City Rail Link C k: CRL Environmental M Managemennt Framewo ork
Report R
Environ E nmental Manaagemen nt Fram mework Date: July 20 D 012
www.aucklan w ndtransportt.govt.nz
City Rail Link C k: Auckland Transport R Requiring A Authority Staatus Contents 1 Environm ment and Susstainability ........................................................................................................................... 3 2
Purpose of the Environmental Management Framework .................................................................................. 4
3
ork Structuree ........................................................................................................................................... 5 Framewo
4
5
3.1
EEnvironmenttal Managem ment Plan .......................................................................................................... 5
3.2
C Communicattions Plan ............................................................................................................................. 6
3.3
FFunction Speecific Require ements ............................................................................................................. 6
Environm mental Manaagement ............................................................................................................................... 8 4.1
P Proactive and d Flexible Ap pproach............................................................................................................. 8
4.2
K Key Result Arreas ...................................................................................................................................... 8
Construcction Environ nmental Man nagement Pl an (CEMP) aand Delivery Work Plans ((DWPs) ..........................1 10 5.1
C Construction n Environmen ntal Manageement Plan (C CEMP) .....................................................................1 10
5.2
R Road Networrk & Transpo ortation DWPP .................................................................................................1 12
5.3
C Construction n Noise & Vib bration DWP ..................................................................................................1 13
5.4
B Built Heritagee & Archaeo ology DWP .......................................................................................................1 14
5.5
A Air Quality DWP ....................................................................................................................................1 17
5.6
C Contaminatio on Remedial Action Plan ..................................................................................................1 18
5.7
TTrees DWP ..............................................................................................................................................1 19
Pag ge 2
www.aucklan w ndtransportt.govt.nz
City Rail Link C k: Auckland Transport R Requiring A Authority Staatus
1
Envvironme ent and Sustain nability
Auckland Tran A nsport (AT) sseeks to conttribute to wiider environm mental and ssustainabilityy objectives in the region n th hrough: •
dal transportt network; Providingg an integrateed multimod
•
Seeking w whole of life vvalue for mo oney outcom mes which takke into accou unt both envvironmental and social benefits aand costs;
•
Ensuring ggood environmental management prractices are undertaken on all of AT’ss projects.
hin AT’s proje ects throughh the concepts of value fo or Environmentaal and sustainability pracctice is incorpporated with money, whole m e of life costss (including m maintenancee and operattions), quality, and acrosss key result a areas. Figure 1: Examples off Auckland T Transport’s ccontribution to regional environmenntal and susttainability objectives 1. Outcomes sought for th he transport n network, infrastructuree and its use
2. Practices & impacts during constrruction and our procu urement
•
• • • •
• • • •
Greenhouse gas emisssion reduction ns on the network Improved d biodiversity connection Reduced material lifeccycle impact Enhanced d water qualitty Increased d energy efficiency
Minim mised waste m material creattion Fuel aand energy re eduction Minim mised storm w water impactss Minim mised impactss to air, land aand water
Pag ge 3
www.aucklan w ndtransportt.govt.nz
City Rail Link C k: Auckland Transport R Requiring A Authority Staatus
2
Pur pose off the En vironm ental M Managem ment Frramewo ork
AT is seeking A Notices of Requirement (NoR) to dessignate land (including sttrata) for thee constructio on, operation n and maintenaance of the C City Rail Link (CRL). The CCRL is a 3.4km m undergrou und passengeer railway (in ncluding two o trracks and thrree undergro ound stations) running b etween Brito omart Station and the Noorth Aucklan nd Line (NAL)) in n the vicinityy of the existiing Mount Eden Station. The CRL alsso requires an additional 2.6km of modifications within the NA w AL including aa rail interchange adjaceent to the Do ominion Road d over‐bridgee. A full descript A tion of the CRL is contain ned in the Citty Rail Link: A Assessment o of Effects on n the Environment (AEE). In n order to ap ppropriately assess the CRL within thee statutory fframework re equired by thhe Resource e Management M t Act 1981 (R RMA) for NoR Rs, a “conserrvative” effeccts envelope e approach hhas been ado opted (as described mo ore fully with hin the AEE). mental Mana agement Fram mework (EM MF) has been developed tto support thhe NoR and p provides an This Environm overarching framework w within which mechanismss are develop ped to mitiga ate actual annd potential adverse effects from tthe construction, operatiion and mainntenance of the CRL. The e purpose of this is to enssure that anyy effects are avvoided remed died and/or mitigated thhroughout th he project life ecycle. The EMF apprroach has beeen develope ed to supporrt a consisten nt and integrrated approaach to addressing environmentaal management througho out the projeect lifecycle. The EMF provvides a broad d environmental manageement appro oach consiste ent with AT’ss environmen ntal and su ustainability practice, and outlines ho ow this apprroach aligns w with the ove erarching prooject deliveryy frameworkk.
