THE LATEST ON REGIONAL COST TRENDS COST INDEX Q2 2026

CLAYCORP.COM


In Q2 2026, the U.S. construction market remained mixed, with data centers and broader AI infrastructure—including cloud, edge computing, power generation, and utility systems—driving nonresidential growth. Data center construction spending increased roughly 45% year over year in June. Supply chains remained manageable overall, although steel, copper, and electrical equipment continued to face price and availability pressure. Lead times remain a key concern, with large fabricated steel packages requiring approximately 40-50 weeks, switchgear 60–80+ weeks, and large transformers 32-50 weeks or longer, reinforcing the need for early procurement and supply-chain planning.

KURT’S KEY UPDATES

The Latest on Regional Cost Trends Kurt Jaeger Executive Vice President, Preconstruction jaegerk@claycorp.com 314.595.6373

Looking ahead over the next 3–6 months, we expect cost pressure to remain concentrated in electrical infrastructure, metals, specialized mechanical and cooling equipment, and skilled labor. Continued AI, cloud, edge, and power infrastructure investment is competing for electricians, pipefitters, mechanical trades, controls specialists, and experienced supervision, particularly in major data center markets. Labor constraints are also increasing reliance on traveling craft, adding per diem, lodging, travel, overtime, and workforce incentives that can materially increase effective labor costs. As a result, power availability, longlead equipment, steel fabrication capacity, and skilled labor are expected to remain the primary cost and schedule risks through the remainder of 2026.

ENR BUILDING COST INDEX Annual Construction Increase of 4.51%

SEP 2025

Q2 2026

Cost Index

NOV 2025

JAN 2026

MAR 2026

MAY 2026

JUL 2026

The Clayco Cost Index Q2 2026 provides an overview of regional construction cost trends. Clayco believes the current year over year rate of 4.51% will increase in the near term due to increased commodity price projections and shortages in skilled labor supply. The report includes detailed insights on material and construction producer price indexes, delivery lead times, and city-specific cost comparisons across various regions. We would like to extend our sincere thanks to our vendors and trade partners for their invaluable contributions in providing the data and insights that helped shape the Clayco Cost Index Q2 2026.

CLAYCORP.COM


Private Construction Spending

In June 2026, private construction spending decreased 0.1% from May and fell 4.7% year over-year. For the first six months, spending declined by 1.2% compared to the same period in 2025. Type of Construction Aviation

2023 to Jun 26

Jun 25 to Jun 26

May 26 to Jun 26

16.12%

-4.01%

-2.03%

209.56%

45.78%

6.98%

Food/Beverage

-9.98%

-4.73%

0.46%

Health Care

5.36%

-4.57%

0.17%

Higher Education

2.18%

-5.49%

0.52%

Manufacturing

-13.18%

-21.99%

-1.23%

Warehouse

-33.13%

-9.15%

-1.66%

1.13%

-4.71%

-0.13%

Data Center

Overall

150%

100%

50%

0%

2024

United States Census Bureau. Construction Spending - Data.

2025

The material indexes are a quarterly compilation from our suppliers, trade partners, self-perform entities and nationally published commodity indexes. The material cost consist of the following: Concrete, Aggregates, Carbon Steel Pipe, Stainless Steel Pipe, Rebar, Wide Flange Steel, 5/8” Drywall, Copper, Hot Milled Sheet Steel, Lumber, Crude Oil and Hot Liquid Asphalt.

%Δ PREVIOUS QUARTER

%Δ PREVIOUS YEAR

Aggregates

3.94%

4.39%

Aluminum

4.74%

13.33%

Asphalt Paving

1.32%

2.85%

Carbon Steel Pipe

12.02%

22.82%

Concrete

0.68%

4.20%

Copper

7.26%

25.03%

Crude Oil

48.58%

74.05%

Drywall

1.63%

1.45%

Insulation

4.62%

7.55%

Lumber 2x

2.47%

8.93%

Lumber Sheet

-2.45%

-0.50%

Rebar

4.49%

11.56%

Stainless Steel Pipe

3.74%

14.80%

Stainless Steel Sheet

4.76%

6.70%

Structural Steel

5.15%

9.85%

Average

4.99%

12.72%

MATERIAL TYPE

200%

2023

MATERIAL PRODUCER PRICE INDEX

2026

CLAYCORP.COM


. . MIDWEST 

Chicago St. Louis Kansas City Minneapolis Detroit Indianapolis

1.19 1.00 1.01 1.10 0.99 0.94

. . NORTHEAST 

WEST WEST

.

