Skip to main content

Sheldon & Bradshaw Intersection

Page 1

WELCOME! OPEN HOUSE SHELDON & BRADSHAW INTERSECTION The 30 minut e present at ion will begin at 6:30 pm. Unt il t hen, please enjoy t he refreshment s and feel free t o view t he exhibit s around t he room. Thank you.


INTRODUCTIONS Present ers: Tom Met calf – Project Manager Amberly Morgan – Environment al Mat t Braught on – Traffic


PURPOSE OF TONIGHT’S WORKSHOP • Bring everyone up t o speed on t he project (past part icipant s and new part icipant s) • Present t he signalizat ion alt ernat ive and t he roundabout alt ernat ive • Discuss benefit s and challenges of bot h alt ernat ives • Wit h your “ st icky dot ” , show your preference for t he alt ernat ive you prefer – Dat a t o be shared wit h Cit y Council

• Allow t ime for sharing feedback wit h t he Cit y at t he post ers


TONIGHT’S AGENDA

• Present at ion (30 minut es) – Please hold all quest ions/ comment s

• Post er Exhibit s (Remainder of t he evening)


EXISTING INTERSECTION • Four way st op • Sheldon = 7,0 0 0 ADT • Bradshaw = 11,0 0 0 ADT

N

• No t urn lanes

Sheldon

Bradshaw

o Significant delays in t he peak hour


EXISTING INTERSECTION • Four way st op • Sheldon = 7,0 0 0 ADT • Bradshaw = 11,0 0 0 ADT

N

• No t urn lanes

Sheldon

o Significant delays in t he peak hour

Bradshaw

• Creek


EXISTING INTERSECTION • Four way st op • Sheldon = 7,0 0 0 ADT • Bradshaw = 11,0 0 0 ADT

N

• No t urn lanes o Significant delays in t he peak hour

Sheldon

• 8 0 ’ long by 32’ wide t wo-span bridge at a 4 5 degree skew

Bradshaw

• Creek


EXISTING INTERSECTION • Four way st op • •

Sheldon = 7,0 0 0 ADT Bradshaw = 11,0 0 0 ADT

N

• No t urn lanes o Significant delays in t he peak hour

Sheldon

• 8 0 ’ long by 32’ wide t wo-span bridge at a 4 5 degree skew • 10 0 year FEMA Floodplain

Bradshaw

• Creek


PROJ ECT NEED 1. Int ersect ion Level of Service a) Exist ing Int ersect ion = LOS F (172 t o 224 seconds of delay) b) EG Policy CI-13: All int ersect ions t o operat e at a minimum of Level of Service “ D” at all t imes


PROJ ECT NEED 1. Int ersect ion Level of Service (cont inued) c) Rural Roads Policy – Invest igat e Traffic Signal Cont rol as well as a Roundabout


PROJ ECT NEED 2. Hydraulics a) Eliminat es overt opping of t he bridge and roadway during t he 10 0 Year Flood Event • Benefit t o emergency service access and evacuat ions if necessary


RECENT PROJ ECT MILESTONES • November 30 , 20 11 – Open House wit h t he ent ire Rural Roads area invit ed t o provide input on t he project • J une 13, 20 12 - Cit y Council direct ed t o proceed wit h a signal and a roundabout design • November 20 15 – Design advanced t o t he 30 % level – Environment al field st udies complet ed – Environment al t echnical report s approved by Calt rans (federal funding requirement )

• December 20 15 – Environment al document (IS/ MND) complet ed and circulat ed for public review/ comment – Comment s due t oday (1/ 14 )

• Here we are t oday!


PROJ ECT SCHEDULE J an 20 16 Open House J an 27, 20 16 Council Mt g – Int ersect ion alt ernat ive select ed Summer 20 16 – Federal Environment al Document approved by Calt rans and FHWA Summer 20 17 – Final Design Complet ed Early 20 17 Open House Summer 20 17 – Right Of Way Acquisit ion Complet ed

Fall 20 17 – Advert ise for Const ruct ion Lat e 20 17 t o Lat e 20 18 – Const ruct ion


GRANTS RECEIVED • Highway Bridge Program – $1.3M for Design – $2.6M for Const ruct ion • Sacrament o Area Council of Government s – $1.3M for Const ruct ion • Tot al of Grant s Received = $5.2M


• Add signal and left t urn lanes • LOS C and 34 second delay in 20 18

Bradshaw

Signal Alt ernat ive N

Sheldon


• Add signal and left t urn lanes • LOS C and 34 second delay in 20 18 • 60 0 ’ of work • St andard shoulders / bike lanes

Bradshaw

Signal Alt ernat ive N

Sheldon


• Add signal and left t urn lanes • LOS C and 34 second delay in 20 18 • 60 0 ’ of work • St andard shoulders / bike lanes • Pedest rian pat hs at int ersect ion per ADA

