Project
City Rail Link
Co-ordinates
(consistency, relative density, water content, plasticity, grading, etc)
GEOLOGICAL DESCRIPTION
Graphic Log
MATERIAL DESCRIPTION
Depth
PID (ppm)
Analysis
Sample ID
Casing remarks
-90°
Various Locations Along the CRL in Auckland
Feature
SAMPLING & TESTING
Core Loss/Lift
Drilling Method
Project number 60222458
Orientation Location
Elevation
STAINING/ ODOURS AND COMMENTS
Piezometer Construction
Auckland Transport
Groundwater
Client
TP103
HOLE IDENTIFICATION
LOG OF DRILLHOLE
0 - 100%
GRAVEL, grey. Loose, dry. Gravel is railway ballast.
0.0
TP103_0.5-0.6
0.7
GRAVEL, grey. Dense, dry.
TP103_0.9-1.2
0.9
SILT with some clay and minor gravel, brown. Firm, moist, low plasticity.
FILL
TP103_0.1-0.2
No odour or staining observed.
VAC EX
1
DRILLHOLE LOG ENVIRONMENTAL CRL.GPJ BASE.GDT 13/08/12
TP103 terminated at 1.2m Unable to advance due to basalt rock.
GROUNDWATER OBSERVATIONS Depth _ Reading Date
Date logged 11/04/2012 Logged DDf
Remarks 1) Hydro vac drill rig with 50 mm diamater rods used to advance borehole to target depth. 2) PID headspace readings taken from bag sample with MiniRAE PID calibrated to 100ppm Isobutylene. 3) Refusal at 1.2m on Basalt.
Checked DDf
No ground water encountered
Driller Drill Rig Started
Brown Bros (NZ) Ltd. Hand Excavation 11/04/2012
Finished 11/04/2012 Page
1
of
Date Printed: 13/08/2012
1