Pag ge 4
www.aucklan w ndtransportt.govt.nz
City Rail Link C k: Auckland Transport R Requiring A Authority Staatus
3
Fram meworkk Structture
mprises a hierrarchy of doccuments andd provides fo or the transfe er of informaation betwee en CRL project The EMF com ents within this EMF is suummarised in n figure 2 phases. The relationship aand description of the m ajor docume below. Figure 2: City Rail Link Envvironmentall Manageme ent Framewoork GUIDING DOCUM ENTS AND PRINCIPLEES:
ENVIRONM MENTAL MAN NAGEMENT FFRAMEWORKK [EMF]
1. CRL URBAN DESSIGN FRAMEWORK 2. NETWORK INTEGRATION PLAN 3. CRL CONCEPT DEESIGN
ENVIRRONMENTAL MANAGEMENT PLAN [EMP] URBAN DESIGN N PRINCIPLES (1. MANA A WHENUA CULTURALL DESIGN PRINCIPLES, 2. MOVEMENT AND CO ONNECTIONS, 3. PUBLIC REALM AN D LANDSCAPE, 4. EXISTING AND NEW BUILD DINGS/STRUCTURES) MENTAL CONDITIONS A AND OPPORTUNITIES REGISTER ENVIRONM INCLUDES No oR MITIGATION REQUI REMENTS & CONDITIO ONS + RESOURCE CONSENT MITIGATION & CCONDITIONS
PRINCIP PAL’S REQUIREMENTSS
DESIGNER SPECIFICATTIONS
DESIGN
DESIGN MANAGEM MENT PLAN [DMP] ENVIRONM MENTAL CONSTRAINTSS & OPPORTUNITIES (ECO) CHECK
GROUNDWATER MANAGEMENT
AUCKLLAND TRANSPORT
EROSION & SEDIMENT CONTROL
RESPONSSIBILITIES :
STORMWATER MANAGEMENT
OPERATION
OWNER’S MANUAL
EARTHWORKS
CONTAMINATION REMEDIAL ACTION PLAN
UTILITIES
TREES
BUILT HERITAGE & ARCHAEOLOGY
AIR QUALITY
NOISE & VIBRATION
ROAD NETWORK & TRANSPORTATION
DELIVERY
WORK PHASE
DELIVERY WORK P PLANS [DWPs] REQUIRRED FOR THE DESIGNA ATION
COMMUNICATIONS (related to all other plans)
CONSTRUCT CTION ENVIRONMENTA AL MANAGEMENT PLA AN [CEMP]
DELIVERY WORK PPLANS REQUIRED FOR R RESOURCE CON NSENTS ‐ RMA 1991
OPERAT TIONAL COMPLIANCE PPLAN
DESIGNER
CONTR RACTOR
3.1 3 Enviro onmental Managem ment Plan The Environm mental Management Plan n (EMP) is thee core docum ment within the EMF. Thhe EMP will a address all major activitie m es to be und dertaken as p part of the deesign, constrruction and o operation of the CRL. This will includ de project aspeccts or activitiees covered b by the designnations and ffuture resource consentss. Responsib bility for Principal.1 Th he following g key docume ents and administration and implementation of the EMP is with AT as P principles willl guide the d developmentt of the EMP:: •
1
CRL Urban Design Framework (pro ovides the foollowing urban design principles: 1. M Mana Whenu ua Cultural Design Prrinciples, 2. M Movement and Connecti ons, 3. Public Realm and Landscape, 4. Existing a and New Buildings//Structures);;
As Principal, AT is the le ead organisation responssible for the CRL. C Pag ge 5
www.aucklan w ndtransportt.govt.nz
City Rail Link C k: Auckland Transport R Requiring A Authority Staatus •
Network Integration P Plan (demon nstrates how w the CRL will integrate with the varioous transportt networks, particularrly around eaach of the prroposed stat ions and inte erchange, an nd the subse quent workss required); CRL Concept Design (iincludes indiicative statioon design, co onstruction m methodologyy etc).
•
The EMP will include the mitigation an nd conditionns of the NoR R and future resource connsents. Thesse statutory re equirementss, along with the design a and environm mental stand dards/specifications, will inform the design/constrruction requirements to be incorporaated at those e stages. ance‐based oobjectives an nd requireme ents and assiign accounta abilities The EMP will define specific performa 2 (including delegations) to Designers , Contractors and AT as Principal. ental parameeters within w which it is exxpected the CContractor w will have The EMP will establish thee environme flexibility. In return, it is eexpected tha at the Contraactor will be proactive in delivering ppositive proje ect performance against thesse parameterrs. The EMP will be reviewed d on a regular basis to ennsure it remaains relevant and compliees with the cconditions off any statutoryy authorisatio ons and apprrovals. The EMP will be structureed to minimisse the numbber of Contraactor plans re equired. Thi s approach a avoids too many individu m ual plans for the manage ement of a raange of effeccts, whilst alsso recognisinng the need ffor certaintyy re egarding envvironmental outcomes.
3.2 3
Com mmunicatio ons Plan
The EMF inclu udes a comm munications p plan which A AT will have rresponsibilityy for as Princcipal. Key co omponents o of th his plan will iinclude: •
Developin ng a communications framework thaat reflects acccountabilitie es, AT’s comm munications strategy and d any otherr relevant maatters;
•
Project co ommunicatio ons, such as:
•
o
D Disseminatingg any relevan nt informatioon throughout the project team;
o
R Reviewing reggular projectt reports proovided by Contractors to identify any issues or risks;
Communications with h stakeholders, such as: o
D Disseminatingg any relevan nt informatioon to inform the public a and stakeholdders of proje ect matters and developm ments where e appropriatee;
o
Processes forr receiving an nd handling ccomplimentss and compla aints.
