Skip to main content

Citizens UniverCity - Session 2

Page 1

Session 2 ODESSA AS A CITY WITH STRONG INFRASTRUCTURE


SCHEDULE 5:30 p.m. - 8:00 p.m. - Wednesday

Participants will be provided dinner at 5:30 p.m. during all sessions

Session #2: October 14, 2026 Odessa as a City with Strong Infrastructure Municipal Plaza, 119 W. 4th Street (1st Floor Conference Room) Speakers: Edgar Navarrette - Geographic Information Officer Director of Communications - Monica McDaniel Interim Manager/TAC/LASSO - Tiffany Baker (911 Dispatch) Odessa Fire Rescue Chief - Jason Cotton (OFR oversees 911 Dispatch. OFR will be discussed at another session.) Director of Utilities - Alex Rowlett Wastewater Operations Division Manager - Melissa Looney For the Bob Derrington Water Reclamation Plant visit, please wear closed-toe shoes and jeans or pants that fully cover the legs. 5:30 p.m. - 1st Floor Conference Room: Enjoy dinner while learning about GIS, the Team Odessa App, Social Media, City Website, JETT, and IPAWS. 6:00 p.m. - Get an inside look at 911 Dispatch (located on the 3rd floor of Municipal Plaza) 6:20 p.m. - Depart for Bob Derrington Water Reclamation Plant, 9600 S. County Road 1325 7:30 p.m. - Return to Odessa City Hall

Citizens UniverCity


Speakers

Edgar Navarrete Geographic Information Officer

Monica McDaniel Director of Communications

Tiffany Baker Interim Manager (911 Dispatch)


Speakers

Alex Rowlett Director of Utilities

Jason Cotton Odessa Fire Rescue Chief

Melissa Looney Wastewater Operations Division Manager


GEO INTELLIGENCE Geointelligence helps the City of Odessa use geographic information, mapping technology, and data to better understand the community. By turning complex information into visual maps, the City can identify patterns, monitor city resources, and support informed decisions that improve municipal services and long-term planning. www.odessa-tx.gov/gis MAPPING ODESSA Geographic Information Systems (GIS) help organize and display information about streets, properties, infrastructure, and other city resources. These maps give City staff a clearer picture of Odessa and help departments coordinate projects and services. SUPPORTING CITY SERVICES Geographic data can help City departments plan infrastructure improvements, manage resources, evaluate development, and understand community needs. This information supports more efficient operations and helps the City prepare for future growth. DATA-DRIVEN DECISIONS By combining location-based information with digital mapping tools, the City can identify geographic trends, visualize important information, and make betterinformed planning decisions. PLANNING FOR THE FUTURE As Odessa continues to grow, geointelligence can help the City understand changing community needs and support responsible development. Geographic information provides valuable insight for building a more connected, efficient, and well-planned community.

5


CONNECT WITH THE CITY WEBSITE ODESSA-TX.GOV CITY OF ODESSA Facebook Instagram LinkedIn Nextdoor X YouTube CIUDAD DE ODESSA, TEXAS GOBIERNO MUNICIPAL Facebook Instagram KEEP ODESSA BEAUTIFUL Facebook English and Spanish Instagram English and Spanish LinkedIn YouTube ODESSA FIRE RESCUE Facebook YouTube ODESSA POLICE Facebook Instagram LinkedIn Nextdoor X YouTube

TEAM ODESSA APP ODESSA-TX.GOV/TEAMODESSA

DOWNLOAD FOR IOS

PARKS AND RECREATION Facebook Instagram YouTube

DOWNLOAD FOR ANDROID 6


COMMUNICATIONS DEPARTMENT KEEPING OUR COMMUNITY INFORMED AND CONNECTED

Informing. Connecting. Engaging. The City of Odessa Communications Department plays an important role in keeping residents informed about city services, programs, events, and important community updates. Through clear, timely, and accessible communication, the department helps residents stay connected with their local government and understand what is happening throughout Odessa. From sharing public announcements and promoting community events to providing important information during emergencies, the Communications Department works to ensure residents have access to reliable information when they need it.

TRANSPARENT AND ACCESSIBLE GOVERNMENT The Communications Department builds trust and transparency by keeping residents informed and engaged. Through public announcements, safety updates, and community highlights, the department shares Odessa’s story and strengthens connections between the City and its residents.

