Session 3 ODESSA AS A CITY WITH STRONG INFRASTRUCTURE (PART 2)
SCHEDULE 5:30 p.m. - 8:00 p.m. - Wednesday
Participants will be provided dinner at 5:30 p.m. during all sessions
Session #3: October 21, 2026 Odessa as a City with Strong Infrastructure (Part 2) Solid Waste, 1100 W. 42nd Street Speakers: Mayor Cal Hendrick, Solid Waste Division Manager Jathan Escontrias, Director of Utilities Alex Rowlett For the Odessa Water Treatment Plant visit, please wear closed-toe shoes and jeans or pants that fully cover the legs. 5:30 p.m. - Enjoy dinner while learning about Solid Waste operations. 6:00 p.m. - Trash Truck Demonstration 6:30 p.m. - Depart for the Odessa Water Treatment Plant 811 W. 42nd Street (across from Solid Waste) 6:45 p.m. - Tour the Odessa Water Treatment Plant
Citizens UniverCity
Speakers
Cal Hendrick Mayor of Odessa
Jathan Escontrias Solid Waste Division Manager
Alex Rowlett Director of Utilities
TRASH TRUCK DEMONSTRATION SEE SOLID WASTE IN ACTION The City of Odessa’s Solid Waste Department uses specialized trucks and equipment to collect and transport waste throughout the community. A trash truck demonstration gives residents an opportunity to see the equipment and collection process up close.
WHAT YOU WILL LEARN 01 TRUCK OPERATIONS See how Solid Waste collection equipment is operated during the collection process.
02 SIDE-LOAD TECHNOLOGY Odessa uses side-load trucks as part of its Solid Waste fleet, including automated side-load vehicles.
03 COLLECTION EQUIPMENT Learn how different trucks are used for different Solid Waste collection needs, including side-load and roll-off trucks.
KEEPING ODESSA CLEAN
ONE CART AT A TIME The City of Odessa’s Solid Waste team works every day to keep our community clean, serving more than 2,800 businesses and 16,000 alley dumpsters. As the City transitions to residential rollout carts, the goal is to provide reliable and convenient trash collection while helping reduce litter and illegal dumping. Residents using rollout carts receive twice-weekly collection. Carts should be placed at the designated collection area by 7:00 a.m. on pickup day, with the lid closed and clear of nearby objects. The City also follows TCEQ requirements for food-containing trash collection.
TRANSITIONING TO ROLLOUT CARTS (MAP) Use the map below to see where rollout-cart service is available and learn more about the City’s transition to residential cart collection. odessa-tx.gov/solidwaste
A CLEANER COMMUNITY
KEEPING ODESSA CLEAN The City of Odessa’s Solid Waste team hosts special events throughout the community where residents can safely dispose of large or bulky items they no longer need. Neighborhood Bulk Drop-Off events are held on Saturdays from 8:00 a.m. to 12:00 p.m.
2026 Neighborhood Bulk Drop-Off Results Mar 7, 2026
13 tons
148 vehicles
April 11, 2026
22 tons
162 vehicles
May 16, 2026
19 tons
181 vehicles
Jun 13, 2026
14 tons
132 vehicles
Jul 11, 2026
17 tons
140 vehicles
Items You Can Bring Furniture, appliances, water heaters, hot tubs, and above-ground pools Outdoor equipment (remove fuel, oil, and batteries first) Mowers, trimmers, blowers, generators, edgers, and BBQ pits Patio furniture, exercise equipment, trampolines, and pianos Small truckloads of pallets Home electronics such as microwaves, TVs, cables, crock pots, and space heaters
Items You Can’t Bring Construction or demolition debris Paint or chemicals Tires Tree limbs
6
WATER TREATMENT PLANT How Odessa gets clean drinking water
The City of Odessa’s Water Treatment Plant provides clean, safe drinking water to the community. The City purchases untreated water from the Colorado River Municipal Water District (CRMWD), which is then treated at the plant before entering Odessa’s water distribution system. TREATMENT PROCESS
STORAGE AND DISTRIBUTION
Before reaching homes and businesses, the water goes through several treatment steps: Coagulation – Helps gather small particles together
STORAGE & DISTRIBUTION CLEARWELLS Treated water is stored in clearwells at the plant before being pumped into the City's water distribution system.
Flocculation – Forms larger particles that can be removed more easily
Sedimentation – Allows particles to settle out of the water
Filtration – Removes remaining particles and impurities
WATER TOWERS Three elevated water towers help store water and maintain steady pressure throughout the distribution system.
pH Adjustment – Balances the water’s pH
Disinfection – Removes harmful microorganisms and helps keep the water safe
55 MILLION The plant can treat up to 55 million gallons of water per day
WATER QUALITY AND SAFETY TCEQ & EPA
24/7 OPERATIONS
REGULAR MAINTNANCE
9.5 BILLION GALLONS
Odessa's water meets applicable safety standards established by the Texas Commission on Environmental Quality and the U.S. Environmental Protection Agency.
Modern tools and technology to respond effectively.
Maintenance crews perform regular checks and repairs to help keep the system operating reliably.
The plant treats approximately 9.5 billion gallons of water each year.
7
WASTEWATER COLLECTION How wastewater travels through Odessa's sewer system
WASTEWATER TREATMENT PROCESS 01 COLLECTION Wastewater from homes and businesses enters the City's sewer system. 02 TRANSPORTATION Approximately 600 miles of sewer lines carry wastewater to the Derrington Plant. 03 INSPECTION & MAINTNANCE Crews use TV cameras, clean sewer lines, maintain manholes and identify damaged infrastructure. 04 TREATMENT Wastewater arrives at the Bob Derrington Plant, where it is treated and prepared for reuse.
PIPE MAINTNANCE
INFRASTRUCTURE INSPECTIONS
CAPITAL IMPROVEMENTS
Cleaning and vacuuming sewer lines helps remove grease and debris.
Special cameras help crews identify damage inside sewer lines.
The City replaces and improves sewer infrastructure to support reliable service and future growth.
PLANNING FOR THE FUTURE The City is planning modernization improvements at the Bob Derrington Water Reclamation Plant to support safety, reliability, compliance and long-term operations.
Session 3 ODESSA AS A CITY WITH STRONG INFRASTRUCTURE (PART 2)