3.3 3
Funcction Speccific Requirements
The EMP will be supporteed by a mana agement plann for each off the primaryy project phaases and funcctions. Design Mana D gement Plan n (DMP) The DMP is a tool that willl enable the project to ““self‐check” tthe design an nd constructtion contractt re equirementss against the EMP and sta atutory authhorisations be efore advanccing any phyysical works. The key focu us of the DMP iss the Environ nmental Consstraints and Opportunitie es (ECO) Che eck – which i s a reconcilia ation of the design againsst statutory aand project requirementss (as capture ed within the e EMP). 2
This refers to engineerin ng design. Pag ge 6
www.aucklan w ndtransportt.govt.nz
City Rail Link C k: Auckland Transport R Requiring A Authority Staatus The purpose o of this recon nciliation is tw wofold and i s not only to o check the d design, but allso to identiffy other matters arisin m ng from the d design that n need to be inncluded within the subsequent phasees (i.e. construction and operations). Construction Environmen ntal Manage ement Plan ( CEMP) The CEMP willl be the mosst complex o of the docum ments prepared within the EMF given the range of environmentaal matters th hat need to b be addressedd during the construction n of the CRL. An importa ant re equirement of the CEMP P is that it does not mere ly repeat the e requiremen nts of the EM MP, but rathe er establish sp pecific detaills on how the Contractorr will give efffect to it. Th his includes d details of wh ere environm mental risks are located an nd exactly ho ow these are e to be mitig ated. The CEMP willl: •
Establish an effects en nvelope and focus on thee strategic and perimeter controls annd interfacess;
•
Address ccumulative eeffects and in ntegrate consstruction staaging, works and program mming to minimise effects;
•
Provide a framework to support a a number of Delivery Wo ork Plans (DW WPs).
The CEMP and DWPs are discussed further in secttion five. Delivery Wor D rk Plans (DW WPs) DWPs will add D dress specific environme ental areas o n an effects basis (e.g. th he Road Netw work & Transportation Noise & Vibration Work Plan), or by work site where all effeccts are integgrated. Indica Work Plan or W ative DWPs are included iin this EMF ffor the purpo ose of illustraating the typ pes of matterrs that will bee considered d and addressed wh hen the full w work plans are formulateed by either A AT or its Con ntractors/Connsultants. Th he EMF approach (outlined here aand discussed further in section four) provides fle exibility to ennable the most effectivee so olutions to b be adopted fo or the projecct, provided these complly with the applicable ge neric and specific co ontractor req quirements. Operational C O Compliance Plan (OCP) The OCP will cclearly identify any opera ational requ irements and d maintenan nce regimes ffor the physiical assets an nd se ervice‐based d delivery asp pects of the project. Thiss plan will co over matters such as opeerational KPIss, roles and re esponsibilitiees and proceesses for ensuring that teenants, operaators and contractors givve effect to tthe OCP and EMP. Owner’s Man O nual (OM) The OM will d document alll on going co ompliance reequirements and statutorry obligationns together w with all re elevant speccifications and calculation ns needed too enable AT tto effectivelyy manage, opperate and m maintain its faacilities. Thee OM will also serve as a central storee for other key CRL documentation inncluding as‐b built in nformation, tthird party agreements a and mainten ance frequencies/requirements.
Pag ge 7
www.aucklan w ndtransportt.govt.nz
City Rail Link C k: Auckland Transport R Requiring A Authority Staatus
4
Envvironme ental Ma anagem ment
4.1 4
Proaactive and Flexible A Approach
Sound environmental management iss based arounnd the anticiipation and p prevention oof potential a adverse environmentaal effects. Th his reduces tthe reliance oon quantitattive monitoriing (which prromulgates a a reactive approach to eenvironmenttal managem ment) and willl ensure the e CRL meets tthe requirem ments of the RMA which aims to avoid, remedy or mitigate advverse environnmental effe ects. The approach h adopted byy this EMF aim ms to providde greater ce ertainty to all parties, wh ile retaining a degree of flexibility in acknowledgin ng the need tto adapt andd respond to changing cirrcumstancess. The proacttive id dentification of potentiall adverse effe ects throughh the EMF process will en nable the releevant parties to agree in n advance the b best solution ns to addresss known issu es and effects, and provides a clear fframework to address other future issues and efffects as theyy arise. As noted abov A ve, the EMP (drafted and d administerred by AT) will establish tthe environm mental param meters within n which the Con w ntractor will have flexibility. Exactly how these risks, issues a and effects w will be mitiga ated and/or then be add managed will m dressed laterr in the Consttruction Envvironmental M Managemennt Plan (CEMP) and Delivery Work D k Plans (DWP Ps). The CEM MP and indivvidual DWPs will be drafted and admiinistered by Contractors, and approved d by AT. Thiss is considere ed to be an aappropriate aand flexible approach whhich will help p facilitate th he most effective m e solutions b being implem mented to deeliver on the CRL’s projecct parameterrs. Environmentaal management is a component of thhe CRL from tthe initial de esign stage riight though tto on‐going operation. Ass at August 2 2012, the CRL has progreessed through to the concept design sstage and th he EMF has been develop ped to suppo ort this. Deta ail around th e design and d actual consstruction meethodologies will follow in n su ubsequent d design and co onstruction sstages. The EEMF approacch outlined in this reportt allows the project’s environmentaal management aspects tto evolve, reefine and devvelop in para allel with thee project itself. ove will ensuure that relevvant knowledge and infoormation is ccarried The linked serries of plans outlined abo fo orward throu ugh the projeect (e.g. any designation or early resource consent requiremeents are kno own to futuree CRL operation nal managers). Finally, the reegular review ws and evolviing nature off the EMF’s kkey documen ntation will eensure that tthey reflect aall uture statuto ory authorisaations and ap pprovals, andd are an up‐tto‐date key rresource for all project p participants. fu
4.2 4
Key Result Areeas
