Bridge Mitigation Plan

Introduction

• Centennial Bridge Closure – Expected 2026

• Collaboration with City of Miramichi/NBDTI

• Focus on Public Safety

o Public Works/Engineering

o Police

o Fire

o Transit

• Community Wellness and Recreation

• Setting Realistic Expectations

Public Works/Engineering

– Completed

Upgrades

(2017-2022)

• Route 8/Water Street – Roundabout

• King George Highway Intersection Upgrades

o Kingsway Avenue

o Jane Street

o George Street

o Newcastle Boulevard

o Ledden Street

o French Fort Road

• Intersection Upgrade, Pleasant Street/Hennessy Street

• Temporary Traffic Lights

1. University Avenue at Route 8 WB

2. Hennessy Street at Pleasant Street

3. KGH at Cove Road

4. KGH at French Fort Road

5. KGH at Percy Kelly Drive

6. KGH at Rennie Road

• Temporary Message Board

• Traffic Study – Temporary/Permanent Traffic Light Timings

• Completed additional patching 2025

• Strategic locations for staff/equipment

• Off hour operations (sweeping, line painting, garbage collection on King Goerge Highway)

Police

Mitigation Plan 2026

• Additional Staffing to cover Douglastown (coverage 24/7)

• Purchase Equipment/Software – Collision Reconstruction

o Expected to reduce road closures due to major accidents from 6 hrs to 2 hrs

Fire

Mitigation Plan 2026

• Additional Staffing located in Douglastown (coverage 24/7)

• Setup Temporary Fire Station in Douglastown

• Temporary Rezoning with Greater Miramichi Service Commission

Transit

• Purchased two used accessible transit vehicles (Express Route)

• Additional Staffing

• Updated Routes – Monday to Saturday 6:00am to 7:00pm

o Two buses Southside

o Two buses Northside

o One bus – Chatham Shopping Centre to Northumberland Square (Express Route)

Community Wellness and Recreation –

Mitigation Plan 2026

• Strategic locations for staff/equipment

• Utilize Satellite Office to reduce disruption in programming

• Limited deliveries (i.e. bleachers)

• Sports field maintenance will be adjusted

• Facility openings will be monitored, potentials changes required

Setting Realistic Expectations

• City to implement Centennial Bridge Closure Communications Plan

• Expect Traffic Delays

• City staff will continue to monitor/update plans as required

• Levels of Service will be affected across the City

• More closures expected in years to come