Bradshaw

Signal Alt ernat ive N

Sheldon


• Replace exist ing bridge

Bradshaw

Signal Alt ernat ive N

Sheldon


•

Replace exist ing bridge

•

Const ruct 165’ long t riple box culvert

Bradshaw

Signal Alt ernat ive N

Sheldon


•

Replace exist ing bridge

•

Const ruct 165’ long t riple box culvert

•

Raise int ersect ion almost 2 feet

•

Realign channel upst ream and downst ream

Bradshaw

Signal Alt ernat ive N

Sheldon


•

Replace exist ing bridge

•

Const ruct 165’ long t riple box culvert

•

Raise int ersect ion almost 2 feet

•

Realign channel upst ream and downst ream

•

$6.1M Tot al Project Cost – $5.2M Federal funds – $90 0 K Cit y funds

Bradshaw

Signal Alt ernat ive N

Sheldon


N

• LOS C and 16 second delay in 20 18

Bradshaw

Roundabout Alt ernat ive

Sheldon


N

• LOS C and 16 second delay in 20 18 • 70 0 ’ of roadway work • St andard shoulders/ bike lanes for full lengt h of roadway work

Bradshaw

Roundabout Alt ernat ive

Sheldon


N

• LOS C and 16 second delay in 20 18 • 70 0 ’ of roadway work • St andard shoulders/ bike lanes for full lengt h of roadway work • Pedest rian and Bike Bypass pat hs at int ersect ion

Bradshaw

Roundabout Alt ernat ive

Sheldon


Roundabout Alt ernat ive Bradshaw

• Replace exist ing bridge

N

Sheldon


Roundabout Alt ernat ive

• Const ruct 28 0 ’ long t riple box culvert

Bradshaw

• Replace exist ing bridge

N

Sheldon


Roundabout Alt ernat ive • Replace exist ing bridge • Const ruct 28 0 ’ long t riple box culvert • Raise int ersect ion almost 2 feet • Realign channel upst ream and downst ream

Bradshaw

N

Sheldon


Roundabout Alt ernat ive • Replace exist ing bridge • Const ruct 28 0 ’ long t riple box culvert • Raise int ersect ion almost 2 feet • Realign channel upst ream and downst ream • $7.9M Tot al Project Cost – $5.2M Federal funds – $2.7M Cit y funds

Bradshaw

N

Sheldon


ENVIRONMENTAL REVIEW Bot h Alt ernat ives • Tre e impa ct s – 14 t o 17 prot e ct e d t re e s re move d • Mit iga t ion


ENVIRONMENTAL REVIEW Bot h Alt ernat ives • Tre e impa ct s – 14 t o 17 prot e ct e d t re e s re move d • Mit iga t ion

• St re a m re loca t ion – No prot e ct e d s pe cie s – Pe rmit t ing


ENVIRONMENTAL REVIEW Bot h Alt ernat ives • Tre e impa ct s – 14 t o 17 prot e ct e d t re e s re move d • Mit iga t ion

• St re a m re loca t ion – No prot e ct e d s pe cie s – Pe rmit t ing

• Tra ffic • Air qua lit y


TRAFFIC/ AIR QUALITY IMPROVEMENTS React ive Organic Gases (ROG)

Nit rogen Oxide (NOX)

Carbon Monoxide (CO)

Coarse Part iculat e Mat t er (PM10 )

Fine Part iculat e Mat t er (PM2.5 )

20 15 Condit ion lbs/ day

54 .6

153.1

34 2.5

3.0

1.5

20 17 Signal Condit ions lbs/ day

7.9

22.5

4 8 .5

0 .2

0 .2

20 17 Roundabout lbs/ day

3.8

10 .9

23.6

0 .1

0 .1

20 37 Signal 9.7 Lbs/ day

20 .2

50 .1

0 .1

0 .1

20 35 Roundabout Lbs/ day

14 .4

35.8

0 .1

0 .1

7x reduct ion

6.9


TRAFFIC/ AIR QUALITY IMPROVEMENTS React ive Organic Gases (ROG)

Nit rogen Oxide (NOX)

Carbon Monoxide (CO)

Coarse Part iculat e Mat t er (PM10 )

Fine Part iculat e Mat t er (PM2.5 )

20 15 Condit ion lbs/ day

54 .6

153.1

34 2.5

3.0

1.5

20 17 Signal Condit ions lbs/ day

7.9

22.5

4 8 .5

0 .2

0 .2

20 17 Roundabout lbs/ day

3.8

10 .9

23.6

0 .1

0 .1

20 37 Signal 9.7 Lbs/ day

20 .2

50 .1

0 .1

0 .1

20 35 Roundabout Lbs/ day

14 .4

35.8

0 .1

0 .1

14 x reduct ion

6.9


ROUNDABOUT SUMMARY • We all drive t hrough signals every day and are quit e familiar wit h t hem • Roundabout s are less common • Let ’s t ake a moment t o learn more about roundabout s