As noted abov A ve, the EMF provides forr the ongoingg developme ent and refinement of th e specific components of environmentaal management througho out the projeect lifecycle. The following table listss examples o of AT’s environment and sustainaability key re esult areas w which will be considered tthroughout tthe CRL proje ect lifecycle. Figure 3: Example environmennt and sustaiinability area as of consideeration KEY RESULT AREAS*
KEY SUB‐AR REAS
Energy & Carb bon
• • • •
The project will not ccontribute gre eater emission ns to the netw work through its end usage erates multi‐m modal opportuunities The project considerss and/or gene Opportu unities for ennergy & carb bon reduction n have been identified an nd explored within tunn el and station n design (operration and connstruction) Renewa able energy opptions have be een investigatted
Pag ge 8
www.aucklan w ndtransportt.govt.nz
City Rail Link C k: Auckland Transport R Requiring A Authority Staatus
KEY RESULT AREAS*
KEY SUB‐AR REAS
Water
• •
Materials
•
Discharge to Air, Land & • Water • Land
• • •
Waste
Ecology
• • • • •
Community Health, • Well‐being & Safety • • Heritage
•
Urban and Landscape • Design
Water use u reductionn and water saving s opportunities have been identifie ed and inco orporated (inccluding for maaintenance) Potentia al non‐potabl e water sourcces that match demand aree identified an nd explored Measures to unde rstand and reduce matterial lifecyclle impact are aken (includinng material se election and the incorporattion of recycle ed underta materials) Opportu unities to im mprove local receiving wa ater quality aand/or provid de environmental flows have been identified and implemented d constrruction and ooperation havve Measures to prevennt light spill during entified and im mplemented been ide Any land d take is minim mised or offse et Any topsoil and suubsoil impacted is separrated and pprotected fro om ation, erosionn and mixing with waste, and retains its productiviity degrada and is re eused on or nnearby the pro oject/asset The run n off, flood riisk and poten ntial increased flood risk eelsewhere as a result of the project hhave been asssessed over th he expected w working life Predictions of wastte quantities and types have been developed for f d 80%+ of material m is reeturned for re‐ r construction and opperation, and erted from lanndfill use/dive A decon nstruction plann is developed d based on go ood practice A mana agement plaan has been developed that prioritisses minimising ecologiccal impacts o n the projectt site (including land used for tempora ary works w where land ha s been deeme ed ecologically y sensitive) The pro oject is contriibuting to a no‐net n loss off biodiversity and ecologiccal value Habitat connectivity opportunitiess are identifie ed and maintaained (including offsettin ng) or enhancced Factors that contribuute to community wellbeing g are incorporrated, including dentified durinng stakeholde er engagement those id Design a and practice tthat reduce th he likelihood o of crime is impplemented Conside eration and ddesign for whole w of life safety, incluuding end‐use er, mainten nance and opeerational aspe ects Baseline e surveys of existing herittage have be een carried oout, communiity heritage e values havee been incorp porated and measures m to eenhance values are iden ntified and im plemented AT urban design princciples are app plied
* The abovve key resultt areas are no ot intended tto replace re equirements to meet ressource conse ents but are indicatorrs of the mattters that willl be taken innto account tthroughout tthe project liifecycle.
Pag ge 9
www.aucklan w ndtransportt.govt.nz
City Rail Link C k: Auckland Transport R Requiring A Authority Staatus
5
Con nstructio on Envi ronmen ntal Ma nageme ent Plann (CEMP P) and Del ivery W Work Pla ans (DW WPs)
ntractor(s) foor works within the desig gnation foot print. The C CEMP and The CEMP willl be prepareed by the Con DWPs will be D provided to Auckland Co ouncil, as parrt of the Outtline Plan of Works for itss information, 20 workin ng days prior to construction n starting on site. Iteratioons and/or ssub‐plans willl be provideed as necessa ary th hroughout th he construction phase. This section p provides exam mples of the possible strructure and ccontent of th he CEMP andd DWPs.
5.1 5
Consstruction EEnvironmental Mannagementt Plan (CEM MP)
The CEMP willl be the detaailed plan wh hich demonsstrates how tthe requirem ments of the EMP (includ ding statutoryy re equirementss) will be imp plemented. T This is the pllan that will be submitted to supportt the Outline Plan of Works. W Table 1 provid des an example outline o of the structuure and conttent that is likely to be coontained witthin the CEMP. Table 1: Ind dicative Construction Ennvironmental Manageme ent Plan (CEM MP) Outline Sttructure
Content
• • • •
Geneeral overview of constructioon manageme ent; Desccription of con nstruction metthodology; Desccription of gen neral construcction procedures and protocols; How works are to be undertakeen to avoid, re emedy or mitigate the poteential adverse envirronmental efffects.
Site manaagement information, suchh as: • Site iinformation (h hours of oper ation, contactt details, site layout (to minnimise effects), etc.);; • Consstruction meth hods and proggramme; • Means of ensuringg the safety off the general public and pro ovision for em mergency services; • Trafffic manageme ent (routes, acccess, numberrs, etc.); • Identtification of any utility servvices and means of protecting the servicees; • “Hou use‐keeping” m measures (e.gg. waste manaagement, site tidiness, grafffiti manaagement). Documen nt management and review w requirementts, such as: • Align nment with the EMP and thhe requiremen nts set out witthin the desig nation cond ditions and conditions of coonsent; • Apprroval and revie ew requiremeents includingg a requiremen nt for approvaal of the CEMP priorr to any construction workss commencingg, and updatin ng the CEMP aand any releva ant DWP Ps with materiial amendmennts to be apprroved by AT; • The n need for the C CEMP to be auuditable and tthe construction works to bbe regularly se elf‐ auditted by the Contractor againnst the require ements of the e EMP, designnation conditio ons and cconditions of consent; • Proceesses for upda ating the ECO O Register in th he Design Management Plaan (managed b by AT but informing tthe CEMP); • Management reviews of the CEEMP to occur aat least annua ally.
