‘Niirun Yalawa Awabakal dha Worimi burrai.’
We all sit on Awabakal and Worimi land.
The City of Newcastle (CN) acknowledges its Local Government Area (LGA) sits within the Country of the Awabakal and the Worimi peoples. We acknowledge that Country for Aboriginal peoples is an interconnected set of ancient relationships. The CN Acknowledges the custodianship of the Awabakal and Worimi peoples and the care and stewardship they have performed in this place since time immemorial.
‘Wunyibu wunyibu warra wunyibu wunyibu gkuuba Aboriginal burrai.’ Always was, always will be Aboriginal land.
In recognition of Aboriginal cultural heritage, eight Newcastle landmarks are officially dual-named with their traditional Aboriginal names. These are based on Aboriginal references to the landmarks documented in maps, sketches and geological descriptions dating back as early as 1798:
• Nobbys Head – Whibayganba
Flagstaff Hill – Tahlbihn
• Pirate Point – Burrabihngarn
• Port Hunter – Yohaaba
• Hunter River (South Channel) – Coquun
• Shepherds Hill – Khanterin
• Ironbark Creek – Toohrnbing
• Hexham Swamp – Burraghihnbihng
Under Section 608 of the Act, CN may charge and recover an approved fee for any service it provides, other than a service proposed or provided on an annual basis which is covered by an annual charge (Sections 496 and 501).
Services for which CN may charge a fee include:
Supply of services and products
Giving information
Providing a service in connection with the exercise of CN’s regulatory function (eg applications, inspections, certificates)
Allowing admission to buildings.
Fees and Charges made under Section 608 of the Act are classified according to the following pricing basis:
Full Cost Recovery (F) CN recovers all direct and indirect costs of the service (including depreciation of assets employed).
Partial cost Recovery (P) CN recovers less than the Full Cost. The reasons for this may include community service obligations and legislative limits.
Statutory Requirements (S) Price of the service is determined by Legislation.
Market Pricing (M) The price of the service is determined by examining alternative prices of surrounding service providers.
Zero Cost (Z) Some services may be provided free of charge and the whole cost determined as a community service obligation.
Rate of Return (R) This would include Full Cost Recovery as defined above in addition to a profit margin to factor in a return to CN for assets employed. CN’s policy for determining fees to be charged is that all CN fees and charges not subject to statutory control are to be reviewed on an annual basis, prior to finalisation of the annual operating budget.
In applying the above pricing basis to fees made under Section 608 of the Act, CN considers the following factors as outlined in Section 610D of the Act:
The cost to CN of providing the service - the Full Cost Recovery method is used as a benchmark in this instance. This includes any debt and servicing costs, depreciation and maintenance associated with the provision of the service
The price suggested for that service by a relevant industry body or in a schedule of charges published, from time to time by the Division of Local Government
The importance of the service to the community - this is considered in determining any potential community service obligations or community benefit particularly under a Partial Cost Recovery or Zero Cost method
Any factors specified in the Local Government (General) Regulation 2005 or other applicable legislation
Other factors not specifically mentioned under Section 610D of the Act that may also be considered include:
Whether services are being supplied on a commercial basis as part of a defined CN business
The capacity of the user to pay
Market prices.
All fees and charges not included in the Division 81 GST free schedule will attract GST at the current rate of 10%. CN’s 2024-2025 Fees and Charges document is bound as a separate report.
Section 610E of the Act allows CN to waive payment of or reduce a fee in a particular case if it is satisfied that the case falls within a category of hardship or any other category that CN has determined.
CN has determined that fees may be waived or reduced in the following categories:
Category one - financial hardship
CN may reduce or waive fees in cases where the applicant provides evidence that the payment of the fee will impose significant financial hardship.
Each application will be considered on its merits on a case-by-case basis. In determining eligibility on the basis of significant hardship, CN will:
1. Apply a criteria commensurate with the value of the fee requested to be waived;
2. Require the applicant to provide reasonable proof of financial hardship which may include details of assets, income and living expenses, a letter from a recognised welfare agency or financial counsellor confirming financial hardship and/or medical certificate and other information required to make a valid assessment.
Category two - charity
Category three - illness or death
CN may reduce or waive fees in where the applicant is a registered charity and the fee is for a service that will enable the provision of charitable services to CN’s community.
CN may reduce or waive fees in cases where the applicant provides evidence that the charge was incurred because of:
1. Serious illness of a customer or the customer’s immediate family member;
2. Serious accident involving the customer or the customer’s immediate family member;
3. Death of a customer or the customer’s immediate family member; and in determining eligibility on the basis of illness or death, CN will require the customer to present:
1. Medical certificate; or
2. Statutory declaration.
Category four - Large Commercial Waste Operators
Category five – Civic Services commercial operators
CN may reduce fees for Commercial Customers that have committed to dispose (at SWMC) either:
• > 5,000 tonnes per annum of soil classified as General Solid Waste; or
• > 15,000 tonnes per annum of mixed General Solid Waste
CN may reduce or waive fees relating to commercial operators providing they provide a positive net benefit to the community, and in line with competitive neutrality principles.
City
CivilConstruction&Maintenance
LocalRoads
WorksWithinRoadReserve
Installationofrail,pipe,wire,orcablein,on,orovera publicroadorplace
PermitfeeforRoadOpening–inclPublicUtilities, PrivateContractors,etc.
PermitFeeisadditionaltorestorationcharges.
AdditionalInspectionFeeappliesifadditionalinspectionsarerequireddueto:iscaleoftheworks
iiprogrammingoftheworks iiifailuretocomplywithCouncil'sapprovalconditions.
Crossing
AdditionalInspectionFeeappliesifadditionalinspectionsarerequireddueto:iscaleoftheworks iiprogrammingoftheworks iiifailuretocomplywithCouncil'sapprovalconditions OR
Iftherearemultipledrivewaysatonelocation,theadditionalinspectionfeeisperadditionaldriveway.
RestorationCharges
Charges [continued]
AnypaversremovedtobereturnedtoTheCityofNewcastleWorksDepot.
TenderDocuments
Chargesapplytoopen(advertised)tendersonly.
TenderDocumentswithA3,A2,A1plansandcolour pictures
Chargesapplytoopen(advertised)tendersonly.
TenderLink(onlinetenderdocuments)Documents lessthan150pagesor<100MB
TenderLink(onlinetenderdocuments)Documents over150pagesor>100MB
FeenotapplicablewhenissuedinaccordancewithStatutoryrequirements PrintedCopy
PrivateOccupationofRoadReserve(s.138(RoadsAct)Erectastructurein,onoroverapublicroad)
Othercostsassociatedwithconsentaretobebornebytheapplicant(e.g.surveys,legalfees,valuations,title searchesetc.)
ConsentFeeforoccupationintheroadreserve (Pipes,conduitsetc) AverageMarketValueof land(ValuerGeneral'smost currentlandvalueofthe Applicant'spropertyand surroundingproperties)per squaremetre,multipliedby theencroachmentarea. Minimum$1,000 perconsent
inperpetuitysubjecttoSection140oftheRoadsAct
PrivateOccupationofRoadReserve(s.138(RoadsAct)Erectastructurein,onoroverapublic road) [continued]
ConsentFeeforoccupationontheroadreserve (Retainingwall,parkingetc)
inperpetuitysubjecttoSection140oftheRoadsAct
ConsentFeeforoccupationovertheroadreserve (Balconies)
AverageMarketValueof land(ValuerGeneral'smost currentlandvalueofthe Applicant'spropertyand surroundingproperties)per squaremetre,multipliedby theencroachmentarea.
Minimum$1,000
AverageMarketValueof land(ValuerGeneral'smost currentlandvalueofthe Applicant'spropertyand surroundingproperties)per squaremetre,multipliedby theencroachmentarea.
Minimum$1,000
Councilhasthediscretiontoreducethefeeonacasebycasebasiswherethedevelopmentrelatestoaheritageitemoriswithina heritageconservationareaandtheproposedbalconyisconsistentwiththeheritageconservationprinciples.
ConsentFeeforoccupationovertheroadreserve (Awning)
inperpetuitysubjecttoSection140oftheRoadsAct
ConsentFeeforoccupationintheroadreserve(Voids underRoadReserve)
AverageMarketValueof land(ValuerGeneral'smost currentlandvalueofthe Applicant'spropertyand surroundingproperties)per squaremetre,multipliedby theencroachmentarea.
Minimum$1,000
InperpetuitysubjecttoSection140oftheRoadsAct
Wherepartoralloftheencroachmentiscertifiedasanon-habitableroom,theFeewillbereducedby50%forthenon-habitable area.Wherepartoralloftheencroachmentisforassetmaintenancepurposesonly,theFeewillbereducedby100%forthe maintenancearea.
PrivateOccupationofRoadReserve(s.153(RoadsAct)Short-termleasesofunusedpublicroads)
Othercostsassociatedwithconsentaretobebornebytheapplicant(e.g.surveys,legalfees,valuations,title searchesetc.) Initial
referrals)
LeaseFeeforoccupationoftheroadreserve
AverageMarketValueof land(ValuerGeneral'smost currentlandvalueofthe Applicant'spropertyand surroundingproperties)per squaremetre,multipliedby theencroachmentarea multipliedbyayieldof6% perannum,prorated. Minimum$1,000
ClosureandSaleofaPublicRoad
Other costs associated with closure and sale are to be borne by the applicant (e.g. surveys, legal fees, valuations,titlesearchesetc.)
Councilownedandmanagedlandandbuildings
PropertyManagementandLeasing
Leasemeanslease,licenceorotherestate
Contract
TemporaryOccupationofCouncilLandforConstructionWorks
Other
InitialApplicationFee(includes1hourresearchand referrals)
ContractPreparationFee,upto2
LeaseFeefortemporaryaccessacrossCNland/ publicdomain,restrictingaccesstothepublic
LeaseFeefortemporaryoccupationofCNland/public domain,restrictingaccesstothepublic
metreperannum, pro
Minimum$500
AverageMarketValueof land(ValuerGeneral'smost currentlandvalueofthe Applicant'spropertyand surroundingproperties)per squaremetre,multipliedby thesiteareamultipliedbya yieldof6%perannum,pro rated.Minimum$1,000
Othercostsassociatedwithapplicationaretobebornebytheapplicant(e.g.surveys,legalfees,valuations, titlesearchesetc.)
"NoObjection"concurrenceonthepartofthelocal council,includingbutnotlimitedtoapplicationsfor PossessoryTitle,ReleaseofEasement/Caveatetc (s.45(d)(5)RealPropertyAct)
Initialapplicationforvariationorextinguishmentofa Covenant,CaveatorEasementwhereCNhasan interestinthedealing(includes2hoursresearchand referrals)
Feeforvariationorextinguishment
applicationforEasement,CovenantorCaveat onCouncilLand(includes6hoursresearchand referrals)
ofCouncillandtoanadjoiningowner(adjoiningowner
SaleofCouncillandtoanadjoiningowner(adjoiningownerinitiated) [continued]
AncillaryPropertyServices
ExternalConsultancyServices
Allpublicnotificationandadvertisingassociatedwith propertymatterswillbeatcostincurredtoCouncil
Ancillarycostsassociatedwithanapplicationcovered byFeesandChargesforPropertyServices,including butnotlimitedtopreparationofplansandinstruments forregistrationofdealings,valuations,consultant fees,statutorycostsanddisbursements
GeospatialInformationServices
GeographicalInformationServices
GISDigitalData
These
These charges relate to labour & consumables associated
Administrationchargefora3Dmodelnotsatisfying Council'srequirementsforlodgement,submittedby theapplicant–withtheexceptionofcomplex developmentswhichwillbePOA.
