COUNCILLOR TOWN HALL MEETING

Lower River –
March 2026

![]()

Lower River –
March 2026

July to December 2025




A total of 13 events received funding, with $40,000 in cash support and $21,500 provided in kind. Including:
• NSW Working Stock Dog Trial Championships
• Clarence Harvest Celebration
• Yamba Triathalon
• Jacaranda
• Yamba Hot Rods
• Remembrance Day
• Wheelchair basketball event to celebrate International Day of People with Disability.
• NAIDOC Week activities

The Yamba Library opened on Friday 18 July with 1626 people in attendance.
Growth in use of the Yamba Library includes:
• memberships increased by 17.1%
• loans increased by 47.8%
• reservations increased by 57.8%
• items added to the collection increased by 84.5%
• programs increased by 69.6%
• program attendance increased by 91.1%

Community Initiatives Program
Round 1: 43 applications totalling $68,811.45.
Round 2: 18 applications totalling $27,794.04.
Sports and Cultural Trust Fund
Ten young people were supported under the Sports and Cultural Trust Fund totalling $3250.
13 organisations shared almost $200k in Community Building Partnership funding.
4 organisations shared almost $50k in FRRR Small and Vital funding.
The annual One Stop Shop Program, in collaboration with the Clarence Youth Network, delivered health and wellbeing education to 377 students at 5 schools.
Contributed $6,000 (towards transport costs) that enables Life Education (Healthy Harold) to visit primary and preschools across the Clarence Valley. Healthy Harold visited 15 schools, involving 446 children in 34 sessions.

765 young people, in 61 sessions have engaged in Out of the Box after school activities in Yamba, Maclean and Coutts Crossing.
The Clarence Regional Library produced and distributed 'Curriculum Connections 2026' guide to all Clarence Valley Schools. Held 15 school tours and commissioned the GRG Art Cart artworks and Education Kit (Art Cart launch April 2026) for public loan of artworks to schools.


• Reconstruction of ageing stormwater infrastructure.
• Replacement of Road pavement.
• New Bus bay.
• New shared Path on McLachlan Street.
• Extension of Argyle Street footpath.




• Construction of new pits at the Union and River Street intersection and at John Street.
• Reuse of heritage sandstone kerbing onsite.
• Reconstructing kerb, gutter, and footpath in narrow streets.
• Managing a high-water table and pedestrian traffic.


Commencing in October 2025, benefits of this project include:
• Enhanced flood resilience of Yamba Road.
• Reduced duration of road closures.
• A guided right-turn lane into Palmers Channel Southbank Road to improve traffic flow and safety.
• Wider road shoulders to enhance safety for both vehicles and cyclists.
• Construction of a more durable and resilient road pavement.
• Upgraded drainage infrastructure to better manage stormwater and reduce flood impacts.
• A wider road corridor to support future growth and improve overall road functionality.


This winter the gates to the Yamba Community Pool reopened.
As of 20/11/2025 there had been:
• Over 8,300 visitors.
• Over 350 – individual enrolments in swim programs.
• 11 events hosted including the Yamba Triathlon Festival.
Maclean’s Pool got a facelift. Works included:
• Resurfacing of all 3 pools (50m, toddler and slide).
• Regrout wall trim tiles in 50m pool.
• Repainting grandstand frames and rails, and picnic sets/seats.
• Repainting amenities.
• Recoating waterslide steps and rails.
• Garden edging around slide pool.
• Replacement of shade sail at slide pool.
• New lights in marshalling area.

This is the first comprehensive overland flood study for these urban areas, providing essential baseline data that was previously unavailable.
Stage 1 Report documenting modelling approach, modelled flood extents, identified problem areas, and technical analysis now complete.
Resurface and re-fence Court 2.
Clubhouse refurbishment – new roof and cabinetry, replaced the roof, entry door and bench cabinet, added new lighting, put in a stainless-steel splashback & new tap on the sink and replaced some of the front veranda posts.




Council repaired more than $16 million in damage within nine months following Cyclone Alfred and subsequent flooding in 2025.
Over the past two years, Council has completed the equivalent of 10 years’ worth of repairs to transport infrastructure, valued at more than $155 million.
Funded by the annual Urban Stormwater Management Charge the team has undertaken a huge program of inspection, cleaning and clearing throughout the LGA including this problem area in Orion Drive Yamba.


Stage 1 of the works saw Council staff cleaning the open drain and improving the drainage gradient to increase water flow.
Stage 2 involved the jetting and cleaning of the blocked stormwater pipes that feed into the Shores Drive drainage system.
Council is in discussions with National Parks regarding approvals and potential easement creation to improve stormwater drainage further.



The new facility includes an operations/logistics center, training rooms, administration offices, and vehicle bays to support RFS brigades and aviation teams.
The structural frame, external cladding and roof are all completed with the internal electrics, plumbing and internal walls underway.
Completion is expected in April 2026.


Council continued to strengthen its network of Visitor Information Outlets . Hubs are located at the Emporium at Iluka, Yamba Bowling Club, Ulmarra Art Gallery, and the Maclean Scottish Shop. In December 2025, Yamba Museum became a Visitor Information Outlet, expanding coverage in a high-demand visitor area.
Engaged with local Aboriginal organisations—particularly Yaegl Traditional Owners, LALCs, TOACs, Destination North Coast, and Destination NSW—to explore opportunities for developing new and authentic First Nations tourism experiences.
Council met with National Parks and Wildlife Service representatives in August to discuss opportunities for strengthened collaboration, including improvements to visitor facilities, signage and access along key nature-based assets such as the Yuraygir Coastal Walk.


