A NEW DESTINATION IS TAKING SHAPE
UNDER REVIEW
UNDER REVIEW
Access ENJOY EXPLORE, & STAY AWHILE Flyway
UNDER REVIEW FUTURE ADDITIONAL PARKING
UNDER REVIEW
FLYWAY PLAZA
Parcel Map • • •
• Parcel 18 • 8.3 Acres
Build-Ready Parcels No Detention Required All Utilities Provided on Site
• Parcel 19 • 4.57 Acres • Parcel 15 • 1.59 Acres
• Parcel 17 • 0.95 Acres
• Parcel 16 • 0.78 Acres
UNDER REVIEW
• Parcel 3 • 1.36 Acres
FUTURE ADDITIONAL PARKING
• Parcel 7 • 1.26 Acres
UNDER REVIEW
• Parcel 8 • 1.24 Acres
• Parcel 1 • 1.48 Acres
• Parcel 12 • 2.13 Acres
• Parcel 11 • 1.59 Acres
• Parcel 10 • 3.12 Acres
• Parcel 9 • 1 Acre
January 30, 2024
*Quoted pricing is subject to change
UNDER REVIEW
FUTURE ADDITIONAL PARKING
14 FLYWAY PLAZA
UNDER REVIEW
FLY WAY | BOARDWALK AND PATHWAY PL AN
OVERLOOK WITH PAVILION
ENTRANCE MONUMENT SIGN
BOARDWALK CONNECTIVITY
BOARDWALK CONNECTIVITY FLYWAY | CITY OF WEBSTER CONCEPT DESIGN | 09.27.2022
8
FLYWAY BOARDWALK - GRAND OVERLOOK
TAKING THE OUTDOORS TO THE NEXT LEVEL
BOARDWALK GRAND OVERLOOK FLYWAY | CITY OF WEBSTER CONCEPT DESIGN | 09.27.2022
13
GRAND OVERLOOK FLYWAY BOARDWALK - OSPREY OVERLOOK
OSPREY OVERLOOK FLYWAY | CITY OF WEBSTER CONCEPT DESIGN | 09.27.2022
26
FLYWAY ROUND-ABOUT
ROUNDABOUT FLYWAY | CITY OF WEBSTER CONCEPT DESIGN | 09.27.2022
6
DETENTION POND
ENJOY THE NATURAL SURROUNDINGS
PARK
FLYWAY | CITY OF WEBSTER CONCEPT DESIGN | 09.27.2022
2
13
BOARDWALK AND PATHWAY SCHEMATICS 14
16 15
7
8
9
10
11
E IV R D
16
AY
YW
FL
17
12
17
UNDER CONSTRUCTION 16
16
15
R.O
17 .W .
16 17
B.O
.C. 17
17
SECTION 1 - FULL WALL
SECTION 2 - HALF WALL
B.O
.C.
100 YR. FLOODPLAIN
R.O
IVE DR
(DEFINED PER STRUCTURAL FRAMING) FG 18.25
(DEFINED PER STRUCTURAL FRAMING) FG 17.5
.
SALTROCK FINISH CONCRETE
LIMIT OF WO RK
6
ROY AL T ERN WAY
EY PR
OS
4
5 R.O.W.
R.O.W.
PEREGRINE DRIVE
.W
7
TOW 17
TOW 16.5 15 14
TOP OF WALL 17.00
13 12.5
FLATWORK ABUTS RAILING FOOTER AND WALL AT 17.00
R.O.W.
R.O.W.
BLUE HERON DRIVE
BOTTOM OF SLOPE FG 5
3" = 1'-0"
TOP OF WALL 17.00
P-FL-FLY.2-22
3" = 1'-0"
R.O.W.
I LIM
R.O.W.
X.
RO
PP 1.5
IVE
.
.W
R.O
DR
H.1
%
EY
ROYAL TERN WAY
8
EA
R.O.W.
R.O.W.
9
OP
.