ThisfeewillbeinadditiontotheDAfee.
ForCounciltodevelopthe3Dmodeltomeet Council'srequirements–withtheexceptionof complexdevelopmentswhichwillbePOA.
AmendmenttotheDAinvolvingresubmissionofa3D modelnotmeetingCouncil'srequirements–withthe exceptionofcomplexdevelopmentswhichwillbe POA.
More
Requiredtosecurebookingofpublicspacefollowingassessmentof
Requiredtosecurebookingofpublicspacefollowingassessmentofapplication.Non-transferrabletochangeofdatesorlocations. NotapplicablewhereCNhasrequestedchange.Onecontingencydateallowedperbooking,non-transferrable.
venueand
withintheVisitorInformationCentrebuildingandsouthernplatform.
TunnelTours
TheparadegroundsarenotavailableforhireduringnormaloperatinghoursforFortScratchleyHistoricSite. HireFeelistedisforupto2hours.Additionalhourspro-rata.
EventsatFortScratchleymustceaseby10pmSunday-Thursday,andmidnightFridayandSaturday.
NewcastleLibraries
TheLibrarymayfromtimetotimeofferretailproductsforsale.Pricesfortheseitemswillbeadvertisedatthe timeofsale.
OverdueandLostStockFees
InterLibraryLoans
Feeforexamsupervisiononly.Pleaserefertovenuehireforroomcharges.
Halfdayvenuehirereferstoaminimumthree(3)hourshireineitheramorning,afternoonorevening session.
MinimumhalfdayvenuehireappliestobookingsmadeattheWarMemorialCulturalCentre-Meet1andthe WallsendLibraryMulti-FunctionRoom.Allotherlibraryvenuescanbebookedateitherhourlyordailyrates.
TheLibrariesManagerreservestherighttorequireandchargefortheuseofpersonnelforopening,closingandsecurity
duringthehireperiodifusedoutsideofnormalopeninghours.Additional
bondunlessforfeited.
TheLibrariesManagerreservestherighttorequireandchargefortheuseofpersonnelforopening,closingandsecuritypurposes duringthehireperiodifusedoutsideofnormalopeninghours.Additionalcleaningcostsmayalsoapply.NoGSTapplicableon Securitybondunlessforfeited.
WarMemorialCulturalCentre-Meet1–Commercial/ Government(Staffedoperatinghoursonly)
WarMemorialCulturalCentre-Meet1–NonCommercial(Staffedoperatinghoursonly)
LocalHistoryResearch
Plannedabsencefeeavailableforchildrenwhowillbeawayfromthecentre.2weeksnoticeisrequiredandthisfeeisonly applicabletoabsencesinoneweekincrementsuptoamaximumof2weekswhereachildisabsentforalloftheenrolleddaysina week(MondaytoFriday)
Plannedabsencefeeavailableforchildrenwhowillbeawayfromthecentre.2weeksnoticeisrequiredandthisfeeisonly applicabletoabsencesinoneweekincrementsuptoamaximumof2weekswhereachildisabsentforalloftheenrolleddaysina week(MondaytoFriday)
Plannedabsencefeeavailableforchildrenwhowillbeawayfromthecentre.2weeksnoticeisrequiredandthisfeeisonly applicabletoabsencesinoneweekincrementsuptoamaximumof2weekswhereachildisabsentforalloftheenrolleddaysina week(MondaytoFriday)
Plannedabsencefeeavailableforchildrenwhowillbeawayfromthecentre.2weeksnoticeisrequiredandthisfeeisonly applicabletoabsencesinoneweekincrementsuptoamaximumof2weekswhereachildisabsentforalloftheenrolleddaysina week(MondaytoFriday)
Ifchildattendscentrewithoutsuitableheadcovering,theywillbesuppliedwithahatatlistedcostforSunSafetyprotection
StateGovernmentLevies
StateGovernmentlevieswillbechargedinadditiontoapplicablefeesbelow. Exemptionstolevy-Intermentservicesfordestitutepersonsorchildrenunder12years. AnyotherStateGovernmentlevieswillbechargedattheapplicablelegislatedrate.
NicheWall-WallsendCemetery
NicheWall-WallsendCemetery [continued]
NicheWall-StocktonCemetery
NicheWall-AdditionalFees
Forsiteinductionsrequestedoutsidescheduledsessions.
Introductionofnewcemeteryproducts/services (garden,wall,plot&memorialbench)subjecttosize, typeofmaterialandinstallationcosts
Minimum4hourssuggestedforCasual/Socialhires. Allhiresincludethekitchen. Thebelowfeesrelatetoallcommunityfacilities.
DuetoagenerousbequestbyAnnePowell,certainhirecostsfortheNewLambtonCommunityCentrewillbe subsidised for the 2025-2026 financial year. Funds will be allocated to users of the building who meet predetermined criteria, and will be allocated per hirer to a maximum dollar value, and only until funds are expended.
GeneralHire-canincludeHall,Meeting,Officeor Storagespace
ForhireofaCommunityFacilitysiteotherthanthosespecificallylistedbelow.
SmallHalls(40-60people)
Includes: Beresfield Community Hall, Carrington Community Centre, Elermore Vale Community Hall, HendersonParkHall,HenryParkHall,MinmiProgressHall,TarroCommunityHall.
MediumHalls(70-90people)
Includes: Adamstown Community Hall, Elermore Vale Community Centre, Jesmond Neighbourhood Centre, MarylandMultipurposeCentre(NeighbourhoodandConferenceBuildings),NewLambtonCommunityCentre (SavoyRoom),WarabrookCommunityCentre,MayfieldSeniorCitizensCentre.
LargeHalls(100-200people)
Includes: Alice Ferguson Community Centre, Fletcher Community Centre, New Lambton Community Centre (MainHall),WallsendPioneer'sMemorialHall.
SmallerMeetingRooms(<10people)
Includes:AliceFergusonCommunityCentre,FletcherCommunityCentre(Smaller),NewLambtonCommunity Centre(CromwellRoom).
/
LargerMeetingRooms(10-40people)
Includes: Elermore Vale Community Centre, Fletcher Community Centre (Larger), Jesmond Neighbourhood Centre,MarylandMultipurposeCentre,WarabrookCommunityCentre,WallsendRailwayGoodsShed.
/NotforProfit-
OfficeSpaces
Includes:Allvenues,whereavailable. Cappedat8hours.
Beaches,
ParkReserves&SportingFacilities-Sport [continued]
Additionallinemarking(byrequest):
Football,Touch,Oztag,RugbyUnion/Leagueand AFL-Initial
Additionallinemarking(byrequest):
Football,Touch,Oztag,RugbyUnion/Leagueand AFL-Remark
Theabovefeeappliesforinitialoccurrence. Foreachadditionaloccurrencethereafter,theabovefeewillbemultipliedbynumberofoccurrences.
1xplayingSurface,2xdressingshedsand1canteen(2nightstrainingand
competitiondressingsheds,seasonalcanteen)
Beaches,ParkReserves&SportingFacilities-Sport [continued]
Regional–DressingSheds–Casualuser
DressingSheds(per2sheds)
Regional
(full)
1xplayingsurface,2xdressingshedsand1canteen(2nightstrainingand1day
field,2nightstrainingand1day competitiondressingsheds,seasonalcanteen) DistrictSeniorSeasonal
1xplayingsurface(2nightstrainingand1daycompetitionfield)
DistrictJuniorSeasonal(full)
1xplayingsurface,2xdressingshedsand1canteen(2nightstrainingand1daycompetitionfield,2nightstrainingand1day competitiondressingsheds,seasonalcanteen)
1xplayingsurface(2nightstrainingand1daycompetitionfield)
Dressing
1xplayingsurface(2nightstrainingand1daycompetitionfield)
TheNotforProfit(NFP)rateappliestoregisteredincorporatednot-for-profitorganisationsorcharities, presentingeventswithcommunitybenefit,educationalorculturalpurposewheretheorganisationisbasedin theLGAorcanclearlydemonstrateareinvestmentbackintotheLGAcommunity.Doesnotapplytoanyother organisationorcommercialpurpose.ProofofstatusisviaACNCRegisteredCharityTick/ABNconfirmationof NotforProfitstatuswhereapplicable.
CharityratesastheyapplytoCharityBallsandCivicTheatreareapplicabletoregisteredcharitiesonlyand willbeapplieduponproofofACNCRegisteredcharitytick.
CityHallandFortScratchleyVenueHire:
1/2DayHire=upto4eventhoursplus1hourbumpin.
FullDayHire=morethan4,lessthan8eventhours,plus1hourbumpin.
Additionalhoursarechargedpro-rata.
Hireinclusionsvarybetweenvenuesandwillbeadvisedatthetimeofquotingoronenquiry.
DAlimitationsmayapply.
RegularHirerdiscountapplicabletostandardbasefee(venuehire).
GuidedTours
CityHall/CivicTheatre
GuidedToursandEducationalPrograms $10-$150 perperson Y P
NewcastleCityHall
MeetingRoom:OneofNewcastleRoom1,WaratahRoom.
Schoolformalpackage:Includescatering,decorations,DJentertainment,venuehireandstaffing.Pricevaries inaccordancewithguestnumbersandcateringselection.AvailableMonday-Thursdayonly.
Weddingpackage:Includescatering,venuehireandstaffing.Pricevariesinaccordancewithguestnumbers andcateringselection.Minimum60people.
Delegate package: Full day includes venue hire, basic AV, continuous tea & coffee, morning tea, lunch and afternoon tea. Half day includes venue hire, basic AV, morning OR afternoon tea and lunch. Minimum 40 people.
MinimumcateringspendappliesonFriday,SaturdayandSundayevents.
Venue Hire for Live Performance is charged at the published hire rate, or 11.5% of the net box office, whichever is greater. Venue Hire includes the use of Concert Hall, Cummings Room, Mulubinba Room and Backstage Area for a period of 8 hours + 1 hour bump out. The fee includes setup according to Box Office seating plan and use of Meyer sound system. Refer to the Equipment Hire charges for any additional equipmentandstagingrequirements.
ConcertHallbookingsmayincurastaffingchargeforuseofthegallery.
A surcharge per performance applies where a Live Performance booking has no interval or a significant restrictionisotherwiseplacedonthevenue'susualabilitytogeneraterevenuefromtheliveperformancebar. Thissurchargedoesnotapplytochildrens'shows.
FridayandSaturdayperformancesincludehireoftheentireCityHallvenue.
ForbookingsonPublicHolidays,thesewillbequotedseparatelybasedoneventrequirements.
Rates [continued]
Fee
ForhirerswhoattendaCityHallPromotionalOpenDay,makeabookingthatdayandpaydepositwithin7daysfollowing.
Forregisteredcharitiesonly,holdingcateredfundraisingball. Minimumcateringspendapplies NotavailableSundays
/Latemeetingstart
Events at Fort Scratchley Function Centre must cease by 10pm Sunday-Thursday, and midnight Friday and Saturday.
Delegate package: Full day includes venue hire, basic AV, arrival tea & coffee, morning tea, lunch and afternoon tea. Half day includes venue hire, basic AV, morning OR afternoon tea and lunch. Minimum 40 people.