Page e 10
www.aucklan w ndtransportt.govt.nz
City Rail Link C k: Auckland Transport R Requiring A Authority Staatus Personneel requirements, such as: • An appropriately q qualified Envirronmental Maanager: Consttruction with ooverall accountability for construction environmental compliance e; • Broader constructtion responsibbilities and line es of commun nication; • Details of how sub bcontractor coompliance will be managed d and maintainned. Training rrequirements, such as: • A sitee induction an nd on‐going/rrefresher train ning for all site e personnel inncluding subcontractors. T This is to addreess key enviro onmental matters includingg: o Statutoryy requirementts; o Spill response; o Key risks;; o Importan nce of archaeoology and Mao ori heritage sites (includingg training on what to lo ook for in cas e new material is encounte ered); o Noise and d vibration reqquirements (including but not limited too project criteria, roles and d responsibilitiies and procedures to minimise unnecesssary noise and vibration); o Community liaison prootocols and co ommunication ns expectationns. • Reco ord keeping an nd reporting rrequirements.. Works management in nformation, suuch as: • The iimplementation and install ation of appro opriate management and m mitigation meassures prior to construction,, including pro ocesses covering situationss where projeect/environme ental criteria (or a condition) maybe exceeded/breachhed in the futurre; • Consstruction technique/metho ds and how th his addresses any potentiall ground moveement from the project (noote: noise and d vibration issu ues are covereed in more de etail in their own DWP)) • Refuelling and che emical storagee areas, requirements, spill preparednesss and responsse, including: o Notificatiion of third paarties; o Spill response and cleaan up requirem ments; o Reportingg and review. • Proceesses for the management and treatmen nt of dewatering liquors; • Apprropriate erosio on and sedim ent controls, including: o Procedurres for controllling sedimentt tracking and dust on publlic roads and places; o The mean ns of minimisiing construction material lo oss. • Complaints and no on‐complianc e managemen nt processes. Monitorin ng and reportting requiremeents, such as: • Regu ular reporting of routine co mpliance self‐‐auditing, incidents, non‐coompliances, respo onses/actionss taken, risks, training and aany other rele evant matters;; • Trigggered reportin ng (e.g. archaeeological findss); • Wastte testing and d disposal certtificates.
Page e 11
www.aucklan w ndtransportt.govt.nz
City Rail Link C k: Auckland Transport R Requiring A Authority Staatus
5.2 5
Road d Networkk & Transp portation DWP
The Road Nettwork & Tran nsportation D Delivery Worrk Plan (RNTWP) will set out how thee road netwo ork and trransportation will be managed during constructioon. Since co onstruction w will occur in tthe busy city centre, it is particularly im mportant to manage tran nsportation i ssues to enssure the safety of pedest rians, road a and rail userss and constructtion workerss. Maintainin ng property aaccess for ow wners and acccess to locaal roads is alsso of vital im mportance. Table 2 provid des an example outline o of the structuure and conttent that is likely to be coontained witthin the RNTWP. Table 2: Indicative e Road Netw work & Transsportation D Delivery Worrk Plan Sttructure
• • •
Content
• • •
•
• •
Discu ussion of the o overall managgement of roaad network an nd transportattion matters durin ng constructio on for all mod es and users; Desccription of the road networkk & transportation environment for all m modes and use ers; Desccription of road network an d transport m management p proposals for eeach section and//or station. Assessment of the e existing trannsport environ nment; Conffirmation of th he technical asssessment me ethodology; Identtification of sp pecific risks, m mitigation requirements and opportuniti es to individu ual build dings and area as. For exampple, specific m mitigation measures relatingg to Albert Strreet may include: o Movement is to be rettained along A Albert Street throughout coonstruction, w with the reten ntion of one trraffic lane perr direction; o Local access is to be reetained along Albert Street,, with left in, lleft out accesss to propertie es on the east ern side, from m the southbo ound carriagew way, and left in, left out access to propperties on the western side, from the norrthbound carriagew way; o Restrictio ons at the inteersections servving the majo or east‐west rooutes crossingg Albert Strreet (Customss Street, Victo oria Street and d Wellesley Sttreet) are to be phased to o reduce the ppotential adve erse effects to o east‐west traaffic movemen nts; o During th he constructioon phase, travel demand ma anagement innitiatives could d be requirred to seek to reduce the demand for tra avel to and wi thin the city centre byy private vehiccles, and therefore to avoid d further effeccts; o Some tem mporary rerouuting of bus se ervices may also be requireed; o Consideriing the relatioonship with an nd timing of o other major prrojects in the draft Cityy Centre Mast erplan. Otheer locations where there maay be effects d during construction are: o Queen Sttreet at Britom mart, between n Quay Street and Customss Street; o Along Galway Street annd Tyler Stree et (one at a tim me), adjacent to Britomart;; o Beresford d Street, wherre access onto o Pitt Street iss likely to be cclosed; o George Street and Porrters Avenue, where the levvel crossings aare likely to be e closed; o Ngahura Street which is likely to be closed to accommodate thhe tunnel stagging area; o There ma ay also be tem mporary restricctions on Normanby Road, Mount Eden Road and d Sandringham m Road. The p proposed min ned constructiion methodology should en nsure that effeects during construction around the propossed Karangahape Road and d Newton stattions are modest; The ffollowing prio ority should bee given to movvements within the city cenntre during th he
Page e 12
www.aucklan w ndtransportt.govt.nz
City Rail Link C k: Auckland Transport R Requiring A Authority Staatus
•
•
construction phase: o Pedestria an and public ttransport sho ould be afforded highest priiority, along w with other esssential movem ment, including emergency services wherre practicable e; o Essential vehicle accesss to propertie es within or ad djacent to thee construction n areas sho ould be given second prioritty; o Private ca ar travel shouuld be given lo ower priority, particularly exxtraneous traffic which sho ould be encouuraged to avoid passing thrrough the city y centre. Area wide city cen ntre mitigationn options include: o Attempting to minimisse single occupant private vvehicle trips innto the city centre via a advertising ccampaigns; o Creating and putting inn place alternative routes a and detours w which are regularly managed andd updated thrroughout the cconstruction pperiod; o Parking m management ((e.g. amendin ng early bird parking in Auckkland Transpo ort car parks and the provvision of park aand ride sites outside the ccity centre); o Encouragging greater usse of public trransport; o Changes to the phasingg and operation of traffic signals within tthe city centre. Conssideration must also be giveen to: o How the CRL is to be c onstructed, in ncluding how essential (peddestrian, bus a and other) mo ovements aree to be retaine ed; o The timin ng of closures,, restrictions, diversions or other on streeet works, and d how this timing relatess to other asp pects of the CR RL project, andd the relationsh hip of the tem mporary CRL w works with oth her projects; o How acce ess to local pr operties adjaccent to the co onstruction zoones is to be maintained; o Which routes are to bee used by construction related traffic (esspecially truckks); o The suite e of Travel Dem mand Manage ement measures that are pproposed to reduce th he temporary effects duringg construction n.