PR
.W
OS
R.O
14
FLATWORK ABUTS RAILING FOOTER AND WALL AT 17.00
SL
R.O.W.
13 2
PEREGRINE DRIVE
TO
R.O.W.
OR
P-FL-FLY.2-23
R.O.W.
FW
2
FG PER CIVIL
SECTION - FULL WALL
1
SECTION - HALF WALL
K
BLUE HERON DRIVE ASSUMING OSPREY DRIVE IS NOT STOP CONTROLLED. CAN BE ELIMINATED BY ADDING STOP TO OSPREY.
H.1
R.O.W.
DECK FLOATS ABOVE WALL @ APPROX. 18.00
R.O.W.
H.1
SECTION 1 FULL WALL
XX WALL CONTINUES 00 BELOW DECK AT 17.00
H.1
LIMIT OF WORK
LIMIT OF WORK
SLOPE APPROX.
1.5%
ROYAL TERN WAY
SLOPE APPROX. 1.5%
H.1
R.O.W.
KEBONEY WOOD DECKING
.
W O.
R.
H.1
Y
WA
FLATWORK ABUTS RAILING FOOTER AND WALL AT 17.00
LT
W.
O.
R.
IT
LIM
KEBONEY WOOD DECKING
LIMIT OF WORK
YA
RO
N ER
OF WO
12 11
H.1
RK
16.50
K
IT
LIM
10
20FT
OF
OR
TOP OF WALL 17.00
W
FLATWORK ABUTS RAILING FOOTER AND WALL AT 17.00
16.50
SL
1
16.61
8.0
8.5
5.0
4.5
4.0 4.0
4.5
5.0
5.5
6.0
6.5
7.0
7.5
8.0
8.5
TOP OF WALL 16.50
9.0
9.5
10.0
10.5
11.0
11.5
12.0
12.5
13.0 13.5 16.0 15.0 14.0 14.5 16.5 15.5
DECK FLOATS ABOVE WALL @ APPROX. 17.50
SECTION 2 HALF WALL
SALTROCK FINISH CONCRETE
8FT
H.1
5.0
5.5
LIM
6.0
6.5
7.0
IT O
7.5
8.0
FW
8.5
OR
9.0
9.5
10.0
10.5
11.0 11 .5
12.0
12.5
13.0 15.5 16 13 14 .0
WALL STEPS UP FROM 16.5 TO 17.00
F
IT O
LIM
16.50 TO HERE
K
K
6F T
13.5
5.5
16.58
R WO
DECK FG @ APPROX. 17.00
H.1
DECK STEPS DOWN @ APPROX. 16.00
FLATWORK ABUTS RAILING FOOTER AND WALL AT 17.00
5
16.55
SLOP
E AP
H.1
PROX
. 1.5%
%
. 1.5
PROX
E AP
SLOP
H.1
17.0
16.5
16.0
15.5
15.0
14.5
14.0
13.5
13.0
12.5
11.5 12.0
FLATWORK ABUTS RAILING FOOTER AND WALL AT 17.00
RAILING FOOTER TO STEP WITH WALL ELEVATION
WALL CONTINUES BELOW DECK AT 17.00 00 XX
7.5
13.0
6.0
WALL CONTINUES BELOW DECK AT 16.50
T
7.0
12.5
6.5
16.50 TO HERE
7F T
7.5 7.0
16.50 FROM HERE
.5
8.0
16.75
XX 00
9.5 9.0 8.5
16.72
XX 00
6.5
12.0
16.0
16.68
16
10.5 10.0
XX 00
0 5 0 5 0 16. 15. 13. 14. 16.5012. 12. 11. 11.