[continued]
Earlymeetingfinishpre9am/Latemeetingstartpost 5pm
Events held in Wheeler Place attract both a licence fee and a venue hire fee which varies according to the nature and duration of the event. Staff charges may also apply, for instance if the event requires vehicular accessorsetupofequipment.
For applicable licence fees, please refer to the Media Engagement, Economy & Corporate Affairs section in thisdocument.
EntiresiteincludesbothWheelerPlaceNorthandSouth.50%ofsiteappliestooneofeitherWheelerPlace NorthORSouth.
Exclusiveuseisnotguaranteed.Anydamagemustbepaidfor,regardlessofthetypeofevent.
HireofWheelerPlaceincludesspaceonly,anyadditionalinfrastructurerequiredwillbechargedatapplicable rates. If there is any catering attached to Wheeler Place events, City Hall Catering requires first right of refusal.
Wheeler Place is a licensed area for the sale of liquor, under the Civic Theatre Liquor License. No other alcoholistobesuppliedorsoldonsite.
The Not for Profit (NFP) rate applies to registered incorporated not-for-profit organisations or charities, presentingeventswithcommunitybenefitorculturalpurposewheretheorganisationisbasedintheLGAor can clearly demonstrate a reinvestment back into the LGA community. Does not apply to any other organisationorcommercialpurpose.ProofofstatusisviaACNCRegisteredCharityTick/ABNconfirmationof NotforProfitstatus.
Venue Hire for Live Performance is charged at the published hire rate or 11.5% of the net box office, whicheverisgreater.
Venue Hire fees for LivePerformanceevents do not include staff. An EntertainmentIndustry ServiceFee is chargedattheratedeterminedbyLivePerformanceAustralia.
AVenueHireratewillapplyfornon-liveperformanceorzeropricedticketevents.
GroundFloorLoungeBar&Foyer,FirstFloorPromenadeRoom&Balcony&PromenadeFoyermaybehired independently from the theatre (no more than 10 weeks prior to an event). Hire rates provide for the usual, existingsetup,anddonotincludeAVorstaff.
Shared access rates are subject to availability, and are applicable only when there are multiple bookings occurringononeday.
AsurchargeapplieswhereaLivePerformancebookinghasnointervalorasignificantrestrictionisotherwise placedonthevenue'susualabilitytogeneraterevenuefromthetheatrebar.Thisdoesnotapplytochildrens' shows.
Anadditionalcleaningfeewillbechargedwhenpostshowcleaningcannotbecompletedintheusualtime,for instanceifthereisuseofglitterorconfetti.Thisfeewillbechargedbasedonthenumberofhoursrequiredfor cleaning,withaminimumofafour(4)hourcall.
Please note maximum backstage capacities apply. Please refer to the Information for Hirers document for moreinformation.
RehearsalrateapplicableSun-Thursonly,whichmayvarybyagreement
Rates [continued]
RehearsalrateapplicableSun-Thursonly,whichmayvarybyagreement
Venue Hire for Live Performance is charged at the published hire rate or 11.5% of the net box office, whicheverisgreater. Asurchargemaybeleviedwhereabarserviceisrequestedbythehirer,buttheperformanceattractsverylow attendance.
StandardRates
StaffingcostswillbechargedinadditiontoVenueHire.
TicketServiceFeesarebasedonthevalueoftheticket,andthemethodofcalculationwillbepublishedonthe CivicTheatrewebsiteandmaybereviewedannually.
ThecostofprovidingFirstAidofficerswillbechargedtothehirer.SecuritymayberequiredatManagement’s discretionandwillalsobeonchargedtothehirer.
Forbarsoperatingafter11.30pm,additionalstaffingratesmayapply.
Functioncancellationfeesmayberefundedwhereanotherbookingissecuredwhichreplacesthecancelled booking,lessanadministrationchargeof$100.
Priceissetbyacase-by-caseassessmentof:thecostofservicedelivery,marketcompetition,andtheabilitytoattractadequate usageoftheservice.
FunctionCancellationFees–>271dayspriortoevent $100.00administrationfee charged,allotherdeposits refundable. Lastyearfee $100.00
LivePerformanceCancellationFees–<180days from
forfeitedplus ticketingfeesincurred (equivalenttotheservice feeperticket)plusstafftime chargetoprocessrefunds (min4hrs)
$250plusticketingfees incurred(equivalenttothe servicefeeperticket)plus stafftimechargetoprocess refunds(min4hrs)
Lastyearfee $250plusticketingfees incurred(equivalenttothe servicefeeperticket)plus stafftimechargetoprocess refunds
Applicablewhenclientsdonotsettlepaymentofconsumptioncharges
Allstaffarechargedforaminimumof4hoursonanyshift.
50%penaltyrateappliestostaffworkingonSaturday,andtoallstaffonovertimeforfirst2hoursofovertime. 100%penaltyrateappliestoovertimebeyond2hoursandallstaffworkingonSundays. Public holiday rates: Price on application. Please note that penalty rates of up to 200% can apply on public holidays.
Forfunctionsandevents,additionalstaffchargesmaybeincurredforvenuesetupwhereoccursoutsideof normaloperatinghours(MondaytoFriday9am–5pm).
The number of Customer Experience/ Venue and event staff are determined by venue management, on a ratioofapproximately1staffmemberper100patrons/guests.
Iftechnicalsupportisrequiredforfunctionsandevents,thiswillincurchargesfortechnicalstafftime.
VenueStaff:Commissionaire,Security,CustomerExperience(FOH),FoodService/Bar
PublicProgramsSupportereventrateisbyINVITATIONONLYandappliestoorganisationsandcommunity groups invited to contribute to Newcastle Art Gallery's public program of events. The event must align with NewcastleArtGallery'saudiencedevelopmentgoalsandpresentclearsynergiestotheGalleryprogramming andcollection.
Hireincludes(whereapplicable):electricity,A/C,minimumeventstaff(2),cleaning,initialsetup,tables,chairs, tablecloths,wi-fi,lecternµphone.
Hireexcludesadditionalequipmenthire,additionalstaff(requiredforeventswith100+attendees),responsible serviceofalcoholand/orcateringandstaffing,operationalcostsandadditionalcleaningcharges.
Staffchargesmaybeleviedforsetupoffunctions.Thenumberofstaffrequiredforeachfunctiondependson operational factors and event patronage at an estimated ratio of 1:100. Additional staff charges apply for technicalsupport.Penaltiesapplytothedailylabourrecoveryratewhenastaffmemberworksinexcessof8 hours(chargedatSunday/Overtimerate).
Education/PublicProgramming/Events
inc.artisttalks,tours,performances,workshops,screeningsetc.
TemporaryadditionalfeeforGallerystafftomanageworksoffsitewhileourcollectionisinstorage
FeeforGallerystafftravellingtosupportacollectioninstalloffsite/interstate(maximumrate)
Provisionofstaff,facilitiesorotherassistanceand technicalsupportasmayberequiredtoassistState GovernmentAgenciesinexercisingtheirfunctions
Searching/Scanning/CopyingHistoricalDevelopmentApplicationDocumentation
SearchingforanyarchivedplansheldbyCouncilinconnectionwithdevelopmentapplicationsorsimilar,for theownersofapropertyorforothersauthorisedbyanownerofaproperty,andforcopyingofavailableplans and/orspecifications
Inconnectionwitharesidential(singledwellingsand/ ordualoccupancy)developmentapplicationpriorto1 July2010
In
applicationpriorto1July
Inconnectionwithnon-residentialdevelopment applicationpriorto1July2010uptofour(4)separate developmentapplications
Inconnectionwithnon-residentialdevelopment applicationpriorto1July2010-five(5)ormore separatedevelopmentapplications
In
RefundDevelopmentContributionswherehistorical recordsarenotrequiredtobesearched
RefundDevelopmentContributionsinvolving searchesof
FeePrecedence
In the event of any inconsistency between the fees in this document and the statutory fees determined by NSWlegislation,thefeesintherelevantlegislationshallprevail.
Considerationwillbegiventoa writtenrequestforarefundof aparticularfeeorchargepaidtoCityof Newcastle. Anyrefundwillbeproportionatetotheextentofadministrativeandprofessionalworkscarried outatthedateoftherequest.
WhereanapplicationiswithdrawnpriortodeterminationandCityofNewcastleconsidersitappropriate,a partialrefundofdevelopmentapplicationfeesmayoccuraspercl253ofthe EnvironmentalPlanningand AssessmentRegulations2021 andthe LocalGovernmentAct1993.
SupplyofTechnicalandProfessionalAdvice/Information
Additionalservicefeefordevelopmentapplications
(under5
Professionalexternalconsultancyservicesfeefor applicationassessmentandpeerreviewwhere Councilhastoengagetheservicesofanoutside consultancyforspecialistadviceorpeerreview.The costofthisservicewillbeforwardedtotheparty causingtheneedforthepeerreview,adviceor inspection.
AmusementDevices
CertificateRegistration(archiving)Fee
Aquotationcanbeprovided (subjecttoratificationby Planning&Development,or therelevantExecutive Manager).
Lastyearfee
Aquotationcanbeprovided (subjecttoratificationby Planning,Transport& Regulationortherelevant ExecutiveManager).