Phoenix San Francisco Las Vegas Denver Los Angeles Seattle

0.94 1.30 1.07 0.94 1.17 1.11

1.09

New York Boston Philadelphia Cleveland Pittsburgh Baltimore

1.09

1.04

0.89

1.28 1.16 1.15 0.96 1.06 0.96

.SOUTHEAST . 

Greenville Nashville Birmingham Tampa Atlanta Dallas

0.88 0.91 0.90 0.89 0.91 0.86

NATIONAL AVERAGE = 1.0 RSMEANS

City Cost Index

National City Cost Index, reference RSMeans 2026 Second Quarter. Shown are six of the main NATIONAL AVERAGE = 1.0 National Cityare Cost Index, averages, reference RSMeans Second Shown are six of the markets in each of the four regions. These weighted leveraging2026 material and Quarter. labor across all scopes of work. This chart compares city cost averages, based on leveraging a national average 1. labor across all scopes main markets in each of the four regions. Thesecity aretoweighted material of and of work. This chart compares city to city cost based on a national average of 1. CLAYCORP.COM


Midwest

2022/2023

2023/2024

2024/2025

2025/2026

Concrete Mason

$57.06

$60.60

$63.73

$64.84

Carpenter

$58.13

$62.94

$70.33

$75.79

Electrician (Inside Wireman)

$71.73

$73.35

$78.02

$84.55

Iron Worker (Structural)

$57.19

$64.99

$76.19

$81.06

Laborer (Common)

$50.37

$55.07

$58.78

$60.85

Plumber

$75.30

$77.24

$78.14

$85.24

$64.14 $63.26 $64.32 $62.07 $47.17 $82.18

$68.46 $66.74 $75.79 $68.17 $52.73 $84.57

$75.76 $73.29 $84.67 $82.74 $54.96 $89.62

$79.61 $77.51 $90.65 $93.34 $62.75 $95.48

$32.49 $35.74 $39.97 $37.77 $27.71 $40.14

$37.92 $41.71 $46.64 $44.07 $32.33 $46.84

$40.45 $45.82 $48.54 $45.85 $34.69 $53.97

$43.35 $49.50 $52.77 $48.81 $41.10 $55.55

$48.48 $53.12 $89.52 $61.78 $50.19 $84.20

$55.41 $61.10 $102.97 $71.07 $57.73 $96.85

$62.47 $66.59 $104.41 $77.35 $58.98 $100.37

$63.23 $68.19 $108.58 $80.44 $63.72 $102.34

Northeast Concrete Mason Carpenter Electrician (Inside Wireman) Iron Worker (Structural) Laborer (Common) Plumber

Penn State Pollock Halls

University Park, PA Pollock Halls is a five-phase, nine-building, multi-year residence hall renovation. Once we finish the last phase of Pollock Halls in 2029, Clayco will have been an active presence on Penn State’s campus for 15 years. The Penn State and Clayco partnership has been a success story of our collaboration and Clayco has hired six graduates as full-time employees, currently working as mission control, superintendents, and senior project engineers.

Southeast Concrete Mason Carpenter Electrician (Inside Wireman) Iron Worker (Structural) Laborer (Common) Plumber West Concrete Mason Carpenter Electrician (Inside Wireman) Iron Worker (Structural) Laborer (Common) Plumber

CLAYCO COST INDEX Q2

Regional

Project Tempo Distribution Facility Hebron, IN The project includes approximately 114 acres of site development, a cross-dock warehouse with 85 dock positions, office space, truck courts, trailer and employee parking, site utilities, stormwater infrastructure and landscaping. Delivered through an integrated design-build approach, the project combines Clayco’s construction expertise with architectural design by LJC Design & Engineering to deliver a coordinated industrial facility designed to support efficient logistics and long-term operational growth.

