Carparking - By Level
Carparking - Summary
B01 Loading
LEI CNTR - DISABLED LEI CNTR - STANDARD LOADING
3 33 2 38
B02
LEI CNTR - SMALL CAR 2 LEI CNTR - STANDARD 112 114 B03
CARSHARE MOTORBIKE RES - STANDARD RESI - ADAPTABLE RESI - VISITOR
CARSHARE LEI CNTR - DISABLED LEI CNTR - SMALL CAR LEI CNTR - STANDARD LOADING MOTORBIKE RES - STANDARD RESI - ADAPTABLE RESI - VISITOR
2 8 70 13 22
Basement Storage Schedule 2 3 2 145 2 8 481 65 22
B07 B06 B05 B04 B03
In accepting and utilising this document the recipient agrees that SJB Architecture (NSW) Pty. Ltd. ACN 081 094 724 T/A SJB Architects, retain all common law, statutory law and other rights including copyright and intellectual property rights. The recipient agrees not to use this document for any purpose other than its intended use; to waive all claims against SJB Architects resulting from unauthorised changes; or to reuse the document on other projects without the prior written consent of SJB Architects. Under no circumstances shall transfer of this document be deemed a sale. SJB Architects makes no warranties of fitness for any purpose. The Builder/Contractor shall verify job dimensions prior to any work commencing. Use figured dimensions only. Do not scale drawings.
Bicycle Parking - By Level
116 116 116 105 86
8
B04 B05 B06 B07
35
Nominated Architects: Adam Haddow-7188 | John Pradel-7004
35 35
FOR INFORMATION
113
539
Rev 9 11 14 15 18 23 25 27 29 31 34 39 40 52 53
730
115 B04
RES - STANDARD RESI - ADAPTABLE
93 13
Date 07.08.2017 21.08.2017 05.09.2017 14.09.2017 05.10.2017 19.10.2017 26.10.2017 07.11.2017 13.11.2017 21.11.2017 24.11.2017 14.12.2017 12.06.2018 13.03.2020 20.03.2020
Revision
By
Chk.
FOR COORDINATION FOR INFORMATION PRE DA MEETING FOR INFORMATION FOR INFORMATION FOR COORDINATION FOR INFORMATION CONSULTANT ISSUE FOR INFORMATION FOR INFORMATION FOR INFORMATION ISSUED FOR DA REVISED DA ISSUE FOR INFORMATION DRAFT MOD
106 B05
RES - STANDARD 105 RESI - ADAPTABLE 13
2
1
1
0602
0605
0602
118 B06
RES - STANDARD 105 RESI - ADAPTABLE 13 118
121 730
FAN ROOM 35.6 m² FAN ROOM 52.8 m²
5800
MECH - CARPARK SUPPLY
RES - STANDARD 108 RESI - ADAPTABLE 13
MECH - CARPARK SUPPLY
B07
BASEMENT 06 5856.0 m²
RL -9.30
FIRE STAIR 1
1100
ELEC.
S.P.
FIRE STAIR 3
1
TOWER D LIFT LOBBY
0601 1
TOWER E LIFT LOBBY
0601 COMM.
ELEC.
FIRE STAIR 2
COMM.
1:5.0
Billbergia
1:8.0
MECH - CARPARK EXHAUST
FAN ROOM 33.9 m²
Project
MECH - CARPARK EXHAUST
OUT
Mixed-use Development & Community Centre
IN LINE OF TOWER E OVER
L IN EO
FT OW
Secure Bicycle Storage
ER
DO
34 Walker Street Rhodes NSW 2138
VE R FAN ROOM 46.9 m²
70 Bicycle Storage Spaces
Drawing Name 1
1
0603
0603
Basement 06
FUTURE CAR PARKING LINK
Date
1
0601
2
1
1
0602
0605
0602
20.03.2020
Scale
1 : 200
Drawn
Chk.
ME EK
JP
Job No.
Drawing No.
4440
0204
Floor Plan - Basement 06 1 : 200@A1 SJB Architects Level 2 490 Crown Street Surry Hills NSW 2010 Australia T 61 2 9380 9911 F 61 2 9380 9922 www.sjb.com.au
Sheet Size
@ A1
Revision
/ 53