Certificateundersection88GofConveyancingAct1919
CertificateunderSection88GofConveyancingAct 1919
Ifaninspectionisrequiredforthepurposeofissuing thecertificate
Flood
Provisionofadditionalinformationregarding developmentstandardsforfloodcontrollots,asper theGeneralHousingCode,RuralHousingCodeor anyotherrelevantprovisionofanEnvironmental PlanningInstrument
Additionalfeeforurgentfloodinformationcertificateor developmentstandardsforfloodcontrollots,asper theGeneralHousingCode,RuralHousingCodeor anyotherrelevantprovisionofanEnvironmental PlanningInstrument
Providedinnomorethantwobusinessdays
ReviewofdeterminationofaDAotherthananapplicationforcomplying,designatedoranapplication bytheCrown
ReviewofdeterminationofDA(s8.3)inrespectofa DAthatdoesnotinvolveanywork
ReviewofdeterminationofDA(s8.3)inrespectofa DAforadwellinghouse,withanestimatedcostof constructionof$100,000orless
ReviewofdeterminationofDA(s8.3)inrespectofany otherDA,withanestimatedcostofworkas described:
ReviewofdeterminationofDA(s8.3)inrespectofany otherDA,withanestimatedcostofworkas described:
$114plus$1.50foreach $1,000orpart$1,000above $5,000
yearfee $111plus$1.50foreach $1,000orpart$1,000above $5,000
ReviewofdeterminationofDA(s8.3)inrespectofany otherDA,withanestimatedcostofworkas described:
$666plus$0.85foreach $1,000orpart$1,000above $250,000
Lastyearfee
$651plus$0.85foreach $1,000orpart$1,000above $250,000
$250,000
costof developmen t$250,001$500,000
ReviewofdeterminationofDA(s8.3)inrespectofany otherDA,withanestimatedcostofworkas described:
$949plus$0.50foreach $1,000orpart$1,000above $500,000
$927plus$0.50foreach $1,000orpart$1,000above $500,000 estimated costof developmen t$500,001$1,000,000
Lastyearfee
ReviewofdeterminationofaDAotherthananapplicationforcomplying,designatedoranapplication bytheCrown [continued]
ReviewofdeterminationofDA(s8.3)inrespectofany otherDA,withanestimatedcostofworkas described:
$1,314plus$0.40foreach $1,000orpart$1,000above $1M
Lastyearfee
$1,285plus$0.40foreach $1,000orpart$1,000above $1M
ReviewofdeterminationofDA(s8.3)inrespectofany otherDA,withanestimatedcostofworkas described:
$6,310plus$0.27foreach $1,000orpart$1,000above $10M
Lastyearfee $6,167plus$0.27foreach $1,000orpart$1,000above $10M
ReviewofdeterminationofaDAModotherthananapplicationforcomplying,designatedoran applicationbytheCrown
ReviewofdeterminationofDAMod(s8.2) 50%
ReviewofdecisiontorejectaDA
ReviewofrejectionofDA(s8.2)inrespectofaDAwithanestimatedcostofdevelopmentasdescribed:
>
proposalsorifvariationtooneor moreplanningcontrolsissought–forfirstmeeting regardingadevelopmentproposalforsingleordual occupancydwellings
Fordevelopmentproposalsorifvariationtooneor moreplanningcontrolsissought–forfirstmeeting regardingdevelopmentproposalsotherthansingleor dualoccupancydwellings $850.00 $905.00 valueof developmen t<$500,000 &/or subdivisions upto3lotsuptohalf hour meeting, site inspection and documented
Fordevelopmentproposalsorifvariationtooneor moreplanningcontrolsissought–forfirstmeeting regardingdevelopmentproposalsotherthansingleor dualoccupancydwellings
Fordevelopmentproposalsorifvariationtooneor moreplanningcontrolsissought–forfirstmeeting regardingdevelopmentproposalsotherthansingleor dualoccupancydwellings
$1,700.00 $1,820.00 valueof developmen t$500,000 to $1,000,000 &/or subdivisions with4to10 lots-upto onehour meeting
valueof developmen t$1,000,001 to $5,000,000 &/or subdivisions with11to 20lots-up toonehour meeting
Fordevelopmentproposalsorifvariationtooneor moreplanningcontrolsissought–forfirstmeeting regardingdevelopmentproposalsotherthansingleor dualoccupancydwellings $3,100.00 $3,314.00 valueof developmen t> $5,000,000 &/or subdivisions withmore than20lots -uptoone hour meeting
Fordevelopmentproposalsorifvariationtooneor moreplanningcontrolsissought–foradditional meetingsoradditionalwrittencommentsonplans
Developmentapplicationinvolvingtheerectionofa building,alterationstoabuilding,thecarryingoutofa workorthedemolitionofaworkorbuilding $144.00 $147.00 estimated costof developmen t<=$5,000
Iftwoormorefeesareapplicabletoasingledevelopmentapplication,thefeepayableisthesumofthosefees(clause256 Environmental,Planning&AssessmentRegulation2021)
Developmentapplicationinvolvingtheerectionofa building,alterationstoabuilding,thecarryingoutofa workorthedemolitionofaworkorbuilding
$226plus$3foreach $1,000orpart$1,000above $5,000 Lastyearfee $220plus$3foreach $1,000orpart$1,000above $5,000 estimated costof developmen t$5,001$50,000
Iftwoormorefeesareapplicabletoasingledevelopmentapplication,thefeepayableisthesumofthosefees(clause256 Environmental,Planning&AssessmentRegulation2021)
Developmentapplicationinvolvingtheerectionofa building,alterationstoabuilding,thecarryingoutofa workorthedemolitionofaworkorbuilding
$469plus$3.64foreach $1,000orpart$1,000above $50,000
Lastyearfee
$459plus$3.64foreach $1,000orpart$1,000above $50,000
costof developmen t$50,001$250,000
FeeincludesachargebyPlanningNSWattherateof0.064%ofestimatedcostofdevelopment.Iftwoormorefeesareapplicable toasingledevelopmentapplication,thefeepayableisthesumofthosefees(clause256Environmental,Planning&Assessment Regulation2021)
Developmentapplicationinvolvingtheerectionofa building,alterationstoabuilding,thecarryingoutofa workorthedemolitionofaworkorbuilding
$1,544plus$2.34foreach $1,000orpart$1,000above $250,000
Lastyearfee
$1,509plus$2.34foreach $1,000orpart$1,000above $250,000 estimated costof developmen t$250,001$500,000
FeeincludesachargebyPlanningNSWattherateof0.064%ofestimatedcostofdevelopment.Iftwoormorefeesareapplicable toasingledevelopmentapplication,thefeepayableisthesumofthosefees(clause256Environmental,Planning&Assessment Regulation2021)
Developmentapplicationinvolvingtheerectionofa building,alterationstoabuilding,thecarryingoutofa workorthedemolitionofaworkorbuilding
$2,325plus$1.64foreach $1,000orpart$1,000above $500,000
Lastyearfee
$2,272plus$1.64foreach $1,000orpart$1,000above $500,000 estimated costof developmen t$500,001$1,000,000
FeeincludesachargebyPlanningNSWattherateof0.064%ofestimatedcostofdevelopment.Iftwoormorefeesareapplicable toasingledevelopmentapplication,thefeepayableisthesumofthosefees(clause256Environmental,Planning&Assessment Regulation2021)
Developmentapplicationinvolvingtheerectionofa building,alterationstoabuilding,thecarryingoutofa workorthedemolitionofaworkorbuilding
$3,483plus$1.44foreach $1,000orpart$1,000above $1M
Lastyearfee
$3,404plus$1.44foreach $1,000orpart$1,000above $1M estimated costof developmen t$1,000,001$10,000,000
FeeincludesachargebyPlanningNSWattherateof0.064%ofestimatedcostofdevelopment.Iftwoormorefeesareapplicable toasingledevelopmentapplication,thefeepayableisthesumofthosefees(clause256Environmental,Planning&Assessment Regulation2021)
Developmentapplicationinvolvingtheerectionofa building,alterationstoabuilding,thecarryingoutofa workorthedemolitionofaworkorbuilding
$21,146plus$1.19foreach $1,000orpart$1,000above $10M
Lastyearfee
$20,667plus$1.19foreach $1,000orpart$1,000above $10M
costof developmen t> 10,000,000
FeeincludesachargebyPlanningNSWattherateof0.064%ofestimatedcostofdevelopment.Iftwoormorefeesareapplicable toasingledevelopmentapplication,thefeepayableisthesumofthosefees(clause256Environmental,Planning&Assessment Regulation2021)
Developmentapplicationforapprovaltoerectan advertisementand/oradvertisingstructure
Iftwoormorefeesareapplicabletoasingledevelopmentapplication,thefeepayableisthesumofthosefees(clause256 Environmental,Planning&AssessmentRegulation2021)
Iftwoormorefeesareapplicabletoasingledevelopmentapplication,thefeepayableisthesumofthosefees(clause256 Environmental,Planning&AssessmentRegulation2021)
DevelopmentapplicationforerectionofaDwellinghouseupto$100,000
Iftwoormorefeesareapplicabletoasingledevelopmentapplication,thefeepayableisthe
ofthosefees(clause256 Environmental,Planning&AssessmentRegulation2021)
Iftwoormorefeesareapplicabletoasingledevelopmentapplication,the
Environmental,Planning&AssessmentRegulation2021)
Iftwoormorefeesareapplicabletoasingledevelopmentapplication,thefeepayableisthesumofthosefees(clause256 Environmental,Planning&AssessmentRegulation2021)
If
Environmental,
Regulation2021)
Developmentapplicationforproposeddevelopment notinvolvingtheerectionofabuilding,thecarrying outofawork,thesubdivisionoflandorthedemolition ofabuildingorwork
Iftwoormorefeesareapplicabletoasingledevelopmentapplication,thefeepayableisthesumofthosefees(clause256
Environmental,Planning&AssessmentRegulation2021)
Additionalfeefordevelopmentapplicationinvolving designateddevelopment
application
Iftwoormorefeesareapplicabletoasingledevelopmentapplication,thefeepayableisthesumofthosefees(clause256 Environmental,Planning&AssessmentRegulation2021)
Additionaldevelopmentapplicationfeefor developmentthatrequiresconcurrence
Feeisexclusiveofanyapplicableconcurrencefee($320maximum)thatispayabletoaconcurrenceauthority.Iftwoormorefees areapplicabletoasingledevelopmentapplication,thefeepayableisthesumofthosefees(clause256Environmental,Planning& AssessmentRegulation2021)
Additionaldevelopmentapplicationfeeforprocessing integrateddevelopment
application
Feeisexclusiveofanyapplicableapprovalfee($320maximum)thatispayabletoanapprovalbody.Iftwoormorefeesare applicabletoasingledevelopmentapplication,thefeepayableisthesumofthosefees(clause256Environmental,Planning& AssessmentRegulation2021)
Additionaldevelopmentapplicationfeeforfloodreport assessmentwhereafloodstudyisrequiredtobe submitted
Additionalfeeforamendmenttoadevelopment application,assoughtbyanapplicant,(subjecttothe agreementofCouncil)pursuanttosection37ofthe EP&ARegulation2021
Additionalfeeforamendmenttoadevelopment application,assoughtbyanapplicant,(subjecttothe agreementofCouncil)pursuanttosection37or113 oftheEP&ARegulation2021
Applicationstomakemodificationstoadevelopment consentinordertocorrectaminorerror, misdescriptionormiscalculationpursuanttoSec 4.55(1)oftheEP&AAct1979
NochargeifCouncilisresponsibleforerrorormiscalculation
Applicationstomakemodificationstoadevelopment consent,involvingminimalenvironmentalimpact, pursuanttoSections4.55(1A)&4.56(1)oftheEP&A Act1979
Applicationtomakeothermodificationstoa developmentconsentpursuanttoSection4.55(2)of theEP&AAct1979orunderSection4.56(1)ofthe Actif,intheopinionofCouncil,theproposed modificationisnotofminimalenvironmentalimpact
50%oftheoriginalDAfee or$859(whicheveristhe lesser)
Lastyearfee
50%oftheoriginalDAfee or$839(whicheveristhe lesser)
application
50%oforiginalDAfee modification to developmen tconsent thatdoes notinvolve the:erectionofa building,thecarrying outofa workor-the demolition ofaworkor buildingorifthefeefor theoriginal developmen tapplication wasless than$100
Applicationtomakeothermodificationstoa developmentconsentpursuanttoSection4.55(2)of theEP&AAct1979orunderSection4.56(1)ofthe Actif,intheopinionofCouncil,theproposed modificationisnotofminimalenvironmentalimpact
$253
Lastyearfee
$247 modification to developmen tconsent involving:erectionof dwelling housewith value $100,000or less
Applicationtomakeothermodificationstoa developmentconsentpursuanttoSection4.55(2)of theEP&AAct1979orunderSection4.56(1)ofthe Actif,intheopinionofCouncil,theproposed modificationisnotofminimalenvironmentalimpact
Thereferencetoestimatedcostisareferencetotheestimatedcostofthedevelopmentforwhichdevelopmentconsentwasgranted
Applicationtomakeothermodificationstoa developmentconsentpursuanttoSection4.55(2)of theEP&AAct1979orunderSection4.56(1)ofthe Actif,intheopinionofCouncil,theproposed modificationisnotofminimalenvironmentalimpact
$113plus$1.50foreach $1,000orpart$1,000above $5,000
Lastyearfee
$110plus$1.50foreach $1,000orpart$1,000above $5,000
costof developmen t$5,001$250,000
Thereferencetoestimatedcostisareferencetotheestimatedcostofthedevelopmentforwhichdevelopmentconsentwasgranted
Applicationtomakeothermodificationstoa developmentconsentpursuanttoSection4.55(2)of theEP&AAct1979orunderSection4.56(1)ofthe Actif,intheopinionofCouncil,theproposed modificationisnotofminimalenvironmentalimpact
$666plus$0.85foreach $1,000orpart$1,000above $250,000
Lastyearfee
$651plus$0.85foreach $1,000orpart$1,000above $250,000
costof developmen t$250,001$500,000
Thereferencetoestimatedcostisareferencetotheestimatedcostofthedevelopmentforwhichdevelopmentconsentwasgranted
Applicationtomakeothermodificationstoa developmentconsentpursuanttoSection4.55(2)of theEP&AAct1979orunderSection4.56(1)ofthe Actif,intheopinionofCouncil,theproposed modificationisnotofminimalenvironmentalimpact
$949plus$0.50foreach $1,000orpart$1,000above $500,000
Lastyearfee
$927plus$0.50foreach $1,000orpart$1,000above $500,000 estimated costof developmen t$500,001$1,000,000
Thereferencetoestimatedcostisareferencetotheestimatedcostofthedevelopmentforwhichdevelopmentconsentwasgranted
Applicationtomakeothermodificationstoa developmentconsentpursuanttoSection4.55(2)of theEP&AAct1979orunderSection4.56(1)ofthe Actif,intheopinionofCouncil,theproposed modificationisnotofminimalenvironmentalimpact
$1,314plus$0.40foreach $1,000orpart$1,000above $1M
Lastyearfee
$1,285plus$0.40foreach $1,000orpart$1,000above $1M estimated costof developmen t$1,000,001$10,000,000
Thereferencetoestimatedcostisareferencetotheestimatedcostofthedevelopmentforwhichdevelopmentconsentwasgranted
Applicationtomakeothermodificationstoa developmentconsentpursuanttoSection4.55(2)of theEP&AAct1979orunderSection4.56(1)ofthe Actif,intheopinionofCouncil,theproposed modificationisnotofminimalenvironmentalimpact
$6,310plus$0.27foreach $1,000orpart$1,000above $10M
Lastyearfee
$6,167plus$0.27foreach $1,000orpart$1,000above $10M
costof developmen t> $10,000,000
Thereferencetoestimatedcostisareferencetotheestimatedcostofthedevelopmentforwhichdevelopmentconsentwasgranted
Additionalfeeformodificationapplicationthatis accompaniedbystatementofqualifieddesigner
Thisfeeonlyapplieswhereamodificationapplicationisnotrequiredtobereviewedbyadesignreviewpanel(s102oftheEP&AAct 1979).