5.3 5
Consstruction N Noise & V Vibration D DWP
The Constructtion Noise & & Vibration Delivery Workk Plan (CNVW WP) will desccribe how thee potential e effects of noise and vibration duringg constructio on will be ad dressed. Table 3 provid des an indicaative/example outline of f the structurre and content that is likeely to be con ntained within th he CNVWP. Table e 3: Indicativve Constructiion Noise & Vibration Delivery Workk Plan Sttructure
Content
• • • • • • • • •
Explaanation of con nstruction noiise and vibration standards; Identtification of th he predicted cconstruction n noise and vibrration effects and methods to avoid d, remedy or m mitigate thesee effects; Identtification of m monitoring meeasures. Reco ommended no oise and vibrattion CRL proje ect criteria; Timeeframe and ho ours of operattion; Mach hinery and equipment to b e used; Liaiso on and engagement with sttakeholders; Identtification and cataloguing oof at‐risk receivers, structurres, infrastruccture and buried services; uirements for building conddition surveys of at‐risk rece eivers prior too and during Requ
Page e 13
www.aucklan w ndtransportt.govt.nz
City Rail Link C k: Auckland Transport R Requiring A Authority Staatus
• • • •
• • •
construction workks; Roless and responssibilities of pe rsonnel on sitte, regarding n noise and vibrration; Consstruction operrator training procedures to o minimise un nnecessary nooise and vibraation; Consstruction noise e and vibratioon monitoring and reporting g requiremennts; Consstruction noise e and vibratioon mitigation o options, including strategiees where full comp pliance with the CRL projecct criteria cann not be achieved. Example mitigation meassures include:: o Use of low w‐noise and loow‐vibration machinery wh here practicabble; o Temporary relocation of sensitive re eceivers; o Provision of mechanicaal ventilation;; o Fitting altternatives to ttonal reversin ng alarms on e equipment opperating above e ground during night‐tim me o Activity scheduling: mity to reside In close proxim ences, above g ground high‐nnoise and/or vibration activ v vities shall be scheduled for day‐time whhere practicab ble, and avoided d a during night‐time; mity to comm In close proxim mercial buildings, high‐noisee and/or vibration activ v vities shall be scheduled for evening andd night‐time periods wheree this is practicable; o Constructtion of noise bbarriers and e enclosures; o Liaising w with neighbou ring sensitive receivers to a avoid simultanneous schedu uling of affecte ed activities w where possible e. Management sche edules containning site specific informatio on; Meth hods for receiving and handdling complain nts about construction noisse and vibration; A framework for site‐specific nooise and vibraation managem ment plans (SSSCNMPs and SSCV VMPs), which are to be preppared for partticular at‐risk receivers to aaddress areas of particularly high vibration level,, particularly ssensitive strucctures, or on‐ggoing comp plaints.