Council successfully delivered the Business Leaders Roundtable Forum in Yamba.
Council delivered a comprehensive program of small business workshops designed to build digital capability, strengthen resilience, and support local industry development.
Supported Small Business Week events in Iluka, Maclean, Yamba, and Grafton with $500 funding per event.
First bi-annual local contractor / supplier information session successfully held in Yamba in December.
Inaugural Sustainable Agriculture Grants Program established, program promoted and open for applications until early 2026.
Projects approved for 50% CVC funding in FY2025:
• Lower Clarence Cricket Association: Replacement Cricket Covers.
• Big River Sailing Club: Rescue Tender Outboard Motor.
• Maclean Show Society: Horse / Cattle Yard Upgrade.
• Yamba Rugby Club: Clubhouse and Canteen Improvements.
• Lower Clarence Magpies Rugby League Football Club: Player Shade Shelter.
• Maclean Football Club: Shared Path to Storage Shed.
• Maclean Football Club: Canteen & Shelter Extension.
• Yamba Football Club: Signage.
• Lower Clarence Suns AFL: Storage Container.
• Clarence Coast Pickleball Club: Pickle Nets.
• Yamba Football Club: Folding Goals.

• Total Value of Projects: $78,855.37

The new compliance team will provide additional oversite in relation to compliance with conditions of development consent and implement appropriate enforcement action for breaches / illegal clearing.
The team will also monitor compliance with and respond to breaches of various legislation such as Environmental Planning and Assessment Act, Protection of the Environment Operations Act, Swimming Pools Act etc.

Planting target on track, with a large portion of trees endemic to the area planted. 80 advanced native trees in the Junction Hill and Grafton area.
120 Native trees planted in Yamba between Civil Services projects and Open Spaces budgeted plantings.
50 trees planted in the Maclean and Townsend area.
Progress on both the landfill gas and solar farm projects continues to be achieved. Contractors have further improved gas capture at the regional landfill at no cost to Council and will double gas flaring capacity in near future.
Water Efficiency Officer active during National Water Week in October to promote water efficiency across the Clarence Valley community.
Our Water Efficiency Officer heads a strong water efficiency education school program of visiting students in class and organising the ELF and Shannon Creek Dam visits.


• School Holidays Free Activities
• Youth Week.
• Youth Voice Pilot Program - Attending SGHS, GHS, MHS, CVAS monthly.
• Close the Gap.
• NAIDOC Week.
• National Reconciliation Week.
• Annual One Stop Shop Health & Wellbeing Days at local High Schools.



Construction has commenced on a raised crossing on Angourie Road near Yamba Public School, and nearby Favourite Avenue. A crossing on Angourie Road near the sports fields is scheduled to commence in March 2026.
Concept designs have been developed for traffic calming in the Stage 3 of the Maclean Public School Zone as well a further 10 crossings in streets surrounding Yamba Public School and St James Primary School, with funding being sought to deliver these projects.
Cameron Street has been nominated for Get NSW Active construction funding, while the Yamba Hill Pathway has received funding for detailed design which is now underway.

Funding applications have been submitted under the NSW Coastal and Estuary Grants Program for several Stage 5 projects including:
• coastal habitat restoration.
• Brooms Head coastal protection works.
• emergency coastal protection works.
• coastal hazard monitoring.
Grant outcomes are expected to be announced February-March 2026.

Consultant will be engaged early in 2026 to undertake the traffic analysis and network planning.
Council’s Draft Koala Strategy is currently out on exhibition.
The Strategy contains current and best practice knowledge for the management and conservation of koalas and their habitat with a particular focus on six areasAshby, Lawrence, Waterview Heights, South Grafton, Coutts Crossing and Shannondale.
You can provide feedback via Council’s website.


Construction progressing with the contractor’s program currently indicating completion in early 2027.


Design consultant has commenced work on preparation of design for the missing section of the riverside walkway in Maclean between McLachlan Park and the boat ramp.


The festival runs right through April, and there is something for everyone with more than 120 experiences.
Try a workshop, learn a craft, catch a performance, see an exhibition, and celebrate our talented creative community.


The sewer main relining program is about 90% complete and is on track to be completed by March.


Grants to the total value of $51,238,260.21 have been secured for:
• Rock protection works around Grafton, Ulmarra and Maclean Levees.
• Repairs to Iluka Levee.
• Other associated floodplain infrastructure such as relocation & replacement of pipes and floodgates at Boormans Creek, Palmers / Marsh’s Drain & Thompsons Drain.

Works along Marine Parade, Yamba will address road deterioration, improve stormwater drainage and pedestrian access.
Strengthen the road against future severe weather and coastal erosion to reduce emergency repairs.
Council will plant nine new pandanus trees (3:1 replacement ratio) to maintain and enhance the coastal landscape.
Completion due May 2026.




Want to know what’s coming up?
Sign up to Council’s Noticeboard.
Details upcoming projects, advertised DAs, items on exhibition, announcements and other important information.
Want to know what Council has achieved?
Clarence Magazine is published quarterly.