Additionalfeeforproposedmodificationsto developmentconsentundersections4.55(2)and 4.56(1)oftheEP&AAct1979thatinvolveresidential flatdevelopmentwhichisrequiredtobereferredtoa designreviewpanelunderSEPP65
Feehasbeenseparatedfromfeeforsimilarprocessthatappliestotheoriginaldevelopmentapplicationtowhichaproposed modificationrelates-duetoadifferentiationmadeinlegislation
DevelopmentofaCommunityFacilitybyabonafide non-profitcommunityorganisation
Notincludingeducationalestablishments,hospitals,retailpremises,placesofpublicworshiporresidentialaccommodation.
Waiverorrefundpaymentofallorpartofthefeeorchargeonacasebycasebasis.
Developmentapplicationlodgedbyoronbehalfof Council-ifanindependentconsultantisrequiredto conductanypartoftheassessment,thecostistobe paidbytheApplicant/Council(inadditiontostandard DevelopmentApplicationfees)
Renotification/advertisingfeewhereCouncilis requiredtorenotifyanapplicationduetoamendments totheproposal
Inthecaseofdesignateddevelopment(asdefinedby theAct)anddevelopmentrequiredbyan EnvironmentalPlanningInstrumenttobenotifiedin themannerofdesignateddevelopment
Inthecaseofadvertiseddevelopment(asdefinedby theCommunityParticipationPlan)
Inthecaseofadvertiseddevelopment(asdefinedby theCommunityParticipationPlan)fornominated integrateddevelopment,threatenedspecies developmentorClass1aquaculturedevelopment
InthecaseofanapplicationpursuanttoSection 4.55(2)orSection4.56(1)oftheEP&AAct1979
Inthecaseofprohibiteddevelopment,including existinguserights(buttheCouncilshallrefundso muchoftheadditionalportionofthefeeasisnot expendedingivingtherequirednotification)
Inthecaseofnotificationrequiredtobegivenin connectionwithanapplicationpursuanttoSection8.3 oftheEP&AAct1979
InthecaseofallotherDevelopmentApplicationsand amendmentsthereto–forworkinvolvingasingle dwelling&oroutbuildings
InthecaseofallotherDevelopmentApplicationsand amendmentsthereto–forallothertypesof development
toinstallamanufacturedhome,moveable dwellingorassociatedstructureonland–LGA1993, S68
Inspectionofinstallationofamanufacturedhome, moveabledwellingorassociatedstructureonland–LGA1993,S68
DeterminationofCertificateofCompletionof installationofmanufacturedhomeorassociated structure–LG(ManufacturedHomeEstates,Caravan Parks,CampingGroundsandMoveableDwellings) Regulation2005,Cl69
–LGA1993, S68
to
Processingofanobjectiontotheapplicationof regulationsandlocalpolicies–LGA1993,S82
Subdivision/StrataCertificates
–
Subdivision/StrataCertificates [continued]
SubdivisionCertificate
Re-endorsementofSubdivisionCertificateand/or s88Binstrumentafteroriginalendorsement,dueto amendmentstodocuments
plus$67peradditional lot
10%GSTforConstructionCertificateapplicationfees,GSTExemptforRoadsActapplications
Newroadconstructionorconstructionofmorethan halfoftheexistingpavementwidth
10%GSTforConstructionCertificateapplicationfees,GSTExemptforRoadsActapplications Road
10%GSTforConstructionCertificateapplicationfees,GSTExemptforRoadsActapplications
Roadconstructionlessthanhalfofexistingpavement widthand/orkerbandgutterconstructionor replacement>30mandassociateddrainageand/or footwayworks
10%GSTforConstructionCertificateapplicationfees,GSTExemptforRoadsActapplications
MiscellaneousworksE.g.:Interallotmentdrainage, drainagestructuresandotherpublicdomain improvmentssuchas:footpaths,paving,planter boxes,bikeracks,bespokefurnitureetc.
10%GSTforConstructionCertificateapplicationfees,GSTExemptforRoadsActapplications
MiscellaneousworksE.g.:Interallotmentdrainage, drainagestructuresandotherpublicdomain improvementssuchas:footpaths,paving,planter boxes,bikeracks,bespokefurnitureetc. 2%ofcostofconstructionor $930whicheveristhe greater
10%GSTforConstructionCertificateapplicationfees,GSTExemptforRoadsActapplications
Feesforsubdivisionworks,DArelatedroadworks&non-DArelatedroadworks [continued]
Modificationorre-issueofSubdivisionWorkcertificate &/orRoadsActapproval 35%ofcostoforiginal applicationfeeor$405 whicheveristhegreater
Lastyearfee 35%ofcostoforiginal applicationfeeor$386 whicheveristhegreater
10%GSTforConstructionCertificateapplicationfees,GSTExemptforRoadsActapplications
Modificationorre-issueofSubdivisionWorkcertificate &/orRoadsActapproval
ofcostoforiginal applicationfeeor$930 whicheveristhegreater Lastyearfee 35%ofcostoforiginal applicationfeeor$886 whicheveristhegreater
10%GSTforConstructionCertificateapplicationfees,GSTExemptforRoadsActapplications
Additionalfeeforwhenassessmentofapplication extendsbeyondtheinitialassessmentplusfurther reviewsofamended/additionaldetailsontwo subsequentoccasionsandtheapplicationcontinues tobeinaformthatisnotsuitableforapproval
10%GSTforConstructionCertificateapplicationfees,GSTExemptforRoadsActapplications
Permittoinstallgroundanchors/shoringordewatering
AppointmentasthePrincipalCertifier(SubdivisionandCivilWorks)ortoinspect/monitorworksunder theRoadsActapplications
Roads Act Section 138 applications will be charged at the published rate, with a non-refundable initial instalment.Additionalpaymentswillbechargedbasedontheapplicationtypeandrequirements.
pavementwidth.
AppointmentasThePrincipalCertifier(SubdivisionandCivilWorks)ortoinspect/monitorworksunderRoadsActapplications.Fee coversallinspectionsaslistedintheDevelopmentConsentand/oracouncilletterconfirmingrequirements.GSTExemptexceptif theroleiscontestablebyprivatecertifiers(inwhichcase10%GSTapplies)
Newroadconstructionorconstructionofmorethan halfofexistingpavementwidth.
AppointmentasThePrincipalCertifier(SubdivisionandCivilWorks)ortoinspect/monitorworksunderRoadsActapplications.Fee coversallinspectionsaslistedintheDevelopmentConsentand/oracouncilletterconfirmingrequirements.GSTExemptexceptif theroleiscontestablebyprivatecertifiers(inwhichcase10%GSTapplies)
Roadconstructionlessthanhalfofexistingpavement widthand/orkerbandguttercontructionor replacement>30mandassociateddrainageand/or footwayworks
AppointmentasThePrincipalCertifier(SubdivisionandCivilWorks)ortoinspect/monitorworksunderRoadsActapplications.Fee coversallinspectionsaslistedintheDevelopmentConsentand/oracouncilletterconfirmingrequirements.
AppointmentasthePrincipalCertifier(SubdivisionandCivilWorks)ortoinspect/monitorworksunder theRoadsActapplications [continued]
Roadconstructionlessthanhalfofexistingpavement widthand/orkerbandguttercontructionor replacement>30mandassociateddrainageand/or footwayworks
AppointmentasThePrincipalCertifier(SubdivisionandCivilWorks)ortoinspect/monitorworksunderRoadsActapplications.Fee coversallinspectionsaslistedintheDevelopmentConsentand/oracouncilletterconfirmingrequirements.GSTExemptexceptif theroleiscontestablebyprivatecertifiers(inwhichcase10%GSTapplies)
Miscellaneousworkse.g.Interallotmentdrainage, drainagestructuresandotherpublicdomain improvementssuchas:footpaths,paving,planter boxes,bikeracks,bespokefurnitureetc. 2%ofcostofconstructionor $405whicheveristhe greater Lastyearfee 2%ofcostofconstructionor $386whicheveristhe greater
AppointmentasThePrincipalCertifier(SubdivisionandCivilWorks)ortoinspect/monitorworksunderRoadsActapplications.Fee coversallinspectionsaslistedintheDevelopmentConsentand/oracouncilletterconfirmingrequirements.GSTExemptexceptif theroleiscontestablebyprivatecertifiers(inwhichcase10%GSTapplies)
Miscellaneousworkse.g.Interallotmentdrainage, drainagestructuresandotherpublicdomain improvementssuchas:footpaths,paving,planter boxes,bikeracks,bespokefurnitureetc.
AppointmentasThePrincipalCertifier(SubdivisionandCivilWorks)ortoinspect/monitorworksunderRoadsActapplications.Fee coversallinspectionsaslistedintheDevelopmentConsentand/oracouncilletterconfirmingrequirements.GSTExemptexceptif theroleiscontestablebyprivatecertifiers(inwhichcase10%GSTapplies)
Additionalfeeforadditional/extraordinary
AppointmentasThePrincipalCertifier(SubdivisionandCivilWorks)ortoinspect/monitorworksunderRoadsActapplications.
