Normanby Road Temporary level crossing closure
ENT NUG
OW FL
The level crossing will remain open RTH RD for people on foot NO until mid-July W E 2021. The Nnew Temporary Services Bridge (TSB) will then open for people to use. ST
ST
The Normanby Road level crossing will close to vehicles overnight on Tuesday, 01 June 2021 while we construct the new Normanby Road over-rail bridge. To Eden Terrace
T
S ER
ST RI
KA KO
ST RU RU
To SH1 and Newmarket
U KA
NI
AH NG
If you use a walking aid, pram, bike or scooter the temporary services ST bridge will not be suitable for you DDOCK A SH to use. Look for the clearly Mt Eden Station signposted alternative which takes a OPENS DEC 2024 few more minutes via Enfield Street to reach Mt Eden and Boston Road.
D
NR
STO
BO
New turning lanes
Pedestrian access
ED EN
T AS UR
RD
BOSTON RD
D ER R
MO UN T
D LAU
Mt Eden Corrections Facility
Improving people’s safety IRAHO ST When the City Rail Link opensAKin 2024 more trains will pass Normanby Road more often. Removing the level SYLVAN crossing permanently will improve AVE people’s safety by separating cars, people and trains. It is also expected to improve traffic flow in the area by allowing people to ride, drive and walk across Normanby Road without stopping for a passing train.
IEL
DS
T
HAROLD
D
LA0183_013.04.21
ST
KEY
RD
LAN A
EN ED
DE R
IN
W ED
NO RM
AN BY RD
ST
NT OU M
MT EDEN STATION CONSTRUCTION ZONE
ESP
The City Rail Link is a game-changer for Auckland as it allows the rail network to at least double in capacity, improving travel options and journey times. From Mt Eden Station, it will take only three minutes to get to Karangahape Station, six minutes to the midtown Aotea Station, and nine minutes to the downtown Britomart Transport Centre.
ENF
Pedestrian crossing
VEHICLE ROUTE DETOUR ROUTE FOR VEHICLES PEDESTRIAN ACCESS IVE RD TRAFFIC SIGNALS NEW
CL
WESTERN LINE
New signals
This map is indicative only. Dates and activities subject to change.
PUKA ST
Businesses remain open. Support your local operators Businesses in the area will remain open during construction and you’ll always be able to reach them. We’re committed to supporting local businesses and encourage you to do the same.
LA0183 Normanby Rd closure brochure.indd 1
14/05/21 9:42 AM