6FT
SLOPE APPROX. 1.5%
ORK
OF W
6.0
10.0
11.5
15.5
16.65 16.63
FLATWORK ABUTS RAILING FOOTER AND WALL AT 16.5
H.1
XX 00
LIMIT
5.5
9.5
11.0
15.0
16.62
6F
.5%
5.0
9.0
10.5
14.5
6FT
16.56 16.58
16.50 FROM HERE
14.0
16.54
16.70 16.35
COORDINATE WALL TERMINUS
H.1
H.1
16.51 FROM HERE 16.51 TO HERE
DECK FLOATS ABOVE WALL @ APPROX. 18.00
SECTION 2 HALF WALL
K
XX 00
.1
OX
SL
16.50 TO HERE 16.50 FROM HERE
H.1
%
. 1.5
PROX
AP OPE
16.47 16.45
16.40
16.40
16.38 TO HERE
16.38 FROM HERE
XX 00
PR AP
ORK
OF W
LIMIT
10 FT
E OP
EXPAND PROPERTY LINE TO ENCOMPASS THIS AREA
11.0
10.5
10.0
7. 8.0 TOP OF 8.5 WALL 9.0 9.517.00
7.0
6.5
KEBONEY WOOD DECKING
6.0
5.5
5.0
4.5
4.0
3.5
DECK STEPS DOWN @ APPROX. 15.00
IT
LIM
OF
OR
W
PARK
MODERN ADVENTURE, TEXAS STYLE
GREAT W LF LODGE OPENING 2024
GREAT W LF LODGE
GREAT WOLF LODGE GULF COAST TEXAS WILL BE THE FIRST GENERATION 4 RESORT THE COMPANY HAS BUILT, FEATURING THE MOST SUCCESSFUL ATTRACTIONS AND LATEST INNOVATIONS. • 532 FAMILY-FRIENDLY SUITES • 95,000 SQUARE FOOT INDOOR WATERPARK • 58,000 SQUARE FOOT FAMILY ENTERTAINMENT CENTER • 11,200 SQUARE FOOT CONFERENCE CENTER
OPENING FEBRUARY 2024
OPENING
Q3 2024
OPENING Q4 2024
H to
READY FOR ACTION ou
n sto
Clear Lake
Super-regional destination
Seabrook
I-45, just south of NASA Road 1 Bypass Midway between downtown Houston and Galveston
Baybrook Mall Excellent ingress & egress from I-45, NASA Road 1 Bypass, and Highway 3 y Ba
Project Demographics
Home to more than 2,500 businesses in the trade area Baybrook Mall is the #1 suburban mall in the Houston MSA, with more than 1.7M SF and 200 retailers Population (5mi): 206,300 Population (10mi): 500,300
Friendswood
B ea r A
rd va e l ou
NA
528
SA
Kemah Boardwalk
y wa k r Pa
NA
Average Household Income (5mi): $111,650
ass
SA
. Rd
yp 1B
Daily Traffic Count for I-45: 250,000 vehicles per day Medical Density includes 2M SF of medical facilities within 3 miles
League City
Medical Service Area Population: 1.8M Aerospace Capital with NASA (JSC), Houston Spaceport, and over 50 major space companies - workforce over 16,000 Tourism – 22 hotels, over 150 restaurants and entertainment venues
3
518
TEXAS
NASA’s Space Center Houston - 1.5M visitors annually Galveston Beaches - 6M visitors annually
517
Dickinson
6
G to e alv
64
Galveston Bay
n sto
y Ba
ea Ar
B
rd va e l ou
3
TEXAS
528
3
TEXAS
518
ACCESS FLYWAY
96
CONTACT US FOR INFORMATION BE TSY GIUSTO | Economic Development | City of Webster bgiusto@cityofwebster.com 281.316.4116 | 713.542.7137 K AT Y HICKS | Economic Development | City of Webster khicks@cityofwebster.com 281.316.4135 | 832.455.6258 JACOB HATFIELD | Development Consultant | JKHat, LLC jkhat1llc@yahoo.com 903.563.4618
FOR MEDIA
K ATIE VEL A | Economic Development | City of Webster kvela@cityofwebster.com 281.316.4121 | 248.496.3438
FLYWAYTX.COM