5.4 5
Builtt Heritage & Archae eology DW WP
The Built Heriitage & Archaeology Deliivery Work PPlan (BHAWP P) will describ be how poteential effects such as noisse and vibration on built herritage and archaeology d uring construction will be addressedd. Table 4 provid des an indicaative/example outline of f the structurre and content that is likeely to be con ntained within th he BHAWP. Tablle 4: Indicatiive Built Herritage & Arch haeology Delivery Work Plan Sttructure
Content
• • • • • •
Discu ussion of the o overall managgement of buiilt heritage and archaeologyy matters durring construction; Desccription of pottential heritagge and archaeological sites and impacts; Desccription of herritage and archhaeological im mpact manage ement for thee CRL. Assessment of the e existing herittage and arch haeological en nvironment; he technical asssessment me ethodology; Conffirmation of th Identtification of th he specific riskks, mitigation requirements and opportuunities to indivvidual buildinggs and areas. The followingg matters may y require partiicular attentio on: o Tunnellin ng and excavattion sequence e; o Structura al continuity;
Page e 14
www.aucklan w ndtransportt.govt.nz
City Rail Link C k: Auckland Transport R Requiring A Authority Staatus
•
•
o Foundations; o Orientation of the buil ding; o Previous movements aand existing crracking. Deveelopment of a ‘mitigation h ierarchy’, a caascading serie es of actions w where: o Impacts a are to be avoi ded or reduce ed at source, w where possiblle, designing tthe project so o that the imppact is avoided d in the first p place; o Mitigation measures a re to be included in the pro oject to reducce the adverse e impact w where it has noot been practiicable to avoid d or reduce thhat impact at source; o For those e adverse imp acts that still remain signifiicant after thee application o of the above e measures, aadditional meaasures are to be taken to avvoid the potential impact or, if not practicable, to compen nsate for it by some other means. Wheerever possible e, the project will protect h heritage assets within its coontrol. Mitigattion meassures that add dress the poteential impact on built herita age items will need to be considered on a building by buiilding or site b by site basis. T The definition of these meassures will be ffinalised in succcessive refinements as the e project is deeveloped, detailed information on the prooperties becom mes available and the consstruction meth hods are finaliised. There arre, however, aa number of universal mitiggation actions that can be identiffied at an earlly stage and that will be applicable: o Mitigation programmee ‐ An agreed mitigation pro ogramme for the impact on n built heritage will needd to be agreed d and implemented throug h the developm ment of a Heriitage Management Plan prior to the com mmencement of any consttruction workk and monitored during con nstruction as aappropriate. T This will bringg together thee specific mitiggation actions required for specific propertie es. o Relevant planning and other policies ‐ The design n and construcction methods should m meet the requi rements of all relevant stattutory legislattion, codes of practice a and standardss. o Condition n surveys ‐ Coondition surveys will need to o be undertakken to define appropria ate vibration aand settlemen nt limits for historic buildinngs and structure es that may bee potentially aaffected by construction woorks. o Precautio ons ‐ Suitable precautions w will be taken to avoid any uunplanned impacts o on identified hheritage assetts. Where necessary, suitabble screening a and other pro otective meas ures will need d to be erected to protect hhistoric buildin ngs within an nd adjacent too works areas.. o Importan nt features ‐ Sppecific protecctive measures will need to be undertake en where ne ecessary to pr otect the building or its important or valluable heritagge features. Appropriate procedures w will also need to be establisshed for the repair of any damage tto historic buiildings from th he constructioon or operatio on of the CR RL. o Building R Recording ‐ Ann appropriate e level of Build ding Recordingg and publicattion of these iinvestigationss will need to be agreed and d implementeed in a formatt suitable ffor public disssemination. o Dismantling and Reconnstructing ‐ Ap ppropriate pro ocedures will need to be established and agreedd for any dism mantling or re‐‐erection of ceertain historicc buildings and other hisstorical structures tempora arily or perma nently affecte ed by the wo orks. o Adaptive Reuse – Any proposal to siignificantly altter or demolissh heritage buildings or structuress should be baased on a full jjustification a nd exploration of all possible alternat ive options avvailable, includ ding their reteention, adaptive
Page e 15
www.aucklan w ndtransportt.govt.nz
City Rail Link C k: Auckland Transport R Requiring A Authority Staatus reuse, inttegration in thhe new design n or partial rettention. Salvage SStrategy ‐ A suuitable set of p procedures will need to be established and agreed fo or the removaal, storage and d for later refitting/reuse off elements fro om certain historic buildinngs and other historical stru uctures. o Interiors ‐ Suitable preecautions shou uld be put in p place for the pprotection of more sen nsitive interiorrs. o Setting ‐ T The success oof any proposaal to alter the historic envirronment is like ely to be measured by its relationship to the context that it is partt of. o Context ‐‐ Deep knowleedge and a tho orough underrstanding of thhis context should fo orm part of thee design process. o Vacant Buildings Proceedures – Proce edures should d be establisheed and agreed d for the m management aand maintenan nce of historicc buildings thaat may be leftt empty du uring construcction, until succh times as these buildings are subseque ently occupiedd or disposed of. o Method sstatements ‐ M Method statements will be required for certain speciffied works and will be subm mitted to the local planning g authority forr its approval,, as well as NZHPT where rrequired; o Enhancem ment of publicc appreciation n – The CRL prresents an op portunity to improve tthe built envirronment arou und existing heritage buildinngs, and also (through presentation and interprettation) an opp portunity to e ducate the general p public on theirr city and heritage. These actions may reesult in higher levels of public apprecciation and perceived value of the city’s hhistoric environm ment. Effeccts on subsurfface archaeoloogy can only b be confirmed once works arre underway and can b be appropriately mitigated under the Hisstoric Places A Act 1993. Mittigation optio ons/actions include: HPT prior to the o Obtainingg an authorityy to modify arrchaeological ssites from NZH start of co onstruction w works so that p processes can be put in pla ce for any archaeolo ogy that may be exposed during construction; o Preparatiion of an Archhaeological Management Plan setting ouut requiremen nts and proce edures for arcchaeological m monitoring of preliminary eearthworks in areas of a archaeologicaal potential, th he accidential discovery of aarchaeologica al remains a and recordingg any archaeological evidence before it iss modified or destroyed d; o Any archa aeological rem mains exposed d during the cconstruction oof the CRL sho ould be investigated and re corded (unde er authority fro om NZHPT) too add to our understanding of 19th ccentury Auckland. o
•
Su ub‐plans to bee developed
• •
Herittage Managem ment Plan; Archaeological Ma anagement Pl an.