CONNECTING THE CITY WITH ITS RESIDENTS The depar tment manages the Cit y 's c omm u nic a tio n ch a nne l s, including social media, website co n ten t , n e wsl e tte r s, n ews rel eases , and public ser vice announcemen t s. B y s h ari n g u p dat e s a c ross multiple platforms, the team he lps res i den t s s t ay i nfo r med abo ut ci ty operations, upcoming events, s e r vi c e c h ang e s, a nd o ppo r tuni tie s to get involved in their community. The Communications Depar tme nt a lso wor k s c l ose l y w i th o ther Ci ty depar tments to highlight their wor k , s h are imp o r ta n t i n iti a tives, a nd showcase the employees who hel p ke e p O d ess a ru n nin g .

7


JETT THE JACKRABBIT Meet JETT (the Jackrabbit) – Just, Efficient Tracking & Transparency. He’s our chatbot meant to make searching our website much easier on you. Meaning Behind Each Term: Just – Promotes fairness, justice, and equity in addressing citizen issues. Efficient – Implies the system works quickly and reliably. Tracking – Citizens can monitor the status of their reports. Transparency – Ensures government or civic bodies are open about actions taken. The Jackrabbit is an iconic symbol in Odessa.

TEAM ODESSA

report issues. track your progress. stay connected in real time.

DOWNLOAD IT ON IOS

DOWNLOAD IT ON ANDROID

odessa-tx.gov/teamodessa


First in Texas: 911 Emergency Dialing & Dispatch Located on the 3rd floor of Municipal Plaza, Public Safety Communications serves as the vital lifeline between citizens experiencing critical emergencies and immediate ground response teams. Historic Legacy: Odessa was the first city in Texas to install the 911 system (April 1970). In September of 1995, the communications center moved to its current location, which houses state-of-the-art equipment, including computers and software, that allow its employees to give the citizens of Odessa and Ector County the best possible service. Consolidated Operations: The 911 Dispatch Center operates 24/7/365, serving as the consolidated dispatch point for the Odessa Police Department, Odessa Fire Rescue, and Emergency Medical Services (EMS). This multi-agency integration enables seamless communication during complex critical incidents.

Advanced Life-Saving Protocols: Emergency Call- Takers utilize Emergency Medical Dispatch (EMD) protocols to provide step-by-step, life-saving medical instructions—including CPR, bleeding control, and airway management—to callers while units are en route. Operational Scale: Utilizing high-capacity CAD (Computer-Aided Dispatch) technology, telecommunicators process thousands of emergency and non-emergency calls each month, ensuring rapid dispatch accuracy and responder safety.


BOB DERRINGTON WATER RECLAMATION PLANT How Odessa Treats and Reuses Wastewater

The Bob Derrington Water Reclamation Plant receives wastewater from homes and businesses throughout Odessa through the City's underground sewer system. Wastewater comes from everyday activities such as flushing toilets, taking showers, washing dishes, and doing laundry. This is different from stormwater, which comes from rainfall. The facility cleans approximately 7.5 million gallons of wastewater each day, preparing much of the treated water for reuse. In June 2026, City Council approved a $39.977 million professional-services agreement for the design and bid phase of the plant's modernization. The plant has not had major upgrades since the 1990s.

WASTEWATER TREATMENT PROCESS 01 BIOLOGICAL TREATMENT Tiny living organisms help break down and remove contaminants through an activated sludge process. 02 FILTRATION & DISIFECTION The water is filtered and disinfected with chlorine before it is prepared for reuse.

03 WATER REUSE Treated water is reused for industrial operations, irrigation, and parks.

7.5 MILLION Gallons of wastewater treated each day.

24/7 Plant Operations

4.2 MILLION Gallons per day available for irrigation and other reuse purposes.

Homes & Businesses → Wastewater → Treatment → Cleaned Water → REUSE

10


WASTEWATER COLLECTION How wastewater travels through Odessa's sewer system

WASTEWATER TREATMENT PROCESS 01 COLLECTION Wastewater from homes and businesses enters the City's sewer system. 02 TRANSPORTATION Approximately 622 miles of sewer lines carry wastewater to the Derrington Plant. 03 INSPECTION & MAINTENANCE Crews use TV cameras, clean sewer lines, maintain manholes and identify damaged infrastructure. 04 TREATMENT Wastewater arrives at the Bob Derrington Plant, where it is treated and prepared for reuse.