Arrangementforcashorbankguaranteesecurity bondsforuncompletedworksormaintenancewhere the
ofthebondisupto$10,000
GSTdoesnotapplytoanyservicesthatfollowfromsubdivisionapplicationslodgedpriorto30/6/98
Arrangementforcashorbankguaranteesecurity bondsforuncompletedworksormaintenancewhere thevalueofthebondismorethan$10,000
GSTdoesnotapplytoanyservicesthatfollowfromsubdivisionapplicationslodgedpriorto30/6/98
Substitutionofexistingsecuritybondswithanother bondofalesseramountduetocompletionofsome workscoveredbyexistingbond
GSTdoesnotapplytoanyservicesthatfollowfromsubdivisionapplicationslodgedpriorto30/6/98
ReferraltotheUrbanDesignReviewPanelfora modificationapplication
ReferraltotheUrbanDesignReviewPanelpriorto submissionofDA
AttendanceatPublicArtReferenceGroupMeetingsifrelatedtoadevelopmentapplication
AttendanceatPublicArtReferenceGroupMeetingsotherthanDAorBIA
ConstructionCertificateFees-BuildingWork
For development in respect of which Council employs staff that are accredited to the extent required to determineaconstructioncertificateapplication
FordevelopmentinrespectofwhichCouncilemploys staffthatareaccreditedtotheextentrequiredto determineaconstructioncertificateapplication
$415plusamountcalculated inaccordancewiththe followingcomponentamount (expressedas%ofcost) Lastyearfee
$395plusamountcalculated inaccordancewiththe followingcomponentamount (expressedas%ofcost)
Cost(i.e.thecontractpriceorifthereisnocontract, thecostasdeterminedbyCouncil,includinglabour andmaterials) 0.40%plusGST <=$500,000
Cost(i.e.thecontractpriceorifthereisnocontract, thecostasdeterminedbyCouncil,includinglabour andmaterials)
0.40%for1st$500,000plus 0.21%oftheamountin excessof$500,000(plus GST)
Cost(i.e.thecontractpriceorifthereisnocontract, thecostasdeterminedbyCouncil,includinglabour andmaterials) aquotationcanbeprovided (subjecttoratificationbythe relevantExecutive Manager).
$2,000,000
Lastyearfee aquotationcanbeprovided (subjecttoratificationby Planning,Transport& Regulationorrelevant ExecutiveManager). > $2,000,000
Alldevelopmentwhencombinedwithadevelopment applicationorlodgedpriortodeterminationof developmentapplication
Modificationof
AdditionalFeetoassessmajordrainageworks requiredinconnectionwithaproposal,including drainagedetentionsystems
Additionalfeetoassessaminorperformancesolution tothedeemedtocomplystandardsoftheBuilding CodeofAustralia(BCA)
Additionalfeetoassessamajorperformancesolution tothedeemedtocomplystandardsoftheBuilding CodeofAustralia(BCA)
AdditionalfeetoprepareandmakeareferraltoNSW FireBrigadesasperSections25-29oftheEP&A (DevelopmentCertificationandFireSafety) Regulation2021
AdditionalfeeforservicesrenderedbyFire&Rescue NSWinconnectionwithareferralmadeasper Sections25-29ofEP&A(DevelopmentCertification andFireSafety)Regulation2021(payabletoFire& RescueNSWsubsequenttolodgementofapplication forConstructionCertificate) amountoftheinvoice receivedfromFire&Rescue NSW
FordevelopmentinrespectofwhichCouncildoesnot employdevelopmentofficersthatholdaclassof registrationthatenablesthemtodeterminea constructioncertificateapplication
$6,480plusthedirectcosts ofallthirdpartiesengaged byCNtoprocessthe application(plusGST)
Lastyearfee
$6,175plusthedirectcosts ofallthirdpartiesengaged byCNtoprocessthe application(plusGST)
For development in respect of which Council employs staff that are accredited to the extent required to determineacomplyingdevelopmentcertificateapplication
Dwelling-houses&associatedoutbuildings(including secondarydwellingsandgrouphomes) $660.00 $708.00 aggregated grossarea ofnew worksincluding alterations, additions and outbuildings of<50m2
ComplyingDevelopmentCertificates [continued]
Swimmingpools,changeofuse(includingbedand breakfastaccommodation),demolitionwork,small windturbinesystems,solarenergysystems, telecommunicationfacilities,temporarystructuresand conversionoffire
andIndustrialworkanddevelopmentfor thepurposeofinstallingafiresprinklersystemand other
WharforBoatingFacilities–fences,gates, retainingwalls&satellitedishes/telecommunications
Aquotationcanbeprovided (subjecttoratificationbythe relevantExecutive Manager). Lastyearfee aquotationcanbeprovided (subjecttoratificationby Planning,Transport& Regulationorrelevant ExecutiveManager).
ModificationofaComplyingDevelopmentCertificate
63%oftheoriginal certificatefeeor$525(plus GST)whicheveristhe lesser
Lastyearfee 60%oftheoriginal certificatefeeor$500(plus GST)whicheveristhe lesser
Additionalfeetoassesscompliancewithdevelopment standardsforbushfireproneland
CertificationofBushfireAttackLevelinconnection withtheapplicationofdevelopmentstandardsofthe GeneralHousingCodeandRuralHousingCodeof StateEnvironmentalPlanningPolicy(Exemptand ComplyingCodes)2008
Additionalfeetoassessaminorperformancesolution tothedeemedtocomplywiththestandardsofthe BuildingCodeofAustralia(BCA)
Additionalfeetoassessamajoralternativesolutionto thedeemedtocomplywiththestandardsofthe BuildingCodeofAustralia(BCA)
FordevelopmentinrespectofwhichCNdoesnot employdevelopmentofficersthatholdaclassof registrationthatenablesthemtodeterminea complyingdevelopmentcertificateapplication
$6,260plusthedirectcosts ofallthirdpartiesengaged byCNtoprocessthe applications(plusGST)
Lastyearfee
$5,964plusthedirectcosts ofallthirdpartiesengaged byCNtoprocessthe applications(plusGST)
FordevelopmentinrespectofwhichCNemploys developmentofficersthatholdaclassofregistration thatenablesthemtodetermineacompliance certificateapplication $305perhour
FordevelopmentinrespectofwhichCNdoesnot employdevelopmentofficersthatholdaclassof registrationthatenablesthemtodeterminea compliancecertificateapplication
Class1&Class10Buildings
OtherClassesofBuildings
Lastyearfee $295perhour
$3,238plusthedirectcosts ofallthirdpartiesengaged byCNtoprocessthe applications(plusGST)
Lastyearfee
$3,084plusthedirectcosts ofallthirdpartiesengaged byCNtoprocessthe applications(plusGST)
$625plus$0.80perm2for eachm2>200m2
Lastyearfee
$595plus$0.80perm2for eachm2>200m2
OtherClassesofBuildings
Where
partofabuilding consistingofexternalwallonlyordoesnototherwise haveafloorarea
$1,997plus$0.95perm2 foreachm2>2000m2
Lastyearfee
$1,902plus$0.95perm2 foreachm2>2000m2
AdditionalfeeforBuildingInformationCertificate applicationsthatincludeunauthoriseddevelopment
Amountthatwouldhave beenpayableforan applicationfordevelopment consentandaconstruction certificateforunauthorised partsofthebuilding,plus anyamountthatwouldbe payableundera DevelopmentContributions Plan,allbasedonamounts payableatthedatethatthe applicationislodged.
Lastyearfee amountthatwouldhave beenpayableforan applicationfordevelopment consentandaconstruction certificate,oracomplying developmentcertificate(if appropriate)for unauthorisedpartsofthe building
OccupationCertificate(wholeorpart)fordevelopment involvingbuildingworks
AdditionalfeetoprepareandmakeareferraltoNSW Fire&RescueasperSections50-51ofEP&A (DevelopmentCertificationandFireSafety) Regulation2021
FordevelopmentinrespectofwhichCouncilemploysstaffthatareaccreditedtotheextent
development
[continued]
AdditionalfeepayableforservicesrenderedbyFire& RescueNSWinconnectionwithareferralmadeas perSections50-51ofEP&A(Development CertificationandFireSafety)Regulation2021 (payabletoFire&RescueNSWsubsequentto lodgementofapplicationforOccupationCertificate
FordevelopmentinrespectofwhichCouncildoesnot employdevelopmentofficersthatholdaclassof registrationthatenablesthemtobethePCfora particulardevelopment
amountoftheinvoice receivedfromFire&Rescue NSW
$3,238plusthedirectcosts ofallthirdpartiesengaged byCNtoprocessthe applications(plusGST)
Lastyearfee
$3,084plusthedirectcosts ofallthirdpartiesengaged byCNtoprocessthe applications(plusGST)
AppointmentasaPrincipalCertifierforBuildingWorks
PCFee
Lowscaleresidentialdevelopmentincludingnewsingledwellings,secondarydwellingswithtotalfloorareano more than 60 square metres, new domestic outbuildings & swimming pools and alterations/additions to existingresidentialdevelopment
FordevelopmentinrespectofwhichCouncilemploysstaffthatareaccreditedtotheextentrequiredtobethe PCforaparticulardevelopment
PCFee
Alldevelopmentwhencombinedwithadevelopment applicationorlodgedpriortodeterminationof developmentapplication
Aquotationcanbeprovided (subjecttoratificationbythe relevantExecutive Manager).
Lastyearfee aquotationcanbeprovided (subjecttoratificationby DevelopmentAssessment SectionManageror RelevantExecutive Manager).
of developmen t$80,001$2,000,000
costof developmen t> $2,000,000
Twoormorenewdwellings,secondarydwellingswithtotalfloorareamorethan60squaremetresorclass3 boardinghouses
FordevelopmentinrespectofwhichCouncilemploysstaffthatareaccreditedtotheextentrequiredtobethe PCforaparticulardevelopment. PC
A
canbeprovided (subjecttoratificationbythe relevantExecutive Manager). Lastyearfee aquotationcanbeprovided (subjecttoratificationby DevelopmentAssessment SectionManagerorrelevant ExecutiveManager).
FordevelopmentinrespectofwhichCouncilemploysstaffthatareaccreditedtotheextentrequiredtobethe PCforaparticulardevelopment
Commercial/IndustrialDevelopment
developmentwhencombinedwithadevelopment applicationorlodgedpriortodeterminationof developmentapplication
Aquotationcanbeprovided (subjecttoratificationbythe relevant Executive Manager).
Lastyearfee aquotationcanbeprovided (subjecttoratificationby DevelopmentAssessment SectionManageror relevant Executive Manager).
AdditionalInspectionsincludingBASIXinspection, reinspectionsandinspectionsinrelationto applicationsapprovedover5yearsago
FordevelopmentinrespectofwhichCouncilemploysstaffthatareaccreditedtotheextentrequiredtobethePCforaparticular development
IfCouncilisappointedtoreplaceaprivateRegistered Certifieronapartiallycompletedproject-1A Buildingsonly.
Fullfeeispayablerelevant tocategoryofdevelopment, asabove,plus$600 administrationfeeper changeofPCrequest
Lastyearfee fullfeeispayablerelevantto categoryofdevelopment,as above,plus$575 administrationfeeper changeofPCrequest
FordevelopmentinrespectofwhichCouncilemploysstaffthatareaccreditedtotheextentrequiredtobethePCforaparticular development.Inaddition,ifdeemedtobeacomplexproject,additionalfeesareapplicable.Subjecttoaquotationtoberatifiedby DevelopmentAssessmentSectionManagerorExecutiveManagerPlanning,Transport&Regulation.
