Clayco_Life Sciences

Page 1


LIFE SCIENCES INTEGRATED DEVELOPMENT, DESIGN, ENGINEERING & CONSTRUCTION SERVICES

Life Science Leadership Team

Leveraging our combined experience in process engineering and operations, cGMP manufacturing, laboratory design, and workplace at various scales – our Enterprise team effectively integrates user requirements and regulatory knowledge into each buildout.

Paul DePenning

SR. VICE PRESIDENT

Life Science, Operations

Clayco

Mary Sturgeon AIA

PRINCIPAL

Process Architect

Lamar Johnson Collaborative

Marc Hanson VICE PRESIDENT

Life Science, Project Development

Clayco

John Coelho

INTEGRATED DELIVERY LEADER

Life Sciences

Lamar Johnson Collaborative

Robert Sunukjian

PROJECT DEVELOPMENT

DIRECTOR

Life Science, Project Development

Clayco

Cullen Stewart

SR. PRECONSTRUCTION MANAGER

Life Sciences

Clayco

Eric Adams DIRECTOR

Engineering, Life Science & Advanced Manufacturing

Clayco Design & Engineering

• Site Master Planning & Due Diligence

• Basis of Design (BOD) Development

• Front End Loading (FEL) Studies, Peer Evaluations

• Strategic Facility Planning, Existing Facility Assessments

• Life Safety/Code Reviews

• Process Architecture Design

• Aseptic Process Design

• Consulting (Aseptic Filling, Inspection, Packaging, Lyophilization, Sterilization, OSD)

• Regulatory Impact Assessments and Guidance

• Manufacturing Process and Logistics Planning

• Sustainability Planning and Delivery

• Process Engineering, Mechanical, Plumbing, Electrical and Structural Design

• Cleanroom Design & Installation

• Hygienic Utility System Analysis & Design

• Preconstruction Planning and Budgetary Analysis

• Laboratory Planning and Design

• Workplace & Interior Design

Clayco Safe - Outstanding Results

Clayco takes a proactive approach to safety management, production and quality to provide the owner with a superior final project that is injury and accident free.

NOW IN VPP ACROSS 15 STATES:

• OSHA REGION 7

Mobile Workforce OSHA VPP STAR

• OSHA REGION 5

• OSHA SC VPP

• OSHA NC VPP

• KENTUCKY CPP

• WYOMING VPP

• ADOSH REGION 9

Arizona Statewide VPP

• NATIONALLY

In Pursuit of OSHA VPP Regions across the US

DECREASE OF TRIR:

0.40 CURRENT EMR (WELL BELOW 1.0 INDUSTRY AVERAGE)

79% BELOW NATIONAL AVERAGERECORDABLE RATE OSHA VOLUNTARY PROTECTION PROGRAM (VPP) STAR 8-YEAR MEMBER 75% OF ALL PROJECTS HAD ZERO RECORDABLES IN 2024

NATIONAL SAFETY COUNCIL (NSA) AWARDS:

2024 NSA Significant Achievement Award

2024 NSA Perfect Record Award

2024 NSA Million Work Hours Award

2024 NSA Occupational Excellence Award

2024 NSA Milestone Award

Our Clients & Community

PEOPLE & SAFETY

Safety is foundational to our work, and we are all responsible for creating a safe environment. Through regular trainings and awareness activities we prioritize proactive measures. Addressing physical and psychological well-being is vital, and we foster open dialogue for all employees.

CLAYCO RISING (CULTURE, EMPOWERMENT, AND INCLUSION)

Clayco coordinates social impact efforts through Clayco Rising, a leading CEI program in the industry. With 25 years of experience, Clayco Rising creates opportunities and structural change for employees, our trade partners, and communities.

OUR COMMUNITY

Clayco’s culture extends beyond building structures. We’re committed to long-term partnerships with our communities. A vital part of our identity is dedicating time, energy, and resources to projects and nonprofit organizations in the communities where we live and work.