PIPE MAINTENANCE

INFRASTRUCTURE INSPECTIONS

CAPITAL IMPROVEMENTS

Cleaning and vacuuming sewer lines helps remove grease and debris.

Special cameras help crews identify damage inside sewer lines.

The City replaces and improves sewer infrastructure to support reliable service and future growth.

PLANNING FOR THE FUTURE The City is planning modernization improvements at the Bob Derrington Water Reclamation Plant to support safety, reliability, compliance and long-term operations.


WASTEWATER COLLECTION FAQ’s to Help You Better Understand Where does the Bob Derrington Water Reclamation Plant receive wastewater? The Bob Derrington Water Reclamation Plant receives wastewater from homes and businesses throughout Odessa through the City's underground sewer system. Wastewater comes from everyday activities such as flushing toilets, taking showers, washing dishes, and doing laundry. This is different from stormwater, which comes from rainfall. How does the City protect the treatment plant from harmful waste? The Utilities Department's Pretreatment Division works with businesses to prevent harmful materials from entering the sewer system. Inspectors routinely monitor restaurants for grease control, car washes for sand traps, and other commercial and industrial customers to ensure their wastewater meets environmental regulations before it enters the City's collection system. These efforts help protect both the treatment plant and the environment. Does the City treat industrial wastewater? Industrial wastewater generated by many industrial facilities, such as chemical companies, is treated by the Gulf Coast Authority (GCA) under an agreement with the City. Previously, the City treated some industrial wastewater; today today those services are provided through GCA's facility in Odessa. How much wastewater can the Bob Derrington Water Reclamation Plant treat? The plant was originally constructed in 1982 with an average treatment capacity of approximately 7 million gallons per day. In 1995, the facility was expanded to treat an average of 12.7 million gallons per day. Who regulates Odessa's wastewater system? The City's wastewater collection system and the Bob Derrington Water Reclamation Plant are regulated by: The Texas Commission on Environmental Quality (TCEQ) The U.S. Environmental Protection Agency (EPA) The City performs routine monitoring and testing to ensure wastewater treatment meets all required environmental permits and regulations. Testing is conducted daily on the wastewater entering the Bob Derrington Water Reclamation Plant. Once the water has been treated, it is tested every 24 hours before it leaves the facility to ensure it meets all state and federal water quality standards. What happens to the treated wastewater? After treatment, reclaimed water is either: Released into Monahans Draw in accordance with state environmental permits, or Delivered to customers who reuse the water for beneficial purposes.


WASTEWATER COLLECTION FAQ’s to Help You Better Understand Who uses reclaimed water? Reclaimed water helps conserve Odessa's drinking water supply. Current reuse customers include: ExxonMobil, which uses a minimum of 4.2 million gallons per day for industrial process water. Golf courses, parks, landscaped areas, and Memorial Gardens, which together can use up to 3 million gallons per day for irrigation and maintaining pond levels. What happens to the solids removed during treatment? The remaining solids, known as sludge, are collected, loaded into City trucks, and transported to a landfill permitted by the Texas Commission on Environmental Quality (TCEQ) for disposal. Why does the City want to replace the Bob Derrington Water Reclamation Plant? The existing facility has served Odessa for more than 40 years. Replacing the plant will improve reliability, increase efficiency, accommodate future growth, and help ensure Odessa continues to meet state and federal environmental regulations for decades to come. How much will the replacement project cost? The estimated construction cost is approximately $440 million. The project is expected to take about 5½ years, including: Approximately 2½ years for design Approximately 3 years for construction Will wastewater treatment continue during construction? The existing Bob Derrington Water Reclamation Plant will remain fully operational throughout construction of the new facility. Once the replacement plant is complete and fully operational, the existing plant will be decommissioned and demolished.


Session 2 ODESSA AS A CITY WITH STRONG INFRASTRUCTURE


Turn static files into dynamic content formats.

Create a flipbook
Citizens UniverCity - Session 2 by CityofOdessa1 - Issuu