Mt Eden Community Liaison Group meeting 8 October 2019


Agenda • Mt Eden enabling works updates • Station area • Fenton Street area

• Western Line update • Breakout session with management plan specialists

2


Link Alliance staff here tonight •

Sonya Leahy, Communications & Engagement

•

Aidan Kirkby-McLeod, Senior Planner

•

Aslam Bhikoo, Senior Planner

•

Thibaut L’Hopital, Mt Eden Station Construction Manager

•

Ros Brown, Communications & Engagement

•

Phil Young, Utilities Engineer

3


What’s happening now in the Mt Eden Station area? • Temporary site office established here at 97 Mt Eden Rd • Meetings with parties in the vicinity of the enabling works as part of preparing construction management plans • Soft-strip & salvage work within the Mt Eden demolition area – ongoing until about March 2020 • Erection of temporary fencing around the demolition site (Nikau/Flower/Shaddock/Ruru) – October 2019

Mt Eden demolition area

• Geotechnical investigations - started 5 October • Physical building demolition – mid-October to Q2 2020 (approx.) • Asbestos removal – starting shortly

4


Indicative dates for upcoming works •

Geotechnical investigations in the wider station area – ongoing until the end of 2019.

•

Utility investigations and relocations on corner of Nikau & Flower Streets – Nov to Dec 2019.

•

Mt Eden Road Bridge utility investigations and relocations – early 2020

•

Tunnel portal works - piling and ground retention for tunnel entrance, basalt blasting, bulk excavation & mining – early 2020 to early 2021

•

Utility relocations (including Huia 2 watermain) in Fenton St area – from about March to September 2020

•

Construction of additional Mt Eden Road bridge & Ruru Street bridge for CRL lines – Q2 2020 Geotechnical investigation sites 5


6


7


8


9


Perspective of construction area setup for tunnel boring machine (TBM) operations

10


Diversion of Huia 2 watermain in the Fenton Street area – from March 2020

11


Fenton/Porters/Wynyard/Haultain Early Works – March 2020

12


Fenton/Porters/Wynyard/Haultain Early Works – Easter 2020

13


Fenton/Porters/Wynyard/Haultain Early Works – May to July 2020

14


Fenton/Porters/Wynyard/Haultain Early Works – August to September 2020

15


C5 - Western Line connection Link Alliance & CRL Ltd are working on the design development of C5 – CRL’s integration with the Western Line. A contractual agreement is expected to be finalised by November 2019, which will enable the design and staging of Western Line works to be finalised.

Normanby Rd level crossing

Two key closures that we have confirmed dates for: • •

Porters Ave vehicle crossing - Easter 2020 Mt Eden Station – early June 2020 (Queen’s Birthday weekend)

We are working with Auckland Transport and KiwiRail to ensure these closures (and detour routes and alternative public transport options) are publicly advertised well ahead of time. 16


Normanby Road Utilities Early Works To ensure that programme can be maintained, the C5 team are starting planning for utility relocations at Normanby Road. We will be talking to directly impacted properties about these works from this week. These discussions with affected parties will help inform the construction management plans for these particular utility works. Summaries of these draft management plans will be brought to the Mt Eden CLG later this year for input and discussion.

17


Draft construction management plans: Mt Eden Station enabling works & utility relocations in the Fenton Street area • The management plans are developed by

industry specialists, covering such areas as: •

Traffic, access and parking

•

Noise and vibration

•

Air quality

•

Contamination

•

Social impact and business disruption

•

Archaeology and built heritage

•

Erosion and sediment control

• Summaries of those draft plans were sent to all CLG members ahead of this meeting. The full plans are available to you on request.

• The subject matter experts who have

drafted the plans are here tonight so you can provide your feedback directly and ask any questions you may have about their respective plans.

• The plans will then be finalised before

undergoing an independent peer review and then lodgement with Auckland Council for final approval.

18


Management plan specialists for Mt Eden early works Management plan

Name

Air quality Archaeology Built heritage Noise and vibration Contamination Erosion and sediment control Groundwater and settlement

Jason Pene Sarah Macready Jane Matthews Craig Fitzgerald Elyse Laface Mike McConnell George Brink

Industrial and trade activities Social impact and business disruption

Rob Van de Munckhof Duncan Whyte

Trees and vegetation Transport, access and parking

Lyndsey Smith Michael Jongeneel

Communication and consultation Construction environmental management plan

Sonya Leahy Caroline Secretin / Caitlin Smith

19


For more information and questions

• City Rail Link website - www.cityraillink.co.nz • 0800 CRL TALK – choose option 5 for Mt Eden Station • Email the Mt Eden Station team at mteden@linkalliance.co.nz