Sheldon & Bradshaw Intersection Handout

Page 1

SHELDON ROAD & BRADSHAW ROAD

INTERSECTION IMPROVEMENT PROJECT

JANUARY 14, 2016 6—8 PM

Pleasant Grove High School 9531 Bond Road Elk Grove, CA 95624


WHAT IS THE PURPOSE OF THIS MEETING? This Open House meeting is being held to provide the public an opportunity to review the proposed project, view project designs (currently 35% complete), obtain the latest information about the project, ask questions, and offer input to the project team.

WHAT IS THE PLAN FOR THE EVENING? 6—8 PM

OPEN HOUSE Sign in, review displays, provide input, ask questions, and enjoy refreshments

6:30—7 PM

PRESENTATION Learn more about the project details.

WHAT IS BEING PROPOSED? Improvements to the intersection of Sheldon Road and Bradshaw Road are planned because threshold values for increased traffic have been met, per the process outlined in the Rural Road Improvement Policy and Standards. Based on community input and City Council direction, two options are being considered for the intersection: a signal or a roundabout. All proposed designs, currently 35% complete, take into consideration design preferences expressed in the Rural Road Improvement Policy and Standards. Tonight we would like to get your input on these designs and understand your design preferences.


WHAT IS THE PROJECT SCHEDULE? DATE

MILESTONE

November 30, 2011

First Open House with the entire Rural Roads area invited to provide input on intersection alternatives to be considered

June 13, 2012

City Council directed to proceed with a signal and a roundabout design

November, 2015

• Design advanced to the 35% level • Environmental field studies completed • Environmental technical reports approved by Caltrans (federal funding requirement)

December, 2015

City environmental document (IS/MND) completed and circulated for public review/comment

January 14, 2016

Community Open House

January 27, 2016

City Council Meeting

Summer 2016

Federal environmental documents approved by Caltrans and FHWA

Early 2017

Community Open House

Summer 2017

Right-of-way acquisition completed

Summer 2017

Final design completed

Fall 2017

Advertise for construction

Late 2017—2018

Construction

WHAT WILL THIS PROJECT COST? SIGNAL PROJECT COST = $6.1M $5.2M in federal funds $900K in City funds ROUNDABOUT PROJECT COST = $7.9M $5.2M in federal funds $2.7M in City funds

Here we are today!


ROUNDABOUT INTERSECTION OPTION LEGEND: Proposed Roadway Proposed Paths

Bradshaw Road

Sheldon Road

ROUNDABOUT INTERSECTION

SIGNAL INTERSECTION OPTION LEGEND: Proposed Roadway Proposed Paths

Bradshaw Road

Sheldon Road

CONTACT US Tom Metcalf (916) 478-2281 TMetcalf@elkgrovecity.org

City of Elk Grove Public Works Department 8401 Laguna Palms Way Elk Grove, CA 95758