These numbers constitute both union & non-union composite rates, as well as year over year changes for the following trades: Concrete Mason, Carpenter, Electrician, Iron Worker, Laborer and Plumber. CLAYCORP.COM


Material Price Trends & Projections

The following graphs depict material price changes each quarter, with the initial baseline set at Q1 2025. The values represent the percentage change from the initial baseline, offering a clear perspective on quarterly fluctuations in material prices. CARBON STEEL PIPE 10%

CARBON STEEL PIPE CARBON STEEL PIPE

PROJECTION

10%

STAINLESS STEEL PIPE STAINLESS STEEL PIPE

STAINLESS STEEL PIPE

30%

PROJECTION

30%

-1.12% 0%

-6.32%

0%

-1.12%

18.59% 15.23%

20% 20%

-6.32%

11.08%

18.59%

15.23%

11.08% -10% -10%

-20% -20%

-30%

10%

-16.37%

10%

-16.37% -23.73%

-23.24%

-23.73%

-23.24%

2025 QTR 3

2025 QTR 4

0%

2026 QTR 3

QTR 1 STAINLESS2026 STEEL SHEET 2026 QTR 2 STAINLESS STEEL SHEETSTAINLESS STEEL SHEET 40%

2026 QTR 3

2025 QTR 3

2026 QTR 1

2025 QTR 4

40%

22.04%

30%

14.37%

20%

14.37%

15.49% 15.49%

16.49%

26.35%

0%

2025 QTR 4

-10%

2025 QTR 3

2025 QTR 4

2025 QTR 3

2025 QTR 4

2026 QTR 1

2026 QTR 1 STRUCTURAL STEEL STRUCTURAL STEEL

2026 QTR 3

2026 QTR 2

2026 QTR 3

PROJECTION

30% 30%

16.35%

20%

2026 QTR 2

2026 QTR 2

40%

20%

16.49%

2026 QTR 1

-10%

18.88%

10%

2025 QTR 3

1.01%

22.04%

10%

0%

0.38%

STRUCTURAL STEEL 40% PROJECTION

26.35%

30%

20%

1.01%

0%

2026 QTR 2

-30%

0.38%

2026 QTR 3

10.65%

10%

5.92%

10%

5.92%

0% 0%

2025 QTR 3

7.92%

18.88%

16.35%

10.65%

7.92%

2025 QTR 4

2026 QTR 1

2026 QTR 2

2026 QTR 3

2025 QTR 3 2025 QTR 4 2026 QTR 1 2026 QTR 2 2026 QTR 3 2025 QTR 3 2025 QTR 4 2026 QTR 1 2026 QTR 2 2026 QTR 3 Note: The graphs depict material price changes each quarter, with the initial baseline set at Q1 2025. The values represent the percentage change from the initial baseline, offering a clear perspective on quarterly fluctuations in material prices.

CLAYCORP.COM

Note: The graphs depict material price changes each quarter, with the initial baseline set at Q1 2025. The values represent the percentage change from the initial baseline, offering a clear perspective on quarterly fluctuations in material prices.

The 2026 Q1 Clayco cost projections for Q2 2026 resulted in a 0.33% variance from the actual Q2 2026 costs.


Material Price Trends & Projections (continued) DRYWALL DRYWALL

DRYWALL 20%

PROJECTION

20%

30%

5.56%

10%

5.56%

5.11%

5.37%

5.11%

5.37%

7.09% 7.09%

8.26% 8.26%

20%

13.43%

20%

8.17%

8.42%

8.17%

8.42%

2025 QTR 3

2025 QTR 4

2026 QTR 1

2025 QTR 3

2025 QTR 4

0%

10%

5.47%

0%

10%

5.47%

-10%

0%

-10%

0%

-20%

2025 QTR 3

2025 QTR 4

2026 QTR 1

2026 QTR 2

2026 QTR 3

2025 QTR 3

2025 QTR 4

2026 QTR 1 LUMBER 2X LUMBER 2X

2026 QTR 2

2026 QTR 3

LUMBER 2X 30%

PROJECTION

30%

20% 20%

11.43% 6.44%

10% 10%

2.30%

6.44%

8.75%

-10% -10%

LUMBER SHEET 30%

15.01%

20%

15.01%

20%

8.75%

10% 10%

0%

0%

0%

-10%

2025 QTR 4

2026 QTR 1

14.39% 14.39%

2026 QTR 2

2026 QTR 3

2026 QTR 2

2026 QTR 3

PROJECTION

11.43%

0%

2025 QTR 3

2026 QTR 1 LUMBER SHEET LUMBER SHEET

13.43%

30%

2.30%

-10%

PROJECTION

30%

10%

-20%

INSULATION INSULATION

INSULATION

2026 QTR 2

2026 QTR 3

-10% -10%

2.69%

3.17%

2.69%

3.17%

2025 QTR 3

2025 QTR 4

4.75% 4.75%

2026 QTR 1

2.18%

2.12%

2.18%

2.12%

2026 QTR 2

2026 QTR 3

2025 QTR 3 2025 QTR 4 2026 QTR 1 2026 QTR 2 2026 QTR 3 2025 QTR 3 2025 QTR 4 2026 QTR 1 2026 QTR 2 2026 QTR 3 Note: The graphs depict material price changes each quarter, with the initial baseline set at Q1 2025. The values represent the percentage change from the initial baseline, offering a clear perspective on quarterly fluctuations in material prices.