OUR ENVIRONMENT

Clayco prioritizes environmental responsibility, as we meet the needs of employees, clients, and future generations. We design and construct buildings to reduce emissions and enhance energy efficiency. We lead with innovative solutions to minimize embodied carbon and waste. We have 100+ Sustainably Certified Projects and 70+ Sustainability Accredited Professionals.

Clayco

40 YEARS OF THE A FIRM OF THE BEST & BRIGHTEST WITH 3,800+ EMPLOYEES ACROSS THE COUNTRY A SAFETY LEADER WITH A CURRENT EMR OF 0.40 (1.0 INDUSTRY AVERAGE) ACCOMPLISHED 2024 REVENUE

$7.6B

A LOOK AT

Our team specializes in the “art and science of building,” providing fast-track, efficient solutions. Year after year, we are ranked by Engineering News Record as a top 5 design-builder and contractor. By embracing the passion, creativity, and ideas of our people, we have been recognized as the Fast Company Best Workplace for Innovators and Brands That Matter.

The Power of Integration

Clayco is an unmatched, collaborative team. Financial planners, designers, engineers, programmers, builders, and clients work transparently, sharing knowledge with a common desire to exceed owner expectations. Our vast offering of in-house disciplines allows us to provide the specialized services to meet our client’s individual project needs to deliver unparalleled results.

Develop Design & Engineer Build

+ Site Selection

+ Development

+ Financing

+ Asset Management

+ Architecture

+ Interiors

+ Urban Planning & Design

+ Landscape Architecture

+ Sustainability

+ Process & Manufacturing

+ Building Systems

+ Structural

+ Design-Build

+ Design-Assist

+ Integrated Delivery

+ CM@Risk

+ EPC

+ Self-Perform Concrete Construction

+ Self-Perform Mechanical, Electrical & Process Systems

+ Self-Perform

Glass Exterior

Cladding Systems

+ Procurement

Direct Manufacturer Sourcing

Nationwide

Purchasing Power

Delivery Logistics

Technology

+ Virtual Design & Construction (VDC)

+ 3D Visualization/Augmented Reality

+ Pre-Construction Integration (4D/5D)

+ Digital Layout & Reality Capture

+ Robotics

+ Digital Jobsite

+ AI & Machine Learning

+ Digital Project Handover

+ Generative Design

+ ACC Common Data Environment

+ Facility Asset Tracking

+ Digital Twin Development

COMPREHENSIVE

Preconstruction

At Clayco, competitive pricing, speed-to-market, safety, and quality are paramount. Our preconstruction approach enables us to deliver highly complex projects within accelerated time frames by collaborating across our full platform of services through communication, lean principles, and technology.

Our Technical Assurance Group (TAG) and Quality Control Team supports all our business and market sectors by meticulously formulating and testing design solutions and ensuring our design processes are of the utmost quality.

With these unique services, Clayco delivers a seamless, transparent, and fully integrated delivery experience to our customers. This is what we do every day. It’s not a segmented endeavor, but a continuum from the initial idea to the project outcome.

Team Experience

OFFICE LOCATIONS

Lilly Lebanon Plant 1 (API) Program

Lebanon, IN

395,000 SF

Lilly Medicine Foundry

Lebanon, IN

200,000 SF

160,000 SF

Benson Hill Biosystems
Creve Coeur, MO

Chesterfield, MO

295,000 SF

137,000 SF

20,000 SF

Pfizer Boulder Campus Phase 1 Building Renovation Boulder, CO

Clayco’s team of architects, engineers, and construction professionals are experienced in executing a wide range of state-of-the-art programs across all sectors of the biopharmaceutical industry. This uniquely positions the delivery of fast-track, complex projects from initial concept to successful turnover which supports the end goal of delivering essential products to patients.

Procurement Perspective

• Direct manufacturer contacts, securing product availability and reducing time to market.

• Bundling of multiple projects equipment requirements into one purchase order to facilitate outstanding value.

• Continuous relationship development, education, and outreach with trade partners and suppliers.

• Maintenance of current trade partners and supplier safety and financials supporting prequalification readiness.

• Direct one-on-one communication and outreach with partners, incrementally building trust.

Strategies for Reducing Procurement Costs

Project

Project Execution Plan: Trade Partner Procurement

Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.