1. Introduction

Next Article
2. Aotea Station

2. Aotea Station

The City Rail Link (CRL) project (the Project) comprises the construction, operation and maintenance of a 3.4km twin-tunnel underground passenger railway up to 42m below Auckland’s city centre. It will transform the downtown Britomart Station into a two-way through-station that better connects Auckland’s rail network, allowing it to double in capacity. Two new stations will be constructed (Aotea and Karangahape) and Mount Eden Station will be redeveloped.

Each stage of the construction works for the Aotea Station (referred to collectively as the ‘Aotea Construction Works1’) are authorised and provided for by CRL Designation 2500-1 in the Auckland Unitary Plan Operative in Part (AUP), for which City Rail Link Limited (CRLL) is the requiring authority. Social Impact and Business Disruption Delivery Work Plans (SIBDDWPs) have been prepared to identify the measures that will be implemented to mitigate and manage potential adverse effects on businesses, residents and community services/facilities during the Aotea Construction Works. In accordance with CRL designation Condition 61.1, the objective of the SIBDDWP is: “to avoid, remedy or mitigate the adverse effects arising from disruption to businesses, residents and community services/facilities so far as reasonably practicable.” In order to comply with designation conditions, SIBDDWPs have been prepared. The 2019/2020 Aotea SIBD Annual Report (Annual Report) provides an overview of the changes that have occurred to the SIBD environment since the commencement of the Aotea Construction Works and analyses matters raised by the community and how these have been responded to.

Structure of the Annual Report

This annual report, prepared for the Aotea Construction Works will outline the following: Section 1: Introduction: Provides an overview of the Project and Aotea Construction Works. Section 2: Aotea Station: Provides a brief overview of construction works to date and summarises the impacts. Section 3: Annual Report Methodology: Provides an overview of the methodology used to inform this Annual Report as well as the SIBD mitigation measures implemented. Section 4: Community Profile and Development Response: Reviews information relating to the Community Profile and Demographic Profile. Provides an overview of Development Response. Section 5: Overview of Matters Raised by the Community: Provides statistics on matters raised by the community. Section 6: Link Alliance Response to Matters Raised by the Community: Considers the matters raised by the community and provides examples of Link Alliances response to those matters.

1 Works required to construct the Aotea Station. Includes construction works authorised by the Stage 1-3 (authorised by

OPW60345651), Stage 4 and 5 (authorised by OPW60348747) and Main Works (authorised by OPW6035461) Outline Plan documentation (refer Table 1). Page 5 | 2019-2020 SIBD Annual Report - Aotea Station

Section 7: Feedback Received: provides an overview of the feedback received during the 2019/2020 construction period. Section 8: Recommendations: outlines areas where Link Alliance can improve during the 2020/2021 construction period. Section 9: Conclusion.