CLAYCORP.COM

Note: The graphs depict material price changes each quarter, with the initial baseline set at Q1 2025. The values represent the percentage change from the initial baseline, offering a clear perspective on quarterly fluctuations in material prices.

The 2026 Q1 Clayco cost projections for Q2 2026 resulted in a 0.33% variance from the actual Q2 2026 costs.


Material Price Trends & Projections (continued) AGGREGATES AGGREGATES

AGGREGATES 30%

PROJECTION

30%

30%

30%

20%

20%

20%

20%

10% 10%

0%

4.55% 0.16% 0.16%

-0.44% -0.44%

0.59%

4.55%

-10%

7.02%

7.23%

7.02%

7.23%

2025 QTR 3

2025 QTR 4

2026 QTR 1

2025 QTR 3

2025 QTR 4

5.68%

10%

5.65%

5.68%

10%

5.65%

2025 QTR 3

2025 QTR 4

2026 QTR 1

2026 QTR 2

2026 QTR 3

2025 QTR 3

2025 QTR 4

CONCRETE CONCRETE

2026 QTR 2

2026 QTR 3

2026 QTR 1

PROJECTION

-10% -10%

REBAR 30%

10.16%

REBAR REBAR

2026 QTR 1

20%

20%

20%

10%

-1.59% -1.59%

0.78% 0.78%

1.84% 1.84%

2.54%

2026 QTR 3

2026 QTR 2

2026 QTR 3

PROJECTION

15.93% 12.98% 8.13%

10%

2026 QTR 2

30%

20%

5.08%

10%

5.08%

10%

2.54%

15.93%

12.98%

8.13% 1.27% 1.27%

2.38% 2.38%

0%

0%

-10%

8.66%

10.16%

0%

30%

-10%

8.66%

0%

CONCRETE 30%

0%

PROJECTION

0.59%

0%

-10%

ASPHALT PAVING ASPHALT PAVING

ASPHALT PAVING

0%

2025 QTR 3

2025 QTR 4

2026 QTR 1

2026 QTR 2

2026 QTR 3

-10% -10%

2025 QTR 3

2025 QTR 4

2026 QTR 1

2026 QTR 2

2026 QTR 3

2025 QTR 3 2025 QTR 4 2026 QTR 1 2026 QTR 2 2026 QTR 3 2025 QTR 3 2025 QTR 4 2026 QTR 1 2026 QTR 2 2026 QTR 3 Note: The graphs depict material price changes each quarter, with the initial baseline set at Q1 2025. The values represent the percentage change from the initial baseline, offering a clear perspective on quarterly fluctuations in material prices.

CLAYCORP.COM

Note: The graphs depict material price changes each quarter, with the initial baseline set at Q1 2025. The values represent the percentage change from the initial baseline, offering a clear perspective on quarterly fluctuations in material prices.

The 2026 Q1 Clayco cost projections for Q2 2026 resulted in a 0.33% variance from the actual Q2 2026 costs.


Material Price Trends & Projections (continued) ALUMINUM ALUMINUM

ALUMINUM 50%

PROJECTION

50%

37.96% 40%

33.14%

40%

20%

10% 10%

30.53% 24.50%

30%

24.50%

30.53%

16.07% 16.07%

20%

27.12% 17.49% 17.49%

18.95% 18.95%

10%

5.55%

10%

5.55% -0.42%

0%

-0.42%

0% 2025 QTR 3

2025 QTR 4

2026 QTR 1

2026 QTR 2

2026 QTR 3

2025 QTR 3

2025 QTR 4

2026 QTR 1

2026 QTR 2

2026 QTR 3

2025 QTR 3

2025 QTR 4

CRUDE OIL CRUDE OIL

2026 QTR 2

2026 QTR 3

2025 QTR 3

2025 QTR 4

2026 QTR 1

2026 QTR 2

2026 QTR 3

CRUDE OIL 100%

2026 QTR 1

100%

PROJECTION

70.80% 70.80%

56.71% 56.71%

50% 50%

14.95% -1.87% 0%

PROJECTION

30%

20%

27.12%

30%

20%

37.96%

33.14%

30%

COPPER COPPER

COPPER

-1.87%

0% 2025 QTR 3

14.95% -7.78%

Projection Accuracy The 2026 Q1 Clayco cost projections for Q2 2026 resulted in a 0.33% variance from the actual Q2 2026 costs.