ROUNDABOUT - TYPICAL FEATURES


PRINCIPLES OF GOOD ROUNDABOUT DESIGN NCHRP Report 672 Roundabout s: An Informat ion Guide • Slow ent ry speeds and consist ent speeds • Adequat e capacit y and number of lanes • Smoot h channelizat ion • Accommodat ing design vehicles • Providing sight dist ance, visibilit y, and light ing • Int egrat ing pedest rian and bicycle feat ures


BENEFITS OF ROUNDABOUT • Improved Overall Safet y – 36% t o 60 % fewer t ot al crashes t han a signal – Reduct ion in crash severit y in general – Nearly 10 0 % reduct ion in fat al Crashes

• Reduced Delay – No st opping if no opposing t raffic

• Reduced Noise • Aest het ically Pleasing – Adapt able t o Local Cont ext


ROUNDABOUT - BICYCLE AND PEDESTRIAN FEATURES Crosswalk and t wost age crossing

Pedest rian refuge

Pedest rian and bike bypass shared use pat h


ROUNDABOUT - “ RURAL” AESTHETICS


Cent ral Island Public Art

ROUNDABOUT “ RURAL” AESTHETICS

Use of Decomposed Granit e wit h Cobble and Accent Boulders along wit h zones of non-irrigat ed nat ive grass and wild flowers

Tan Colored Surface t o Blend wit h Rural Surroundings


ROUNDABOUT - “ RURAL” AESTHETICS


ALTERNATIVE COMPARISON Sheldon and Bradshaw Int ersect ion Feat ure Ant icipat ed vehicular delay in 20 18 aft er const ruct ion

Signal

Roundabout

34 Seconds

16 Seconds

Fewer number and lower severit y of crashes

X

Increased t raffic calming effect

X

Abilit y t o bet t er incorporat e rural aest het ics

X

Reduct ion in vehicle emissions

X

Lower long t erm maint enance and operat ion cost s

X

Eliminat es overt opping of t he 10 0 year st orm event

X

X

St ream relocat ion impact s

X

X

Least amount of right -of-way needed

X

Overall Project cost

$6.1 M

$7.9 M

Port ion of project cost paid by t he Cit y

$0 .9 M

$2.7 M


CONNECTION TO OTHER RURAL AREA PROJ ECTS Bond/ Bader Signal Project Const ruct ion in Early 20 16 Sheldon and Wat erman Roundabout Project Const ruct ion in Lat e 20 16 Wat erman Road Rehabilit at ion and Bike Lane Project Const ruct ion in 20 17? (Env & ROW) This Project Const ruct ion in Lat e 20 17? (ROW)


INTERSECTION CONSTRUCTION STAGING


INTERSECTION CONSTRUCTION STAGING


INTERSECTION CONSTRUCTION– STAGED CONSTRUCTION


INTERSECTION CONSTRUCTION– STAGED CONSTRUCTION


INTERSECTION CONSTRUCTION– STAGED CONSTRUCTION


INTERSECTION CONSTRUCTION– STAGED CONSTRUCTION


INTERSECTION CONSTRUCTION– STAGED CONSTRUCTION


INTERSECTION CONSTRUCTION– FULL CLOSURE


INTERSECTION CONSTRUCTION STAGING OPTIONS Opt ion 1 Maint ain t raffic wit h 4 mont hs of st aged const ruct ion • Const ruct ion will last addit ional mont hs Requires t emporary det our and more ROW Opt ion 2 Full 6 week closure • Const ruct ion will last addit ional mont hs Impact s ot hers out side t he Sheldon area In t he summer Primary det our rout e Secondary det our rout e Saves $4 0 0 K t o $60 0 K


POSTER EXHIBIT INSTRUCTIONS • Visit as many post er exhibit s as you would like • Order does not mat t er • Use st icky dot s t o inform us your int ersect ion preference • Add new ideas t o t he easel pads – Have had some new ideas come up t hrough recent discussions wit h propert y owners

• Facilit at ors at each st at ion t o help


NEXT STEPS • Communit y input from t onight will be collect ed and provided t o t he Cit y Council on 1/ 27 • 1/ 27 Cit y Council Meet ing – Will include environment al document approval and t he Council decision on a signal or a roundabout • Design will be advanced • Next Open House in Early 20 17 – Be sure t o sign-in t o receive email updat es

• Const ruct ion in 20 17/ 20 18 ?


THANK YOU FOR YOUR PARTICIPATION!

Cont act Informat ion: Tom Met calf t met calf@elkgrovecit y.org 916-532-8 169