Decision on notification of an application for resource consent under the Resource Management Act 1991 Restricted discretionary activity Application number:

R/LUC/2016/4789

Applicant:

Auckland Transport

Site address:

Three CRL ‘Active Construction Zones’ (ACZ) within the locations of two new stations (Aotea Station and Karangahape Station) and Mt Eden Station. Works to take place at Albert Street, Kingston Street, Mayoral Drive, Pitt Street, Beresford Square, Mercury Lane, Shaddock Street, Ruru Street, Flower Street, Nikau Street, Fenton Street, Mt Eden Road, Normanby Road and Boston Road.

Legal description:

Legal road/road reserve

Proposal: To undertake works relating to a series of trench/pothole utilities investigations required in various road/road reserves to investigate the location of subsurface utilities and geological conditions in advance of relocation and protection works required to support the CRL project. The resource consents required are:

Land use consents (s9) – R/LUC/2016/4789 Auckland Unitary Plan: Operative in Part 

Earthworks for network utilities and electricity generation facilities that do not comply with the standards in E26.6.5.2 within a Site and Place of Significance to Mana Whenua Overlay.  In the Aotea Station ACZ, the proposed earthworks will exceed 10m2 and 5m3 and may exceed the area and depth of earth previously disturbed or modified (cannot comply with General Standards 26.6.5.2(15) and (18)). As such, resource consent as a restricted discretionary activity is required pursuant to Chapter E, Infrastructure, E26.6 Network Utilities and Electricity Generation,

Earthworks for network utilities and electricity generation facilities that do not comply with the standards in E26.6.5.2 within a Historic Heritage Overlay.  In the Karangahape Station ACZ the earthworks will exceed 10m2 and 5m3 and will take place within 20m of any building or structure within the scheduled historic heritage place, will exceed an excavation depth of 0.6m within a Historic Heritage Overlay (cannot comply with General Standards 26.6.6.52(15), (17)(a) and (17)(c)).