-7.78%

2025 QTR 4

2026 QTR 1

2026 QTR 2

2026 QTR 3

2025 QTR 3 2025 QTR 4 2026 QTR 1 2026 QTR 2 2026 QTR 3 Note: The graphs depict material price changes each quarter, with the initial baseline set at Q1 2025. The values represent the percentage change from the initial baseline, offering a clear perspective on quarterly fluctuations in material prices.

CLAYCORP.COM

Note: The graphs depict material price changes each quarter, with the initial baseline set at Q1 2025. The values represent the percentage change from the initial baseline, offering a clear perspective on quarterly fluctuations in material prices.

The 2026 Q1 Clayco cost projections for Q2 2026 resulted in a 0.33% variance from the actual Q2 2026 costs.


Material & Equipment Delivery Lead Times MATERIAL

CURRENT LEAD TIME

STEEL JOIST & DECKING

4-5 Months

ACOUSTICAL DECKING

6-9 Months

STEEL BEAMS/COLUMNS

10 Months

Typical Lead Time

ROOFING

Insulation Board, Membrane, Fastners & Accessories 1-4 Weeks

Average Lead Time

DRYWALL, METAL STUDS, ACT

2-4 Weeks

Longer Lead Time

Month 1

Month 2

Month 3

Month 4

Month 5

Month 6

Month 7

Month 8

Month 9

Month 10

Month 11

Month 12

Month 13

Month 14

Month 15

LEGEND

Slightly Longer Lead Time

GE/Whirlpool Residential Packages 6-12 Weeks APPLIANCES

Commercial Breakroom Appliances 2-12 Weeks White Doors 6-8 Weeks

OVERHEAD DOCK DOORS

Dock Levelers & Dock Seals 8-16 Weeks Light Commercial =<25 tons 14-16 Weeks

PACKAGED DX ROOFTOP UNITS

Commercial RTUs >25 tons 16-28 Weeks

AIR HANDLING UNITS

18-42 Weeks

LIGHT FIXTURES (INTERIOR, EXTERIOR)

10-18 Weeks with exception of Poles 18-22 Weeks

Vista Gear Remote and Manual 60 Weeks PAD MOUNT SWITCHES

Vista Gear Automatic Transfer 70 Weeks Air Cooled 28-73 Weeks

CHILLERS COOLING TOWERS

Water Cooled 16-48 Weeks

16-18 Weeks Generators 24-56 Weeks (2.5 meg and larger 70-85 Weeks) ATSs 18-40 Weeks Switchgear 28-48 Weeks

ELECTRICAL

Switchboards 18-38 Weeks Panelboards 8-18 Weeks Copper Conductor 5KV to 25KV - 30-56 Weeks Aluminum Conductor 5KV to 25KV - 34-56 Weeks VPI 42 Weeks

TRANSFORMERS

CRT 32-36 Weeks Oil Filled Pad Mounted 26-50 Weeks

BUSWAY

1600amp and 2000amp 38-65 Weeks

SHOP FABRICATED STEEL TANKS

18-34 weeks

POLY TANKS

8-12 weeks

IMP

8-14 weeks

ELEVATORS

14 weeks

CLAYCORP.COM


Get in Touch with Our Team Ryan Abbott President, Southwest Region abbottr@claycorp.com 602.725.4995

Ryan McGuire President, Construction President, Clayco Compute mcguirer@claycorp.com 312.576.3804

OFFICE LOCATIONS Atlanta, GA Birmingham, AL Chicago, IL Culver City, CA Greenville, SC Kansas City, MO Phoenix, AZ Raleigh, NC St. Louis, MO

AVIATION

ADVANCED MANUFACTURING

FOOD & BEVERAGE/ DISTRIBUTION

HEALTHCARE

LIFE SCIENCES

RESIDENTIAL & HOSPITALITY

COMMERCIAL

AUTOMOTIVE & ELECTRIC VEHICLE

POWER & ENERGY

HIGHER EDUCATION

CLAYCO COMPUTE

SPORTS & ENTERTAINMENT

CLAYCORP.COM


Turn static files into dynamic content formats.

Create a flipbook
Clayco_CostIndex2026-Q2 by Clayco - Issuu