City Rail Link – C1-C2 Community Liaison Group Meeting MINUTES AND ACTION POINTS Rā: Wā: Wāhi:
30 October 2019 4pm – 5:30pm Level 17, AMP Building, 29 Customs Street West, Auckland Central
ATTENDEES CLG Members
CRL staff & contractors
R Tiang –Dilworth building
Maria HernandezCurry (MHC)
Stakeholder Communications Manager – CRL Ltd
Derek Robertson (DR)
C1 Project Director - Downer Solanche Bachy Joint Venture (DSBJV)
Nicole Lawton (NL)
Communications Coordinator – CRL Ltd
Nick Adams (NA)
C1 Construction Manager – CRL Ltd
Simon Lough (SL)
Design Manager Urban Realm – CRL Ltd
Robyn Findlay (RF)
Engineer – CRL Ltd
Aude Salmon (AS)
Stakeholder Advisor Connectus Joint Venture
Brandy Smith (BS)
Stakeholder Manager, DSBJV
T Loveridge – Heart of the City D Brown – resident R Baxter – resident L Walker – Precinct Properties L Tilson – Precinct Properties N Playle – Resident
ITEM
UPDATE/ACTIONS
1
Welcome and introductions
• CLG members in attendance introduced themselves. • MHC welcomed everyone and introduced the meeting agenda.
2
C2 Albert St contract update – Robyn Findlay
• RF introduces herself • Starts with current staging, notes the C2 main focus is on the public realm works along Albert Street on the block between Wyndham and Swanson Streets • This is due to be complete towards the end of next month (November) • There will be a traffic switch over the next couple of days and pedestrian access is changing • There will be a slight pedestrian detour in front of the ANZ. • Notes asphalt has gone down on one side of the road which will be followed by the other side • Progressing the removal of the steel struts that hold the Albert Street trench open, so backfilling can occur