONTRACT.
40