Fullfeeispayable,tocompensateforhavingtofamiliarisewiththestatusoftheproject.Withtheexceptionofthecategorieswithan openended"valueofdevelopment",thefeecoversallstagedinspectionsaslistedinaCouncilletterconfirmingappointmentas PrincipalCertifier.Fortheopenendedcategories,themaximumnumberofinspectionscoveredbythisfeeis:-LowScaleResidential Development-5,MultipleResidentialDevelopment-15,Commercial/IndustrialDevelopment-7
IfCouncilisappointedtoreplaceaprivateRegistered Certifieronapartiallycompletedproject-allclasses ofbuildingsexcept1A
Fullfeeispayablerelevant tocategoryofdevelopment, asabove,plus administrationfeeof$1,000.
Lastyearfee
fullfeeispayablerelevantto categoryofdevelopment,as above,plusadministration feeasquoted.
Other [continued]
FordevelopmentinrespectofwhichCouncildoesnot employdevelopmentofficersthatholdaclassof registrationthatenablesthemtobethePCfora particulardevelopment
$6,476plusthedirectcosts ofallthirdpartiesengaged bycounciltoprocessthe application(plusGST)
Lastyearfee
$6,168plusthedirectcosts ofallthirdpartiesengaged bycounciltoprocessthe application(plusGST)
Supply
AllplanningproposalapplicationswillbesubjecttoStage1Aand1Bbelow. The applicable category for each planning proposal application will be determined at the initial planning proposalmeeting. The additional staged fees will be charged as below, subject to the determination by CN of the application beingStandard,ComplexorPrincipal.
-
Complex* [continued]
Principal*
Other
Engagementofconsultanttoprepareaplanning proposalandmanagetheGatewaydetermination processwhencouncilisthePlanningProposal AuthorityfollowingaGatewaydeterminationreview Stage2feeof
Minormappinganomalieswhereanerrorcanbe identifiedintheNewcastleLEPandwherethe proposedamendmentisconsistentwiththeintentand directionoftheLEPandCouncil.
AmendmentproposedbyaNSWgovernment departmenttoenabledevelopmentoflandforuse definedasan‘InfrastructureFacility’underState EnvironmentalPlanningPolicy(Infrastructure)2007
Reclassificationoflandtoenabletheprovisionof publicinfrastructureorcommunityfacilities
PreparationofDCP,PrecinctPlanorPlaceStrategy
if
(Minimum 1/2hour charge)
perhour. (Minimum chargeof30 minutesand 15minute increments thereafter)
Thisfeecoversinspectionsofcaravanparks&campinggrounds,watercoolingsystems,warmwatersystems,beautyshop, hairdresser,hairdressingvehicle,skinpenetration,horsesonpremises,on-siteseweragemanagementsystems,swimmingpool waterquality,eventandmarketsfoodinspectionfeeandinspectingvehiclesorarticlesusedforsellingfood.
Thisfeecoversre-inspectionsofcaravanparks&campinggrounds,watercoolingsystems,warmwatersystems,beautyshop, hairdresser,hairdressingvehicle,skinpenetration,horsesonpremises,on-siteseweragemanagementsystems,swimmingpool waterquality,eventandmarketsfoodinspectionfeeandinspectingvehiclesorarticlesusedforsellingfood.
WorkZonesandVariousSpecialUseZonesforEvents&Activities
Paralleltokerbparking-Approvalzonewithintheroadcarriageway
Angleparking-Approvalzonewithintheroadcarriageway
Workzonesaretobeaminimumlengthof6metres(equivalentto1
All zonesapplicationsshouldbeminimumof1monthduration.
Supply,installationandremovalofconstructionzonesignage
Workzonesaretobeaminimumlengthof6metres(equivalentto1parallelor2angleparkingspaces).All zonesapplicationsshouldbeminimumof1monthduration.
Chargedonallpermitswhererequesteddateisinsidetherequirednotificationperiod. Thisincludes,butisnotlimitedto,RoadOccupancyLicence,ShippingContainerApplications,Parking
TemporaryRoadClosuresandCraneApplications.
Supervisioncostswillbesharedbythenumberofeventsonthesameday.Additionalcosts-atfullcostto applicantplusGST.
EnclosePublicPlace [continued]
Inrespectofworksinvolvingtheconstructionor maintenanceofasingledwellinghouse
In
ParkingOperations
UseofSuburbanCarparks
foruptotwomonths durationplus$290per monththereafter
Lastyearfee $580foruptotwomonths durationplus$285per monththereafter
OtherParkingCharges
TemporaryParkingAuthorisation
$380perspaceperweek (Mon-Sun)plusApplication Feeof$35 Lastyearfee
$360perspaceperweek (Mon-Sun)plusApplication Feeof$32
CompanionAnimal-LifetimeRegistration
CompanionAnimalsAct,1998
Thefollowingareexempt:
-Companionanimalusedasaguideorassistanceanimal;
-AdogusedforworkingonfarmlandpropertiesrecognisedunderSection515LocalGovernmentAct1993;
-GreyhoundregisteredundertheGreyhoundRacingAct2017;
-Catsordogsdesexedandsoldbypoundorshelter
Dog-Registrationfee(by12weeksorwhensoldif earlierthan12weeks)
Dog-AdditionalFee(dognotdesexedby6months)
InvasiveSpeciesBiosecurity
ForchargingstationssolelyownedandmanagedbyCityofNewcastle. Priceisdependantonthechargerspowercapacityand/ortimeofuse
Notethatanyelectricvehiclechargingstationsownedandoperatedprivately,orinpartnershipwithCouncil,mayhaveadifferentfee structureandaredeterminedbytheoperator.
Theoverstaychargewillbeincurredonaperminutebasiswhenvehicleshavestayedlongerthanthespecifiedtimeperiod
Someoralloftheitemslistedmaynotbeavailableoracceptableduetooperatingrequirementsorproduct availability.
Site management reserves the right to refuse to receive and/or load vehicles at any times and/or for any reason.
CNmayofferreducedfeesforlarge-scalecustomers,includingthoseclassifiedasLargeCommercialWaste Operators.
Chargesareinclusiveofallstatutorycharges.WasteServicesacceptselectronicpaymentsonly nocashor cheque.Paymentsmadebycardmayattracta0.75%(GSTinclusive)surcharge.
Disposal&Recycling
Domesticpaper&cardboard(dry,clean),bottles,cans
Carparts,bikes,steel,aluminium,whitegoods(excludingfridges,freezersandairconditioners)
CommunityRecyclingCentre-ResidentialHousehold Hazardous&ProblemWaste(corematerials)
First10itemsfreepervisit.Referto"ElectricalWaste-commercialcustomers"foritemsinexcessofthislimit. TV's,Computers,Printers/Scanners,Fans,Phones,VCR's,DVDPlayers,Radios/Stereos,PowerTools,KitchenAppliances, VacuumCleaners,Heatersetc.
ElectricalWaste-commercialcustomers
TV's,Computers,Printers/Scanners,Fans,Phones,VCR's,DVDPlayers,Radios/Stereos,PowerTools,KitchenAppliances, VacuumCleaners,Heatersetc.
Inadditiontotonnagechargeifincludedinmixedload
Inadditiontotonnagechargeifincludedinmixedload
–LeadAcid(drycellbatteries–free)
Inadditiontotonnagechargeifincludedinmixed
Inadditiontotonnagechargeifincludedinmixedload
Freezers&AirConditioners
Inadditiontotonnagechargeifincludedinmixedload
Inadditiontotonnagechargeifincludedinmixedload
Inadditiontotonnagecharge(ifincludedinmixedload)
OtherItems
Allcancellationandchangeofservicefeespertaintotheproperty,nottheaccountholder. Additionalservicerelatestoanycollectionthatisoutsideoftherateableserviceentitlement.
Miscellaneous [continued]
ServiceChargesofEventbins-1100litrebin-bins emptiedfromkerbsidelocation
Differentsizes,typesanddeliverymethodsotherthan thoselistedinthisschedule
[continued]
fee–ifmorethanoneinspectionifcarried out
Additionalfeeforadditional/extraordinary inspectionsorre-inspectionsduetoincomplete works
Additionalfeeforamendmenttoadevelopment application,assoughtbyanapplicant,(subjectto theagreementofCouncil)pursuanttosection37of theEP&ARegulation2021
Additionalfeeforamendmenttoadevelopment application,assoughtbyanapplicant,(subjectto theagreementofCouncil)pursuanttosection37or 113oftheEP&ARegulation2021
feeforBuildingInformationCertificate applicationsthatincludeunauthoriseddevelopment
Additionalfeefordevelopmentapplicationinvolving designateddevelopment
Additionalfeeformodificationapplicationthatis accompaniedbystatementofqualifieddesigner
Additionalfeeforproposedmodificationsto developmentconsentundersections4.55(2)and 4.56(1)oftheEP&AAct1979thatinvolveresidential flatdevelopmentwhichisrequiredtobereferredtoa designreviewpanelunderSEPP65
AdditionalfeeforservicesrenderedbyFire& RescueNSWinconnectionwithareferralmadeas perSections25-29ofEP&A(Development CertificationandFireSafety)Regulation2021 (payabletoFire&RescueNSWsubsequentto lodgementofapplicationforConstructionCertificate)
feeforsitesignidentifyingtheCityof NewcastleasPC
Additionalfeeforurgentfloodinformationcertificate ordevelopmentstandardsforfloodcontrollots,as pertheGeneralHousingCode,RuralHousingCode oranyotherrelevantprovisionofanEnvironmental PlanningInstrument
Additionalfeeforwhenassessmentofapplication extendsbeyondtheinitialassessmentplusfurther reviewsofamended/additionaldetailsontwo subsequentoccasionsandtheapplicationcontinues tobeinaformthatisnotsuitableforapproval
AdditionalfeepayableforservicesrenderedbyFire &RescueNSWinconnectionwithareferralmade asperSections50-51ofEP&A(Development CertificationandFireSafety)Regulation2021 (payabletoFire&RescueNSWsubsequentto lodgementofapplicationforOccupationCertificate
Additionalfeetoassessamajoralternativesolution tothedeemedtocomplywiththestandardsofthe BuildingCodeofAustralia(BCA)
Additionalfeetoassessamajorperformance solutiontothedeemedtocomplystandardsofthe BuildingCodeofAustralia(BCA)
feetoassessaminorperformance solutiontothedeemedtocomplystandardsofthe BuildingCodeofAustralia(BCA)
feetoassessaminorperformance solutiontothedeemedtocomplywiththestandards oftheBuildingCodeofAustralia(BCA)
feetoassesscompliancewith developmentstandardsforbushfireproneland
AdditionalFeetoassessmajordrainageworks requiredinconnectionwithaproposal,including drainagedetentionsystems
Additionalfeetocoverdifferencebetween
ApplicationandFullRoad
Additional
to NSWFire&RescueasperSections50-51ofEP&A (DevelopmentCertificationandFireSafety) Regulation
Additional
toprepareandmakeareferralto NSWFireBrigadesasperSections25-29ofthe EP&A(DevelopmentCertificationandFireSafety) Regulation
inrelationto
over5yearsago
linemarking(byrequest):Athletics, Football,Touch,Oztag,RugbyUnion/Leagueand
a3Dmodelnotsatisfying Council'srequirementsforlodgement,submittedby theapplicant–withtheexceptionofcomplex developmentswhichwillbePOA.