Page e 16
www.aucklan w ndtransportt.govt.nz
City Rail Link C k: Auckland Transport R Requiring A Authority Staatus
5.5 5
Air Q Quality DW WP
The Air Qualitty Delivery W Work Plan (AQ QWP) will deescribe how potential airr quality imppacts will be a addressed. des an indicaative/example outline of f the structurre and content that is likeely to be con ntained within Table 5 provid th he AQWP. Table 5 5: Indicative Air Quality Delivery Wo ork Plan Sttructure
Content
• • • • • • • •
• • • •
•
•
Discu ussion of the o overall managgement of air quality matte ers during connstruction; Desccription of pottential air qua lity impacts; Desccription of air quality impacct managemen nt for the CRL tunnels and sstations; Desccription of monitoring meassures. Area by area assesssment of thee existing air q quality environ nment; Defin nition of dust mitigation reqquirements; Conffirmation of th he technical asssessment inccluding metho odology; Identtification and definition of air quality facctors, for exam mple: o Dust; o Odour; o Hazardou us Air Pollutannts; o Vehicle Exhaust Emissiions. Identtification of se ensitive receivvers and specific risks in rellation to thosee receivers; Impleementation of a dust monittoring programme; Proceedures for ressponding to a larms (i.e. invvestigation, recording and t aking actions as neceessary); Identtification of th he mitigation requirementss and opportu unities for airbborne contaaminants. This will include the frequencyy of visual mo onitoring, locaations of instrumental monitoring sites, ccomplaint ressponse proced dures and idenntification of perso ons responsib ble for undertaaking the mon nitoring. Exam mple mitigation measures innclude: o Use of en nclosed transpport, storage aand handling; o Enforcem ment of vehiclee speed limitss on site; o A wheel w wash or truck washing facillity at site exitt(s); o Road swe eeping to rem move tracked m material; o Metallingg/hard surfaci ng of yard and haul roads; o Use of wiind break fenccing and stabiilising; o Use of wa ater sprinkler systems; o Limiting tthe extent of eearthworks caarried out durring dry condittions as far ass practicab ble; o Use of od dour suppresssant sprays; o Removingg any odorouss excavated m material as quiickly as possibble; o Removal of any hazarddous excavate ed material without discharrging dust beyond the constructioon site; o Ensuring trucks and maachinery are kkept appropriately maintainned. Identtification of m measures for t he safe removval and dispossal of asbestoos.
Page e 17
www.aucklan w ndtransportt.govt.nz
City Rail Link C k: Auckland Transport R Requiring A Authority Staatus
5.6 5
Conttamination Remedial Action PPlan
The Contamin nation Remeedial Action P Plan will desccribe how co ontamination n impacts willl be addresssed. des an indicaative/example outline of f the structurre and content that is likeely to be con ntained within Table 6 provid th he action plaan. ative Contam mination Rem medial Actio on Plan Outliine Taable 6: Indica Sttructure
Content
• • • • • • • •
•
Discu ussion of the o overall managgement of con ntamination m matters duringg construction n; Desccription of pottential contam mination impacts; Desccription of con ntamination p rotection, imp pact managem ment and rem medial actions;; Desccription of monitoring meassures. Area by area assesssment of thee contaminatio on environme ent; Conffirmation of th he technical asssessment inccluding metho odology; Identtification and definition of contamination factors; Identtification of th he key potenttial adverse efffects related to contamina tion requiringg mitiggation. Potential adverse eeffects may incclude: o Exposure e to workers a nd members of the public; o Disposal of waste at a landfill not su uitable for type and concenntrations of contamin nants; o Mobilisattion of contam minants through the creatio on of preferenntial pathwayss; o Contamin nated sedimennt runoff into stormwater; o Aggressivve chemical prroperties. Proteection and mitigation meassures may include: o Developm ment and imp lementation o of a health and safety plan that addresse es worker sa afety in relatioon to hazardo ous substances; o Worker training with rregard to hand dling hazardou us substancess, identifying potentially contaminatted soil or gro oundwater, an nd notificationn procedures ffor discoveryy of contaminaation; o Implementation of eroosion and sediiment control plans, storm water managem ment plans, annd dust and od dour control p plans; o Appropriate soil and g roundwater cclassification, management and disposal;; o Sealing of trenches/exxcavations durring civil works; o Restrictin ng work areas to authorised d personnel only and limitinng the presen nce of ignition sources (e.gg. no smoking within or adjacent to const struction area,, no or open flamees near areas w with high concentrations off hydrocarbon n welding o contamin nation); o On‐goingg monitoring aand managem ment by a suita ably qualified environmenta al specialistt; o Proper classification/seegregation off materials; o Pre‐plann ning for manaagement of co ontaminated soil, groundwaater and waste; o Tracking placement of f re‐used contaminated soil; o Establishing areas for sstockpiling and storing conttaminated soiil, groundwater and waste.
Page e 18
www.aucklan w ndtransportt.govt.nz
City Rail Link C k: Auckland Transport R Requiring A Authority Staatus
5.7 5
Treees DWP
The Trees Dellivery Work P Plan (TWP) w will describe how issues rrelating to trrees will be aaddressed ass part of the CRL project. Table 7 provid des an indicaative/example outline of f the structurre and content that is likeely to be con ntained within th he TWP. Table 7: Tr ees Deliveryy Work Plan Sttructure
Content
Su ub‐plans to bee developed
• • • • • •
• • •
Discu ussion of the o overall managgement of tree matters durring constructtion; Desccription of pottential impact s and opportu unities on tree es; An updated tree a assessment at the time of construction; Desccription of the tree mitigatioon measures; Desccription of monitoring meassures. The ttree related m mitigation meaasures to be u undertaken ass part of the CCRL. Potential mitiggation measurres include: o The reloccation of treess where appro opriate and fe easible; o Replacem ment planting;; o The prote ection of otheer trees from cconstruction impacts, for ex example: Undertaking pprotection me easures; Assessing pot A tential root losss; Investigating tthe effect of ggroundwater changes on neeighbouring trees. t Tree Protection Plan; Tree Reinstatement Plan (wherre possible and d appropriate e); Tree Planting Plan.
Page e 19
www.aucklan w ndtransportt.govt.nz