Adviceonminordevelopmentproposals(whichare notclassifiedasdutyrequests)andthemeeting involves
proposedbyaNSWgovernment departmenttoenabledevelopmentoflandforuse definedasan‘InfrastructureFacility’underState Environmental
(Infrastructure)2007
AmendmenttotheDAinvolvingresubmissionofa 3DmodelnotmeetingCouncil'srequirements–with theexceptionofcomplexdevelopmentswhichwill bePOA.
andChargesfor
Services, includingbutnotlimitedtopreparationofplansand instrumentsforregistrationofdealings,valuations, consultantfees,statutorycostsanddisbursements
adomesticoilorsolidfuel heatingapplianceotherthanaportableappliance
installamanufacturedhome, moveabledwellingorassociatedstructureonland–LGA1993,S68
Applicationtomakeothermodificationstoa developmentconsentpursuanttoSection4.55(2)of theEP&AAct1979orunderSection4.56(1)ofthe Actif,intheopinionofCouncil,theproposed modificationisnotofminimalenvironmentalimpact
Applicationtomakeothermodificationstoa developmentconsentpursuanttoSection4.55(2)of theEP&AAct1979orunderSection4.56(1)ofthe Actif,intheopinionofCouncil,theproposed modificationisnotofminimalenvironmentalimpact
Applicationtomakeothermodificationstoa developmentconsentpursuanttoSection4.55(2)of theEP&AAct1979orunderSection4.56(1)ofthe Actif,intheopinionofCouncil,theproposed modificationisnotofminimalenvironmentalimpact
Applicationtomakeothermodificationstoa developmentconsentpursuanttoSection4.55(2)of theEP&AAct1979orunderSection4.56(1)ofthe Actif,intheopinionofCouncil,theproposed modificationisnotofminimalenvironmentalimpact
Applicationtomakeothermodificationstoa developmentconsentpursuanttoSection4.55(2)of theEP&AAct1979orunderSection4.56(1)ofthe Actif,intheopinionofCouncil,theproposed modificationisnotofminimalenvironmentalimpact
Applicationtomakeothermodificationstoa developmentconsentpursuanttoSection4.55(2)of theEP&AAct1979orunderSection4.56(1)ofthe Actif,intheopinionofCouncil,theproposed modificationisnotofminimalenvironmentalimpact
Applicationtomakeothermodificationstoa developmentconsentpursuanttoSection4.55(2)of theEP&AAct1979orunderSection4.56(1)ofthe Actif,intheopinionofCouncil,theproposed modificationisnotofminimalenvironmentalimpact
Applicationtomakeothermodificationstoa developmentconsentpursuanttoSection4.55(2)of theEP&AAct1979orunderSection4.56(1)ofthe Actif,intheopinionofCouncil,theproposed modificationisnotofminimalenvironmentalimpact
Applicationtomodifyahoardingpermit-additional siteinspectionrequired
Applicationtomodifyahoardingpermit-no additionalsiteinspection
Applicationtooperateacaravanpark,camping groundormanufacturedhomeestate–LGA1993, S68
Applicationtooperateapubliccarpark–LGA1993, S68
Applicationtosetup,operateorusealoudspeaker orsoundamplifyingdevice
Applicationstomakemodificationstoadevelopment consentinordertocorrectaminorerror, misdescriptionormiscalculationpursuanttoSec 4.55(1)oftheEP&AAct1979
Applicationstomakemodificationstoadevelopment consent,involvingminimalenvironmentalimpact, pursuanttoSections4.55(1A)&4.56(1)ofthe
Act
for
orbankguaranteesecurity bondsforuncompletedworksormaintenancewhere thevalueofthe
HomeEstates,CaravanParks,CampingGroundsand MoveableDwellings]
and Moveable
DeterminationofCertificateofCompletionof installationofmanufacturedhomeorassociated structure–LG(ManufacturedHomeEstates, CaravanParks,CampingGroundsandMoveable Dwellings)Regulation2005,Cl69
toerectan advertisementand/oradvertisingstructure
Developmentapplicationforapprovaltoerecteach additionaladvertisement
DevelopmentapplicationforerectionofaDwellinghouseupto$100,000
Developmentapplicationforproposeddevelopment notinvolvingtheerectionofabuilding,thecarrying outofawork,thesubdivisionoflandorthe demolitionofabuildingorwork
Developmentapplicationinvolvingtheerectionofa building,alterationstoabuilding,thecarryingoutof aworkorthedemolitionofaworkorbuilding
Developmentapplicationinvolvingtheerectionofa building,alterationstoabuilding,thecarryingoutof aworkorthedemolitionofaworkorbuilding
Developmentapplicationinvolvingtheerectionofa building,alterationstoabuilding,thecarryingoutof aworkorthedemolitionofaworkorbuilding
Developmentapplicationinvolvingtheerectionofa building,alterationstoabuilding,thecarryingoutof aworkorthedemolitionofaworkorbuilding
Developmentapplicationinvolvingtheerectionofa building,alterationstoabuilding,thecarryingoutof aworkorthedemolitionofaworkorbuilding
Developmentapplicationinvolvingtheerectionofa building,alterationstoabuilding,thecarryingoutof aworkorthedemolitionofaworkorbuilding
Developmentapplicationinvolvingtheerectionofa building,alterationstoabuilding,thecarryingoutof aworkorthedemolitionofaworkorbuilding
Developmentapplicationlodgedbyoronbehalfof Council-ifanindependentconsultantisrequiredto conductanypartoftheassessment,thecostistobe paidbytheApplicant/Council(inadditiontostandard DevelopmentApplicationfees)
Home
CaravanParks,Camping
and MoveableDwellings]
FordevelopmentinrespectofwhichCNdoesnot employdevelopmentofficersthatholdaclassof registrationthatenablesthemtodeterminea complyingdevelopmentcertificateapplication
FordevelopmentinrespectofwhichCNemploys developmentofficersthatholdaclassofregistration thatenablesthemtodetermineacompliance certificateapplication
FordevelopmentinrespectofwhichCouncildoes notemploydevelopmentofficersthatholdaclassof registrationthatenablesthemtobethePCfora particulardevelopment
FordevelopmentinrespectofwhichCouncildoes notemploydevelopmentofficersthatholdaclassof registrationthatenablesthemtobethePCfora particulardevelopment
FordevelopmentinrespectofwhichCouncildoes notemploydevelopmentofficersthatholdaclassof registrationthatenablesthemtodeterminea constructioncertificateapplication
FordevelopmentinrespectofwhichCouncil employsstaffthatareaccreditedtotheextent requiredtodetermineaconstructioncertificate application
Fordevelopmentproposalsorifvariationtooneor moreplanningcontrolsissought–foradditional meetingsoradditionalwrittencommentsonplans
Fordevelopmentproposalsorifvariationtooneor moreplanningcontrolsissought–forfirstmeeting regardingadevelopmentproposalforsingleordual occupancy
Fordevelopmentproposalsorifvariationtooneor moreplanningcontrolsissought–forfirstmeeting regardingdevelopmentproposalsotherthansingle ordualoccupancydwellings
Fordevelopmentproposalsorifvariationtooneor moreplanningcontrolsissought–forfirstmeeting regardingdevelopmentproposalsotherthansingle or
Fordevelopmentproposalsorifvariationtooneor moreplanningcontrolsissought–forfirstmeeting regardingdevelopmentproposalsotherthansingle ordualoccupancydwellings
Fordevelopmentproposalsorifvariationtooneor moreplanningcontrolsissought–forfirstmeeting regardingdevelopmentproposalsotherthansingle ordualoccupancydwellings
connectionwithnon-residentialdevelopment applicationpriorto1July2010-five(5)ormore separatedevelopmentapplications
Inconnectionwithnon-residentialdevelopment applicationpriorto1July2010uptofour(4) separatedevelopmentapplications
Inconnectionwithresidentialdevelopment(single dwellingand/ordualoccupancy)withinternalfloor plans
Inthecaseofadvertiseddevelopment(asdefined bytheCommunityParticipationPlan)fornominated integrateddevelopment,threatenedspecies developmentorClass1aquaculturedevelopment
InthecaseofallotherDevelopmentApplications andamendmentsthereto–forall
InthecaseofallotherDevelopment
InthecaseofanapplicationpursuanttoSection 4.55(2)orSection4.56(1)oftheEP&AAct
Inthecaseofdesignateddevelopment(asdefined bytheAct)anddevelopmentrequiredbyan EnvironmentalPlanningInstrumenttobenotifiedin themannerofdesignateddevelopment
Inthecaseofnotificationrequiredtobegivenin connectionwithanapplicationpursuanttoSection 8.3oftheEP&AAct
Inthecaseofprohibiteddevelopment,including existinguserights(buttheCouncilshallrefundso muchoftheadditionalportionofthefeeasisnot expendedingivingtherequirednotification)
MiscellaneousworksE.g.:Interallotmentdrainage, drainagestructuresandotherpublicdomain improvmentssuchas:footpaths,paving,planter boxes,bikeracks,bespokefurnitureetc.
Port,WharforBoatingFacilities–containers,tanks, cranes,silos,terminals,shiploaders,unloaders,belt conveyors,emergencyservices,wharfs,boating facilities,
externalconsultancyservicesfeefor applicationassessmentandpeerreviewwhere Councilhastoengagetheservicesofanoutside consultancyforspecialistadviceorpeerreview.The costofthisservicewillbeforwardedtotheparty causingtheneedforthepeerreview,adviceor inspection.
underdivision4.5ofthe
underpart6oftheEP&A Act
ReviewofdeterminationofDA(s8.3)inrespectof anyotherDA,withanestimatedcostofworkas described:
ReviewofdeterminationofDA(s8.3)inrespectof anyotherDA,withanestimatedcostofworkas described:
ReviewofdeterminationofDA(s8.3)inrespectof anyotherDA,withanestimatedcostofworkas described:
ReviewofdeterminationofDA(s8.3)inrespectof anyotherDA,withanestimatedcostofworkas described:
ReviewofdeterminationofDA(s8.3)inrespectof anyotherDA,withanestimatedcostofworkas described:
ReviewofdeterminationofDA(s8.3)inrespectof anyotherDA,withanestimatedcostofworkas described:
[ReviewofdeterminationofaDAotherthananapplicationforcomplying, designatedoranapplicationbytheCrown]
[ReviewofdeterminationofaDAotherthananapplicationforcomplying, designatedoranapplicationbytheCrown]
[ReviewofdeterminationofaDAotherthananapplicationforcomplying, designatedoranapplicationbytheCrown]
[ReviewofdeterminationofaDAotherthananapplicationforcomplying, designatedoranapplicationbytheCrown]
[Reviewofdeterminationofa
designatedoranapplicationbytheCrown]
[ReviewofdeterminationofaDAotherthananapplicationfor
designatedoranapplicationbytheCrown]
ReviewofdeterminationofDAMod(s8.2) [ReviewofdeterminationofaDAModotherthananapplicationfor complying,designatedoranapplicationbytheCrown]
Roadconstructionlessthanhalfofexisting pavementwidthand/orkerbandgutterconstruction orreplacement>30mandassociateddrainageand/ orfootwayworks
Roadconstructionlessthan
"NeighbourhoodWatch"and"SafeHouse"Scheme Signs [Signage-CommunityFacilitiesandStreetNames]
"NoObjection"concurrenceonthepartofthelocal council,includingbutnotlimitedtoapplicationsfor PossessoryTitle,ReleaseofEasement/Caveatetc (s.45(d)(5)RealPropertyAct)